Upload
muriel-gibson
View
213
Download
0
Embed Size (px)
Citation preview
FACILITY NEW BUILD/UPGRADE
LONG LEAD ITEMS
Craig Lavender - HMNII
TAG (T/AST/077)
Covers:
• CONSTRUCTION, MANUFACTURE, REPAIR, REPLACEMENT, MODIFICATIONS
• NEW BUILD
LC 17 REQUIRES ADEQUATE QA SYSTEMS WHICH INCLUDES
PROCUREMENT +
AUDIT OF ARRANGEMENTS
CUSTOMER - SUPPLIER
• WHERE LICENSEE IS IN PLACE
• WHERE THERE IS NO LICENSEE YET.
WHAT NII EXPECTS• ALL ORGANISATIONS IN SUPPLY CHAIN HAVE
ADEQUATE QA ARRANGEMENTS.
• SUPPLIER SELECTION
• TECHNICAL SPECIFICATIONS
• QUALITY PLANS
• CONTRACT VARIATION CONTROL
• COMPETENCE IN THE SUPPLY CHAIN
• DEVIATIONS (NON CONFORMANCE)
• RECORDS
• INSPECTION & SURVEILLANCE ACTIVITIES
DIFFICULT REQUIREMENTS FOR LONG LEAD ITEMS
• TECHNICAL SPECIFICATIONS
• COMPETENCE IN THE SUPPLY CHAIN
NII INVOLVEMENT
• ASSESSMENT OF TECHNICAL SPECIFICATION (DESIGN)
• ASSESSMENT OF CONTRACT ARRANGEMENTS• INSPECTION OF
CONSTRUCTION/MANUFACTURE• WITNESS TESTING• ENTRY ONTO Q PLANS