Facility Master Plan (FMP) for Jeffco Schools Board of Education Meeting April 21, 2016 Our Goal is to provide the Best Learning Environment for our Students, the Best Teaching Environment for our Staff 1

Facility Master Plan (FMP) for Jeffco Schools · 2019-05-30 · Facility Master Plan (FMP) for Jeffco Schools Board of Education Meeting . April 21, 2016 . Our Goal is to provide

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Facility Master Plan (FMP) for Jeffco Schools Board of Education Meeting April 21, 2016 Ou

    r Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    1

  • This Evening’s Desired Outcomes • We will gain an understanding of Jeffco’s facilities master plan

    (FMP) • Why we need a comprehensive plan to address our needs • How the plan was developed • When (and under what conditions) the plan will be implemented

    • Secure your support for gathering community input on the plan and

    direction on additional information.

    • Documents available as support information to this presentation: • 2015-16 Facility Condition Assessment Summary of Findings • 2016 District-Wide Facilities Master Plan

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    2

  • Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    “Children are the world's most valuable resource and its best hope for the future.”

    John F. Kennedy

    3

  • In order for

    students to pursue

    their life goals,

    by 2020

    all Jeffco graduates

    will be able to

    successfully

    apply

    the following

    competencies:

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    4

  • Jeffco School’s Current Reality

    • More pathways (STEM, Career, Technical Education, Problem Based Learning, etc.)

    • Pre-school and elementary enrichment programs • Academic, Social, and Emotional Interventions and

    Supports

    Student Learning & Enrichment

    • Enhanced safety and security measures and staffing • Behavioral supports • Federal and State regulations

    Student Safety

    • Changes in student population density and transportation • Technology infrastructure to support learning & operations • Ensuring accommodations for physically disabled

    community members

    School Infrastructure &

    Design 5

    Our School District is over 60 years old and our Educational Programming Needs have Changed Significantly…

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

  • How did we get here? • Jeffco is a “neighborhood” school district.

    District # Students Schools Avg. student per school

    State Per Pupil Funding 15/16

    Denver 90,234 199 453 $7,612

    Jeffco 86,708 154 563 $7,126

    Douglas 66,896 89 751 $7,050

    C. Creek 54,695 61 896 $7,265

    Boulder 31,247 56 557 $7,234

    Littleton 15,780 26 606 $7,040

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    6

  • How did we get here? Comparisons per pupil PPR, MLO and Bond

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    District # Students State Per Pupil Funding 15/16

    Mill Levy Override per pupil 15/16

    Outstanding bonds per pupil 14/15

    Denver 90,234 $7,612 $1,608 $16,429

    Jeffco 86,708 (2nd)

    $7,126 (4th)

    $1,307 (5th)

    $5,160 (6th)

    Douglas 66,896 $7,050 $504 $5,839

    C. Creek 54,695 $7,265 $1,547 $9,060

    Boulder 31,247 $7,234 $2,125 $18,374

    Littleton 15,780 $7,040 $1,825 $8,336 7

  • How did we get here?

    Elementary School

    Middle School

    High School

    School Utilization Average

    89%

    71%

    79%

    Portables in use

    239 7 20

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    8

  • Jeffco Schools Facilities Age

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    Building Age by Age Bracket Average Year Built 1978 1976Campus Average Age

    Pre 1928 1928 - 1947 1948 - 1967 1968 - 1987 1988 - 1997 1998 - 2007 2008 - 2014Square Feet 13,388 195,144 4,311,473 3,974,855 1,664,601 1,874,499 25,300

    -

    500,000

    1,000,000

    1,500,000

    2,000,000

    2,500,000

    3,000,000

    3,500,000

    4,000,000

    4,500,000

    5,000,000

    Tota

    l Sq

    uar

    e F

    ee

    t

    9 29 to 68 years of age

    69% of Jeffco’s square footage is…

  • Current Real Estate Portfolio

    10

    • 12 Million Square Feet of Facilities

    • 3,100 Acres of Land • 169 Campuses with 384 Permanent Buildings, 333 Modular

    Buildings, 12 Cottage Buildings • Average Age 40 years; Median Age 44 years

    • 39% of District Buildings Constructed Prior to 1967, 71% before 1988.

    • Replacement Value of Improvements $2.7 Billion

    • Total Value of Deficiencies $520 Million • Building Condition Related $ 396.6 Million

    • Educational Adequacy Related $ 123.4 Million

    • Average Facility Condition Index 20.4

    • Building Utilization 81%

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    FACILITY CONDITION INDEX

  • How did we get here? Year Mill Levy Bond Levy

    1998 Defeated $265 Million

    1999 $35.8 Million N/A

    2004 $38.5 Million $323.8 Million

    2008 Defeated Defeated

    2012 $39 Million $99 Million Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    11

  • How did we get here?

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    12

  • It is time for us to consider

    “making our own future.” Our Goal

    is to

    pro

    vide

    the

    Be

    st L

    earn

    ing

    Envi

    ronm

    ent f

    or o

    ur S

    tude

    nts,

    the

    Best

    Teac

    hing

    Env

    ironm

    ent f

    or o

    ur S

    taff

    13

  • FMP History • Facility Master Plan last done/presented January of 2011.

    • A comprehensive, long term FMP is essential to the Jeffco

    tradition of excellence. • Multiple presentations to the Board of Education on

    December 17, January 14 and January 28 regarding urgent needs and long-term issues.

    • On January 28 the Board of Education directed COO and Facilities Staff to draft a new Facility Master Plan.

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    14

  • FMP Process/Timeline

    • BOE Establishes Guidelines Develop Set of Parameters to Establish Planning Criteria Consistent Application of Rules

    • Staff Defines & Recommends Goals Optimal Use of our Existing Facilities Balance Articulation Areas Right Sizing Square Footage Portfolio Equitable Distribution Center Programs Financing Approach and Schedule

    • Internal / External Review Cabinet, Capital Asset Advisory Committee, Financial Oversight

    Committee Board of Education, Public Presentations

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    15

  • Facilities Management Model

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    16

  • FMP Key Points • The plan will be phased in over time beginning in 2017-18

    • The plan does not expect to create a reduction in force • Administrative attrition • Teaching vacancies annually • Learning support professionals shortages

    • Community Forums for parent voice

    • We need to hear from our communities and thus have created 12 opportunities in the next 8 weeks to gather this insight

    • To ensure consistent information and gathering of insight, please do not conduct or host local meetings at this time, instead, strongly encourage your parents to attend the community meetings.

    • Remember the plan is interdependent & it is vital not to focus on one aspect in isolation.

    • The plan, if fully implemented, can significantly enhance the efficient use of general fund dollars to significantly improve student learning and teaching conditions.

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    17

  • Jeffco Schools Facilities Focus Our Goal is to provide the

    Best Learning Environment for our Students, and the Best Teaching Environment for our Staff

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    18

  • Jeffco’s Four FMP Drivers Provide Exceptional 21st Century

    Learning Environments for Students

    Maximize existing facilities

    Leverage current financial resources

    Recognize the individuality as well as interdependence of all Jeffco Schools

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    19

  • District Wide Facility Master Plan Addresses the Following:

    1) Enrollment Trends on Articulation Areas, School Boundaries, & Individual Schools

    2) Efficient Utilization of Buildings

    3) Facilities Equity Between Schools and Compliance with District Educational Specifications

    4) Deferred Maintenance Needs

    5) Need for New Buildings, Additions, Renovations, Consolidations, Closures, Ancillary Facilities

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    20

  • Key Terms Term Definition

    Boundary Changes

    Refers to changing the identified school to serve the student population in a neighborhood.

    Closure Closing a school and moving students into a newly identified school to serve the neighborhood students attending the closed school.

    Consolidation Relocate students into an adjacent/nearby existing school or consolidate two existing schools into a new single school; will require boundary changes.

    Grade Reconfiguration

    Changing the grades served in a given school. For example, moving from a 7-8 middle school to a 6-8 middle school.

    Program Offering

    Generic term referring to the grades, courses, pathways, etc. offered in a facility.

    Scheduling Changes

    Adjustments to the school day and school year to increase the volume of students served in a facility. For example, split sessions: half of the student body attends an A.M. session and the other half attends a P.M. session.

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    21

  • 1) FMP Recognizes Enrollment Trends (Growth & Decline) • Reasons for Growth/Decline

    • Long or Short Term • Demographic, Socio-Economic • Program Offerings

    • Means to Address Population Density Changes • New Buildings • Additions/Renovations/Modulars • Consolidations/Closures • Grade Reconfiguration • Boundary Adjustments • School Scheduling Changes

    • Growth due to Programs/Athletics/Activities • Career and Tech Ed Programs/Pre-School/Special Needs • School/Community Athletic Resources

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    22

  • 2) FMP Maximizes Efficiencies • Educational

    • Administrative Staff Operational Cost Reductions • Program Change Opportunities • Grade Reconfiguration to Increase Enrollment at Underutilized Facilities • Decrease Enrollment at Over-Enrolled Facilities

    • Facilities • Maintenance, Operations, Utility Cost Reductions • Reduction in Priority Deferred Maintenance • Energy and Water Savings

    • Transportation • School Locations Effect upon Transportation Services • Boundary Changes and Community Impact

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    23

  • 3) FMP Reviewed Program Equity & Past Promises • Program Equity issues:

    • Auxiliary Gymnasiums in High Schools • Artificial Turf Fields High Schools

    • Review Projects Proposed in 2008 • 3 High Schools • 1 Middle School • 1 Elementary School • 2 Option Schools

    • Develop Facility Master Plans • 3 High Schools • Career & Tech Ed Facility

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    24

  • 4) FMP Addresses Deferred Maintenance Needs

    • Assessment and Evaluation of Priority Needs • High FCI Buildings • End of Life-Cycle; Repair, Replace

    • Address Higher Priority Deficiencies

    • Educational Adequacy • Exterior Envelope • Site, Parking, Underground Utilities • Interior Finishes-Carpet & Paint, Lighting, Cabinetry • HVAC, Plumbing and Electrical Upgrades. • Building Technology

    • Safety and Security Upgrades

    • Secure Vestibules • Door Hardware • Security System/Video Monitoring

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    25

  • 5) FMP Identifies New Square Footage Needs • Recommendations for Additions, Major Renovations &

    Reconstruction/Replacement • Cost Benefit Analysis • Determine Location, Size, Develop Timeline, Budget

    Projections

    • Ancillary & Support Facilities • Stadiums & Fields Renovation/New • Transportation Terminals and Maintenance Shop

    Locations

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    26

  • FACILITIES MASTER PLAN DETAILS

    The following provides an overview of the recommendations contained within the FMP

    Our Goal is to provide the Best Learning Environment for our Students, and the Best Teaching Environment for our Staff

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    27

  • Jeffco’s Four FMP Drivers Provide Exceptional 21st Century

    Learning Environments for Students

    Maximize existing facilities

    Leverage current financial resources

    Recognize the individuality as well as interdependence of all Jeffco Schools

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    28

  • District Wide Facility Master Plan Addresses the Following:

    1) Enrollment Trends on Articulation Areas, School Boundaries, & Individual Schools

    2) Efficient Utilization of Buildings

    3) Facilities Equity Between Schools and Compliance with District Educational Specifications

    4) Deferred Maintenance Needs

    5) Need for New Buildings, Additions, Renovations, Consolidations, Closures, Ancillary Facilities

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    29

  • FMP Timeline

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    30

    No Capital Program

    Task 2017-18 School Year

    Year One

    Year Two

    Year Three

    Year Four

    Year Five

    Year Six

    Boundary ChangesMatriculation ChangesGrade Reconfiguration (K-5, 6-8)

    AdditionsConsolidations & ClosuresReplacementsProgram EquityPast Promises

    Deferred Maintenance

    District Wide Facility Master Plan Phase I Implementation Timeline

    Phase I Capital Improvement Program

    Sheet1

    ArticSchoolProjectCapital InvestmentAdmin SavingsM&O Savings (Deduct)MAPPS DeficienciesPreliminary Schedule for CompletionPast Promise

    Priority 1Priority 2Priority 3No CIPCIP Year 1CIP Year 2CIP Year 3CIP Year 4

    ALKendrick Lakes ElementaryConsolidateR$ 28,000,000$ 175,000$ (5,960,900)$28,000,000Y

    ALStein Elementary (Closed until 2017)$ (2,000,000)Y

    ALDemo 12 Temps at Stein12 TempsDT$ 300,000$ (60,000)$300,000Y

    ALPatterson ElementaryClose, Move to K-LakesC$ (450,000)$ (244,475)$ (5,010,000)Y

    ALPatterson PreKClose Cottages/New PreK$ 4,500,000$ 50,000$ (1,220,000)$4,500,000

    ALDeane ElementaryBoundary ChangeBY

    ALAlameda HighPhase IIPP$ 30,000,000$20,000,000YX

    ALLasley ElementaryBoundary ChangeBY

    ALO'Connell (Stein)Boundary ChangeBY

    ARFoster Elementary4 CR Addition; K-5A$ 3,200,000$ 15,000$3,200,000Y

    ARThomson ElementaryK-5GY

    ARSecrest ElementaryK-5GY

    ARSwanson ElementaryK-5GY

    ARPeck ElementaryK-5GY

    ARArvada HighGym, Artificial TurfAT$ 4,000,000$ 75,000$4,000,000Y

    ARNorth Arvada Middle6-8G$ 150,000Y

    ARArvada K-8Boundary ChangeBY

    ARFitzmorris ElementaryK-5GY

    ARLawrence ElementaryBoundary ChangeBY

    ARHackberry Hill Elementary

    ARRemove 6 Temps at Foster6 TempsDT$ (30,000)$150,000Y

    AWVanderhoof ElementaryK-5GY

    AWCampbell ElementaryClose, move to AllendaleC$ (450,000)$ (217,000)$ (3,671,000)Y

    AWStott ElementaryK-5GY

    AWFremont ElementaryK-5GY

    AWFairmount ElementaryK-5GY

    AWAllendale ElementaryConsolidateR$ 25,000,000$ 110,000$ (1,908,000)$25,000,000Y

    AWTable Rock Mesa K8K-8N$ 35,000,000$ 750,000$ 550,000$35,000,000Y

    AWDrake Middle16 CR Addn., 6-8A$ 10,000,000$ 200,000$ 125,000$10,000,000Y

    AWArvada West High

    BCRed Rocks ElementaryBoundary Change; K-5GY

    BCGreen Gables ElementaryReplace; K-5R$ 25,000,000$ 140,000$ (4,232,000)$25,000,000YY

    BCPeiffer ElementaryK-5GY

    BCKendallvue ElementaryK-5GY

    BCWestgate ElementaryBoundary ChangeBY

    BCCarmody Middle6-8G$ 150,000Y

    BCBear Creek High

    BCBear Creek K-8

    BCClose 24 Temps24 Temps ClosedDT$ (120,000)

    CHStony Creek ElementaryBoundary ChangeBY

    CHCoronado ElementaryK-5GY

    CHUte Meadows ElementaryK-5GY

    CHDeer Creek Middle6-8GY

    CHShaffer Elementary

    CHMortensen ElementaryK-5GY

    CHBradford Primary ElementaryK-8GY

    CHChatfield High$ 1,500,000

    CHBradford Intermediate ElementaryK-8GY

    CHFalcon Bluffs Middle

    CHClose TempsClose & Remove 20 TempsDT$ (100,000)$500,000Y

    CLNormandy ElementaryBoundary ChangeBY

    CLDutch Creek ElementaryBoundary ChangeBY

    CLGovernor's Ranch ElementaryMatriculation ChangeBY

    CLLeawood ElementaryBoundary ChangeBY

    CLColumbine Hills Elementary

    CLColumbine HighGym, Artificial TurfAT$ 3,600,000YX

    CLKen Caryl Middle

    Close & Demo Temps6 TempsDT$ 150,000$ (30,000)$150,000

    CNMarshdale ElementaryReplace; K-6R$ 20,000,000$ 20,000$ (5,100,000)$20,000,000Y

    CNWest Jefferson MiddleArtificial Turf$1,200,000

    CNElk Creek Elementary

    CNConifer HighGym,AT$ 6,250,000$ 60,000$6,250,000YX

    CNWest Jefferson Elementary

    DRColorow Elementary

    DRWestridge Elementary

    DRPowderhorn Elementary8 CR AdditionA$ 4,200,000$ 60,000$4,200,000Y

    DRMount Carbon Elementary4 CR AdditionA$ 2,400,000$ 30,000$2,400,000Y

    DRBlue Heron ElementaryMatriculation ChangeBY

    DRDakota Ridge High

    DRSummit Ridge Middle

    EVParmalee Elementary

    EVWilmot ElementaryPast Promise, AdditionA$ 3,500,000$ 50,000$3,500,000YX

    EVBergen Meadow Elementary

    EVEvergreen HighMP, Sports field upgrade(?)AT$ 2,700,000$ 50,000$2,700,000Y

    EVBergen Valley Elementary

    EVEvergreen MiddleAdditionA$ 7,500,000$ 50,000$7,500,000Y

    GMGreen Mountain ElementaryK-5, 8 CR AdditionAG$ 4,500,000$ 60,000$4,500,000Y

    GMGreen Mountain HighPhase I MPPP$ 10,000,000$ 100,000$10,000,000Y

    GMHutchinson ElementaryK-5GY

    GMFoothills ElementaryK-5GY

    GMDevinny ElementaryK-5GY

    GMRooney Ranch ElementaryK-5GY

    GMDunstan MiddleAddition, 6-8AG$ 4,500,000$ 200,000$ 60,000$4,500,000Y

    GMRemove 13 Temps13 TempsDT$ (65,000)$300,000

    GOKyffin ElementaryAddition, K-5AG$ 18,750,000$ 80,000$18,750,000YY

    GOPleasant View ElementaryClose, Boundary ChangeC$ (450,000)$ (245,000)$ (3,085,000)Y

    GOShelton ElementaryBoundary Change, K-5, 3 CR Add.AG$ 1,700,000$ 25,000$1,700,000Y

    GOWelchester ElementaryBoundary Change, K-5GY

    GORalston ElementaryK-6Y

    GOBell Middle6-8, 4 CR AdditionAG$ 2,250,000$ 30,000$2,250,000Y

    GOMitchell ElementaryK-5

    GOGolden High

    JEMolholm Elementary8 CR AdditionA$ 4,000,000$ 3,000$4,000,000

    JELumberg Elementary8 CR AdditionA$ 4,000,000$ 13,000$4,000,000

    JEEdgewater Elementary

    JEJefferson HighReplacement, Art. Turfpp$ 55,000,000$ 250,000$10,000,000$55,000,000

    LWGlennon Heights ElementaryClose, Boundary ChangeC$ (450,000)$ (175,000)$ (2,700,000)Y

    LWBelmar Elementary6 CR Addition; K-5AG$ 3,100,000$ 45,000$3,100,000Y

    LWEiber Elementary6 CR Addition; K-5AG$ 3,100,000$ 45,000$3,100,000Y

    LWSlater ElementaryK-5GY

    LWSouth Lakewood ElementaryK-5GY

    LWLakewood High

    LWCreighton Middle6-8, 8 CR AdditionAG$ 4,000,000$ 200,000$ 60,000$4,000,000Y

    OPLong ViewClose, Relocate to McLainC$ (30,000)$ (650,000)Y

    OPFletcher Miller SpecialMP, Addition & RenovationA$ 22,000,000$ 340,000$22,000,000Y

    OPSobesky Academy (North Lakewood)Close, RelocatedC$ (150,000)$ (1,885,427)Y

    OPDennison

    OPBrady Exploration School

    OPManning

    OPWarren O.T.C. North Campus

    OPWarren O.T.C.

    OPMclain Community

    OPD'Evelyn

    OPJeffco Open SchoolPhase IIPP$ 10,000,000$ 150,000$8,000,000YX

    OPConnections

    OPJTS Central (Warren)

    OPJTS East (Fletcher Miller)

    PKNorma Anderson

    PKLitz / Tanglewood

    PKIrwin / Green Mountain Center

    POParr ElementaryConsolidate, K-5R$ 28,000,000$ - 0$ 160,000$ (2,466,000)$28,000,000Y

    POWarder ElementaryK-5GY

    POPomona HighGym, Artificial TurfAT$ 3,200,000$ 50,000$3,200,000Y

    POMoore Middle6-8GY

    POLittle ElementaryClose, Relocate to Parr SiteC$ (450,000)$ (204,000)$ (1,600,000)Y

    POWeber ElementaryK-5GY

    RVSierra ElementaryK-5GY

    RVCoal Creek K-8K-5?

    RVOberon Middle8 CR Addition, 6-8AG$ 25,000,000$ 150,000$ 140,000$20,000,000Y

    RVVan Arsdale ElementaryK-5GY

    RVCandelas K-88 CR AdditionA$ 4,500,000$ 60,000$4,500,000Y

    RVWest Woods ElementaryK-5GY

    RVRalston Valley High10 CR Addition, Turf FieldAT$ 5,500,000$ 75,000$5,500,000Y

    RVMeiklejohn ElementaryK-5GY

    SLWitt ElementaryY

    SLAdams ElementaryY

    SLLukas ElementaryY

    SLSheridan Green ElementaryY

    SLMandalay Middle (6-8 option)$ 150,000$ 200,000Y

    SLStandley Lake HighGym, Artificial TurfAT$ 3,600,000$ 40,000$3,600,000YX

    SLRyan ElementaryY

    SLSemper ElementaryY

    SLWayne Carle Middle (6-8 Option)$ 150,000Y

    WRStober ElementaryClose, Relocate to Vivian SiteC$ (450,000)$ (156,000)$ (3,419,000)Y

    WRProspect Valley ElementaryConsolidate, K-5R$ 23,400,000$ - 0$ 130,000$ (5,164,000)$23,400,000Y

    WRWilmore Davis ElementaryK-5GY

    WRVivian ElementaryConsolidate, K-5R$ 23,400,000$ - 0$ 200,000$ (2,032,000)$23,400,000Y

    WREveritt Middle6-8GY

    WRKullerstrand ElementaryClose, Relocate to PV SiteC$ (450,000)$ (177,655)$ (2,164,000)Y

    WRWheat Ridge HighPhase IIPP$15,000,000YX

    WRPennington ElementaryK-5GY

    WRStevens Elementary (future Sobesky)Y

    WRMaple Grove Elementary4 CR Addition; K-5AG$ 1,800,000$ 15,000$1,800,000Y

    WRWheat Ridge 5-8 (2015 Stevens)K-5GYY

    DWN. Transportation & Maint. ShopsR$ 7,000,000$ 60,000$ (2,850,000)$7,000,000

    DWTrailblazerA$ 4,000,000$ 50,000$4,000,000

    DW South Area Athletic ComplexN$ 26,100,000$ 75,000$26,100,000

    DWMt Evans OELS Master PlanA$ 16,000,000$ 150,000$ (1,500,000)$8,000,000

    DWWindy Peak OELS Master PlanA$ 12,500,000$ 150,000$ (1,000,000)$6,000,000

    DWJeffco Virtual Academy

    $ 547,700,000$ (1,050,000)$ 2,371,870$ (59,617,327)$ 359,250,000$ 42,200,000$ 136,800,000440272517

    $538,250,000

    Sheet2

    Type of ProjectPriority OnePriority TwoPriority ThreeTotal

    Replacement Facilities 8 Locations$ 144,800,000$ 28,000,000$ 172,800,000

    Additions to 20 Locations$ 134,000,000$ 4,500,000$ 28,500,000$ 167,000,000

    Program Equity (Aux Gyms) 7 Locations$ 28,850,000$ 28,850,000

    Past Promises$ 65,000,000$ 55,000,000$ 120,000,000

    Two New Facilities$ 61,100,000$ 61,100,000

    $ 372,650,000$ 32,500,000$ 144,600,000$ 549,750,000

    Timeline

    District Wide Facility Master Plan Phase I Implementation Timeline

    No Capital Program Phase I Capital Improvement Program

    Task2017-18 School YearYear OneYear TwoYear ThreeYear FourYear FiveYear Six

    Boundary Changes

    Matriculation Changes

    Grade Reconfiguration (K-5, 6-8)

    Additions

    Consolidations & Closures

    Replacements

    Program Equity

    Past Promises

    Deferred Maintenance

  • Minimal Capital Investment (a) Current Capital Program:

    • Candelas Site K-8 project (Opening fall of 2017) • Sierra Phase II project (Opening fall of 2017) • Rose Stein Renovation (Opening fall of 2017) • Deferred Maintenance Program District-wide

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    31

  • Minimal Capital Investment (b) Minimal Capital Investment - Start Fall of 2017 • Grade Reconfiguration

    • Conversion of 4 Articulation Areas to K-5 Elementary & 6-8 Middle Schools

    • 15 Elementary School Boundary Changes • 2 Elementary School Matriculation Changes

    • Modular Building Disposition • Close and/or Remove 62 Modular Buildings

    • Benefits • ($280,000) Annual Maintenance & Operations Savings from Modulars

    • Estimated Costs • $600,000 Estimated Added Administrative Expense due to 6-8 Change • $1,000,000 One-Time Expense Demolition/Closure of Modulars

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    32

  • Minimal Capital Investment (b) Recommendation Details

    Reconfigurations by Articulation

    (K-5, 6-8)

    • Arvada • Bear Creek • Chatfield • Standley Lake

    Modular Disposition (Remove/Demo 62 modular buildings)

    • Alameda • Bear Creek • Chatfield • Columbine • Dakota Ridge

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    33

  • Capital Investment Program (c) Successful Capital Bond

    • Multiple Year Implementation • Grade Reconfiguration

    • Conversion of 7 Articulation Areas to K-5 Elementary & 6-8 Middle Schools

    • Five Additions to 7-8 Middle Schools Converting them to 6-8 and Reconfiguring Fifty K-6 to K-5 Elementary Schools in Five Articulation Areas

    • Benefits • Build Capacity in Elementary Schools in High Growth Areas • Increased Utilization of Middle Schools • Additions Require Less Capital Investment than New Facilities • Reduce Deferred Maintenance Expense At Buildings with Additions • Add PreK Capacity at Elementary Schools

    • Estimated Costs / (Savings) • $45,750,000 Capital Expense for Five Additions • $750,000 Added Administrative Expense due to 6-8 Change.

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    34

  • Capital Investment Program (c) Details Reconfigurations by

    Articulation

    • Arvada West • Arvada • Golden • Green Mountain • Lakewood • Ralston Valley • Wheat Ridge

    Middle School Additions

    • Bell • Creighton • Dunstan • Drake • Oberon

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    35

  • Capital Investment Program (d) Successful Capital Bond

    • Multiple Year Implementation • Consolidations & Replacements

    • Consolidate 10 Under-Utilized High FCI Elementary Schools into Five New Buildings

    • Conversion of 1 Articulation Areas to K-5 Elementary & 6-8 Middle Schools

    • Replace Two Elementary with New Buildings • Two Elementary School Closures

    • Benefits • Creates a Modern Learning Environment, Better Educational Model,

    Better Facility Utilization • Reduces Maintenance, Operations & Utility Costs • Reduces Deferred Maintenance & Deficiencies • $1,400,000 Annual Savings in Maintenance & Operations Expenses • $3,150,000 Annual Savings in Educational Administrative Expense • $52,580,000 Reduction in Deferred Maintenance

    • Estimated Costs • $172,800,000 Capital Expense for Seven Elementary Schools

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    36

  • Let’s Take a Moment To Breathe Draft FMP to

    Board of Education

    Community Review Process

    Board to Provide Additional Review

    Final FMP Approved

    Funding and Implementation Process Begins

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    37

    You are

    Here

  • Capital Investment Program (d) Details Consolidations

    • Allendale-Campbell

    • K-Lakes-Patterson

    • Parr-Little • Prospect

    Valley-Kullerstrand

    • Vivian-Stober

    Replacements

    • Green Gables • Marshdale • Jefferson HS

    Closures

    • Glennon Heights

    • Pleasant View

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    38

    • Pomona

    Reconfigurations by Articulation

    (K-5, 6-8)

  • Capital Investment Program (e) Successful Capital Bond

    • Multiple Year Implementation • Elementary & Middle School Additions & Renovations

    • Additions to 20 Facilities resulting in 118 New Classrooms Deferring the Need for New Buildings.

    • Benefits • Better Learning Environment, Educational Model and Utilization

    • Estimated Costs • $108,300,000 Capital Expense for Nineteen Elementary & Middle Schools • $760,000 Increase in Maintenance & Operations Expenses

    • Program Equity • High School Sites - 7 Auxiliary Gym Additions; 10 Artificial Turf Fields

    • Benefits • Ability to Better Schedule Student Activities; Less “Wear & Tear” on Fields

    • Estimated Costs • $34,000,000 Capital Expense

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    39

  • Capital Investment Program (e) Details

    Additions & Renovations

    • Bell MS • Belmar ES • Candelas K-8 • Creighton MS • Drake MS • Dunstan MS • Eiber ES • Edgewater ES • Evergreen MS • Foster ES • Green Mtn ES

    Additions & Renovations

    • Kyffin ES • Lumberg ES • Maple Grove ES • Molholm ES • Mount Carbon ES • Oberon MS • Powderhorn ES • Ralston Valley HS • Wilmot ES

    High School Equity Improvements

    • Arvada • Chatfield • Columbine • Conifer • D’Evelyn • Dakota Ridge • Green Mtn • Jefferson • Pomona • Ralston Valley • Standley Lake

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    40

  • Capital Investment Program (f) Capital Program

    • Multiple Year Implementation • Ancillary Facilities

    • New Stadium Complex • Renovate & Expand Existing Stadia Facilities

    • Benefits • Ability to Better Schedule Student Activities; Less “Wear &

    Tear” on Fields • Estimated Costs

    • $30,000,000 Capital Expense

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    41

  • Capital Investment Program (g) Capital Program

    • Multiple Year Implementation • “Past Promises”

    • Two High Schools Complete Second Phase • One High School Start First Phase • Two Option Schools

    • One Replacement High School • Two New Schools • Career & Tech Ed Expansion • Benefits

    • Better Learning Environment, Educational Model and Utilization

    • Estimated Costs • $195,000,000 Capital Expense

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    42

  • Capital Investment Program (g) Details

    Replacement and First & Second Phase

    Implementation

    • Alameda HS • Green Mtn HS • Wheat Ridge HS • Fletcher Miller K-12 • Jeffco Open School • Jefferson HS

    New Schools

    • Table Rock ES (K-8) • Leyden Rock

    Career & Tech Ed Expansion

    • South Area Location TBD

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    43

  • Charter School Investment (h)

    • The scope of the projects include: • Safety & security • Critical and general maintenance • Roofs • Parking lots • Build out, additions & new builds • Limited FFE • Boilers/HVAC • Drainage • Playgrounds

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    44

    Capital Program

  • FMP Timeline

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    45

    No Capital Program

    Task 2017-18 School Year

    Year One

    Year Two

    Year Three

    Year Four

    Year Five

    Year Six

    Boundary ChangesMatriculation ChangesGrade Reconfiguration (K-5, 6-8)

    AdditionsConsolidations & ClosuresReplacementsProgram EquityPast Promises

    Deferred Maintenance

    District Wide Facility Master Plan Phase I Implementation Timeline

    Phase I Capital Improvement Program

    Sheet1

    ArticSchoolProjectCapital InvestmentAdmin SavingsM&O Savings (Deduct)MAPPS DeficienciesPreliminary Schedule for CompletionPast Promise

    Priority 1Priority 2Priority 3No CIPCIP Year 1CIP Year 2CIP Year 3CIP Year 4

    ALKendrick Lakes ElementaryConsolidateR$ 28,000,000$ 175,000$ (5,960,900)$28,000,000Y

    ALStein Elementary (Closed until 2017)$ (2,000,000)Y

    ALDemo 12 Temps at Stein12 TempsDT$ 300,000$ (60,000)$300,000Y

    ALPatterson ElementaryClose, Move to K-LakesC$ (450,000)$ (244,475)$ (5,010,000)Y

    ALPatterson PreKClose Cottages/New PreK$ 4,500,000$ 50,000$ (1,220,000)$4,500,000

    ALDeane ElementaryBoundary ChangeBY

    ALAlameda HighPhase IIPP$ 30,000,000$20,000,000YX

    ALLasley ElementaryBoundary ChangeBY

    ALO'Connell (Stein)Boundary ChangeBY

    ARFoster Elementary4 CR Addition; K-5A$ 3,200,000$ 15,000$3,200,000Y

    ARThomson ElementaryK-5GY

    ARSecrest ElementaryK-5GY

    ARSwanson ElementaryK-5GY

    ARPeck ElementaryK-5GY

    ARArvada HighGym, Artificial TurfAT$ 4,000,000$ 75,000$4,000,000Y

    ARNorth Arvada Middle6-8G$ 150,000Y

    ARArvada K-8Boundary ChangeBY

    ARFitzmorris ElementaryK-5GY

    ARLawrence ElementaryBoundary ChangeBY

    ARHackberry Hill Elementary

    ARRemove 6 Temps at Foster6 TempsDT$ (30,000)$150,000Y

    AWVanderhoof ElementaryK-5GY

    AWCampbell ElementaryClose, move to AllendaleC$ (450,000)$ (217,000)$ (3,671,000)Y

    AWStott ElementaryK-5GY

    AWFremont ElementaryK-5GY

    AWFairmount ElementaryK-5GY

    AWAllendale ElementaryConsolidateR$ 25,000,000$ 110,000$ (1,908,000)$25,000,000Y

    AWTable Rock Mesa K8K-8N$ 35,000,000$ 750,000$ 550,000$35,000,000Y

    AWDrake Middle16 CR Addn., 6-8A$ 10,000,000$ 200,000$ 125,000$10,000,000Y

    AWArvada West High

    BCRed Rocks ElementaryBoundary Change; K-5GY

    BCGreen Gables ElementaryReplace; K-5R$ 25,000,000$ 140,000$ (4,232,000)$25,000,000YY

    BCPeiffer ElementaryK-5GY

    BCKendallvue ElementaryK-5GY

    BCWestgate ElementaryBoundary ChangeBY

    BCCarmody Middle6-8G$ 150,000Y

    BCBear Creek High

    BCBear Creek K-8

    BCClose 24 Temps24 Temps ClosedDT$ (120,000)

    CHStony Creek ElementaryBoundary ChangeBY

    CHCoronado ElementaryK-5GY

    CHUte Meadows ElementaryK-5GY

    CHDeer Creek Middle6-8GY

    CHShaffer Elementary

    CHMortensen ElementaryK-5GY

    CHBradford Primary ElementaryK-8GY

    CHChatfield High$ 1,500,000

    CHBradford Intermediate ElementaryK-8GY

    CHFalcon Bluffs Middle

    CHClose TempsClose & Remove 20 TempsDT$ (100,000)$500,000Y

    CLNormandy ElementaryBoundary ChangeBY

    CLDutch Creek ElementaryBoundary ChangeBY

    CLGovernor's Ranch ElementaryMatriculation ChangeBY

    CLLeawood ElementaryBoundary ChangeBY

    CLColumbine Hills Elementary

    CLColumbine HighGym, Artificial TurfAT$ 3,600,000YX

    CLKen Caryl Middle

    Close & Demo Temps6 TempsDT$ 150,000$ (30,000)$150,000

    CNMarshdale ElementaryReplace; K-6R$ 20,000,000$ 20,000$ (5,100,000)$20,000,000Y

    CNWest Jefferson MiddleArtificial Turf$1,200,000

    CNElk Creek Elementary

    CNConifer HighGym,AT$ 6,250,000$ 60,000$6,250,000YX

    CNWest Jefferson Elementary

    DRColorow Elementary

    DRWestridge Elementary

    DRPowderhorn Elementary8 CR AdditionA$ 4,200,000$ 60,000$4,200,000Y

    DRMount Carbon Elementary4 CR AdditionA$ 2,400,000$ 30,000$2,400,000Y

    DRBlue Heron ElementaryMatriculation ChangeBY

    DRDakota Ridge High

    DRSummit Ridge Middle

    EVParmalee Elementary

    EVWilmot ElementaryPast Promise, AdditionA$ 3,500,000$ 50,000$3,500,000YX

    EVBergen Meadow Elementary

    EVEvergreen HighMP, Sports field upgrade(?)AT$ 2,700,000$ 50,000$2,700,000Y

    EVBergen Valley Elementary

    EVEvergreen MiddleAdditionA$ 7,500,000$ 50,000$7,500,000Y

    GMGreen Mountain ElementaryK-5, 8 CR AdditionAG$ 4,500,000$ 60,000$4,500,000Y

    GMGreen Mountain HighPhase I MPPP$ 10,000,000$ 100,000$10,000,000Y

    GMHutchinson ElementaryK-5GY

    GMFoothills ElementaryK-5GY

    GMDevinny ElementaryK-5GY

    GMRooney Ranch ElementaryK-5GY

    GMDunstan MiddleAddition, 6-8AG$ 4,500,000$ 200,000$ 60,000$4,500,000Y

    GMRemove 13 Temps13 TempsDT$ (65,000)$300,000

    GOKyffin ElementaryAddition, K-5AG$ 18,750,000$ 80,000$18,750,000YY

    GOPleasant View ElementaryClose, Boundary ChangeC$ (450,000)$ (245,000)$ (3,085,000)Y

    GOShelton ElementaryBoundary Change, K-5, 3 CR Add.AG$ 1,700,000$ 25,000$1,700,000Y

    GOWelchester ElementaryBoundary Change, K-5GY

    GORalston ElementaryK-6Y

    GOBell Middle6-8, 4 CR AdditionAG$ 2,250,000$ 30,000$2,250,000Y

    GOMitchell ElementaryK-5

    GOGolden High

    JEMolholm Elementary8 CR AdditionA$ 4,000,000$ 3,000$4,000,000

    JELumberg Elementary8 CR AdditionA$ 4,000,000$ 13,000$4,000,000

    JEEdgewater Elementary

    JEJefferson HighReplacement, Art. Turfpp$ 55,000,000$ 250,000$10,000,000$55,000,000

    LWGlennon Heights ElementaryClose, Boundary ChangeC$ (450,000)$ (175,000)$ (2,700,000)Y

    LWBelmar Elementary6 CR Addition; K-5AG$ 3,100,000$ 45,000$3,100,000Y

    LWEiber Elementary6 CR Addition; K-5AG$ 3,100,000$ 45,000$3,100,000Y

    LWSlater ElementaryK-5GY

    LWSouth Lakewood ElementaryK-5GY

    LWLakewood High

    LWCreighton Middle6-8, 8 CR AdditionAG$ 4,000,000$ 200,000$ 60,000$4,000,000Y

    OPLong ViewClose, Relocate to McLainC$ (30,000)$ (650,000)Y

    OPFletcher Miller SpecialMP, Addition & RenovationA$ 22,000,000$ 340,000$22,000,000Y

    OPSobesky Academy (North Lakewood)Close, RelocatedC$ (150,000)$ (1,885,427)Y

    OPDennison

    OPBrady Exploration School

    OPManning

    OPWarren O.T.C. North Campus

    OPWarren O.T.C.

    OPMclain Community

    OPD'Evelyn

    OPJeffco Open SchoolPhase IIPP$ 10,000,000$ 150,000$8,000,000YX

    OPConnections

    OPJTS Central (Warren)

    OPJTS East (Fletcher Miller)

    PKNorma Anderson

    PKLitz / Tanglewood

    PKIrwin / Green Mountain Center

    POParr ElementaryConsolidate, K-5R$ 28,000,000$ - 0$ 160,000$ (2,466,000)$28,000,000Y

    POWarder ElementaryK-5GY

    POPomona HighGym, Artificial TurfAT$ 3,200,000$ 50,000$3,200,000Y

    POMoore Middle6-8GY

    POLittle ElementaryClose, Relocate to Parr SiteC$ (450,000)$ (204,000)$ (1,600,000)Y

    POWeber ElementaryK-5GY

    RVSierra ElementaryK-5GY

    RVCoal Creek K-8K-5?

    RVOberon Middle8 CR Addition, 6-8AG$ 25,000,000$ 150,000$ 140,000$20,000,000Y

    RVVan Arsdale ElementaryK-5GY

    RVCandelas K-88 CR AdditionA$ 4,500,000$ 60,000$4,500,000Y

    RVWest Woods ElementaryK-5GY

    RVRalston Valley High10 CR Addition, Turf FieldAT$ 5,500,000$ 75,000$5,500,000Y

    RVMeiklejohn ElementaryK-5GY

    SLWitt ElementaryY

    SLAdams ElementaryY

    SLLukas ElementaryY

    SLSheridan Green ElementaryY

    SLMandalay Middle (6-8 option)$ 150,000$ 200,000Y

    SLStandley Lake HighGym, Artificial TurfAT$ 3,600,000$ 40,000$3,600,000YX

    SLRyan ElementaryY

    SLSemper ElementaryY

    SLWayne Carle Middle (6-8 Option)$ 150,000Y

    WRStober ElementaryClose, Relocate to Vivian SiteC$ (450,000)$ (156,000)$ (3,419,000)Y

    WRProspect Valley ElementaryConsolidate, K-5R$ 23,400,000$ - 0$ 130,000$ (5,164,000)$23,400,000Y

    WRWilmore Davis ElementaryK-5GY

    WRVivian ElementaryConsolidate, K-5R$ 23,400,000$ - 0$ 200,000$ (2,032,000)$23,400,000Y

    WREveritt Middle6-8GY

    WRKullerstrand ElementaryClose, Relocate to PV SiteC$ (450,000)$ (177,655)$ (2,164,000)Y

    WRWheat Ridge HighPhase IIPP$15,000,000YX

    WRPennington ElementaryK-5GY

    WRStevens Elementary (future Sobesky)Y

    WRMaple Grove Elementary4 CR Addition; K-5AG$ 1,800,000$ 15,000$1,800,000Y

    WRWheat Ridge 5-8 (2015 Stevens)K-5GYY

    DWN. Transportation & Maint. ShopsR$ 7,000,000$ 60,000$ (2,850,000)$7,000,000

    DWTrailblazerA$ 4,000,000$ 50,000$4,000,000

    DW South Area Athletic ComplexN$ 26,100,000$ 75,000$26,100,000

    DWMt Evans OELS Master PlanA$ 16,000,000$ 150,000$ (1,500,000)$8,000,000

    DWWindy Peak OELS Master PlanA$ 12,500,000$ 150,000$ (1,000,000)$6,000,000

    DWJeffco Virtual Academy

    $ 547,700,000$ (1,050,000)$ 2,371,870$ (59,617,327)$ 359,250,000$ 42,200,000$ 136,800,000440272517

    $538,250,000

    Sheet2

    Type of ProjectPriority OnePriority TwoPriority ThreeTotal

    Replacement Facilities 8 Locations$ 144,800,000$ 28,000,000$ 172,800,000

    Additions to 20 Locations$ 134,000,000$ 4,500,000$ 28,500,000$ 167,000,000

    Program Equity (Aux Gyms) 7 Locations$ 28,850,000$ 28,850,000

    Past Promises$ 65,000,000$ 55,000,000$ 120,000,000

    Two New Facilities$ 61,100,000$ 61,100,000

    $ 372,650,000$ 32,500,000$ 144,600,000$ 549,750,000

    Timeline

    District Wide Facility Master Plan Phase I Implementation Timeline

    No Capital Program Phase I Capital Improvement Program

    Task2017-18 School YearYear OneYear TwoYear ThreeYear FourYear FiveYear Six

    Boundary Changes

    Matriculation Changes

    Grade Reconfiguration (K-5, 6-8)

    Additions

    Consolidations & Closures

    Replacements

    Program Equity

    Past Promises

    Deferred Maintenance

  • FMP FUNDING REQUIREMENTS

    The following provides an overview of the funding requirements and impact to our valued Jeffco stakeholders

    Our Goal is to provide the Best Learning Environment for our Students, and the Best Teaching Environment for our Staff

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    46

  • SUMMARY OF PHASE I & PHASE II EXPENSES

    Our

    Goa

    l is t

    o pr

    ovid

    e th

    e

    Best

    Lea

    rnin

    g En

    viro

    nmen

    t for

    our

    Stu

    dent

    s, th

    e Be

    st Te

    achi

    ng E

    nviro

    nmen

    t for

    our

    Sta

    ff

    No Capital Program

    Task 2017-18 School Year

    Boundary ChangesMatriculation Changes

    AdditionsConsolidationsReplacements/New BuildingsProgram EquityPast PromisesCharters

    Total

    Deferred Maintenance GF Transfer $20,000,000 $120,000,000$120,000,000

    $420,300,000

    Minimal Cost

    Minimal Cost

    $2,700,000

    $194,300,000

    $56,000,000

    $49,500,000

    $58,100,000

    $137,500,000$99,800,000

    $34,000,000$29,000,000

    $28,000,000$80,000,000

    $40,000,000

    Year 7 to Year 13

    District Wide Facility Master Plan Phase I and Phase IIEstimated Implementation Expenses

    Phase II Capital Improvement Program

    Phase I Capital Improvement Program

    Year 1 to Year 6

    47

    Sheet1

    ArticSchoolProjectTotal Capital InvestmentAdmin SavingsM&O Savings (Deduct)MAPPS DeficienciesPreliminary Schedule for CompletionPast Promise

    Priority 1Priority 2Priority 3No CIPCIP Year 1CIP Year 2CIP Year 3CIP Year 4

    ALKendrick Lakes ElementaryConsolidate 768 K-5; Boundary ChangeR$ 28,000,000$ 175,000$ (5,960,900)$28,000,000Y

    ALStein Elementary (Closed until 2017)Remains K-6$ (2,000,000)Y

    ALDemo 12 Temps at Stein12 TempsDT$ 300,000$ (60,000)$300,000Y

    ALPatterson ElementaryClose, Move to K-Lakes - Boundary ChangeC$ (450,000)$ (244,475)$ (5,010,000)Y

    ALPatterson PreKClose Cottages/New PreK$ 4,500,000$ 50,000$ (1,220,000)$4,500,000

    ALDeane ElementaryBoundary ChangeBY

    ALAlameda HighPhase II - Addition & RenovationPP$ 20,000,000$20,000,000YX

    ALLasley ElementaryBoundary ChangeBY

    ALO'Connell (Stein)Boundary ChangeBY

    $48,300,000$0$4,500,000

    ARFoster Elementary4 CR Addition; K-5A$ 3,200,000$ 15,000$3,200,000Y

    ARThomson ElementaryK-5GY

    ARSecrest ElementaryK-5GY

    ARSwanson ElementaryK-5GY

    ARPeck ElementaryY

    ARArvada HighAux Gym, Artificial TurfAT$ 4,000,000$ 75,000$4,000,000$10,000,000Y

    ARNorth Arvada Middle6-8G$ 150,000Y

    ARArvada K-8Boundary ChangeBY

    ARFitzmorris ElementaryY

    ARLawrence ElementaryBoundary ChangeBY

    ARHackberry Hill Elementary

    ARRemove 6 Temps at Foster6 TempsDT$ 150,000$ (30,000)$150,000Y

    $7,350,000$10,000,000$0

    AWVanderhoof ElementaryK-5GY

    AWCampbell ElementaryClose, move to Allendale - Boundary ChangeC$ (450,000)$ (217,000)$ (3,671,000)Y

    AWStott ElementaryK-5GY

    AWFremont ElementaryK-5GY

    AWFairmount ElementaryK-5GY

    AWAllendale ElementaryConsolidate 568 K-5; Boundary ChangeR$ 25,000,000$ 110,000$ (1,908,000)$25,000,000Y

    AWTable Rock Mesa K8K-8N$ 35,000,000$ 750,000$ 550,000$35,000,000Y

    AWDrake Middle16 CR Addn, 950 Capcity; 6-8A$ 10,000,000$ 200,000$ 125,000$10,000,000Y

    AWArvada West High

    $60,000,000$0$10,000,000

    BCRed Rocks ElementaryBoundary Change; K-5GY

    BCGreen Gables ElementaryReplace; 576 K-5; Boundary ChangeR$ 25,000,000$ 140,000$ (4,232,000)$25,000,000YY

    BCPeiffer ElementaryK-5GY

    BCKendallvue ElementaryK-5GY

    BCWestgate ElementaryBoundary ChangeBY

    BCCarmody Middle6-8G$ 150,000Y

    BCBear Creek High

    BCBear Creek K-8

    BCClose 24 Temps24 Temps ClosedDT$ (120,000)

    $25,000,000$0$0

    CHStony Creek ElementaryK-5, Boundary ChangeBY

    CHCoronado ElementaryK-5GY

    CHUte Meadows ElementaryK-5GY

    CHDeer Creek Middle6-8GY

    CHShaffer Elementary

    CHMortensen ElementaryK-5GY

    CHBradford Primary ElementaryK-8, One Boundary for the BradfordsGY

    CHChatfield HighArtificial Turf FieldAT$ 1,500,000$1,500,000

    CHBradford Intermediate ElementaryK-8, One Boundary for the BradfordsGY

    CHFalcon Bluffs Middle6-8

    CHClose TempsClose & Remove 20 TempsDT$ 500,000$ (100,000)$500,000Y

    $2,000,000$0$0

    CLNormandy ElementaryBoundary ChangeBY

    CLDutch Creek ElementaryBoundary ChangeBY

    CLGovernor's Ranch ElementaryMatriculation Change (DR)BY

    CLLeawood ElementaryBoundary ChangeBY

    CLColumbine Hills Elementary

    CLColumbine HighAux Gym, Artificial TurfAT$ 3,600,000$3,600,000YX

    CLKen Caryl Middle

    CLClose & Demo Temps6 Temps at NormandyDT$ 150,000$ (30,000)$150,000

    $3,750,000$0$0

    CNMarshdale ElementaryReplace; 480 K-5R$ 20,000,000$ 20,000$ (5,100,000)$20,000,000Y

    CNWest Jefferson MiddleArtificial TurfAT$1,200,000

    CNElk Creek Elementary

    CNConifer HighAux Gym, RenovationAT$ 6,250,000$ 60,000$6,250,000YX

    CNWest Jefferson ElementaryMaintain PK-5

    $26,250,000$0$1,200,000

    DRColorow ElementaryBoundary ChangeB

    DRWestridge Elementary

    DRPowderhorn Elementary8 CR AdditionA$ 4,200,000$ 60,000$4,200,000Y

    DRMount Carbon Elementary4 CR AdditionA$ 2,400,000$ 30,000$2,400,000Y

    DRBlue Heron ElementaryMatriculation Change (CL)BY

    DRDakota Ridge High

    DRSummit Ridge Middle

    DRClose & Demo Temps9 Temps at PowderhornDT$ 225,000$225,000

    $6,825,000$0$0

    EVParmalee Elementary

    EVWilmot ElementaryPast Promise, Phase II AdditionA$ 3,500,000$ 50,000$3,500,000YX

    EVBergen Meadow Elementary

    EVEvergreen HighMP, Sports field upgradeAT$ 2,700,000$ 50,000$2,700,000$10,000,000Y

    EVBergen Valley Elementary

    EVEvergreen MiddlePhase II Addition & RenovationA$ 7,500,000$ 50,000$7,500,000Y

    EVClose & Demo Temps2 Temps at Evergreen MiddleDT$ 25,000$25,000

    $11,025,000$2,700,000$10,000,000

    GMGreen Mountain ElementaryK-5, 8 CR AdditionAG$ 4,500,000$ 60,000$4,500,000Y

    GMGreen Mountain HighPhase I MPPP$ 10,000,000$ 100,000$10,000,000$40,000,000Y

    GMHutchinson ElementaryK-5GY

    GMFoothills ElementaryK-5GY

    GMDevinny ElementaryK-5; Boundary ChangeGY

    GMRooney Ranch ElementaryK-5; Boundary ChangeGY

    GMDunstan Middle8 CR Addition, 6-8AG$ 4,500,000$ 200,000$ 60,000$4,500,000Y

    GMClose & Demo 13 Temps13 TempsDT$ 300,000$ (65,000)$300,000

    $19,300,000$0$40,000,000

    GOKyffin ElementaryAddition & Renovation, K-5AG$ 18,750,000$ 80,000$18,750,000YY

    GOPleasant View ElementaryClose, Boundary ChangeC$ (450,000)$ (245,000)$ (3,085,000)Y

    GOShelton ElementaryBoundary Change, K-5, 3 CR Add.AG$ 1,700,000$ 25,000$1,700,000Y

    GOWelchester ElementaryBoundary Change, K-5GY

    GORalston ElementaryK-6Y

    GOBell Middle6-8, 4 CR AdditionAG$ 2,250,000$ 30,000$2,250,000Y

    GOMitchell ElementaryK-5

    GOGolden High

    $22,700,000$0$0

    JEMolholm Elementary8 CR AdditionA$ 4,000,000$ 3,000$4,000,000

    JELumberg Elementary8 CR AdditionA$ 4,000,000$ 13,000$4,000,000

    JEEdgewater ElementaryPK-Wing AdditionA$ 3,000,000$3,000,000

    JEJefferson HighMP, Phase I Additon/RenovationA$ 20,000,000$ 250,000$20,000,000$35,000,000

    JEClose & Demo Temps9 Temps at EdgewaterDT$ 225,000$225,000

    $31,225,000$0$35,000,000

    LWGlennon Heights ElementaryClose, Boundary ChangeC$ (450,000)$ (175,000)$ (2,700,000)Y

    LWBelmar Elementary6 CR Addition; K-5; Boundary ChangeAG$ 3,100,000$ 45,000$3,100,000Y

    LWEiber Elementary6 CR Addition; K-5AG$ 3,100,000$ 45,000$3,100,000Y

    LWSlater ElementaryK-5GY

    LWSouth Lakewood ElementaryK-5GY

    LWLakewood High

    LWCreighton Middle6-8, 8 CR AdditionAG$ 4,000,000$ 200,000$ 60,000$4,000,000Y

    LWClose & Demo Temps12 TempsDT$ 300,000$300,000

    $10,500,000$0$0

    OPLong ViewClose, Relocate to McLainC$ (30,000)$ (650,000)Y

    OPFletcher Miller SpecialMP, Addition & RenovationA$ 22,000,000$ 340,000$22,000,000Y

    OPSobesky Academy (North Lakewood)Close, RelocatedC$ (150,000)$ (1,885,427)Y

    OPDennison

    OPBrady Exploration School

    OPManning

    OPWarren O.T.C. North Campus

    OPWarren O.T.C.

    OPMcLain CommunityLong View Consolidation

    OPD'Evelyn

    OPJeffco Open SchoolPhase IIPP$ 8,000,000$ 150,000$8,000,000YX

    OPConnections

    OPJTS Central (Warren)

    OPJTS East (Fletcher Miller)

    $30,000,000$0$0

    PKNorma Anderson

    PKLitz / Tanglewood

    PKIrwin / Green Mountain Center

    $0$0$0

    POParr ElementaryConsolidate, 768 PreK-5: Boundary ChangeR$ 28,000,000$ - 0$ 160,000$ (2,466,000)$28,000,000Y

    POWarder ElementaryK-5GY

    POPomona HighAux Gym, Artificial TurfAT$ 3,200,000$ 50,000$3,200,000Y

    POMoore Middle6-8GY

    POLittle ElementaryClose, Relocate to Parr Site; Boundary ChangeC$ (450,000)$ (204,000)$ (1,600,000)Y

    POWeber ElementaryK-5GY

    POAdd TempsAdd 2 Temps$ 250,000$250,000

    POClose & Demo Temps 15 TempsDT$ 375,000$375,000

    $3,825,000$28,000,000$0

    RVSierra ElementaryK-5; Boundary ChangeBY

    RVCoal Creek K-8K-8

    RVOberon Middle8 CR Addition, 6-8AG$ 20,000,000$ 150,000$ 140,000$20,000,000Y

    RVVan Arsdale ElementaryK-5GY

    RVCandelas K-88 CR Addition; BoundaryA$ 4,500,000$ 60,000$4,500,000Y

    RVWest Woods ElementaryK-5GY

    RVRalston Valley High10 CR Addition, Artificial Turf FieldAT$ 5,500,000$ 75,000$5,500,000Y

    RVMeiklejohn ElementaryK-5; Boundary ChangeGY

    RVLeyden RockK-5; Boundary ChangeN$25,000,000

    RVClose & Demo Temps9 Temps (Leased)DT$ - 0$0

    $25,500,000$4,500,000$25,000,000

    SLWitt ElementaryK-5GY

    SLAdams ElementaryK-5GY

    SLLukas ElementaryK-5GY

    SLSheridan Green ElementaryK-5GY

    SLMandalay Middle (6-8 option)6-8G$ 150,000$ 200,000Y

    SLStandley Lake HighAux Gym, Artificial Turf Field, RenovationAT$ 3,600,000$ 40,000$3,600,000YX

    SLRyan ElementaryK-5GY

    SLSemper ElementaryK-5GY

    SLWayne Carle Middle (6-8 Option)6-8G$ 150,000Y

    $3,600,000$0$0

    WRStober ElementaryClose, Relocate to Vivian Site; Boundary ChangeC$ (450,000)$ (156,000)$ (3,419,000)Y

    WRProspect Valley ElementaryConsolidate, 768 K-5; Boundary ChangeR$ 23,400,000$ - 0$ 130,000$ (5,164,000)$23,400,000Y

    WRWilmore Davis ElementaryK-5GY

    WRVivian ElementaryConsolidate, 768 K-5; Boundary ChangeR$ 23,400,000$ - 0$ 200,000$ (2,032,000)$23,400,000Y

    WREveritt MiddleRenovation, 6-8GY

    WRKullerstrand ElementaryClose, Relocate to PV SiteC$ (450,000)$ (177,655)$ (2,164,000)Y

    WRWheat Ridge HighPhase IIPP$ 7,500,000$7,500,000YX

    WRPennington ElementaryK-5GY

    WRStevens Elementary (future Sobesky)Y

    WRMaple Grove Elementary4 CR Addition; K-5AG$ 1,800,000$ 15,000$1,800,000Y

    WRWheat Ridge 5-8 (2015 Stevens)K-5GYY

    WRClose & Demo Temps13 TempsDT$ 325,000$325,000

    $56,425,000$0$0

    DWN. Transportation & Maint. ShopsR$ 7,000,000$ 60,000$ (2,850,000)$7,000,000

    DWTrailblazerA$ 4,000,000$ 50,000$4,000,000

    DW South Area Athletic ComplexN$ 26,100,000$ 75,000$26,100,000

    DWMt Evans OELS Master PlanPhase IA$ 16,000,000$ 150,000$ (1,500,000)$8,000,000

    DWWindy Peak OELS Master PlanPhase IA$ 12,500,000$ 150,000$ (1,000,000)$6,000,000

    DWJeffco Virtual Academy

    $4,000,000$7,000,000$40,100,000

    $ 508,875,000$ (1,050,000)$ 2,371,870$ (59,617,327)$ 397,575,000$ 52,200,000$ 165,800,000440272517

    $615,575,000

    Sheet2

    Type of ProjectPriority OnePriority TwoPriority ThreeTotal

    Replacement Facilities 8 Locations$ 144,800,000$ 35,000,000$ 179,800,000

    Additions to 20 Locations$ 137,500,000$ 4,500,000$ 45,000,000$ 187,000,000

    Program Equity (Aux Gyms) 7 Locations$ 34,000,000$ 34,000,000$56.65?Arvada, Columbine, Conifer,Green Mtn, Jefferson, Pomona, Standley Lake

    Past Promises$ 85,000,000$ 85,000,000Alameda, Grn Gables, Conifer, Evergreen MS, Kyffin

    Five New Facilities$ 35,000,000$ 7,000,000$ 55,600,000$ 97,600,000Leyden Rock, Tabel Mesa, Patterson Pre-K, South Area Stadium, North Transportation

    $ 436,300,000$ 46,500,000$ 100,600,000$ 583,400,000

    District Wide Facility Master Plan Phase I and Phase IIEstimated Implementation Expenses

    No Capital Program Phase I Capital Improvement ProgramPhase II Capital Improvement Program

    Task2017-18 School YearYear 1 to Year 6Year 7 to Year 13

    Boundary ChangesMinimal CostMinimal Cost

    Matriculation Changes

    Additions$137,500,000$49,500,000

    Consolidations$99,800,000$28,000,000

    Replacements/New Buildings$80,000,000$58,100,000$257,000,000

    Program Equity$34,000,000$2,700,000$73,150,000$62,700,000

    Past Promises$29,000,000$56,000,000

    Charters$40,000,000

    Total$420,300,000$194,300,000$614,600,000$218,000,000($23,700,000)

    Deferred Maintenance GF Transfer$20,000,000$120,000,000$120,000,000$1,187,100,000

    Timeline

    District Wide Facility Master Plan Phase I Implementation Timeline

    No Capital Program Phase I Capital Improvement Program

    Task2017-18 School YearYear OneYear TwoYear ThreeYear FourYear FiveYear Six

    Boundary Changes

    Matriculation Changes

    Grade Reconfiguration (K-5, 6-8)

    Additions

    Consolidations

    Replacements

    Program Equity

    Past Promises

    Deferred Maintenance

    Pres Format A

    Facility UtilizationHide columns J-M to remove budgets and evaluations

    Alameda Articulation AreaCategories of Scopes of Work

    Facility Utilization

    Total Investment:$48,300,000General Renovation

    (Option A)

    Total Investment:$0Warm, Safe, and Dry

    (Option B)

    Total Investment:$4,500,000General Upgrades

    (Option C)

    Infrastructure Repair/Upgrades

    CampusScopeInvestmentOption AOption BOption C

    High SchoolTechnology

    Alameda Int'l Jr/Sr High SchoolPhase II Master Plan, incl 8 classroom addition$20,000,000$0$0Safety and Security

    ADA and Code

    Middle School

    See Tab - "Bond Categories"

    Alameda Int'l Jr/Sr High SchoolIncluded in above

    Investment Categories can be:

    Elementary SchoolsPriorities 1, 2, 3

    Patterson Pre-KNew Pre-K Facility$0$0$4,500,000Options 1, 2, 3

    Kendrick Lakes ESNew 768 ES Replacement$28,000,000$0$0Bond Package 1, 2, 3 ($150M, $250M, $350M, or other)

    Rose Stein ESRemove 12 Temp Classroom Modulars$300,000$0$0

    Patterson ESClose and Consolidate with New Kendrick Lakes$0$0$0

    Deferred Maintenance / General Upgrades

    Alameda Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Alameda Int'l Jr/Sr High SchoolSee Facility Utilization

    Middle School

    Alameda Int'l Jr/Sr High SchoolIncluded in above

    Elementary Schools

    Deane ESGeneral Upgrades

    Carpet, Paint, Gym Floor

    Lasley ES

    Emery O'Connell ES

    Facility Utilization

    Arvada Articulation Area

    Facility Utilization

    Total Investment:$7,350,000

    (Option A)

    Total Investment:$10,000,000

    (Option B)

    `Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Arvada High SchoolConvert to 7-12, Aux Gym Add'n, Artificial Turf Field$4,000,000$10,000,000$0

    Middle School

    North Arvada Middle SchoolConvert to 6-8$0$0$0

    K-8 School

    Arvada K-8$0$0$0

    Elementary Schools

    Foster ES (Option A)4 Classroom Addition and some renovation$3,200,000$0$0

    Convert to K-5

    Fitzmorris ESConvert to K-5$0$0$0

    Foster ESRemove 6 Temp Classroom Modulars$150,000$0$0

    Peck ESConvert to K-5$0$0$0

    Thomson ESConvert to K-5$0$0$0

    Secrest ESConvert to K-5$0$0$0

    Swanson ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Arvada Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Arvada High School (Option A)See Facility Utilization

    Middle School

    North Arvada Middle SchoolSee Facility Utilization

    North Arvada MS (Option A Close)

    K-8 School

    Arvada K-8

    Elementary Schools

    Fitzmorris ES

    Foster ES

    Hackberry Hill ES

    Lawrence ES

    Peck ES

    Secrest ES

    Swanson ES

    Thomson ES

    Facility Utilization

    Arvada West Articulation Area

    Facility Utilization

    Total Investment:ERROR:#REF!

    (Option A)

    Total Investment:$0

    (Option B)

    `Total Investment:$45,000,000

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Middle School

    Drake MS16 Classroom Addition. Convert to 6-8$0$0$10,000,000

    K-8 School

    Table Rock Mesa K-8New 568 K-8ERROR:#REF!$0$35,000,000

    Elementary Schools

    Allendale ESNew 568 K-5 ES$25,000,000$0$0

    Campbell ESClose and Consolidate with Allendale$0$0$0

    Fairmount ESConvert to K-5$0$0$0

    Fremont ESConvert to K-5$0$0$0

    Stott ESConvert to K-5$0$0$0

    Vanderhoof ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Arvada West Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Arvada West High School

    Middle School

    Drake MSSee Facility Utilization

    Elementary Schools

    Campbell ESClose and Consolidate with Allendale ES

    Fairmount ES

    Fremont ES

    Stott ES

    Vanderhoof ES

    Facility Utilization

    Bear Creek Articulation Area

    Facility Utilization

    Total Investment:$25,000,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Bear Creek High School

    Middle School

    Carmody MSConvert to 6-8$0$0$0

    K-8 School

    Bear Creek K-8

    Elementary Schools

    Green Gables ESNew 576 K-5 ES Replacement$25,000,000$0$0

    Kendallvue ESConvert to K-5$0$0$0

    Peiffer ESConvert to K-5$0$0$0

    Red Rocks ESConvert to K-5$0$0$0

    [need list of schools]Remove 24 Temp Classroom Modulars$0$0$0

    Deferred Maintenance / General Upgrades

    Bear Creek Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Bear Creek High School

    Middle School

    Carmody MSSee Facility Utilization

    K-8 School

    Bear Creek K-8

    Elementary Schools

    Kendallvue ES

    Peiffer ES

    Red Rocks ES

    Westgate

    Facility Utilization

    Chatfield Articulation Area

    Facility Utilization

    Total Investment:$2,000,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    $1,500,000$0$0

    Chatfield High School

    Middle School

    Deer Creek MSConvert to 6-8$0$0$0

    K-8 School

    Bradford Primary ES

    Bradford Intermediate ES

    Elementary Schools

    Coronado ESConvert to K-5$0$0$0

    Mortensen ESConvert to K-5$0$0$0

    Ute Meadows ESConvert to K-5$0$0$0

    [need list of schools]Remove 20 Temp Classroom Modulars$500,000$0$0

    Deferred Maintenance / General Upgrades

    Chatfield Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Chatfield High School

    Middle School

    Deer Creek MS

    Falcon Bluffs MS

    K-8 School

    Bradford Primary ES

    Bradford Intermediate ES

    Elementary Schools

    Coronado ES

    Mortensen ES

    Shaffer ES

    Stony Creek ES

    Ute Meadows ES

    Facility Utilization

    Columbine Articulation Area

    Facility Utilization

    Total Investment:$3,750,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Columbine High SchoolGym Addition; Artificial Turf Field$3,600,000$0$0

    Middle School

    Elementary Schools

    Normandy ESRemove 6 Temp Classroom Modulars$150,000$0$0

    Deferred Maintenance / General Upgrades

    Columbine Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Chatfield High School

    Middle School

    Ken Caryl MS

    Elementary Schools

    Columbine Hills ES

    Dutch Creek ES

    Governor's Ranch ES

    Leawood ES

    Normandy ES

    Facility Utilization

    Conifer Articulation Area

    Facility Utilization

    Total Investment:$26,250,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$1,200,000

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Conifer High SchoolGym Addition; Artificial Turf Field$6,250,000$0$0

    Middle School

    West Jefferson MSArtificial Turf Field$0$0$1,200,000

    Elementary Schools

    Marshdale ESNew 480 K-6 Replacement$20,000,000$0$0

    Deferred Maintenance / General Upgrades

    Conifer Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Conifer High School

    Middle School

    West Jefferson MS

    Elementary Schools

    Elk Creek ES

    West Jefferson ES

    Facility Utilization

    Dakota Ridge Articulation Area

    Facility Utilization

    Total Investment:$6,600,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Dakota Ridge High School$0$0$0

    Middle School

    Elementary Schools

    Powderhorn ES8 Classroom Addition$4,200,000$0$0

    Mt. Carbon ES4 Classroom Addition$2,400,000$0$0

    Deferred Maintenance / General Upgrades

    Dakota Ridge Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Dakota Ridge High School

    Middle School

    Summit Ridge MS

    Elementary Schools

    Blue Heron ES

    Colorow ES

    Powderhorn ES

    Mt. Carbon ES

    Powderhorn ES

    Facility Utilization

    RESUME FORMATTING HERE

    Evergreen Articulation Area

    Facility Utilization

    Total Investment:$11,000,000

    (Option A)

    Total Investment:$2,700,000

    (Option B)

    Total Investment:$10,000,000

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Evergreen High SchoolMaster Plan; Sports Field Upgrade (?)$0$2,700,000$10,000,000

    Middle School

    Evergreen MSPhase II - Cafeteria & Kitchen. Major Int. Renovation$7,500,000$0$0

    Classroom Renovation

    Elementary Schools

    Wilmot ESPhase II: 9,000 SF Addition: Remove original wing$3,500,000$0$0

    Cafeteria, Kitchen and Gym Addition

    Deferred Maintenance / General Upgrades

    Evergreen Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Evergreen High School

    Middle School

    Evergreen MS

    Elementary Schools

    Bergen Meadow ES

    Bergen Valley ES

    Parmalee ES

    Wilmot ES

    Facility Utilization

    Golden Articulation Area

    Facility Utilization

    Total Investment:$22,700,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Golden High School$0$0$0

    Middle School

    Bell MS4 Classroom Addition$2,250,000$0$0

    Elementary Schools

    Kyffin ESRenovation and Addition$18,750,000$0$0

    Convert to K-5

    Pleasant View ESClose$0$0$0

    Shelton ES3 Classroom Addition. Convert to K-5$1,700,000$0$0

    Welchester ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Golden Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Golden High School

    Middle School

    Bell MS

    Elementary Schools

    Kyffin ES

    Mitchell ES

    Ralston ES

    Shelton ES

    Welchester ES

    Facility Utilization

    Green Mountain Articulation Area

    Facility Utilization

    Total Investment:$19,300,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$40,000,000

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Green Mountain High SchoolPhase I of Master Plan: Site Development$10,000,000$0$40,000,000

    Athletic Fields, Locker Rms, Aux Gym, Mech & Elec

    Services

    Middle School

    Dunstan MS8 Classroom Addition. Convert to 6-8$4,500,000$0$0

    Elementary Schools

    Devinny ESConvert to K-5$0$0$0

    Foothills ESConvert to K-5$0$0$0

    Green Mountain ES8 Classroom Addition. Convert to K-5$4,500,000$0$0

    Hutchinson ESConvert to K-5$0$0$0

    Rooney Ranch ESConvert to K-5$0$0$0

    [Need list of Schools]Remove 13 Temp Classroom Modulars$300,000$0$0

    Deferred Maintenance / General Upgrades

    Green Mountain Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Green Mountain High School

    Middle School

    Dunstan MS

    Elementary Schools

    Devinny ES

    Foothills ES

    Green Mountain ES

    Hutchinson ES

    Rooney Ranch ES

    Facility Utilization

    Jefferson Articulation Area

    Facility Utilization

    Total Investment:ERROR:#REF!

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$20,000,000

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Jefferson Jr./Sr. High SchoolMaster Plan - Develop Phase IERROR:#REF!$0$20,000,000

    Long Term: Replacement

    Middle School

    Jefferson Jr./Sr. High SchoolIncluded in above

    Elementary Schools

    Lumberg ES8 Classroom Addition$4,000,000$0$0

    Molholm ES8 Classroom Addition$4,000,000$0$0

    Deferred Maintenance / General Upgrades

    Jefferson Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Middle School

    Elementary Schools

    Edgewater ES

    Lumberg ES

    Molholm ES

    Facility Utilization

    Lakewood Articulation Area

    Facility Utilization

    Total Investment:$10,200,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Lakewood HS$0$0$0

    Middle School

    Creighton MS8 Classroom Addition, Convert to 6-8$4,000,000$0$0

    Elementary Schools

    Belmar ES6 Classroom Addition. Convert to K-5$3,100,000$0$0

    Eiber ES6 Classroom Addition. Convert to K-5$3,100,000$0$0

    Glennon Heights ESClose$0$0$0

    Slater ESConvert to K-5$0$0$0

    South Lakewood ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Lakewood Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Lakewood HS

    Middle School

    Creighton MS

    Elementary Schools

    Belmar ES

    Eiber ES

    Slater ES

    South Lakewood ES

    Facility Utilization

    Pomona Articulation Area

    Facility Utilization

    Total Investment:$3,200,000

    (Option A)

    Total Investment:$28,000,000

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Pomona HSGym Addition. Artificial Turf Field$3,200,000$0$0

    Middle School

    Moore MSConvert to 6-8$0$0$0

    Elementary Schools

    Little ESClose and Consolidate with Parr ES$0$0$0

    Parr ESNew 768 K-5$0$28,000,000$0

    Warder ESConvert to K-5$0$0$0

    Weber ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Pomona Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Pomona HS

    Middle School

    Moore MS

    Elementary Schools

    Warder ES

    Weber ES

    Facility Utilization

    Ralston Valley Articulation Area

    Facility Utilization

    Total Investment:$25,500,000

    (Option A)

    Total Investment:$4,500,000

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Ralston Valley HS10 Classroom Addition. Turf Field$5,500,000$0$0

    Middle School

    Oberon MS8 Classroom Addition. Convert to 6-8$20,000,000$0$0

    K-8 School

    Candelas K-88 Classroom Addition$0$4,500,000$0

    Coal Creek K-8Convert to K-5 (?)$0$0$0

    Elementary Schools

    Meiklejohn ESConvert to K-5$0$0$0

    Sierra ESConvert to K-5$0$0$0

    Van Arsdale ESConvert to K-5$0$0$0

    West Woods ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Ralston Valley Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Ralston Valley HS

    Middle School

    Oberon MS

    K-8 School

    Coal Creek K-8

    Elementary Schools

    Meiklejohn ES

    Sierra ES

    Van Arsdale ES

    West Woods ES

    Facility Utilization

    Standley Lake Articulation Area

    Facility Utilization

    Total Investment:$3,600,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Standley Lake HSGym Addition; Artificial Turf Field$3,600,000$0$0

    Middle School

    Mandalay MSConvert to 6-8 option$0$0$0

    Wayne Carle MSConvert to 6-8 option$0$0$0

    Elementary Schools

    Deferred Maintenance / General Upgrades

    Standley Lake Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Standley Lake HS

    Middle School

    Mandalay MS

    Wayne Carle MS

    Elementary Schools

    Adams ES

    Lukas ES

    Ryan ES

    Semper ES

    Sheridan Green ES

    Witt ES

    Facility Utilization

    Wheat Ridge Articulation Area

    Facility Utilization

    Total Investment:$56,100,000

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Wheat Ridge HSPhase II$7,500,000$0$0

    Middle School

    Everitt MSConvert to 6-8$0$0$0

    Elementary Schools

    Kullerstrand ESClose and Consolidate with New Prospect Valley ES$0$0$0

    Maple Grove ES4 Classroom Addition. Convert to K-5$1,800,000$0$0

    Pennington ESConvert to K-5$0$0$0

    Prospect Valley ESNew 768 K-5 ES Replacement$23,400,000$0$0

    Stevens ES (old WR5-8)Convert to K-5$0$0$0

    Stober ESClose and Consolidate with New Stober ES$0$0$0

    Vivian ESNew 768 K-5 ES Replacement$23,400,000$0$0

    Wilmore-Davis ESConvert to K-5$0$0$0

    Deferred Maintenance / General Upgrades

    Wheat Ridge Articulation Area

    Deferred Maintenance / General Upgrades

    Total Investment:$0

    (Option A)

    Total Investment:$0

    (Option B)

    Total Investment:$0

    (Option C)

    CampusScopeInvestmentOption AOption BOption C

    High School

    Wheat Ridge HS

    Middle School

    Everitt MS

    Elementary Schools

    Maple Grove ES

    Pennington ES

    Stevens ES (old WR5-8)

    Wilmore-Da