0

POST VISIT REPORT

May 2015

Fact Finding Mission on Challenges and Best Practices

of Georgia Doing Business Improvement Initiatives

and Istanbul Municipality Courtesy Visit

Page 2: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

1

Contents

1.0 Background

1.1 Current Performance 3

1.2 Georgia’s Impressive Progress in Doing Business 3

1.3 Malaysia Scenario

4

2.0 Best Practices Visits

2.1 Data Exchange Agency

6

2.2 National Agency of Public Registry

8

2.3 Civil Registry Department

13

2.4 Tbilisi Municipality

25

2.5 State Procurement Agency

29

2.6 Rustavi Service Agency

33

2.7 Lilo Economic Zone of Clearance

34

2.8 Tbilisi Public Service Hall

36

2.9 Istanbul Metropolitan Municipality

39

3.0 Concluding Remarks

3.1 Creating One Stop Shops

41

3.2 Integrating Service Innovation 41

The Delegates

43

Page 3: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

2

1.0 BACKGROUND

Members of the Malaysian delegation are from the implementing agencies, professional

companies and policy makers. The mission aims to study and observe recent

developments and best practices in particular areas of interest, that of Dealing

Construction Permits (DCP) and Registering Property (RP) methodology frameworks in

Georgia.

For DCP the mission focused on how local authority (LA) in Tbilisi manages their online

development approvals; communication between LA and technical agencies; granting of

approvals by the utility providers; township planning; and gaining better understanding on

how professionals deal with regulators in Tbilisi. The study will measure procedure, time

and cost to construct a building. It covers all procedures required to construct simple

buildings – from planning submissions until the building is ready for occupancy, time

approval application and cost of all fees. For Registering Property, it was to benchmark on

Page 4: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

3

how Georgia manages their registration with single procedure and requires one day to for

approval.

1.1 Current Performance

Malaysia vs Georgia: Performance on Dealing with Construction Permits

Malaysia vs Georgia: Performance on Registering Property

1.2 Georgia’s Impressive Progress in Doing Business

Georgia’s impressive progress in improving business climate has been well documented in

a number of international indices. Once ranked number 112 on the World Bank’s Doing

Business (DB) survey, bold reforms to Georgia’s business climate catapulted it to 11th

place in 2010. Its commitment to aggressive reforms in improving the regulatory

Page 5: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

4

environment for entrepreneurs has allowed Georgia to close the gap with the top

performers in some areas; underpinned what the World Bank calls an “unprecedented”

climb in the history of the survey. The latest ‘Doing Business 2015: Going Beyond

Efficiency’ report saw Georgia ranked first in the region and took 15th place out of 189

countries. Georgia is amongst the leaders in Registering Property – 1st place and 3rd in

Dealing Construction Permits. Indeed no other country has made so many deep reforms in

so many different areas so consistently. Georgia has undertaken changes in a few years

that most other countries would have taken a generation and has earned a reputation as

one of the world’s great reformers.

1.3 Malaysia’s Scenario

PEMUDAH, or the Special Task Force to Facilitate Business, was established in 2007 to

enhance public service delivery and improve the ease of doing business in Malaysia. In

these eight years, PEMUDAH has successfully introduced many initiatives to enhance the

business environment in the country. The PEMUDAH Focus Group on Dealing with

Construction Permits (FGDCP) has been working together with both the public and

private stakeholders including building professionals and experts to identify issues and

challenges, propose winning solutions and implement various improvement initiatives.

Among the engagement sessions include workshops, benchmarking missions, public

consultations as well as a special engagement with an expert from the World Bank.

Malaysia’s initiatives are unique to certain countries as it promotes collaboration-

innovation. In the case of construction permits, strategic engagements are established

with 5 ministries and 15 agencies to produce the OSC 1 Submission framework.

The OSC 1 Submission has been replicated nation - wide based on Kuala Lumpur’s best

practices. Improvements achieved in Kuala Lumpur were incorporated into the new OSC

3.0 model. Making headway with OSC 3.0 is significant step towards driving an effective,

efficient and transparent building regulatory system as all parties involved could reap the

benefits of having a simpler procedure in place and speedier approval process. Building

Information Modelling is also being developed to facilitate and speed up the process of

Page 6: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

5

smart checking; while a healthy public-private competitive environment for the dual

approval system would be created. The KLisBEST - another lane for complex and high risk

projects in Kuala Lumpur has been developed to streamline procedures and improve

transparency on permitting requirements; enhance efficiency of all parties involved;

reduce compliance costs to investors, attract more investment and increase employment

opportunities.

The online system - the KL TRAX to monitor construction permit applications from the

date of submission until issuance of Certificate of Completion and Compliance (CCC)

including updating and checking application status for both parties (local

authority/agencies and private sectors) has helped enhanced productivity performance

with reduction in time taken, integration of all agencies and business on a single

transparent platform and One-stop Non-stop service.

As for Registering Property, Malaysia attained a DTF score of 71.16 in the DB 2015 with

a rank of 75 out of 189 economies. The ability to register and transfer land ownership is

central to most economic activities and therefore has to be efficiently and transparently

conducted. Among the objectives of the PEMUDAH Focus Group on Registering

Property is to improve the service delivery of land administration in Kuala Lumpur. The

initiative done in Kuala Lumpur has been expanded to other Land Offices in Malaysia.

The Land Offices have implemented the One-Day-One-Piece-Flow project to streamline

Property Transfer transaction. This very important initiative is to move towards

simplified and standardised forms for land-related transactions since Malaysia has only

one National Land Code. The Focus Group is currently reviewing the National Land Code

1965 to ensure that land dealing procedures are safeguarded from fraud. In addition to

investing in an electronic land administration system, the Department of Land and Mines

proactively revises work processes and procedures in land offices as well as reforming

policies to strengthen the land administration system. A web-based e-Consent form has

been introduced as a pilot programme which will further facilitate approvals for

transfers.

Page 7: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

6

In the Doing Business 2016, the indicator set will be expanded to cover the reliability,

transparency and geographic coverage of land administration systems as well as dispute

resolution for land issues. Ensuring the reliability of information on property titles is a

crucial function of land administration systems. Thus one of this mission’s objectives is

to benchmark on how Georgia manages its registration with single procedure and

requiring only one day for approval. Indeed Georgia has made the most significant

improvements towards strengthening its legal institutions by making legal and

administrative services simple, transparent and inexpensive.

2.0 BEST PRACTICES STUDY

Day 1: 16 March 2015

16 March Data Exchange (DEA) Agency of the Ministry of Justice of Georgia

10.00 - 12.30pm

E-government development in Georgia

Georgian Governmental Network Project

Data Exchange Infrastructure and e-government future

architecture

Citizen Portal

Register of Registers

Open Data project

Trade Facilitation System

Information Security Policy & implementation

CERT.GOV.GE

2.1 Data Exchange (DEA) Agency

The priority of Tbilisi City Hall is to develop projects offering citizens various enhanced and

flexible services. In order to improve the information flow management, the

documentation processing program was created in 2007-2008 in the City Hall, for

municipal and public services. The program provided simple and effective administration

Page 8: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

7

for the entire correspondence within one system, but it did not focus on optimization of

the administrative processing in the particular municipal and public services. The software

for processing documentation in the Service was created with focus on its specifics:

Property Management Agency, LEP Land Architecture Service of Tbilisi, LEPL.

The Architecture Service of Tbilisi provides services for the persons involved in

construction activity issues the land use terms and the construction permits exercises

entire public authority over architectural/construction field from the point of view of

customer service with the following priorities of improvement of service, simplification

of correspondence administration and information publicity and accessibility, endeavors

to adopt and develop new information technologies in order to effectively process the

documentation.

The Architecture Service of Tbilisi was founded on Dec. 31, 2008 as Legal Entity of Public

Law, after having been a municipal service, a structural entity in Tbilisi City Hall during the

previous period. Up to the end of 2011 two options of processing the applications were

provided for the customers: documentary correspondence: 80% and on-line filing 20%.

Having adopted new technologies in 2009-2011, the Service united correspondence

within the united Geographic Information System and provided its publicity .This was the

optimal structure in the initial period, providing collecting relevant information in the GIS

data base and improving services.

However constantly growing amount of correspondence posed a number of problems

such as number of applications, to meet deadlines, archiving/filing, requirement of

additional human resources and failures of interactive map functioning. The Service

developed rebranding program for the existing system namely the United Automated

Control system of Information Flow. The system develops existing priorities with 100%

online administration of correspondence and is focused on customer service

improvement and united automated control of information flow. The system provides

automated registration of applications, displaying application immediately after

registration on the map (publicity), automated distribution of registered applications to

Page 9: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

8

workers, automated navigation of application within the service, possibility of

participation in the online council/committee consideration, automated preparation and

publicity of council/committee protocols, automated generation of the decision ready for

sending to applicant, simple correction of errors in documentation, perfect control of

administrative proceeding dates and deadlines, sending decision immediately to

applicant, uniqueness of the decision and protection against falsification, solving analytic

and statistic tasks, flexible relations with different public institutions, and connecting with

different public institutions and obtaining necessary information. Payment can be made

from home for constructing duties, duties for works on cultural monuments and

accelerated service fee.

Day 1: 16 March 2015

16 March National Agency of Public Registry of the Ministry of Justice of

Georgia

3.00 - 5.30pm

Property Registry

Business Registry

Governmental GIS @ Cadastral Data

Document management system for public sector

2.2 National Agency of Public Registry (NAPR)

Page 10: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

9

2.2.1 Land Administration System Establishment in Georgia

In mid 90s: free market economy, privatization, property ownership rights established and

property market development. Until 2000: Land Administration system development

reform: simplification of registration procedures, terms, fees; improvement of geo

database; and 2014-2020: full coverage of the country, with data accuracy and quality

improved, reliable Land Information System established (NSDI established ) , thus

enhancing confidence.

2.2.2 Simplified Registration Service

Its customer-oriented registration system is based on “One-stop-shop” principle with the

following features; centralised registration and cadastre system and decentralized

customer service (delivering services by the authorized users), simplified property

registration procedure and voluntary notarization, electronic application and receipt of

the abstract, cadastral plan and other documents, availability of distance registration

service and cadastral map of Georgia.

The cadastral survey work is done by the private sector. NAPR is responsible for the

maintenance of cadastral data. Centralised processing of cadastral data via internet, data

storing/processing uses ESRI ARCGIS software, and GIS operator inserts data in SDE server

makes situational map, exports it in PDF format and uploads it on PDF servers.

Registration is through web-based software with front-end software (filing applications,

issuance of extracts) and back-end software ENREG (registration of entities). The Front-

end program provides for information on all registered applications, registration

documents attached thereto, decisions made by the registration authority. At the same

time the program prints out a prepared document – extract, decision, information, e-

copies of documents kept in the archive; while registration is done by back officers -

registrars; both programs are connected and, accordingly, one can also get information on

registered data via front-end program. Thus public access to cadastral data is just by

submitting online application to get the cadastral plan. There is also effective data sharing

Page 11: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

10

between institutions: Notary Chamber of Georgia, Public Service Development Agency,

Revenue Service and National Bureau of Enforcement. The creation of Addressing System

of unified address registry (2011–2013) incorporates the description of streets/roads,

inventory and numbering of immovable property, adoption of addressing standards,

creation of unified electronic database, linking immovable property-related information to

civil registry data, partner organisations, self-Government bodies of Georgia Civil Registry

Agency, contractors , private surveying companies and donor organization (USAID).

For Starting Business, it is facilitated by access to charter of all legal forms via NAPR

website, on-line access of Tax Department to NAPR database, reports about transactions

sent to TD in every five minutes, voluntary notarization of agreements, public access to

any registration document and a centralised system.

2.2.3 Georgia In retrospect

Individual property and owning land was difficult in Soviet Union era. Most of the

property belonged to the state. In any economy, economic development can

hardly be achieved without private ownership on land. Before independence, only

the house can be owned by the people of Georgia but not the land. Thus, it is

difficult for international companied to invest in Georgia.

Georgian Government has prepared long term plans. In 1997, they introduced

Public Registry to register immovable properties. The following year 1998, they

introduced new law on “Recognition of Property Rights on Non-agricultural Lands

Used by Physical Persons and Legal Person of the Private Law” to recognize the

lands legitimate use.

Later in 1999, Georgia adopted Land Registration that covers procedures and time.

The introductions of the laws were not good enough to attract more people to

invest. The citizens complained that they only could submit registration

documents to the agency only a half of the day and could receive the prepared

Page 12: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

11

documents on another second half. Information on technical and legal

consultation were not available. The long queue could lead to someone to find

better connections through a hidden networking environment which could lead to

a corruption environment.

Other than long queue issue, citizens are burdened with unnecessary copies of

documents, lengthy documents obtaining, poor compliance and inconsistent

procedure requirements.

Any reform in simplifying doing business requires legislative and administrative

reforms. Georgian Government has institutionalised a National Agency of Public

Registry (NAPR) to adopt liberal legislation to cater the needs of transformation.

First they need to unify all legislative matters to a single act. The objectives are to

meet deadline and offering optimum services. The legislative also requires the

utilisation of modern technology to cater for fast delivery to the citizens. Slow

process of getting a stamp and a signature should be abolished. Integration of data

between municipality and NAPR should be allowed to avoid making copies prior to

submission.

Legislative Reform Road Map

- 2004: Archives of Technical Inventory Bureau, registration of rights on

movable property and intangible property wealth and registration of tax

collateral/mortgage

- 2005: Registration of public-legal restrictions on property (Notary

Chamber)

- 2010: Registration of businesses and non-business (non-commercial) legal

entities

- 2011: Geodesy and cartography

- 2012: Registration of the political unions of citizens, enumeration of real

estate, administration of a countrywide address system and numbering in

Tbilisi and registration of municipalities

Page 13: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

12

Among some administrative reforms for better transparency :Based on previous

experience, the Government of Georgia has implemented new strategy for

National Agency of Public Registry, where they separate frontline services team,

processing application team and payment processing team. The idea is to stop

physical interaction between processing (endorsement team) with the client. The

new business environment has reduced and able to stop corruption as citizens are

unable to contact with the authorised officer.

ICT Reform: In any developed country, other than legislative reform and institutionalize

gatekeeping function for better regulatory quality, technological reform need to be

implemented concurrently. NAPR has formed an internal IT team to develop internal IT

systems and programmes. They never or did not believe in purchasing readymade

programme and solution. NAPR also has adopted Informational Security Management

System ISO 27001. The important value of using this system is to reduce risk of improper

use of information by the agency and to meet Law on Protection Personal Data. NAPR has

done comprehensive preparatory works by mapping all processes in all Georgia. Once the

procedures mapped, the IT simplified procedures and introduced single window

application and subsequently the registration process becomes simpler and faster.

Procurement Reform: Another major step taken by the Georgian Government was to

setup the National Agency Procurement. The tender system can be achieved online and

can be applied from any country or any place in the world. The company selection in the

tendering system is very transparent which allows stakeholders to view the application

and is accessible in three different languages. The Agency who monitors the system has

been voted as 2nd place on Preventing and Combating Corruption.

Starting a Business Reform: There was no unified and no centralized system in Georgia.

After 1994, the business registration was prepared and issued by the Court of Georgia.

The process took a very long time and was very burdensome. Later in 2005, the tax and

Page 14: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

13

registration were unified under Revenue Services. But still, many problems were not being

able to be solved by the new department.

In 2010, NAPR was given new mandate to register business. The previous function in

Revenue Service was abolished. NAPR then introduced e-registration card. They provide a

free service for citizen or business to search information on shareholder in companies

registered in Georgia. The system integrates information with Civil Registry to verify death

notice of individual in the company. The system also allows entrepreneurs to update their

information and beneficiaries, creditors or business partners through online.

Day 2: 17 March 2015

17 March Agency for Development of State Services of MOJ

10.00-12.30pm

Agency for Development of State Services of MOJ

Civil Registry

Registry of Civil acts

eID& e-Signature project

Community Development Center

2.3 Civil Registry Department

The Civil Registry Agency was established in 2006, now as a single unified agency

combined.

Page 15: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

14

Issues before reform: Corrupt system, Low budget, Outdated offices, 10 PCs and

Unmotivated personnel.

The Reform started with new services, improved service, Legislative changes, IT

Technologies, Infrastructure and HR policies. Under HR Policies - New attestation,

internship and trainings system introduced Selection and appointment of employees

through competition, Increase of salaries, motivating personnel. Infrastructure reforms

:All offices work freely in ONLINE mode , Centralised management, transferring decision-

making process to back-office and focusing on services provided by front-offices, Banking

services launched in front-offices and Courier services for all offices. IT Technologies

backing up infrastructure as shown below:

Page 16: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

15

After Reform: Corruption-free, simple, citizen-oriented system, increased budget,

updated offices, PC for every employee, increased salary, motivation and incentives, and

strict quality assurance of services.

Page 17: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

16

Service Improvement

Service delivery time periods reduced

Expedited services available

Lots of services free of charge

SMS notification service introduced

New Services

Second-generation biometric passports have been issued since 2010

Issuance of eID cards started in 2011

The Public Service Development Agency was established in 2012 on the basis of the Civil

Registry Agency. Main Functions of the Civil Registry Department:

1) Civil Acts and Population Registration Service

- Civil acts registration

- Population registration

- Issuance of identity documents

2) Citizenship and Migration Service

- Reviewing applications and decision-making on citizenship issues

- Reviewing applications and decision-making on migration issues

3) Apostille and Legalization Service

- Authentication of documents by Apostille

- Legalization of documents

- Translation of documents to be authenticated

4) Distance Services

- Applying online

- ID card suspension

Page 18: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

17

- Consultation of citizens

5) Commission on Citizenship Issues

- Determination of expediency of acquisition of citizenship and preparation of

relevant opinion

6) Territorial Offices

- Accepting and reviewing applications on issues falling within the competence

of the Civil Registry

- Issuing of general education documents

7) Biometric Documents Personalization Centers

- Personalization of biometric passports

- Personalization of ID cards

2.3.1 Brief Overview of Civil Acts Registration Procedure

a) Agencies having registration authority

In Georgia: 66 Territorial Offices, 13 Public Service Halls and 19 Community Centers while

Abroad: Diplomatic mission / consular office of Georgia abroad.

Types of civil acts: Birth, Establishing paternity, Adoption, Change of given name/surname,

Marriage, Divorce and Death. All these Acts have been registered electronically since

2008.

Birth and death have been registered based on electronic notifications since 2011. The

presentation describes in more detail on the registration of birth, registration of paternity,

registration of adoption, registration of marriage, registration of divorce, registration of

change of given name/surname and registration of death.

The Agency also issues: Repeated certificates of civil acts, Civil act record registration

certificate and Certificate of no impediment to marriage.

Page 19: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

18

Expedited services are provided within shorter term subsequent to payment of the

relevant fee at any territorial office, Application can be filed electronically and Fee is paid

at a bank.

b) EID Card and Trust Services

Highlights of the presentation include Electronic ID Card and Identification Service

Development in Georgia.

• Reasons for new ID

- Durability – with polycarbonate body

- More security features, less risk of fraud

- MRTD standard (ICAO Document 9303)

- Standard size (old one did not fit most wallets)

• Reasons for eID

- e-MRTD for better security

- Usage in online space for Online Authentication and Digital Signature

- Tool for e-Government and e-Business

For the e-Residence Permits, there are different designs with the same technology.

• Production: Produced in Germany, by Muehlbauer AG, in secure facilities

with numbered blanks securely delivered to PSDA. Personalization Feature:

Personalized in PSDA’s Biometric Documents, Personalization Centers, 3

Major Cities Tbilisi, Kutaisi and Batumi.

There are security features of the higher level on the card with Dual-Interface (Contact &

Contactless) Chip. The ISO/IEC 7816 Contact Interface: 2 Certificates, issued by PSDA with

online authentication and digital Signature (Qualified), secured with 2 distinct PIN codes.

The ICAO LDS Applet - Compliant with ICAO 9303with personal Data Storage and secured

with BAC .While the ISO/IEC 14443 Contactless Interface with MIFARE 1k Classic

(Emulated) comprising MIFARE Application Directory, Citizen’s Social Status data (if

applicable) , Any 3rd party data can be securely deployed and Custom-built secure reader-

Page 20: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

19

writer devices are available ; as well as ICAO LDS which is Compliant with ICAO 9303, has

Personal Data Storage and also Secured with BAC (Basic Access Control ) .

The Chip as a Security Feature: Personal data (LDS) is signed using Document Signer Key,

Key type: 2048-bit RSA, Re-key in each 2 months, Can be checked by standard tools

including Free ones (e.g. JMRTD).

Detail features of PKI Applet: Secure Key Storage (Two 2048-bit RSA Keys, secured by

Different PIN codes, 4 digits for Online Authentication, 6 digits for Signature,

Authentication PIN, E-Signature Transport PIN and PUK are delivered in secured envelope

and E-Signature PIN Code is set by the citizen and the Certificate Storage (Two

Certificates, issued by PSDA and two CA certificates and Certificate renewal is possible

(Including remote renew).

c) Electronic signature and seal

At present, Georgian e-Signature Law which was adopted in 2008 is mostly compatible

with Directive 1999/93/EC, but there are some differences. However the upcoming one

prepared by PSDA and DEA will be more suitable for current needs and has high level of

compatibility with Regulation (EU) No 910/2014.

d) Big Plan for e-Georgia

In all scenarios where government is involved in e-communication (C2G, G2C, B2G, G2B,

G2G), usage of Qualified Electronic Signature shall be mandatory. Expecting eID to be a

Personal Signature Tool. Current Status: Legally equivalent to handwritten signatures,

Used to sign PDF files with PAdES format and Signing is free. In progress; Support of

additional signature formats and Support restoration of forgotten signature PIN, w/o need

of card change.

The e-Seal, Signature for Government and Business: motivated to issue electronic birth

certificate and how to protect it from forgery and also to obtain account statement from

Page 21: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

20

internet banking. Plan to issue special cards for business use and Government and large

business entities to use more powerful equipment.

The e-Seal Token is being planned: Usage (Signing Token and Admin Token, E-Signature in

the name of the Legal Entity and to be replaced rubber stamp) with additional Sim-sized

card for USB tokens.

The e-Seal Issuance Plans: National Agency of the Public Registry will make registration for

Business Seal. The e-Seal will be personalized, issued and maintained by PSDA. Application

Process Highlights; an authorized representative will have the right to apply, Seal will be

available for already registered business and It will be possible to apply during business

registration.

Other Projects include Biometric Signatures (Joint project of PSDA, National Bank and

National Forensics B, Commercial banks use e-Signature pads for signing and Not a

Qualified Signature, but legally recognized in a banking sector); Trusted Time Stamping

(Provides evidence of the signing time, PSDA Time stamping Service is free for low-

demanding entities, High load is sold as a commercial service and Qualified Timestamps

will be regulated by new e-Signature law).

e) Introduction of e-Governance in Local Governments

Two main problems were highlighted. In terms of Organisation were outdated and

ineffective forms of public service delivery, lack of transparency, absence of statistical and

analytical data, Lack of tools for promoting civic engagement. In terms of Infrastructural

were obsolete buildings, inappropriate working conditions, outdated and insufficient IT

equipment, low-speed internet / lack of internet connectionand deficiency or absence of

other technical infrastructure (scanners, printers, internal network, etc.)

Project Information: Implemented by Public Service Development Agency (PSDA) , funded

by European Union (EU) , Beneficiaries : 28 Municipalities with participants from the

National Agency of Public Registry, National Archive of Georgia, Social Service Agency,

Page 22: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

21

Training Center of the Ministry of Justice, Data Exchange Agency, Smart Logic, Notary

Chamber of Georgia, Legal Aid Service, Private Sector Representatives (Magti, Liberty

Bank, Meqanizatori, UGT). Project duration May 2014 – May 2016.

Project Description

• Two main project components : Development of Community Centers and

Introduction of e-Governance in Local Governments

Concept of Community Centers

All locally sought-after services within a single space

Page 23: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

22

Demand For services

f) Promotion of Civic Engagement

Training for local population Capacity building, Informational meetings, Civic

engagement activities: discussions, exhibitions, documentary film screenings, etc.

and Contemporary electronic library.

Statistics

Number of public Services delivered through Community Centers to date amount

to 112,630

Number of trainings, seminars, conferences and exhibitions organized in the

Community Centers totaled 160

More than 2000 local citizens participated in the events hosted by the Community

Centers to date

g) Criteria for selecting Community Center Locations

Number of local population, Distance from the Municipal Center, Readiness of the

Municipality and Special circumstances (villages located in the vicinity of

state/administrative borders and in conflict-affected areas, etc).

Page 24: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

23

Future Plans

Construction and opening of new Community Centers, provision of new services, and

stimulation of civic engagement, planning and implementation of activities tailored to the

needs of local population and ensuring sustainability of the project outcomes.

Municipal Management System

- Web-technology based operation system

- Internal work-flow component (Registration of Applications, Status

Management, Tasks Module, Notification Systems and Collegial Decisions, etc)

- Integration with external systems (Data of other Agencies and My.gov.ge

Municipal Management System

Converting services into electronic format, standardization of processes, avoiding

human error, separation of responsibilities and employee roles, effective

distribution of human resources, means to analyze performed work, effective

planning of future work and increasing accessibility at the village level.

Municipal Management System

Municipal management system, determination of construction conditions for a

plot of land, agreement of construction project, issuance of construction permit,

legalization of construction/land, identification of municipal property,

preparation/revision of privatization list, privatization of property, management of

administrative violations, study of village priorities.

Introduction of e-Governance Current Situation:

- Memorandums of Understanding were signed with 7 selected municipalities

(Gardabani, Khashuri, Kareli, Tetritskaro, Khobi, Akhmeta, Kvareli);

- Process analysis was performed with active involvement of the local

government units for optimization and effective planning of municipal services;

Page 25: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

24

- Preparation of the local infrastructure is currently underway for the

implementation of service management and workflow systems;

- The Municipal Management System is connected with up to 15 electronic

services of the Public Service Development Agency, National Agency of Public

Registry and Social Service Agency.

Future Plans

- Testing of the software and its implementation in the municipalities

- Further improvement of the software by adding new e-Services / processes

- Establish cooperation with other interested municipalities

Page 26: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

25

Day 3: 18 March 2015

18 March Tbilisi Municipality

10.00am - 4.30pm

Tbilisi Municipality LEPL Tbilisi Architecture (agency

responsible for issuing construction permits in Tbilisi);

Tbilisi City Hall LEPL Property Management Agency;

Tbilisi City Hall Inspection Agency;

2.4 Construction Permit Reforms in Georgia

Initial problems and challenges encountered: Corruption, illegal constructions, number of

conflicts, legal nihilism, Soviet regulation and weak enforcement. Members of the mission

were enlightened on how/where Georgia started. First they defined what is important

Page 27: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

26

and what is not important); what are implementable under given circumstances and

considering available institutional capacities; and prioritise. As a result Georgia improved

150 places on the “Dealing with Construction Permits” indicator of the annual World Bank

Doing Business (DB) Survey, from 152 on DB 2006 to 2 on DB 2014. The number of issued

construction permits in Tbilisi has increased almost five times from 2004 (0.5million sq.m)

to 2008 (2.4 million sq.m).

Page 28: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

27

Members of the mission were given a comprehensive presentation on the background of

the First Decade of the Post-Independence Period, Main Challenges of the Construction

Regulatory Framework Before 2005, First Phase of Construction Sector Reform ranging

from One-Stop-Shop principle, government’s resolution on Construction Permit Issuance

Procedure and Permit Terms, Putting Completed Premises into Exploitation and

Mandatory state expertise of construction projects. Results from First Phase of Reform:

Changes implemented in 2005-2006 significantly reduced time and procedures required

for obtaining construction permit on the territory of Georgia. Following these changes,

number of procedures to be undertaken for obtaining construction permit was cut, on

average, from 29 to 17, while average time required for obtaining permits reduced from

285 days to 137 days. As a result of streamlining, Georgia’s ranking in the World Bank’s

Doing Business Survey 2007 on Dealing with Licenses category improved from 152nd to

42th.

The Second Phase of Construction Sector Reform: Confirming the engineering and public

utility connections, Approval of architectural project and Issuance of construction permit

.For issuance of building permit and putting completed premises into operation, building

complexity is divided into five classes according to various risk factors.Putting Completed

Premises into Exploitation has reduced time for putting completed premises into

exploitation from 30 to 15 days for certain classes. Results from Second Phase of Reform:

Number of procedures to be undertaken for obtaining construction permit was cut, on

average, from 17 to 9, while average time required for obtaining permits reduced from

137 days to 74 days. As a result of streamlining, Georgia’s ranking in the World Bank’s

Doing Business Survey 2014 on Dealing with Construction Permits indicator improved

from 42nd to 2nd.

Page 29: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

28

Among some of the reforms in progress are abolishing some of the sub-licenses for

designing and construction activities, streamlining of Issuance of construction permits

WBDB Dealing with Construction Permits Indicators

CategoryDB

2006DB

2007DB

2008DB

2009DB

2010DB

2011DB

2012DB

2013DB

2014

Dealing with Construction Permits

152 42 11 10 7 7 3 3 2

Procedures (no.) 29 17 12 12 10 10 9 9 9

Time (days) 282 137 113 113 98 98 74 74 73

Cost (% of income per capita) 145 71.7 28.9 20.3 21.6 23.2 20.2 17.7 14.9

Dealing with Construction Permits Indicators Measure: - Procedures to legally build a warehouse (number)- Time required to complete each procedure (calendar days)- Cost required to complete each procedure (% of income per capita)

Comparative Table of Construction Permit Issuance Procedures Before and After Reform

Construction Permit Issuance Procedures Before Reform

Construction Permit Issuance Procedures After Reform

Unclear procedures / Contradictory normative acts

Clear procedures

Documents and approvals from 5-10 administrative bodies

Single-window principle

Time required for obtaining permits -one year in average

Time required for obtaining permits -one month in average / Silence is consent principle

Page 30: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

29

and Georgia is in the process of elaboration of local building codes and standards, based

on International Code Council’s codes and their referenced standards.

2.4.1 Tbilisi City Hall: Property Management Agency

Has in place electronic application with various search parameters and one can register on

the web-site to get the full-service package of Electronic Bidding Process. The agency

cooperates with the Civil services of the Tbilisi City Hall and state organs: Tbilisi

Architecture, Municipal Improvement Service, Legal Department, Supervisory

Department, Greenery Department, Social Service and Culture Department, Financial

Department, Patrol police, Ministry of Economic Development and Gas, Water and

Electricity supply companies. Results of the reform: Comfort, simplified procedures, saving

time and expenses, a full-service package, a trustful partner, crack down corruption and

reduction of administrative expenses up to 60%.

2.4.2 Tbilisi City Hall Department of Supervision

This department presented on main functions/responsibilities of Department of

Supervision including its administrative processes, requirements and speedy proceeding

services for the following:

• Revealing, control and penalizing of buildings without permit;

• Start proceeding on violation of architectural project;

• Health and safety control of building-up process;

• State-technical supervision service (check up and giving recommendation);

• Building completion approval (acceptance for exploitation).

2.5 State Procurement Agency

The need to reform procurement system: lack of transparency, non-reliable data,

restricted competition, geographical inequality, high compliance costs and high risk of

corruption. The reform journey:

January 2010 - developed e-procurement system in house (within one year)

August 2010 - e-procurement system launched in test mode

October 2010 - first e-tender announced

Page 31: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

30

December 2010 - paper tenders abolished, only e-tenders allowed

December 2014 - 19,911 registered suppliers in Ge-GP; 4472 registered procuring

entities in Ge-Gp, $ 810 mill GEL savings generated, total number of announced e-

tenders totaled 121,232 and more than 7 billion GEL went through Ge-Gp.

Some features of Ge-GP

Basic logic of Ge-Gp

High transparency of Ge-Gp where everyone sees everything in the Ge-Gp business

process from annual procurement plan, tender notice, tender documentation, tender

proposal/bids, minutes of evaluation committee, all related correspondence and

Page 32: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

31

documents, all data on disputes including application and decision, contracts and

amendments, until payments under the contracts.

The Ge-Gp system received many commendations, among them:

a) United nations (UN)

“The Ge-GP system was awarded 2nd place among 471 candidates from 71 countries in the

United Nations’ Public Service Annual Survey, Category: Preventing and Combating

Corruption in the Public Service.”

b) European Bank for Reconstruction and Development (EBRD)

EBRD Assessment of Public Procurement Law and Practice, 2011: “The key components of

Public Procurement policy are introduced in South-European countries, however only

Georgia has high Compliance rating, as Georgia has best complied with and implemented

the efficient procurement instruments recommended by the international best practice.

“According to EBRD 2012 Regional Public Procurement Legislation Self-Assessment

Georgia’s on the 1-st place amongst EBRD Regional 26 countries.

c) Transparency International- Georgia

“The electronic, transparent system of state procurement was success fully introduced in

Georgia, what can be highly appreciated. It is very good, when the Government published

various data online for its citizens and makes them publicly available, thus promoting the

introduction of e-governance.”

“The agency is working towards one of the most important parts of the public

procurement reforms in Georgia – enhancing effective involvement of SMEs in public

procurement and thereby promoting employment and free competition. The effective

changes in this direction are inevitable since today the public procurement is mainly

dominated by large enterprises at the exclusion of local SMEs.”

Page 33: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

32

d) Asian Development Bank (ADB)

“Thee-procurement system implemented in Georgia may serve as a good example for Asia

and other Pacific countries. The countries, which have not yet introduced thee-

procurement system, are particularly interested in the reforms implemented in Georgia.”

e) European Parliament

Report of the European Parliament Committee on International Trade 2011/2306(INI):

“The European Parliament Welcomes Georgia’s new procurement system, Georgia should

also serve as an example for the EU Member States in this area.”

f) The World Bank

Thanks to constant upgrading, the SPA is already a regional leader when it comes to

integrating modern procurement practices, including successfully facilitating electronic

tendering, maintaining an electronic bidding platform, and executing reverse auctions to

drive efficiency forward. Important efforts were made to attract foreign suppliers,

especially large multinationals, to participate in tenders-including publishing all

information online.

Meeting with Construction Private Sectors

Tbilisi City Hall recommended all mission members to visit New Carrefour Complex near

the Tbilisi airport. The building is still under construction, only 60% completed. The

objective of the visit was to verify and validate information with the practitioners on the

ground. The development process is indeed faster in Tbilisi. The only procedure that

members were not so sure was the inspections during construction and certification of

the building. According to the consultants, the inspection will be carried out by many

parties eg. Fire Department, utility providers and Building Department of Tbilisi City Hall.

It was noted that some of these requirements were not recorded in the WB Ease of Doing

Report.

Page 34: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

33

19 March 2015 Day 4 (10.00am-4.30 pm)

19 March Tbilisi Municipality

10.00am

Rustavi Service Agency of Ministry of Internal Affair

The guests will be shown how different services are provided to the

customers, including detailed description of car registration, driving

licenses, etc.

11.30am

Site Visit – Lillo Economic Zone of Clearance of Ministry of Finance

The guests will see streamlined customs clearance procedures through

one stop shop service. Delegation will be acquainted with electronic

services available in customs clearance zone.

2.30pm

Site visit to Tbilisi Public Service Hall of Ministry of Justice

The guests will be shown how different services are provided to the

customers, including detailed description of business registration

process, document submission, registration steps.

2.5 Rustavi Service Agency

In Rustavi Service Agency of Ministry of Internal Affair, the mission members were

introduced to the car registration system in Georgia. In Georgia, Police Department

administers vehicle registration. The Rustavi area we visited was 30 km away from Tbilisi

City Centre and connected by highway. From our observation, this area is a one-stop-

centre, from purchasing a vehicle, driving test, to registering a personal vehicle.

The Rustavi Service Agency area is divided into 5 sections namely Car Registration Section,

Payment-Banking, online examination and vehicle driving test, Weapon Registration and

Administration. All these sections are located at the lobby and accessible to the public.

To register a new vehicle, the owner has a choice to either register with a running number

or to register his own preference number. The running number registration is free and will

take not more than 5 minutes. While the preferred own number is it will take not more

than 10 minutes and has to pay extra. The owner needs to check his number at any online

kiosk. Once the number and the fee have been agreed, he will then book the number and

Page 35: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

34

make payment at the bank. The registration process also separates processing of

registration and payment. The Ministry of Internal Affair has adopted the one-stop-service

introduced by Georgian Government to reduce corruption in the Police Force and regain

trust from the citizen.

2.7 Lillo Economic Zone of Clearance

The Lillo Economic Zone of Clearance, Ministry of Finance which is equivalent to the Royal

Malaysia Customs in Malaysia and the Goods Clearance Zone (CCZ) is located outside

Tbilisi connected by main Highway. The building is equipped with modern IT technology

and well designed with enough parking for trucks. In Georgia, there are 5 CCZs located in

four regions. All CCZs operate 24 hours non- stop daily.

Like any other one-stop-centre, the building also separates processing and payment

services for public. The mission members were given an opportunity to test the clearance

process. The officers chose Mayor to test the system whereby he was provided with the

packing list and invoice. First he was guided to the front counter to get his number. Once

Page 36: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

35

the number was up, he showed his documents to the processing officer at a different

counter within the vicinity. Once the details are captured by the officer, the Mayor was

asked to sign in digital. With that he has completed the procedure and now guided to the

bank counter to make payment. The clearance procedure only requires 3 steps with 10

minutes to complete his request to register and make payment.

The mission members were further informed that it only takes 30-45 minutes for

inspection to clear goods in green lane. To cross the border, the records showed the

average clearance was within 10 minutes.

Page 37: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

36

CCZ Environment

2.8 Tbilisi Public Service Hall of Ministry of Justice

On the last day of the event the delegation had the opportunity to visit the most talked

about Public Service Hall in Tbilisi. The building is very modern and the roof looks like

leafs. This Public Service Hall is 5000ms and offers 350 services. Based on the record in a

Page 38: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

37

day they achieved 10,000 mark transactions with 23,000 customers. The average waiting

time taken per transaction is 3-4 minutes and the delivery transaction average time is 7

minutes.

In the beginning, the public service offered by any government agency was sluggish and

tainted with corruption. To get a passport in the old days, a citizen has to prepare at least

300 GEL to pay officers at various levels.

Breakdown of corruption in getting a passport

Before the systematic approach was introduced, the process of getting an Identification

Card was labeled as very bureaucratic and lengthy.

Page 39: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

38

Getting ID in the old days

Dealing with the state to set up a new business, or operate an existing one, was fraught

with delays and corruption. In 2003, 909 permits and licenses were required, many of

which could be bought and served no societal purpose. By 2011, the number of permits

and licenses had been reduced to 137. Over 2003–11, the number of days needed to

obtain a construction permit was cut from 195 to 98, and the number of procedures was

reduced from 25 to 9. Through aggressive use of the “guillotine,” reformers shut down the

entire government agencies that were not providing value and merely extracting bribes

from the population.

Informal payments were once the norm in public and civil registries. Introduction of a new

culture, new staff, new technology, and new business processes has streamlined all

interfaces between the citizen and the state—from registering a property to obtaining a

passport— eliminating many opportunities for bribes.

Page 40: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

39

23 March 2015 Day 1 (9.00 - 11.00 am)

23 March Istanbul Metropolitan Municipality

9.00-11.00am Meeting with Mayor of Istanbul Metropolitan Municipality

2.9 Istanbul Metropolitan Municipality

Istanbul Metropolitan Municipality is a propulsive force for the Turkish economy and the

Mayor, Mr. Topbas is actively reshaping Istanbul. He has been involved in the restoration

of numerous historical monuments, implemented a project to improve the architectural

silhouette of Istanbul’s Beyoğlu district and designed several socio-cultural facilities as

part of Istanbul’s “Urban Transformation and Social Rehabilitation” agenda. The meeting

was to share numerous urban issues, exchange views on how local and regional

governments have played a major role in the development process of the cities and

regions, and deliberate on potential way forward for cooperation.

3.0 CONCLUDING REMARKS

How did the Georgian Government do it?

From these case studies, a set of 10 cross-cutting factors emerge that have driven

Georgia’s success story. These lessons can be summarised as follows:

1. Exercise strong political will. The overwhelming mandate from voters and the dire

reality of the situation Georgia’s new leaders inherited bolstered their will to act

quickly and forcefully.

2. Establish credibility early. The new leaders struck hard against corruption to

establish early credibility and extend the window of opportunity voters had given

them. High-profile arrests of corrupt officials and criminals signaled zero tolerance

for corruption. Early successes built support for further actions, in a virtuous cycle

of reform.

Page 41: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

40

3. Launch a frontal assault rather than spending precious time strategizing, worrying

about sequencing, or consulting on action plans, the government launched a rapid

and direct assault on corruption in a broad array of public services. It acted quickly

to keep vested interests at bay.

4. Attract new staff. The leaders of the Rose Revolution formed the core of the

government’s executive branch. They looked outside politics and government to

recruit qualified, often Western-educated, staff to spearhead the reforms and paid

them well.

5. Limit the role of the state. The reformers shared a vision of limited government.

They also believed that limiting contact between citizens and civil servants and

slashing red tape reduced opportunities for corruption and was good for the

economy.

6. Adopt unconventional methods. Extraordinary times required innovative

approaches. A special fund financed from outside sources paid for increased

salaries and bonuses for a short initial period. Jailed corrupt officials and tax cheats

who admitted guilt and paid heavy fines were released from prison.

7. Develop a unity of purpose, and coordinate closely. A small group of policy makers,

headed by the president, formed a core team that shared common values,

coordinated closely, and stayed together. Regular cabinet meetings and close ties

with allies in Parliament facilitated coordination.

8. Tailor international experience to local conditions. The government borrowed from

international experience in designing reforms, adapting foreign practices to local

circumstances as needed.

9. Harness technology. The government used technology extensively to limit contact

between the state and citizens, implementing e-filing of taxes, electronic payments

for services, and traffic cameras.

10. Use communications strategically. Communication started at the top, with the

president, whose message on corruption was clear and consistent. The media was

key in investigating corruption and publicizing the sensational arrests of suspected

criminals, tax cheats, and corrupt officials.

Page 42: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

41

3.1 Creating One-Stop Shops

To simplify procedures, the government created one-stop shops. Citizens now go to one

office within each issuing ministry to submit their documents, and the issuing agency, not

the applicant, is responsible for collecting relevant information from other government

agencies. All fees are paid through banks, not to officials.

Processes were automated, with applications entered into a transparent computer

system. Business processes for issuing licenses and permits were spelled out in staff

guidelines and, where possible, computerised, with time limits imposed for the

completion of each step. There would be no more tossing applications on shelves and

forgetting about them.

Each ministry will ultimately have its own service center—many in their own building—to

administer and provide licenses and permits, thereby separating the policy-making bodies

from the units administering and issuing the permits and licenses. This work is ongoing.

Ultimately, a larger system will link service units from different ministries.

To speed up the application process, the government eliminated unnecessary

bureaucratic steps, such as the mandatory registration of company charters—which few

people ever understood how to do. Applicants who register in person at the issuing

agency no longer have to get documents notarized.

3.2 Integrating Service Innovation

In 2011, the government opened the first four public service halls, in Batumi, Kutaisi,

Mestia, and Rustavi. More public service halls were planned; among them were Tevali,

Kvareli, Gori, Zugdidi, Tbilisi and many more. These new institutions go one step beyond

the one-stop shop idea by allowing citizens to access services from various agencies under

a single roof. Citizens can register property or businesses; obtain identifications,

passports, and birth and death certificates; and get notary services at a public service hall.

Self-service areas are available for a number of simple transactions; customers are

directed either to quick service areas for simple questions or to operator desks for tasks

that will take more than five minutes. Each hall is brightly decorated and has staffed areas

Page 43: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

42

where children can be entertained while their parents complete their business.

Comfortable waiting areas are available with free Internet connections. A greeter meets

people at the entrance and guides them to the right place. Employees are intensively

trained, not only in the technicalities of their work but on creating a friendly, customer-

oriented environment. Interestingly, the idea for the public service hall originated at a

management retreat held by the Ministry of Justice. The focus of the retreat was on how

agencies can improve services, reduce delays, and make bureaucratic processes as

painless as possible.

The Malaysian delegates will identify and adopt/adapt certain best practices. The Focus

Group on Dealing With Construction Permits (FGDCP) will study the impact by preparing

cost benefit analysis and conduct public consultation with respective stakeholders before

making any recommendations.

Prepared by,

Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business

Improvement Initiatives and Istanbul Municipality Courtesy Visit delegates.

Contacts:

Khalidatul Asrin binti Abdul Aziz

(Administrative matters)

Ph: 03 – 7960 0173

Email: [email protected]

Mohd Yazid bin Abdul Majid

(Other matters)

Ph: 03 – 7960 0173

Email: [email protected]

Page 44: Fact Finding Mission on Challenges and Best …...0 POST VISIT REPORT May 2015 Fact Finding Mission on Challenges and Best Practices of Georgia Doing Business Improvement Initiatives

43

The Delegates:

1. YBhg. Datuk Seri Ahmad Phesal bin Hj. Talib Mayor Kuala Lumpur City Hall

2. Mr Mohd Haniff bin Hassan

Director Federal Territories Director of Lands and Mines Office

3. Mr Tan Peng Heng

Director of Information Management Department Kuala Lumpur City Hall

4. Ms Nor Fajariah binti Sulaiman

Head of One Stop Centre Kuala Lumpur City Hall

5. Mr Ir Bashir Ahamed bin Maideen

Managing Director and Professional Engineer Nadi Consult Era Sdn Bhd

6. Mr Mohd Yazid bin Abdul Majid

Manager (Smart Regulation) Malaysia Productivity Corporation

7. Ms Khalidatul Asrin binti Abdul Aziz Consultant (Smart Regulation) Malaysia Productivity Corporation