Upload
others
View
11
Download
0
Embed Size (px)
Citation preview
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 278
Projects:
Facility Name: Acworth Elementary School
Add HVAC to Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Add School Lettering to Building
Replace Carpet and Tile in selected Areas
IN ASSOCIATION WITH THE FACILITY GROUP Page 1 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 0
Projects:
Facility Name: Acworth Primary Elementary School
36 IU Primary School. K-2
Removal of Old Structures
IN ASSOCIATION WITH THE FACILITY GROUP Page 2 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 0
Projects:
Facility Name: Acworth Site Middle School
New 71 IU Middle School.
IN ASSOCIATION WITH THE FACILITY GROUP Page 3 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 259
Projects:
Facility Name: Addison Elementary School
Add 1 IU, P.E. Gymnasium with Restrooms
Install HVAC in Gym
Modify existing PE Gym to accommodate guidance and administration. New PE to be built
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Provide Canopy for Bus Lanes
Upgrade locks on Exterior Doors
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 4 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 807
Projects:
Facility Name: Adult Education Center Special School
Main Switchgear & Panel Upgrades
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 5 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 232
Projects:
Facility Name: Argyle Elementary School
Main Switchgear & Panel Upgrades
Painting
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Replace Carpet
Scrape Windows in Cafeteria to Remove Anti-Glare Film.
Add a Staff Restroom
IN ASSOCIATION WITH THE FACILITY GROUP Page 6 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 276
Projects:
Facility Name: Austell Elementary School
Provide HVAC in Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Add Surveillance Cameras to the back of the Building.
Build an Additional Outdoor Storage Area
IN ASSOCIATION WITH THE FACILITY GROUP Page 7 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 283
Projects:
Facility Name: Austell Primary Elementary School
New 36 IU Primary School. K-2
IN ASSOCIATION WITH THE FACILITY GROUP Page 8 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 407
Projects:
Facility Name: Awtrey Middle School
Main Switchgear & Panel Upgrades
Replace HVAC in Office, Media Center, Gym and Theater
HVAC for Main Gym
Roofing for Sections of Building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Whiteboards
Add window to the interior wall of the front office.
Improve Climate Control to Reduce Excessive Humidity in Central Classroom
IN ASSOCIATION WITH THE FACILITY GROUP Page 9 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 256
Projects:
Facility Name: Baker Elementary School
HVAC in Main Gym
Bus Lane Re-paving
Parking lot Re-paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Provide canopy for front area and bus area
Surround School with Fencing and a Gated Entrance
IN ASSOCIATION WITH THE FACILITY GROUP Page 10 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 405
Projects:
Facility Name: Barnes Education Center
Main Switchgear & Panel Upgrades
Replace HVAC system for old school
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Provide Access Control at Entrances
IN ASSOCIATION WITH THE FACILITY GROUP Page 11 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 235
Projects:
Facility Name: Bells Ferry Elementary School
Main Switchgear & Panel Upgrades
Painting
HVAC Main Gym
Bus Lane Re-paving
Parking Lot Re-paving
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Add Restroom in the Pre Kindergarten
Build Canopy over Sidewalk
Upgrade Playground Area to Improve Drainage Problems
IN ASSOCIATION WITH THE FACILITY GROUP Page 12 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 214
Projects:
Facility Name: Belmont Hills Elementary School
Main Switchgear & Panel Upgrades
Replace HVAC system
HVAC Main gym
Replace Water Piping, Plumbing Fixtures, and Hose Bibs
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Replace Carpet
Plant Sod in the Playground Area
Landscape Around Building
Replace Cafeteria Tables
IN ASSOCIATION WITH THE FACILITY GROUP Page 13 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 240
Projects:
Facility Name: Big Shanty Elementary School
Main Switchgear & Panel Upgrades
Painting
Replace HVAC System for 1988 Addition
Replace Water Piping, Plumbing Fixtures, and Hose Bibs
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Install Water Fountain in Gym
Replace Office Furniture
Build Outdoor Storage Unit
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 14 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 240
Projects:
Facility Name: Big Shanty Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 15 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 244
Projects:
Facility Name: Birney Elementary School
Main Switchgear & Panel Upgrades
HVAC Main Gym
Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Carpet Replacement.
Install Lighting at Canopy.
IN ASSOCIATION WITH THE FACILITY GROUP Page 16 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 274
Projects:
Facility Name: Blackwell Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Plant Sod on Area Leading to Primary Playground
Add Handrails at Sidewalks
IN ASSOCIATION WITH THE FACILITY GROUP Page 17 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 221
Projects:
Facility Name: Brown Elementary School
Main Switchgear & Panel Upgrades
HVAC Main Gym
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Renovate Administration Offices for Security
Grade and Level Playground Area
Provide a Blacktop Area for the playground.
Add Sidewalk to Parking Lot
IN ASSOCIATION WITH THE FACILITY GROUP Page 18 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 239
Projects:
Facility Name: Brumby Elementary School
Main Switchgear & Panel Upgrades
Replace Carpet
Replace HVAC System
HVAC Main Gym
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Enclose Open IU's in the Old Building
Paint Interior of Building as Needed.
IN ASSOCIATION WITH THE FACILITY GROUP Page 19 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 266
Projects:
Facility Name: Bryant Elementary School
Main Switchgear & Panel Upgrades
HVAC Main Gym
Bus Lane Re-paving
Parking Lot Re-paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Landscape Driveway Entrance and Front of Building.
Correct Drainage Problem on Lower field
IN ASSOCIATION WITH THE FACILITY GROUP Page 20 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 279
Projects:
Facility Name: Bullard Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 21 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 517
Projects:
Facility Name: Campbell High School
Add 18 IU's; Band, Choral, Graphic Arts, Culinary Arts, Drafting & Design Technology, Horticulture, Law Enforcement, 11 Typical Classrooms.
Main Switchgear & Panel Upgrades
Replace or Repair the existing Sports Lighting at the Football field.
HVAC Wills Gym
Modify existing undersized Band to be Orchestra. Modify the undersized Choral to be Drama.
Track Resurfacing/Track & Field upgrades
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Renovate Selected Portions of the Auditorium
Paint Lockers
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 22 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 517
Projects:
Facility Name: Campbell High School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 23 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 424
Projects:
Facility Name: Campbell Middle School
Add 3900 square feet to the administration and Pupil Personnel Services areas to conform with the Ed. Specs.
Addition of 12 IU's: 9 Typical classrooms, Drama, Business / Computer, Career Connections.
Add 4800 Square feet to the Media Center to conform with the Ed. Specs.
HVAC Main Gym
Modify the existing administration areas to work with a new administration addition.
Modification and Renovation of the Kitchen and Cafeteria and Replacement of Food Service Equipment. Expansion of the Food Service Area Square Footage.
Media Center Modifications to accommodate the new Media Center addition.
Repave Bus Lane
Repave Parking Areas & Drives
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
IN ASSOCIATION WITH THE FACILITY GROUP Page 24 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 424
Projects:
Facility Name: Campbell Middle School
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Replace Bleachers in the New Gym
Upgrade Lighting and Sound Systems in Theater.
IN ASSOCIATION WITH THE FACILITY GROUP Page 25 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 271
Projects:
Facility Name: Chalker Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Whiteboards
Install Hot Water Line to the Front Office
IN ASSOCIATION WITH THE FACILITY GROUP Page 26 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 272
Projects:
Facility Name: Cheatham Hill Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Fencing around Playground
IN ASSOCIATION WITH THE FACILITY GROUP Page 27 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 236
Projects:
Facility Name: Clarkdale Elementary School
Main Switchgear & Panel Upgrades
Replace HVAC System for Classrooms and Media Center
HVAC Main Gym.
Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves
Replace Exterior Sanitary Sewer Piping, Cleanouts and associated Manholes
Roofing for entire Building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Replace Front Sign
Admin. Renovation--To include: installation of window and clinic enlargement
Replace Restroom Stalls and Doors
IN ASSOCIATION WITH THE FACILITY GROUP Page 28 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 236
Projects:
Facility Name: Clarkdale Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 29 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 233
Projects:
Facility Name: Clay Elementary School
Main Switchgear & Panel Upgrades
Painting
Replace HVAC System for Classrooms, Media and Cafeteria
HVAC Main Gym
Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Place Intercom Speakers in Playground and Parking Lot Areas
Install Sidewalk from Gym Door to Front Walk
Replace Cafeteria Blinds
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 30 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 233
Projects:
Facility Name: Clay Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 31 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.:
Projects:
Facility Name: Cobb County System Wide
As new students and staff with significant physical disabilities move to the Cobb County School District, and as new classes are established in schools which have previously had no students or staff with physical disabilities, modifications to the school facility are frequently needed. Examples include restroom adaptations, adding hot and cold running water to a classroom, door and thresh-hold modifications, handrails and ramps. Section 504 of the Rehabilitation Act and the Americans with Disabilities Act require such modifications to permit physical access.
Growth and attrition will require funding for replacement and new buses/support vehicles for the next five years.
Provide computer for every teacher with appropriate content specific software and training.
Complete copier/duplicator replacement program and commence refresh program.
Includes 236 digital duplicators capable of supporting the needs of local schools and 726 networked copier/printers capable of supporting the printing and copying needs of local schools and central administration.
Replace equipment and attached peripheral replacement and/or consolidation.
Includes mainframe equipment, storage area network equipment, and Sun server equipment (purchase, installation, and conversion services)
School facilities need to be accessible to many people during and after normal hours. Increased Security needs require that staff members be confident that the doors, windows and locks can completely control access to each facility. This program will provide limited access to only authorized personnel, identify any person or groups in the building and when they entered as well as numerous other features not available now.
IN ASSOCIATION WITH THE FACILITY GROUP Page 32 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.:
Projects:
Facility Name: Cobb County System Wide
Equipment and Software needed for continued improvement in tracking, reporting and control of CCSD Financial Resources.
Local school building renovations and replacement of large kitchen equipment including, but not limited to, walk-in coolers and freezers, ice machines, steam kettles, steamers and serving lines.
Building renovations, replacement, repair and upgrades to furniture, fixtures and equipment for the Comprehensive Human Resources Information System (CHRIS).
Associated costs for SPLOST Program Management and equipment installationSPLOST Accountability ManagerDirector of Construction and Support PersonnelEquipment Planning and Installation PersonnelFinancial Reporting/Processing PersonnelFurniture/Equipment to Support Program
Replace carpet and repaint, replace blinds, insulation where removed in the ceiling, repair siding, roofing, windows, paneling, doors, ceilings, floor structure, gutters and downspouts.
Expand mobile computing access campus wide to support instructional and administrative initiatives.
Includes 500 access points for centralized District facilities, 2,400 access points for instructional and admin areas, 200 outdoor routers/access to portables, and 600 portable outdoor routers.
Provide support of computer printing needs of curriculum and administrative functions.
Purchase of approximately 3,170 printers at $2,200 each, would provide one printing device per 25 students and staff.
Refresh district servers using a 5-year refresh cycle.
IN ASSOCIATION WITH THE FACILITY GROUP Page 33 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.:
Projects:
Facility Name: Cobb County System Wide
Includes 6 centralized Email servers, 100 Internet caching, 100 Mail servers for local schools, 100 Media Center servers, and 70 Middle/High school labs.
Refresh components of local school core infrastructure, protect servers , and ensure data integrity in case of power loss.
Includes 4 caching appliances, content filtering, 68 environmental control units, firewall, load balance/redundancy fail over, 1,500 network closet switches, switches and routers for central facility, 110 UPS for main, 300 UPS for other closets, and virus scanning.
Ensure continued student and staff access to instructional learning opportunities, assessment capabilities and Web-based administrative systems using energy efficient technology.
Estimated cost for 30,563 units includes installation, 3-year warranty, productivity software, connectivity to network, & enhanced server support as appropriate at time of implementation.
Funding to support the furniture and equipment needs resulting from enrollment growth or replacement of items which are beyond economical repair.
Security fencing, safety and security related signs, traffic flow indicators etc.
The construction of undesignated classrooms / instructional units for unforeseen future growth requirements.
Digital surveillance recording equipment at middle schools and high schools.
IN ASSOCIATION WITH THE FACILITY GROUP Page 34 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 241
Projects:
Facility Name: Compton Elementary School
Main Switchgear & Panel Upgrades
Replace HVAC System for main Building and Annex
HVAC Main Gym
Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves
Bus Lane Re-paving
Parking Lot Re-paving
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Carpet
Interior Painting
Replace Fencing at New Macland Road.
Add Locks to Classroom Doors in New Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 35 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 241
Projects:
Facility Name: Compton Elementary School
Custodial Equipment.
Audio Visual Equipment.
Build Canopy Over Bus Lanes and between Annex and Main Building.
Add Restroom to Staff Lounge
Install an L-shaped Counter in Front Office
Landscaping at the Front of Building.
IN ASSOCIATION WITH THE FACILITY GROUP Page 36 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 426
Projects:
Facility Name: Cooper Middle School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Air Condition Kitchen
IN ASSOCIATION WITH THE FACILITY GROUP Page 37 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 408
Projects:
Facility Name: Daniell Middle School
Addition for Administration and Pupil Personnel to conform to the Ed. Specs.
Add 5 IU's; 1 - Technology, 3 - Science, 1 - Business. Add 3 Teacher's Team Planning Rooms.
Replace gym floor
New tile in hallways and existing tiled rooms. Prep and level slabs to receive the VCT. Flooring for the Theatre also, some tile and some may be carpet.
HVAC Main Gym
Modify the existing administration areas to work with the new administration addition.
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Replace and Extend Canopy toward Theater Entrance
IN ASSOCIATION WITH THE FACILITY GROUP Page 38 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 408
Projects:
Facility Name: Daniell Middle School
Custodial Equipment.
Audio Visual Equipment.
Whiteboards
Move Double Lockers and Replace and or Repair Existing Lockers
Safety Mats on the Walls Under the Basketball Goals.
Restripe Parking Lot
Replace Art Tables and Chairs
IN ASSOCIATION WITH THE FACILITY GROUP Page 39 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 255
Projects:
Facility Name: Davis Elementary School
HVAC Main Gym
Bus Lane Re-paving
Parking Lot Re-paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Additional Laptop Computer Carts and Computers, and Desktop computers
IN ASSOCIATION WITH THE FACILITY GROUP Page 40 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 417
Projects:
Facility Name: Dickerson Middle School
Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs for the new FTE.
Addition of 4 IU's, typical classrooms.
Replace HVAC system Main Building
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Replace Lockers in the boys and girls Locker Rooms
Correct drainage on the Athletic Field
Replace the Door Framing and Doors at the Front Entrance and at the Covere
Renovate Restroom Floors in the Old Building.
Upgrade Lighting and Sound Equipment in the Theater
IN ASSOCIATION WITH THE FACILITY GROUP Page 41 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 417
Projects:
Facility Name: Dickerson Middle School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 42 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 414
Projects:
Facility Name: Dodgen Middle School
Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs for the new FTE
Addition of 23 IU's; 15 Classrooms ( 3 Typical, 12 Science ) 2 Spec Ed., 2 Business / Computer, Career Connections, Exploratory Tech., Band, and Orchestra ( from the old Kitchen Modification). 22 new construction, 1 from modification
Add New Kitchen and Cafeteria
Main Switchgear & Panel Upgrades
HVAC Main Gym
Modify 3 Commons areas to be teacher planning rooms.
Modify the existing under sized Choral room to be Drama Classroom and the existing Band room to be Choral Classroom.
Modify the existing administration areas to work with the new administration addition.
Modify the existing Kitchen to be the Orchestra Classroom. 1 I.U. increase.
Modify General Music to be a Special Ed. Classroom.
IN ASSOCIATION WITH THE FACILITY GROUP Page 43 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 414
Projects:
Facility Name: Dodgen Middle School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Replace Gym Floor
Replace HVAC System
Enlarge Theater Window in the Sound Room
IN ASSOCIATION WITH THE FACILITY GROUP Page 44 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 261
Projects:
Facility Name: Dowell Elementary School
HVAC Main Gym
Bus Lane Re-paving
Parking Lot Re-paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Build Canopy over Bus Lanes
Place Security Gates at Entrance
Upgrade Cafeteria Sound System
Install Hand Dryers to Student Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 45 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 226
Projects:
Facility Name: Due West Elementary School
Addition for Administration and Pupil Personnel Services
Increase size of the cafeteria by 250 SF.
12 C.R.'s; 4 - K, 7 - P, 1 - Computer Classroom.
Main Switchgear & Panel Upgrades
Replace HVAC system
HVAC Main Gym and Portables
Add sprinkler system to the existing building to accommodate the new addition.
Modify existing admin. to work with the admin. addition.
Roofing for sections of building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Level and Grade Playground Area in rear of School
IN ASSOCIATION WITH THE FACILITY GROUP Page 46 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 226
Projects:
Facility Name: Due West Elementary School
Custodial Equipment.
Audio Visual Equipment.
Replace School Sign
IN ASSOCIATION WITH THE FACILITY GROUP Page 47 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 423
Projects:
Facility Name: Durham Middle School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
New Sound System for Cafeteria
IN ASSOCIATION WITH THE FACILITY GROUP Page 48 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 404
Projects:
Facility Name: East Cobb Middle School
Addition for Administration and Pupil Personnel Services
Add 8 IU's; 8 Typical Classrooms
Main Switchgear & Panel Upgrades
Replace (7) HVAC RTUs, two split systems for Band and Choir rooms
HVAC Main Gym
Modify the existing administration areas to work with the new admin. addition.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Whiteboards
Upgrade Clocks
Strip and Refinish Gym Floor
Refinish Canopy to the Gym
IN ASSOCIATION WITH THE FACILITY GROUP Page 49 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 404
Projects:
Facility Name: East Cobb Middle School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 50 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 211
Projects:
Facility Name: East Side Elementary School
Main Switchgear & Panel Upgrades
Replace carpet throughout
Replace HVAC system for Annex modular bldg.
Air conditioning in PE building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Paint School as Needed and Pressure Wash Exterior
Repair Fencing
Replace Existing Canopy
Replace School Sign
IN ASSOCIATION WITH THE FACILITY GROUP Page 51 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 230
Projects:
Facility Name: Eastvalley Elementary School
Main Switchgear & Panel Upgrades
Replace HVAC system
HVAC Main Gym
Bus Lane Re-paving
Parking Lot Re-paving
Roofing for sections of building
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Provide 15 Overhead Projectors.
Cover the Blue Paint on the Exterior of Building with a Uniform Gray Golor
Landscape the Front of the School.
IN ASSOCIATION WITH THE FACILITY GROUP Page 52 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 227
Projects:
Facility Name: Fair Oaks Elementary School
Addition of Administrative Suite including: Principal's office, Adminstrative Office, staff toilets, Pupil Personnel spaces. Also renovation of 1,000 SF of existing administrative space.
Enlarge the cafeteria area to accommodate the new FTE allowed by the SPLOST I classroom addition of 16 I.U.'s.
Addition of 3 I.U.'s lost to modification of the Media Center.
Main Switchgear & Panel Upgrades
Replace HVAC split systems
HVAC Main Gym
Modify the existing Admin. to work with new admin. Addition.
Increase the size of the Media Center to accommodate the increased FTE allowed by the previous classroom addition. Loss of 3 I.U.'s.
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
IN ASSOCIATION WITH THE FACILITY GROUP Page 53 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 227
Projects:
Facility Name: Fair Oaks Elementary School
Custodial Equipment.
Audio Visual Equipment.
Paint School as Needed
New Marquee
Install Hand Dryers in Student Restrooms
Put Name of School on the Outside of the Building
Install Gym Water Fountain
Plant Grass on Playground Areas
IN ASSOCIATION WITH THE FACILITY GROUP Page 54 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 409
Projects:
Facility Name: Floyd Middle School
Addition to the food service areas to accommodate the increased FTE.
19 IU's; 12 Typical Classrooms, 3 Science, Business/Computer,Career Connections, Intro to Technology, Exploratory Target.
Addition of new Media Center to meet the Ed. Specs. and the new FTE,to replace the existing undersized one.
Main Switchgear & Panel Upgrades
Replace HVAC RTUs in Art room and Theater, add RTUs in Classrooms
HVAC Main Gym
Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves
Modify the existing Media Center spaces to be Administration and Pupil Personnel Services.
Modifications to the old Music Spaces, Band and Choral to be Drama and typical classrooms.
Roofing for Sections of Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 55 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 409
Projects:
Facility Name: Floyd Middle School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Reconfigure Parking Lot to Include Bus and Car Areas
Install New Lockers in the Halls and Gym
Cafeteria Tables
Replace and Repair Fencing
Provide Canopy Between Science and Main Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 56 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 264
Projects:
Facility Name: Ford Elementary School
HVAC Main Gym
Bus Lane Re-paving
Parking Lot Re-paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Provide Additional Lighting in Parking Areas
IN ASSOCIATION WITH THE FACILITY GROUP Page 57 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 269
Projects:
Facility Name: Frey Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Landscaping and Additional Trees
Whiteboards
Place Acoustical Panels in the Gym
IN ASSOCIATION WITH THE FACILITY GROUP Page 58 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 412
Projects:
Facility Name: Garrett Middle School
Main Switchgear & Panel Upgrades
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Enclose Media Center and Add Security Gates
Add Covered Walkway Between Eighth Grade and New Wing
Replace Theater Seating
Theater Renovations Lighting and Sound System
IN ASSOCIATION WITH THE FACILITY GROUP Page 59 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 251
Projects:
Facility Name: Garrison Mill Elementary School
Replace existing Emergency Generator Connect lights, cooler, freezer, & phone system to emergency generator
Upgrade Air Conditioning in Gym and Kitchen
Bus lane re-paving
Parking lot re-paving
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Add callback Buttons to Every Classroom
Increase Number of Parking Spaces
IN ASSOCIATION WITH THE FACILITY GROUP Page 60 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 270
Projects:
Facility Name: Green Acres Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Fix Drainage Droblems in Playground Area
Add Fencing Between Street and Portables.
Increase Lighting in Parking Area and Back of Building
Add Canopy from Entrance to Parking Area
Plant trees to Buffer Neighbors
IN ASSOCIATION WITH THE FACILITY GROUP Page 61 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 411
Projects:
Facility Name: Griffin Middle School
Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs. and to accommodate the new FTE.
Addition of new cafeteria and kitchen.
Addition of 14 IU's: 12 science classrooms, Orchestra, and Choral. Add Band lost to modification for Drama.Add 9 Classrooms lost to modification to increase existing classroom size.Totat IU's to be constructed is 24.
Main Switchgear & Panel Upgrades
Replace HVAC system
HVAC Main Gym
Modify the existing undersized classrooms to be the correct size. Convert each pod from a 4 classroom pod to a 3 classroom pod -- a loss of 9 classrooms.
Modify 3 commons areas to be teacher team planning rooms.
Modify the existing administration areas to work with the new administration addition.
Modify kitchen to be Intro to Technology, Band to be Drama, and Orchestra to be Computer Classroom.
Re-conditioning/metal roof replacement for covered play area
IN ASSOCIATION WITH THE FACILITY GROUP Page 62 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 411
Projects:
Facility Name: Griffin Middle School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Renovate Theater- Electronic Screen, Sound System, Curtains, Carpet
Provide Flooring and Network Access to Covered Play Area
Add wall to isolate restroom from Media Center
Canopy to Bus Lot
IN ASSOCIATION WITH THE FACILITY GROUP Page 63 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 213
Projects:
Facility Name: Harmony Leland Elementary School
Addition of 10 IU's, 6 Kindergarten, 4 Primary. Six new IU's and four are to replace those lost to modification of existing building for Administration.
Main Switchgear & Panel Upgrades
HVAC Upgrades
HVAC Main Gym
Modify the existing building for Administration and Pupil Personnel Services. Four IU's will be lost.
Provide fire suppression sprinkler system to the existing building to accommodate the addition of classrooms and administration.
Roof Replacement
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Replace School Sign
IN ASSOCIATION WITH THE FACILITY GROUP Page 64 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 213
Projects:
Facility Name: Harmony Leland Elementary School
Custodial Equipment.
Audio Visual Equipment.
Landscaping Improvements
Drainage Improvements
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 65 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 516
Projects:
Facility Name: Harrison High School
Replace Cooling Towers
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Pave Busport and Upper Parking Lot
Renovate Classrooms in 814 Building
Resurface Tennis Courts
Provide Additional Storage Area
Provide Additional Outdoor Lighting.
Theater-Remove Arch, add Accoustics, Curtains, Lighting
Add Motion Detectors
IN ASSOCIATION WITH THE FACILITY GROUP Page 66 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 209
Projects:
Facility Name: Haven Academy: Fitzhugh Lee Center
Main Switchgear & Panel Upgrades
Bus Lane Re-Paving
Parkinig Lot Re-Paving
Reroof sections of the building
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 67 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 729
Projects:
Facility Name: Haven Academy: Hawthorne Center
Main Switchgear & Panel Upgrades
Painting
Replace HVAC system
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 68 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 267
Projects:
Facility Name: Hayes Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Enclose Walkway Between Buildings
Paint interior and exterior (As Needed)
Replace Restroom Tiles
IN ASSOCIATION WITH THE FACILITY GROUP Page 69 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 421
Projects:
Facility Name: Hightower Trail Middle School
Addition for Band and Orchestra
HVAC Main Gym
Modify the existing Orchestra and Choral to accommodate Drama and ensemble practices. Loss of 1 I.U.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Replace Theater Lighting
Replace 12 Folding Walls with Permanent
Landscaping
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 70 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 242
Projects:
Facility Name: Hollydale Elementary School
Main Switchgear & Panel Upgrades
Paint Entire Building
Replace HVAC system for original building
HVAC Main Gym
Upgrade toilets, urinals, sinks, water coolers, and valves
Roofing for front canopy
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Classroom Function Door Locks on Needed Interior Doors
Install 3 Speed Bumps in Front Parking Area Safety
Increase Electrical Outlets in Classrooms
Upgrade Intercom
IN ASSOCIATION WITH THE FACILITY GROUP Page 71 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 242
Projects:
Facility Name: Hollydale Elementary School
Custodial Equipment.
Audio Visual Equipment.
Cafeteria Tables
IN ASSOCIATION WITH THE FACILITY GROUP Page 72 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 254
Projects:
Facility Name: Keheley Elementary School
Air Conditioning for Covered Play Area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Repair and restripe parking lot.
Install hand dryers into each restroom.
Place tack strips in the needed hallways throughout the building.
IN ASSOCIATION WITH THE FACILITY GROUP Page 73 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 519
Projects:
Facility Name: Kell High School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Add six foot galvenized, finished, chain link fence around perimeter.
IN ASSOCIATION WITH THE FACILITY GROUP Page 74 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 280
Projects:
Facility Name: Kemp Elementary School
Provide airconditioning in the Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Fence Perimeter
IN ASSOCIATION WITH THE FACILITY GROUP Page 75 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 265
Projects:
Facility Name: Kennesaw Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Enclose Walkway Between Buildings
Install Hand Dryers in Student Restrooms
Venition Blinds in Classrooms and Library
Annex-Classroom Function Locks on Interior Doors
IN ASSOCIATION WITH THE FACILITY GROUP Page 76 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 518
Projects:
Facility Name: Kennesaw Mountain High School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Repave Road to Practice Field
Provide exterior lighting in the parking areas.
Landscaping
Resurface Track
IN ASSOCIATION WITH THE FACILITY GROUP Page 77 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 243
Projects:
Facility Name: Kincaid Elementary School
Replace existing Emergency Generator
Air Conditioning for PE Building
Bus Lane Re-Paving
Parking Lot Re-Paving
Roofing for sections of building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Gate at Main Entrance
Improve Drainage at Playgrounds
Sink in Art Room
Provide New Marquee
IN ASSOCIATION WITH THE FACILITY GROUP Page 78 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 243
Projects:
Facility Name: Kincaid Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 79 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 224
Projects:
Facility Name: King Springs Elementary School
Main Switchgear & Panel Upgrades
HVAC Upgrades
HVAC Main Gym
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Call Back Buttons
Shelving for Front Office
IN ASSOCIATION WITH THE FACILITY GROUP Page 80 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 223
Projects:
Facility Name: LaBelle Elementary School
Addition for Administration and Pupil Personnel Services
Addition of 10 IU's: 6 - K, 4 - P.
Main Switchgear & Panel Upgrades
Replace HVAC system for main building
HVAC Main Gym
Modify the existing administration area to work with the new admin. addition.
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Additional Security Lighting
Enclose Walkways Between Buildings
Whiteboards
IN ASSOCIATION WITH THE FACILITY GROUP Page 81 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 223
Projects:
Facility Name: LaBelle Elementary School
Custodial Equipment.
Audio Visual Equipment.
Security Cameras
Correct Moisture and Mold Problems
IN ASSOCIATION WITH THE FACILITY GROUP Page 82 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 512
Projects:
Facility Name: Lassiter High School
Replace existing Emergency Generator
Main Switchgear & Panel Upgrades
Replace carpet throughout and add carpet to the Choral Room. Replace rubber base in all spaces including the corridors.
Replace gym bleachers
Replace cooling towers
Resurface track.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Improve Drainage and Add Sidewalk
Repair and Replace Theater Seating
IN ASSOCIATION WITH THE FACILITY GROUP Page 83 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 252
Projects:
Facility Name: Lewis Elementary School
Add 1 IU, P.E. Gymnasium with restrooms.
HVAC Main Gym
Modify existing P.E. Gymnasium to accommodate Guidance and Administration. New PE to be built.
Bus lane re-paving
Parking lot re-paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Canopy at Front of School
Classroom Function Door Locks for Addition
Enclose Breezeway Connecting New Addition and Old Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 84 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 425
Projects:
Facility Name: Lindley Middle School
Cooling System for Hardwood Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Add 10 Desktop Computers
Accoustical Panels in the Cafeteria
Install Exhaust Fans in Adult Toilets
Athletic Field Fencing
IN ASSOCIATION WITH THE FACILITY GROUP Page 85 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 420
Projects:
Facility Name: Lost Mountain Middle School
Addition of 8 IU's.; 3 Science, 3 Special Ed., Band, Intro to Tech.
Add 3 rooms for teachers' team planning.
HVAC Main Gym
Modify Band to be Orchestra and modify Orchestra to be Drama.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Add Separate Vehicle Entrance to Parking Lot
Replace Sod on Field
Improve Lighting on the Theater Stage
IN ASSOCIATION WITH THE FACILITY GROUP Page 86 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 216
Projects:
Facility Name: Mableton Elementary School
Main Switchgear & Panel Upgrades
Gymnasium HVAC Upgrades Add A/C.
Parking lot re-paving
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Add Canopy for Bus Loading Area
IN ASSOCIATION WITH THE FACILITY GROUP Page 87 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 416
Projects:
Facility Name: Mabry Middle School
Addition for Administration Pupil Personnel Services
Add a new central cafeteria & kitchen
Add 18 IU's, Band, 12 Science, 4 Special Ed., 1 Technology
Main Switchgear & Panel Upgrades
HVAC Main Gym
Modify existing kitchen for classroom space, Technology.
Renovate existing commons areas for teacher workrooms
Roofing for entire building
Replace Skylight, Main hall
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Canopy from the Bus Lanes to the Front of the Building
Replace Shelving in Custodial Areas
IN ASSOCIATION WITH THE FACILITY GROUP Page 88 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 416
Projects:
Facility Name: Mabry Middle School
Custodial Equipment.
Audio Visual Equipment.
Provide Metal Bar for Additional Security at Exterior Doors
Refurbish Gym Floor
IN ASSOCIATION WITH THE FACILITY GROUP Page 89 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 418
Projects:
Facility Name: McCleskey Middle School
HVAC Main Gym
Bus Lane Re-Paving
Parking Lot Re-Paving
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Improve Lighting and Sound in Theater
IN ASSOCIATION WITH THE FACILITY GROUP Page 90 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 501
Projects:
Facility Name: McEachern High School
Main Switchgear & Panel Upgrades
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Replace Dining/Kitchen
Venetian Blinds
IN ASSOCIATION WITH THE FACILITY GROUP Page 91 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 222
Projects:
Facility Name: Milford Elementary School
Addition for Administration and Pupil Personnel Services
Addition of 1 I.U. to replace one lost to tie-in of the new administration area
Main Switchgear & Panel Upgrades
HVAC Main Gym
Upgrade toilets, urinals, sinks, water coolers, and valves
Modify the existing admin. area and one classroom area lost to tie-in of new administration area.
Provide fire suppression sprinkler system to the existing building to accommodate the administration addition.
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
IN ASSOCIATION WITH THE FACILITY GROUP Page 92 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 222
Projects:
Facility Name: Milford Elementary School
Custodial Equipment.
Audio Visual Equipment.
Upgrade Front Entrance
Replace Cafeteria Windows
IN ASSOCIATION WITH THE FACILITY GROUP Page 93 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 249
Projects:
Facility Name: Mount Bethel Elementary School
Replace existing Emergency Generator
HVAC Main Gym
Roofing for sections of building
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Provide Perimeter Fencing and Lockable Gates
Improve Lighting in Front Parking Lot
Modify Front Office for Safety and Security
Canopy at Bus Parking Area
Canopy at Front Walkway
IN ASSOCIATION WITH THE FACILITY GROUP Page 94 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 253
Projects:
Facility Name: Mountain View Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Resurface/Restripe Parking Lot
Paint Interior and Exterior of Building
Build a Fence between Playground and Parking Lot
Provide Wireless Access Points in the Kindergarten Building
Landscape Play Areas
Large Interior Window at Front Office Safety
IN ASSOCIATION WITH THE FACILITY GROUP Page 95 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 245
Projects:
Facility Name: Murdock Elementary School
Addition for Administration and Pupil Personnel Services
Addition of 17 IU's: 9 - K, 2 - P, 2 - Art, 2 - Music, 2 - Computer.
Main Switchgear & Panel Upgrades
HVAC Main Gym
Roofing for sections of building
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Canopy over Sidewalk
IN ASSOCIATION WITH THE FACILITY GROUP Page 96 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 262
Projects:
Facility Name: Nicholson Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Connect Back Exits with Sidewalks
Improve Drainage at Front of Building
Connect downspouts and Pipe to Existing Drainage System
Hand Dryers in Student Restrooms
Whiteboards
Replace Venetian Blinds
IN ASSOCIATION WITH THE FACILITY GROUP Page 97 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 275
Projects:
Facility Name: Nickajack Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Improve Landscaping-additional trees etc.
IN ASSOCIATION WITH THE FACILITY GROUP Page 98 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 505
Projects:
Facility Name: North Cobb High School
Addition for Administration and Guidance to conform to the Ed. Specs. and to accommodate the new FTE.
Add 13 IU's; Band, Choral, Orchestra, Home Ec.,Art, and 8 Typical Classrooms. Demolish existing 10 IU modular building and replace with 10 additional IU's. Total construction = 23 IU's.
Demolish old annex building to make room for a two story addition. 10,800 SF. Loss of 10 I.U.'s.
Main Switchgear & Panel Upgrades
Replace or Repair the existing Sports Lighting at the Football field.
Replace gym floor
Modify the following areas replaced by the new addition: Existing Band and Choral to be Drama and a Black Box Theatre; existing Art to be a classroom, and existing Home Ec. to be Culinary Arts.
Modify the existing administration areas to work with the new administration addition.
Renovate Horticulture classroom to be used as typical classroom.
Roofing for sections of building
IN ASSOCIATION WITH THE FACILITY GROUP Page 99 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 505
Projects:
Facility Name: North Cobb High School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Replace Baseball Field Lighting
Improve Lighting outside the Old Gym and Science Building
Repair Lower PE Field
IN ASSOCIATION WITH THE FACILITY GROUP Page 100 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.:
Projects:
Facility Name: Northwest Elementary School
New 61 IU Elementary School
IN ASSOCIATION WITH THE FACILITY GROUP Page 101 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 428
Projects:
Facility Name: Northwest Middle School
New 71 IU Middle School. Possible 2- Story Building.
IN ASSOCIATION WITH THE FACILITY GROUP Page 102 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 234
Projects:
Facility Name: Norton Park Elementary School
Add 3000 square feet for Administration and Pupil Personnel Services. Renovate 1800 square feet of the existing Administration areas.
Addition of 10 IU's. 6 Kindergarten, 4 Primary.
Main Switchgear & Panel Upgrades
install air conditioning in gym
Upgrade toilets, urinals, sinks, water coolers, and valves
Replace water piping, plumbing fixtures, and outside hose bibs
Modify the existing administration area to work with the new administration area.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Increase Security Lighting
Replace Carpet
IN ASSOCIATION WITH THE FACILITY GROUP Page 103 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 234
Projects:
Facility Name: Norton Park Elementary School
Custodial Equipment.
Audio Visual Equipment.
Replace Risers
IN ASSOCIATION WITH THE FACILITY GROUP Page 104 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 730
Projects:
Facility Name: Oakwood High School
Main Switchgear & Panel Upgrades
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Replace Gym Floor
Improve Lighting in the 100 and 300 Buildings
Modify Administrative Area Safety
IN ASSOCIATION WITH THE FACILITY GROUP Page 105 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 507
Projects:
Facility Name: Osborne High School
Add 18 IU's. Typical Classrooms
Provide new Media Center to meet current space requirements to conform to the Ed. Specs..
Main Switchgear & Panel Upgrades
Replace or Repair the existing Sports Lighting at the Baseball field.
Sports Lighting Football
Replace HVAC system for Gym, Cafeteria, and Theater
Upgrade toilets, urinals, sinks, water coolers, and valves
Modifiy old Media Center to be Administration and Guidance suites to meet current space requirements and to conform to the Ed .Specs. and to accommodate the new FTE.
Add 2 Additional Tennis Courts
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Replace Venetian Blinds
IN ASSOCIATION WITH THE FACILITY GROUP Page 106 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 507
Projects:
Facility Name: Osborne High School
Custodial Equipment.
Audio Visual Equipment.
Upgrade Greenhouse
Refinish and Re-Line Gym Floor
Replace Stage Curtains
Install Sink In Nurse's Office
IN ASSOCIATION WITH THE FACILITY GROUP Page 107 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 427
Projects:
Facility Name: Palmer Middle School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Build Stairway to Field
HVAC Kitchen
Improve Acoustics in Cafeteria
IN ASSOCIATION WITH THE FACILITY GROUP Page 108 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 506
Projects:
Facility Name: Pebblebrook High School
Addition for Administration and Guidance to accommodate the new FTE.
Addition to the cafeteria and kitchen to conform to the Ed. Specs and to accommodate the new FTE.
22 IU addition, 2- story. Typical classrooms. Connect to existing new Fine Arts Facility.
Addition to the Media Center to accommodate the new FTE.
Replace or Repair the existing Sports Lighting at the Baseball field.
Sports Lighting - Football
Upgrade toilets, urinals, sinks, water coolers, and valves
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Resurface Student Parking Lot.
IN ASSOCIATION WITH THE FACILITY GROUP Page 109 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 506
Projects:
Facility Name: Pebblebrook High School
Custodial Equipment.
Audio Visual Equipment.
Renovate Weight Training Classrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 110 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 415
Projects:
Facility Name: Pine Mountain Middle School
Provide Band, Choral and Orchestra Addition .
Main Switchgear & Panel Upgrades
Provide A/C for gym
Modify the existing Band Room to accommodate Drama with dressing rooms and modify existing Choral room to be 1 classroom.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Landscaping Upgrades
IN ASSOCIATION WITH THE FACILITY GROUP Page 111 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 281
Projects:
Facility Name: Pitner Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 112 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 515
Projects:
Facility Name: Pope High School
Replace Bleachers in Main Gym
Replace cooling towers
Resurface Stadium Track
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Window for Pupil Personnel Office
Theater Renovation
IN ASSOCIATION WITH THE FACILITY GROUP Page 113 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 257
Projects:
Facility Name: Powder Springs Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Canopy at Bus Area
Replace Interior Door Locks with Classroom Function Door Locks
Additional Lighting in Bus Area
Fence Around Play Area in Back
Replace Media Center Case Work
IN ASSOCIATION WITH THE FACILITY GROUP Page 114 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 217
Projects:
Facility Name: Powers Ferry Elementary School
Main Switchgear & Panel Upgrades
Replace HVAC system
HVAC Main Gym
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Roofing for sections of building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Canopy for Bus Area
Book Cases for Classrooms
Sign For Front Of School
Add Name Of School To Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 115 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 217
Projects:
Facility Name: Powers Ferry Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 116 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 277
Projects:
Facility Name: Riverside Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Exterior Surveillance Cameras
IN ASSOCIATION WITH THE FACILITY GROUP Page 117 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 282
Projects:
Facility Name: Riverside Primary Elementary School
36 IU Primary School. K-2
IN ASSOCIATION WITH THE FACILITY GROUP Page 118 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 248
Projects:
Facility Name: Rocky Mount Elementary School
Main Switchgear & Panel Upgrades
Air Conditioning for the gym
Bus Lane Re-Paving
Parking Lot Re-Paving
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Install Vision Windows To Interior Doors
Place Room Numbers on Doors
Additional Parking Spaces
Venetian Blinds
Place Hand Dryers In Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 119 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 248
Projects:
Facility Name: Rocky Mount Elementary School
Custodial Equipment.
Audio Visual Equipment.
Backstop for Field
Whiteboards and Tackboards
Add Sink To Teacher Lounge
Landscape Grounds
IN ASSOCIATION WITH THE FACILITY GROUP Page 120 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 231
Projects:
Facility Name: Russell Elementary School
Addition for Administration and Pupil Personnel Services
Addition of 22 IU's: 6 - K, 13 - P, 1 - Art, 1 - Music, 1 - Computer.
Main Switchgear & Panel Upgrades
HVAC Main Gym
Upgrade toilets, urinals, sinks, water coolers, and valves
Modify the existing administration areas to work with the new administration addition.
Bus Lane Re-Paving
Parking Lot Re-Paving
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Venetian Blinds
Casework in Media Center
IN ASSOCIATION WITH THE FACILITY GROUP Page 121 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 231
Projects:
Facility Name: Russell Elementary School
Custodial Equipment.
Audio Visual Equipment.
Canopy at the Bus Area
Perimiter Fencing and Gate
School Sign
Replace Restroom Stalls
IN ASSOCIATION WITH THE FACILITY GROUP Page 122 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 273
Projects:
Facility Name: Sanders Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Acoustical Treatment for Gym
Restripe Parking Area
IN ASSOCIATION WITH THE FACILITY GROUP Page 123 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 225
Projects:
Facility Name: Sedalia Park Elementary School
Addition of 8 IU's. 1 - K, 7 - P. Add 4 Primary Classrooms lost to modification for Administration. Total IU's constructed will be 12.
Air condition the gym and upgrade to multipurpose room
Modify existing administration area and 4 classrooms to accommodate Administration and Pupil Personnel Services. 4500 square feet. Loss of 4 I.U.'s.
Modify the existing administration areas to work with the new administration addition.
Roofing for sections of building
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Improve Security Lighting between Gym and New Addition
Additional Staff Parking
IN ASSOCIATION WITH THE FACILITY GROUP Page 124 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 225
Projects:
Facility Name: Sedalia Park Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 125 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 260
Projects:
Facility Name: Shallowford Falls Elementary School
Addition for Administration and Pupil Personnel Services
Addition of 21 IU's. : 5 - K, 6 - P, 6 - I, 1 - SE, 1 - Art, 1- Music, 1 - Computer.
HVAC Main Gym
Reroof Entire Building
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Venetian Blinds
Whiteboards
Additional Security Window at Front Entrance
Upgrade and Repaint Playscapes
Canopy at Bus Area
IN ASSOCIATION WITH THE FACILITY GROUP Page 126 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 260
Projects:
Facility Name: Shallowford Falls Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 127 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 419
Projects:
Facility Name: Simpson Middle School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Pave Emergency Access Lane
Replace Media Casework
IN ASSOCIATION WITH THE FACILITY GROUP Page 128 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 228
Projects:
Facility Name: Skyview Elementary School
Main Switchgear & Panel Upgrades
Replace HVAC system
HVAC Main Gym
Upgrade toilets, urinals, sinks, water coolers, and valves
Replace exterior sanitary sewer piping, cleanouts and associated manholes
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Additional Adult Bathrooms
Canopy Front Door to Bus Area
Resurface the Lower PE Area and the Four Square Areas.
IN ASSOCIATION WITH THE FACILITY GROUP Page 129 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 228
Projects:
Facility Name: Skyview Elementary School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 130 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 422
Projects:
Facility Name: Smitha Middle School
Addition of 8 IU's; 3 Typical CR's, 3 Spec. Ed., Orchestra, Intro to Technology.
Add 3 Team Planning Rooms
Replace carpet throughout
HVAC Main Gym
Modify Orchestra to be Drama Classroom.
Modify Special Ed. CR's (3), to be Science Classrooms. Remove operable walls from Special Education classrooms add science casework.
Roofing for entire building
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Improve Exterior Security Lighting
Renovate Student Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 131 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 422
Projects:
Facility Name: Smitha Middle School
Custodial Equipment.
Audio Visual Equipment.
Canopy at Front of Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 132 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 247
Projects:
Facility Name: Sope Creek Elementary School
Main Switchgear & Panel Upgrades
Make repair and modification and renovation items to the annex building.
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Replace library shelving as needed
Whiteboards
Extend Canopy in Front of School
Canopy at Bus Lanes
IN ASSOCIATION WITH THE FACILITY GROUP Page 133 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 503
Projects:
Facility Name: South Cobb High School
Main Switchgear & Panel Upgrades
Replace or Repair the existing Sports Lighting at the Baseball field.
Sports Lighting - Football
Replace all HVAC units in Theater, Media Center, offices, and add heat to cafeteria AHUs
Upgrade toilets, urinals, sinks, water coolers, and valves
Resurface track
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Improve Lighting and Sound Systems in Theater
Repair Elevators
IN ASSOCIATION WITH THE FACILITY GROUP Page 134 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 510
Projects:
Facility Name: Sprayberry High School
Main Switchgear & Panel Upgrades
Replace or Repair the existing Sports Lighting at the Football field.
Replace gym bleachers
Resurface tennis courts
Resurface Track
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Renovate Existing Science Labs
Upgrade Fire Alarm System
Improve Outdoor Lighting
Replace Stalls and Doors in Student Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 135 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 246
Projects:
Facility Name: Still Elementary School
Addition for Administration and Pupil Personnel Services
Expand the cafeteria to accommodate the additional FTE
Addition of 21 IU's: 9 - K, 8 - P, 1 - Art, 1 - Music, 2 - Computer.
Replace existing Emergency Generator
Main Switchgear & Panel Upgrades
Replace kitchen exhaust and make-up air units
Provide air conditioning in Gym.
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Whiteboards
Reconfigure Traffic Pattern
Upper Parking Lot Re-Paving
IN ASSOCIATION WITH THE FACILITY GROUP Page 136 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 246
Projects:
Facility Name: Still Elementary School
Custodial Equipment.
Audio Visual Equipment.
Fencing Around Playground
Replace Restroom Partitions and Doors
IN ASSOCIATION WITH THE FACILITY GROUP Page 137 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 413
Projects:
Facility Name: Tapp Middle School
Main Switchgear & Panel Upgrades
Painting
Replace kitchen exhaust and make-up air units
install air conditioning in gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Replace Lockers and Repaint the Locker Rooms
Remove Media Center Interior Walls
Improve Drainage Campus Wide
Parking Lot Re-Paving
Hand Dryers in Student Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 138 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 413
Projects:
Facility Name: Tapp Middle School
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 139 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 238
Projects:
Facility Name: Teasley Elementary School
HVAC Main Gym
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Repair or Replace Fire Alarm Panel
Replace Canopy at Front of School
Upgrade Entrance and Front Elevation of Building
Replace Drinking Fountains
Pave Sidewalk on Side of School
Renovate Student Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 140 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 258
Projects:
Facility Name: Timber Ridge Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Extend Canopy to End of Bus Lanes
Gates at Both Entrances
Convert Open Area on Lower Level into Additional Storage
IN ASSOCIATION WITH THE FACILITY GROUP Page 141 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 805
Projects:
Facility Name: Transportation Dept. South Cobb Drive Support Facility
Replace HVAC System
Roofing for office
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
IN ASSOCIATION WITH THE FACILITY GROUP Page 142 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 250
Projects:
Facility Name: Tritt Elementary School
Replace HVAC
HVAC Main Gym
Re-conditioning/metal roof replacement for covered play area
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Enclose Walkways
Improve Acoustics in Cafeteria
IN ASSOCIATION WITH THE FACILITY GROUP Page 143 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 263
Projects:
Facility Name: Varner Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Landscape Grounds
Create Entrance/Exit for Buses.
IN ASSOCIATION WITH THE FACILITY GROUP Page 144 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 268
Projects:
Facility Name: Vaughan Elementary School
HVAC Main Gym
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Access Controls
Custodial Equipment.
Audio Visual Equipment.
Gate at Entrance
ReCarpet Worn Areas
Paint Interior of School
Hand Dryers to Student Restrooms
IN ASSOCIATION WITH THE FACILITY GROUP Page 145 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 511
Projects:
Facility Name: Walton High School
Add 6 I.U.'s that were lost to the modification of the old building ; 6 Typical Classrooms
20 IU addition. Typical classrooms.
Replace existing Emergency Generator
Main Switchgear & Panel Upgrades
Redesign HVAC for main building
Modify the existing previously open plan classroom areas to be standard classrooms and corridors so that each classroom has a door to the corridor. 36 IU's existing modified to be 30 IU's, loss of 6 IU's. Renovate the Office Areas.
Modification and Renovation of the Kitchen and Cafeteria, and Food Service Equipment Replacement.
Bus Lane Re-Paving
Parking Lot Re-paving Add Striping for Car Parking in the Bus Area.
Roofing for Sections of Building
Roofing for the Weight Lifting Building
IN ASSOCIATION WITH THE FACILITY GROUP Page 146 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 511
Projects:
Facility Name: Walton High School
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Custodial Equipment.
Audio Visual Equipment.
Surveillance Cameras
Renovate Restrooms
Replace Water Fountains
Renovate Locker Rooms
Replace Exterior Doors
Construct Sidewalk from A-parking Lot to Bus Lanes
Replace Hall Lockers Excluding the E-wing.
Install Speed Bumps
Replace Theater Doors
IN ASSOCIATION WITH THE FACILITY GROUP Page 147 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 0
Projects:
Facility Name: West Cobb Middle School
New 71 IU Middle School.
IN ASSOCIATION WITH THE FACILITY GROUP Page 148 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 0
Projects:
Facility Name: West Cobb #1 High School
New 98 IU High School
IN ASSOCIATION WITH THE FACILITY GROUP Page 149 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 0
Projects:
Facility Name: West Cobb #2 High School
98 IU High School
IN ASSOCIATION WITH THE FACILITY GROUP Page 150 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 509
Projects:
Facility Name: Wheeler High School
Add 6 IU's; 6 - Science Labs: 4 Chemistry, 1 - Biology, 1 - Physics.Add 2 IU's ; 2-Science ( Physics ) lost to modification.8 Classrooms constructed, net increase of 6 IU's.
Main Switchgear & Panel Upgrades
Replace or Repair the existing Sports Lighting at the Baseball field.
Sports Lighting - Football
Replace HVAC for Theater, Annex basement, field house, Media center, 300 building, and Cafeteria
Modify 6 existing undersized science labs to be typical classrooms, ESOL and Special ED. Loss of 2 I.U.'s
Refresh Obsolete Workstations
Refresh District Printers
Refresh District Servers
Refresh Existing District Network
Computing Device for Every Teacher
Refresh and Enhance Mobile Computing Access District Wide
Copier/Duplicator Refresh
Surveillance Cameras
Auditorium Renovations
Replace Lights in Old Gym
IN ASSOCIATION WITH THE FACILITY GROUP Page 151 of 152
FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)
Facility No.: 509
Projects:
Facility Name: Wheeler High School
Custodial Equipment.
Audio Visual Equipment.
Install Sidewalk Around Visitors Side of Football Field
IN ASSOCIATION WITH THE FACILITY GROUP Page 152 of 152