14
BUILDING DATA Construction Documents - 4/20/2020 NOT TO SCALE DESCRIPTION OF WORK SCHOOL BOARD MEMBERS A. SURVEY PARCEL ID XXX B. LEGAL DESCRIPTION XXX C. OCCUPANCY TYPE XXX D. CONSTRUCTION TYPE TYPE XXX E. RISK CATEGORY XXX F. AUTOMATIC SPRINKLER XXX G. BUILDING AREA XXX H. BUILDING HEIGHT XXX I. OCCUPANT LOAD XXX LOCATION MAP ENGINEERS & CONSULTANTS VCS Project NO. 2047715 3750 OLSON DR, DAYTONA BEACH, FL 32124 Upgrade Chiller Plant Facilities Services Engineer's Statement of Compliance To the best of my knowledge, these drawings and the project manual are complete and comply with the Florida Building Code. MECHANICAL ENGINEER SABISTON ENGINEERING GROUP, INC. 322 KENTUCKY BLUE CIRCLE APOPKA, FL 32712 CONTACT PHONE NUMBER: 407.884.6769 PROJECT MANAGER: DON SABISTON e-mail: [email protected] WWW.SABISTONENGINEERING.COM SEG Project No. 19003 Sabiston Engineering Group, Inc. www.SabistonEngineering.com State of Florida Certificate No. 9811 P: 407.884.6769 F: 407.884.6764 322 Kentucky Blue Circle, Apopka, FL 32712 PROJECT SITE ELECTRICAL ENGINEER MATERN PROFESSIONAL ENGINEERING, INC. 130 CANDACE DRIVE MAITLAND, FL 32751 CONTACT PHONE NUMBER: 407.740.5020 PROJECT MANAGER: ADRIAN BAUS e-mail: [email protected] WWW.MATERN.NET FAX (407) 740-0365 PHONE (407) 740-5020 CERT. OF AUTH. No. 5096 ENG. BUS. No. EB-0005096 130 Candace Drive Maitland, FL 32751 Upgrade air cooled chiller plant to 200 ton capacity. Add expansion capability for second chiller. Provide temporary chiller during construction. THE SCHOOL BOARD OF VOLUSIA COUNTY FLORIDA 200 North Clara Avenue Deland, Florida 32720 VOLUSIA COUNTY SCHOOLS IDA D. WRIGHT LINDA CUTHBERT RUBEN COLON JAIME M. HAYNES CARL G. PERSIS RONALD S. FRITZ CHAIRMAN VICE CHAIRMAN MEMBER MEMBER MEMBER SUPERINTENDENT DRAWING NO. SHEET TITLE AE PROJECT NUMBER DRAWN BY DESIGNED BY ARCH/ENGR OF RECORD ISSUE DATE DOCUMENT HISTORY REVISIONS VCS Project NO. 2047715 Upgrade Chiller Plant 3750 OLSON DR, DAYTONA BEACH, FL 32124 DJS DJS 19003 4/20/2020 Engineer Donald J. Sabiston, P.E. Facilities Services NO. DATE DESCRIPTION SEG Project No. 19003 Sabiston Engineering Group, Inc. www.SabistonEngineering.com State of Florida Certificate No. 9811 P: 407.884.6769 F: 407.884.6764 322 Kentucky Blue Circle, Apopka, FL 32712 CS Cover Sheet Donald J. Sabiston, P.E. State of Florida No. 54889

Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

BUILDING DATA

Construction Documents - 4/20/2020NOT TO SCALE

DESCRIPTION OF WORK

SCHOOL BOARD

MEMBERS

A. SURVEY PARCEL ID XXX

B. LEGAL DESCRIPTION XXX

C. OCCUPANCY TYPE XXX

D. CONSTRUCTION TYPE TYPE XXX

E. RISK CATEGORY XXX

F. AUTOMATIC SPRINKLER XXX

G. BUILDING AREA XXX

H. BUILDING HEIGHT XXX

I. OCCUPANT LOAD XXX

LOCATION MAP

ENGINEERS & CONSULTANTS

VCS Project NO. 2047715

3750 OLSON DR, DAYTONA BEACH, FL 32124

Upgrade Chiller Plant

Facilities Services

Engineer's Statement of ComplianceTo the best of my knowledge, these drawings and the project manual are complete and comply withthe Florida Building Code.

MECHANICAL ENGINEERSABISTON ENGINEERING GROUP, INC.322 KENTUCKY BLUE CIRCLEAPOPKA, FL 32712CONTACT PHONE NUMBER: 407.884.6769PROJECT MANAGER: DON SABISTONe-mail: [email protected]

SEG Project No. 19003

Sabiston Engineering Group, Inc.

www.SabistonEngineering.comState of Florida Certificate No. 9811

P: 407.884.6769 F: 407.884.6764322 Kentucky Blue Circle, Apopka, FL 32712

PROJECT SITE

ELECTRICAL ENGINEERMATERN PROFESSIONAL ENGINEERING, INC.130 CANDACE DRIVEMAITLAND, FL 32751CONTACT PHONE NUMBER: 407.740.5020PROJECT MANAGER: ADRIAN BAUSe-mail: [email protected]

FAX (407) 740-0365

PHONE (407) 740-5020

CERT. OF AUTH. No. 5096

ENG. BUS. No. EB-0005096

130 Candace Drive

Maitland, FL 32751

Upgrade air cooled chiller plant to 200 ton capacity. Add expansion capability for second chiller.Provide temporary chiller during construction.

THE SCHOOL BOARD OF VOLUSIA

COUNTY FLORIDA

200 North Clara Avenue

Deland, Florida 32720

VOLUSIA

COUNTY SCHOOLS

IDA D. WRIGHT

LINDA CUTHBERT

RUBEN COLON

JAIME M. HAYNES

CARL G. PERSIS

RONALD S. FRITZ

CHAIRMAN

VICE CHAIRMAN

MEMBER

MEMBER

MEMBER

SUPERINTENDENT

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

CS

Cover S

heet

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 2: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

LOADING RAMP

DN

2 3 4

T

M

EM GEN

SCALE:

CEP General Work Plan - Renovation

1/4" = 1'-0"

22'-4"

7'-2

"

44'-8"

1

7

'

-

7

"

21

'-4

"

57'-1"

33

'-9

"

22'-4"

7'-2

"

1

6

5

3

1

33

3

2

2 2

7

EXIST.

ELECTRICAL

GEAR

7 7

CJ

CJ

EXISTING

LIGHT POLE

EXISTING

DRIVEWAY

GENERAL NOTES:

KEY NOTES:

1. STRUCTURAL CONCRETE PAD FOR CHILLER AS INDICATED.

2. HOUSEKEEPING PAD FOR MECHANICAL EQUIPMENT. COORDINATE

DIMENSIONS WITH SHOP DRAWINGS.

3. CONCRETE SKIRT WITH THICKENED EDGE.

4. 6' BLACK VINYL FENCE WITH PVC VIEW SLATS.

5. 3' GATE.

6. 6' GATE.

7. MATCH FINISHED ELEVATION OF SIDEWALK.

1. DEMOLISH ENTIRE EXISTING CHILLER YARD INCLUDING CONCRETE SLABS,

FENCING, MECHANICAL AND ELECTRICAL WORK.

2. CLEAR AND GRUB AREA AND PREPARE FOR NEW WORK.

3. RELOCATE EXISTING IRRIGATION SYSTEM (HEADS AND PIPING) OUTSIDE OF

NEW CHILLER YARD.

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

UTILITY BLDG

MAIN BLDG

LOADING

CEP

AREA OF

WORK

KEYPLAN

NOT TO SCALE

G1.01

CE

P G

eneral W

ork P

lan

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 3: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

SUMMARY OF WORK

BIDDING PROCEEDURES

ELECTRIC DUCT HEATER

FS

AFS

MANUAL DAMPER

RADIATION DAMPER

SMOKE DAMPER (FS = FIRE/SMOKE DAMPER)

FIRE DAMPER

FLEXIBLE CONNECTION

AIR FLOW STATION

S R

AD

STANDARD BRANCH, SUPPLY OR RETURN

TRANSITION, ECCENTRIC

ACCESS DOOR

TRANSITION, CONCENTRIC

RADIUS ELBOW

TURNING VANES

DUCTWORK ELBOW DOWN

MITERED ELBOW

TEE, OUTLET DOWN

VENTURI FLOWMETER

FLEXIBLE CONNECTOR

CONNECTION, BOTTOM

CONNECTION, TOP

UNION

TEE, OUTLET UP

ELBOW TURNED DOWN

ELBOW TURNED UP

PRESSURE GAGE

STRAINER WITH BLOWDOWN VALVE

MANUAL AIR VENT

AUTOMATIC AIR VENTAUTOMATIC AIR VENT

THERMOMETER

SECTION, SUPPLY DUCT

R

12X20

CHANGE OF ELEVATION (R=RISE, D=DROP)

INTERNALLY LINED OR DOUBLEWALL DUCT

DUCT SIZE IN INCHES, WIDTH X DEPTH (INSIDE)

DUCTWORK ELBOW UP

SECTION, EXHAUST DUCT

SECTION, ROUND DUCT

FLEXIBLE DUCT

SECTION, RETURN DUCT

TAG

CFM

TAG

CFM

TAG

CFM

CFM

TAG

CFM

TAG

SIDEWALL RETURN OR EXHAUST GRILLE

HVAC EQUIPMENT

ROOFTOP EXHAUST FAN

SIDEWALL SUPPLY GRILLE

EXHAUST AIR GRILLE

RETURN AIR GRILLE

RETURN AIR FLOW

SUPPLY AIR DIFFUSER

SHUTOFF VALVE (BS=BALANCING/SHUTOFF)

SOLENOID ACTUATOR

MOTORIZED ACTUATOR

BACKFLOW PREVENTOR ASSEMBLY

PIPE CAP

PRESSURE REDUCING VALVE

THREE-WAY VALVE

PLUG VALVE

CHECK VALVE

CHILLED WATER SUPPLY

HOT GAS REFRIGERANT PIPING

REFRIGERANT PIPING

CONDENSER WATER RETURN

C

HG

R

CWR

CONDENSER WATER SUPPLY

HOT WATER RETURN

HOT WATER SUPPLY

CHILLED WATER RETURN

CWS

HWR

HWS

CHWR

CONTROLS

ABBREVIATIONS

PIPING, VALVES AND SPECIALTIES

MECHANICAL SYMBOL LEGEND

AIR MOVING DEVICES AND COMPONENTS

UC

DRAWING REVISION INDICATOR

EXISTING TO BE DEMOLISHED

SUPPLY AIR FLOW

EXISTING TO REMAIN

EQUIPMENT TAG (X=TYPE, Y=SYSTEM, Z=NUMBER)

POINT OF CONNECTION

UNDERCUT DOOR (1" UNO)

KEYED NOTES

GENERAL

MOTORIZED CONTROL DAMPER

DUCT PRESSURE SENSOR

ENERGY MANAGEMENT SYSTEM PANEL

CHILLED WATER SUPPLYCHWS

EMS

CARBON DIOXIDE SENSOR

DUCT MOUNTED SMOKE DETECTOR

HUMIDITY SENSOR

THERMOSTAT OR TEMPERATURE SENSOR

GENERAL NOTES

ENGINEERS COMPLIANCE NOTE

PLUMBING SYMBOL LEGEND

STANDARD PIPING

COLD WATER PIPING AND FLOW ROOF DRAIN AND SIZE

GAS COCK

FLOOR SINK

SHOCK ABSORBER

EXTERIOR CLEANOUT AND SIZE

FLOOR CLEANOUT AND SIZE

WALL CLEANOUT AND SIZE

HOSE BIBB OR WALL HYDRANT

FLOOR DRAIN(S) SIZE AND TYPE (X)

COLD WATER RISER WITH ISOLATION VALVE

VENT PIPING

HOT WATER RETURN PIPING AND FLOW

HOT WATER PIPING AND FLOW

VENT THRU ROOF AND SIZE

WASTE OR SANITARY PIPING

W.HY.HB

4"ECO

3"FD"X"

4"FCO

4"WCO

4"RD

2"VTR

EQUIPMENT

1. THE WORD "PROVIDE" SHALL MEAN "FURNISH AND INSTALL".

2. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL

BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF

THE FACILITY WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS

OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE

CONSTRUCTION AREA.

3. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN

WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS

TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE

SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION,

SUFFICIENT ADVANCE NOTICE MUST BE GIVEN TO THE OWNER INDICATING WHICH AREAS

WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR HOW

LONG A PERIOD OF TIME.

4. THE OWNER HAS THE RIGHT OF FIRST REFUSAL FOR ALL ITEMS REMOVED. ALL ITEMS

REFUSED BY THE OWNER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF

PROPERLY BY THE CONTRACTOR.

5. THE JOB SITE SHALL BE CLEANED DAILY TO REMOVE FROM THE PREMISES ANY DIRT AND

DEBRIS CAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN

PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION

OF PROPERTIES OTHER THAN THE OWNERS.

7. FLUSH AND SUCCESSFULLY PRESSURE TEST ALL PIPING SYSTEMS PRIOR TO PLACING IN

SERVICE. ACCEPTABLE BACTERIOLOGICAL TESTS MUST BE PROVIDED ON ALL DOMESTIC

SUPPLY WATER PIPING AFFECTED BY THE WORK.

8. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED, EXCEPT WHERE

INDICATED AS BEING RELOCATED.

9. PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS, PLUGS, OR VALVES FOR

PIPING TO ALLOW COMPLETION OF WORK. DO NOT LEAVE PIPING OPEN ENDED.

10. COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO BID, FABRICATION, PURCHASE

AND INSTALLATION OF ALL WORK.

11. VISIT THE SITE AND VERIFY ALL DIMENSIONS IN THE FIELD, AND SHALL ADVISE THE

ARCHITECT/ENGINEER AND THE OWNER OF ANY DISCREPANCIES BEFORE PERFORMING

THE WORK. ALL WORK SHALL CONFORM TO ALL STATE AND LOCAL CODES, RULES AND

REGULATIONS AND ORDINANCES.

12. SECURE AND PAY ALL FEES AND PERMITS PERTAINING TO THE CONTRACT.

13. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THE

MANUFACTURER'S WRITTEN INSTRUCTIONS.

14. PROVIDE ALL HANGERS AND SUPPORTS REQUIRED FOR A COMPLETE INSTALLATION.

15. PROVIDE ALL RIGGING, HANDLING AND PROTECTION OF MATERIALS.

16. PROVIDE ALL CORING, LINTELS, BEAM PENETRATIONS, AND STRUCTURAL SUPPORTS AND

FRAMING AS IT RELATES TO THE WORK.

17. SUBMIT SHOP DRAWINGS AND EQUIPMENT CUTS TO THE ENGINEER FOR APPROVAL

PRIOR TO ORDERING ANY MATERIALS. ALL SHOP DRAWING SUBMITTALS SHALL BE IN

ACCORDANCE WITH THE SPECIFICATIONS.

18. MAINTAIN ON-SITE A SET OF FINAL CONSTRUCTION DOCUMENTS (INCLUDING ADDENDA)

WITH MARKUP AS-BUILT INFORMATION.

19. NOTIFY THE ENGINEER PRIOR TO CONCEALING ANY WORK.

20. ALL EQUIPMENT INSTALLED SHALL PROVIDE THE MANUFACTURERS RECOMMENDED AND

CODE REQUIRED ACCESS AREAS.

21. PROVIDE ALL MODIFICATIONS RESULTING FROM USING EQUIPMENT OTHER THAN THE

BASIS OF DESIGN.

22. CLEAN, PRIME, AND PAINT ALL BARE METAL SURFACES TO PREVENT RUST.

23. ALL DRAIN PIPES SHALL BE INSTALLED WITH A MINIMUM OF 1/8" PER FOOT SLOPE.

SANITARY PIPES LARGER THAN 2 1/2" REQUIRE A MINIMUM OF 1/4" PER FOOT SLOPE.

24. PROVIDE SITE UTILITY LOCATING SERVICES AS REQUIRED TO AVOID DAMAGING EXISTING

UNDERGROUND UTILITIES.

25. PRIOR TO DISCONNECTING PIPING OR CONNECTING NEW PIPING, FIELD VERIFY THE

EXISTING PIPING PROVIDES THE SERVICE INDICATED IN THE DRAWINGS.

AAV AUTOMATIC AIR VENT

AC AIR CONDITIONING UNIT

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AP ACCESS PANEL

AVER AVERAGE

B BOILER

BDD BACK DRAFT DAMPER

BFP BACK FLOW PREVENTOR

BLDG BUILDING

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BTU BRITISH THERMAL UNIT

CAP CAPACITY

CD CEILING DIFFUSER

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CLG CEILING

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

CT COOLING TOWER

CU CONDENSING UNIT

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DB DRY BULB

DIA DIAMETER

DIFF DIFFERENTIAL

DISCH DISCHARGE

DN DOWN

DX DIRECT EXPANSION

EA EACH

EAT ENTERING AIR TEMPERATURE

EFF EFFICIENCY

ELEC ELECTRIC

EQUIV EQUIVALENT

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETC AND SO FORTH

EWT ENTERING WATER TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EXT EXTERNAL

F DEGREES FAHRENHEIT

FCU FAN COIL UNIT

FD FLOOR DRAIN

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FLR FLOOR

FP FIRE PROTECTION

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRG FILTER RETURN GRILLE

FRICT FRICTION

FT FEET

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GRS/LB GRAINS PER POUND

H2O WATER

HB HOSE BIBB

HD HEAD (SEE SCHEDULES)

HP HORSEPOWER

HR HOUR

HT HEIGHT

HTR HEATER

HX HEAT EXCHANGER

HZ HERTZ

ID INTERNAL DIAMETER

IN INCHES

INCL INCLUDING

KW KILOWATT

L LENGTH

L LOUVER

LAT LEAVING AIR TEMPERATURE

LB POUND

LBS/HR POUNDS PER HOUR (#/HR)

LD LOUVERED DOOR (24X24 UNO)

LF LINEAR FEET

LRA LOCK ROTOR AMPS

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MBH THOUSANDS OF BTU PER HOUR

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MOD MOTOR OPERATED DAMPER

MTD MOUNTED

NC NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OAT OUTSIDE AIR TEMPERATURE

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OZ OUNCE

P PUMP

PD PRESSURE DROP (SEE SCHEDULE)

PERF PERFORATED

PH PHASE

POS POSITIVE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

PVC POLYVINYL CHLORIDE

QUAN QUANTITY

RA RETURN AIR

RAG RETURN AIR GRILLE

RBJ RUN BETWEEN JOIST

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REQD REQUIRED

RET RETURN

RH RELATIVE HUMIDITY

RLA RATED LOAD AMPS

RM ROOM

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SP STATIC PRESSURE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

SUCT SUCTION

TEMP TEMPERATURE

TG TRANSFER GRILLE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UC UNDERCUT

UH UNIT HEATER

UNOCC UNOCCUPIED

UON UNLESS OTHERWISE NOTED

V VOLTS

VAV VARIABLE AIR VOLUME UNIT

VEL VELOCITY

VTR VENT THRU ROOF

W WIDTH

W/O WITHOUT

WB WET BULB

WC WATER COLUMN

WG WATER GAUGE

WMS WIRE MESH SCREEN

THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS AS REQUIRED AND AS INDICATED

ON THESE DRAWINGS AND NOTES. THIS WORK SHALL INCLUDE, BUT IS NOT LIMITED TO THE FOLLOWING:

1. PERFORMANCE OF ALL WORK AS DESCRIBED ON PROPOSED CONTRACT DRAWINGS AND AS REFERRED TO

IN THE SPECIFICATIONS AND NOTES AS APPLICABLE FOR EACH PARTICULAR CONSTRUCTION DISCIPLINE.

2. RESTORATION OF EXISTING SYSTEMS, DEVICES, FINISHES, ETC. DAMAGED OR ALTERED BY NEW WORK TO

ACCEPTABLE CONDITION AS DETERMINED BY THE OWNER, ARCHITECT, AND/OR ENGINEER.

3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT, GENERAL CHARACTER AND LOCATION OF THE

WORK INCLUDED. OFFSETS AND/OR CHANGES IN ELEVATION OF PIPING AND DUCTWORK DUE TO

STRUCTURAL OR OTHER INTERFERENCES SHALL BE PROVIDED WITHOUT EXTRA COST. CONTRACTOR SHALL

VERIFY AND EVALUATE ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK.

4. COORDINATE WORK WITH THE PRIME CONTRACTOR TO MEET THE CONSTRUCTION SCHEDULE AND PHASING

REQUIREMENTS.

1. SUBMISSION OF BID DIRECTLY OR INDIRECTLY IN CONNECTION WITH THIS WORK SHALL IMPLY THAT THE

BIDDER HAS EXAMINED THE JOB SITE UNDER WHICH HE WILL BE OBLIGATED TO OPERATE SHOULD HE BE

AWARDED THE WORK UNDER THIS CONTRACT. NO EXTRA CHARGE WILL BE ALLOWED FOR FAILURE OF ANY

BIDDER TO EXAMINE THE SITE PRIOR TO BID.

2. REVIEW CONSTRUCTION SCHEDULE AND EQUIPMENT LEAD TIMES AND INCLUDE ALL COSTS AND QUICKSHIP

CHARGES FOR ALL EQUIPMENT NEEDED TO MEET SCHEDULE.

1. TO THE BEST OF MY KNOWLEDGE, THE DRAWINGS AND SPECIFICATIONS COMPLY

WITH THE MINIMUM BUILDING CODE REQUIREMENTS OF THE FLORIDA BUILDING

CODE, 6TH EDITION (2017) AND THE FLORIDA FIRE PREVENTION CODE, 6TH EDITION

(2017).

LD DOOR GRILLE (24"X24" UNO)

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

M0.01

Mechanical Legends and N

otes

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 4: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

157A

RISER

158

TOILET

OFFICE

RECEIV.

DN

1 2 3 4

T

M

EM GEN

4"

4" CHR UNDERGROUND

4" CHS UNDERGROUND

CH

R

CH

S

1" CW MAKEUP

CU1-5

GENERAL NOTES:

KEY NOTES:

1. DEMOLISH ALL EQUIPMENT INDICATED WITH HATCHING OR INDICATED TO BE

DEMOLISHED. DEMOLISH ALL WORK ASSOCIATED WITH THE SYSTEMS

DEMOLISHED (INCLUDING CONTROLS, PIPING AND ELECTRICAL WORK) UNLESS

NOTED OTHERWISE.

2. WHERE EQUIPMENT BEING DEMOLISHED IS INSTALLED ON A HOUSEKEEPING

PAD, DEMOLISH THE HOUSEKEEPING PAD AND PATCH THE FLOOR TO MATCH

SURROUNDING SURFACES.

3. DEMOLISH ALL CONDUIT BELOW CHILLER YARD SLAB.

4. FIELD INVESTIGATE REQUIREMENTS FOR DEMOLITION. PROVIDE ALL LABOR

AND MATERIALS NEEDED.

5. EXISTING EQUIPMENT THAT IS TO REMAIN SHALL BE PROTECTED FROM

DAMAGE DURING CONSTRUCTION. ALL EXISTING TO REMAIN DUCTWORK

SYSTEMS SHALL BE SEALED WITH VISQUEEN DURING THE ENTIRE

CONSTRUCTION PROCESS.

1. DEMO DOM WATER PIPE BELOW GRADE.

2. DEMOLISH CHW PIPING BELOW GRADE.

3. DEMOLISH ALL ABOVE GROUND CHW PIPING, PUMPS, AND ACCESSORIES.

4. DEMOLISH CHILLER AND DISPOSE OF PROPERLY.

5. RELOCATE CONDENSING UNIT PER RENOVATION PLAN. UNDERGROUND

REFRIGERANT LINES TO REMAIN IN PLACE.

6. REFER TO ELECTRICAL PLAN FOR ELECTRICAL EQUIPMENT REQUIREMENTS.

SCALE:

CEP Mechanical Plan - Demolition

1/4" = 1'-0"

S

R

4"

4"

4"

CH

1

250A CH DISC

1

REFRIGERANT PIPE CHASE

2

2

2

3 3

3

3

4

5

6

6

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

UTILITY BLDG

MAIN BLDG

LOADING

CEP

AREA OF

WORK

KEYPLAN

NOT TO SCALE

M2.01

CE

P M

echanical P

lan - D

em

olition

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 5: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

DN

LOADING RAMP

DN

1 2 3 4

T

M

EM GEN

SCALE:

CEP Mechanical Plan - Renovation

1/4" = 1'-0"

4" CHR UNDERGROUND

4" CHS UNDERGROUND

CH

S

1" CW MAKEUP

4"

4"

EL

EC

EL

EC

CU

1.5

ET

9

AS

DISC

1

CH

1

CH

2

2

DIS

C

VF

DD

IS

C

VF

DD

IS

C

5

5

6

8

8

10

10

11

7

12

13

6" CHWR

6" CHWS

6"CHWS&R

FUTURE PIPING

3

4

4

14

11

4" BYPASS

EXISTING

TO REMAIN

GENERAL NOTES:

KEY NOTES:

1. PROVIDE CHILLER PER SPECIFICATIONS AND DETAILS.

2. FUTURE CHILLER.

3. ROUTE PIPING WITHIN CHILLER FRAMEWORK.

4. FUTURE EQUIPMENT.

5. ROUTE PIPING OVERHEAD. PROVIDE SUPPORTS AS INDICATED.

6. MAKEUP WATER SYSTEM WITH SS UNISTRUT AND HARDWARE SUPPORT

FRAMEWORK.

7. EXTEND 1" SCHED 40 PVC DOM WATER LINE BELOW GRADE TO MAKEUP

WATER SYSTEM.

8. STUB-UP 6" EMERGENCY CHILLER CONNECTIONS WITH ISOLATION VALVE

AND BLIND FLANGES AT 24" AFF.

9. CHEMICAL FEEDER. REFER TO DETAIL.

10. LOCATION OF EXTERNAL CHILLER DISCONNECT. REFER TO ELECTRICAL

PLANS FOR ADDITIONAL REQUIREMENTS.

11. PROVIDE 6X6X8' CONC POSTS AND SS UNISTRUT MOUNTING RACK AND

HARDWARE. PROVIDE 30" MIN BURIAL DEPTH FOR POSTS.

12. 4" STUBOUTS WITH VALVES AND BLIND FLANGES FOR FUTURE EXPANSION

IN CONCRETE VALVE BOX. CONTRACTOR TO USE STUBOUTS FOR

TEMPORARY CHILLER CONNECTION DURING CEP CONSTRUCTION.

13. RELOCATE CONDENSING UNIT AS INDICATED. EXTEND AND RECONNECT

REFRIGERANT PIPING, CONTROLS, AND ELECTRICAL AS REQUIRED.

RECHARGE SYSTEM AND CONFIRM PROPER OPERATION.

14. 6" STUBOUTS FOR FUTURE CHILLER 24" AFF. PROVIDE ISOLATION VALVE

AND BLIND FLANGE FOR EACH.

1. CLOSELY COORDINATE ALL WORK IN CHILLER PLANT. PROVIDE 1/4"

COORDINATION PLAN. COORDINATION PLAN TO ENGINEER FOR REVIEW

PRIOR TO PERFORMING ANY NEW WORK. PLAN SHALL INDICATE NEC

CLEARANCES FOR ELECTRICAL DEVICES.

2. COORDINATE PIPING AND CONDUIT REQUIREMENTS FOR ALL DISCIPLINES,

INCLUDING CONTROLS. ALL CONDUIT SHALL BE EITHER UNDERGROUND OR

OVERHEAD. CONDUIT RUNNING ALONG SLAB WILL NOT BE ALLOWED.

3. ALL OVERHEAD PIPING SHALL HAVE 7' (MIN.) CLEARANCE TO BOTTOM OF

PIPE SUPPORTS.

4. CLEAN, FLUSH, AND CHEMICALLY TREATMENT ENTIRE CHILLED WATER

LOOP AND PROVIDE ANALYSIS REPORT TO OWNER AND ENGINEER

INDICATING PROPER CHEMICAL BALANCE.

TEMPORARY COOLING:

1. PROVIDE TURNKEY 100 TON TEMPORARY RENTAL CHILLER AND PUMP TO

MAINTAIN CHILLED WATER SERVICE TO FACILITY DURING CONSTRUCTION.

2. FACILITY HVAC SYSTEM DOWNTIME SHALL NOT EXCEED 3 DAYS. WEEKEND

AND HOLIDAY OUTAGES ARE ACCEPTABLE IF COORDINATED IN ADVANCE.

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

UTILITY BLDG

MAIN BLDG

LOADING

CEP

AREA OF

WORK

KEYPLAN

NOT TO SCALE

M3.01

CE

P M

echanical P

lan - R

enovation

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 6: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

ANY FITTING

ANY FITTING

DIRECTION OF FLOW

PIPE DIA.

MIN. 5

PIPE DIA.

MIN. 2

NOTE:

1. VENTURI SIZE SHALL MATCH PIPE SIZE.

VENTURI

SCALE:

8

VENTRI MEASURING STATION INSTALLATION DETAIL

NOT TO SCALE

PUMP

POUR PUMP BASE SOLID

WITH NON-SHRINK GROUT

1/2" STEEL

ANCHOR BOLTS

THICKNESS

1/2" STEEL DOWELS

EPOXY INTO EXISTING SLAB

MINIMUM 4" EMBEDMENT

PROVIDE LOCK WASHER

AND STEEL WASHER

CONCRETE BASE

EXISTING SLAB

SCALE:

5

PUMP BASE DETAIL

NOT TO SCALE

NOTES:

1. ALL FASTENERS SHALL BE HOT-DIPPED GALVANIZED.

2. BASE SHALL EXTEND 3" BEYOND EQUIPMENT IN ALL DIRECTIONS.

3. PROVIDE ONE DOWEL PER 2.5 SF OF BASE, EVENLY DISTRIBUTED.

4. PROVIDE PUMP BOLT SIZE AND QUANTITY PER MANUF RECOMMENDATION.

5. THICKNESS: 6" FOR 7.5 HP AND LESS, 8" FOR OVER 7.5 HP.

FLOOR

BUTTERFLY VALVE

6' CONCRETE HOUSEKEEPING PAD

LEVEL GROUT

SILENT CHECK VALVE

FLEX. CONNECTOR (TYP.)

PUMP MOTOR

THERMOMETER (TYP.)

BUTTERFLY VALVE

5 P

IP

E D

IA

(M

IN

)

SCALE:

1

CHILLED WATER PUMP DETAIL

NOT TO SCALE

STRAINER AND

BLOW-OFF WITH

HOSE ADAPTER

LINE SIZE SUCTION

DIFFUSER

COOLER

VICTAULIC OR FLANGED

CONNECTION (TYP)

VIBRATION ISOLATOR (TYP)

THERMOMETER (TYP)

UNION (TYP)

P/T PLUG (TYP)

AUTO AIR VENT (TYP)

ISOLATION VALVE (TYP)

NOTE: AIR VENTS SHALL BE AT HIGH POINTS IN PIPING.

1/4" COPPER TUBING

40 MESH STRAINER

EMS SENSOR

RETURN

SUPPLY

SCALE:

4

CHILLER PIPING DETAIL

NOT TO SCALE

CHILLER

PLAN VIEW

12" LONG I-BEAM

SECTIONS (TYP)

1/2" THICK SKIRTBOARD

RUBBER ISOLATION PADS

1/2" DIA SS BOLT W/WASHER IN EACH

SUPPORT BEAM. INSTALL BOLTS THROUGH

CHILLER BASE RAIL AND BEAM. SECURE

WITH SS WASHER AND NYLON INSERT SS

LOCK NUT.

ALUMINUM BEAM, WFB-8.0X8.0X0.288

(If=8")x1'-0" LONG (TYP). BOLT EACH

TO SLAB AS SHOWN. PAINT W/2

COATS OF ACRYLIC PAINT. 6061-T6

ALUMINUM.

AS REQ'D BY MFG.

NTE 5'-0" O.C. MAX

1/2" DIA SS WEDGE ANCHORS AS

SHOWN. TYP 3" MIN EMBEDMENT INTO

SLAB.

ELEVATION VIEW

CONCRETE PAD OR

HOUSEKEEPING PAD

NOTES:

1. CONCRETE PAD TO EXTEND 6" BEYOND EQUIPMENT ON ALL SIDES.

2. CENTER BEAMS UNDER CHILLER RAILS TO DISTRIBUTE WEIGHT EVENLY.

3. BEAM SUPPORT QUANTITY AND LOCATIONS SHALL BE AS RECOMMENDED

BY THE CHILLER MANUFACTURER, NOT TO EXCEED 5' BETWEEN SUPPORTS.

CHILLER FRAME

SCALE:

9

CHILLER SUPPORT DETAIL

NOT TO SCALE

3/4'' BALL VALVE

3/4'' x 4'' NIPPLE

REDUCER

SCALE:

6

TYPICAL HIGH POINT AIR VENT DETAIL

NOT TO SCALE

CIRCULATING

WATER PIPING

3/8'' O.D. COPPER

TUBING TO FLOOR DRAIN

OR TO ACCESSIBLE

POINT FOR DISCHARGE

INTO A CONTAINER.

1/4" COPPER TUBING (TYP)

PRESSURE GAUGE

BALL VALVE (TYP)

RETURN

SUPPLY

SCALE:

7

PIPING SENSOR MANIFOLD DETAIL

NOT TO SCALE

NOTES:

1. SEE EQUIPMENT PIPING DETAIL FOR INSTALLATION LOCATION.

2. INSULATE MANIFOLD AS REQUIRED TO PREVENT CONDENSATION.

HORIZONTAL PIPES

VERTICAL PIPES

SNUBBER

(TYP)

GAUGE COCK

(TYP)

WELD-O-LET

CONNECTION

(TYP)

3/8" STEEL

TUBING (TYP)

SCALE:

3

HYDRONIC SYSTEM PRESSURE GAUGE DETAIL

NOT TO SCALE

NOTE:

1. WHERE CARRIER PIPE IS INSULATED, INSULATE GAUGE TUBING TO GAUGE.

PRV (15 PSI)

PIPE SUPPORT

(TYP)

HOUSEKEEPING

PAD (4" THICK)

EXPANSION

TANK

NEOPRENE

ISOLATORS

HIGH VOLUME

COALESCING

AIR/DIRT

SEPARATOR

BALL VALVE

WITH HOSE CONN

HIGH CAPACITY

AUTO AIR VENT

M

CONNECT TO

DOMESTIC

WATER SUPPLY

PRESSURE RELIEF (100 PSI)

REDUCED PRESSURE DBL BACKFLOW

PREVENTER WITH FUNNEL

1/2" COPPER

TO NEAREST

FLOOR DRAIN

NOTES:

1. ROUTE 1/4" COPPER TUBING FROM AIR VENT AND

PRESSURE RELIEF TO NEAREST FLOOR DRAIN.

WATER METER WITH UNIONS

1/4" COPPER TUBING

UNION

HOSE BIBB

SCALE:

2

AIR SEPARATOR AND EXPANSION TANK DETAIL

NOT TO SCALE

WATER HAMMER

ARRESTOR

PDI SIZE 'C'

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

M5.01

Mechanical D

etails

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 7: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

GROUTE SOLID

AFTER ADJUSTMENT

(4) 3/8" BOLTS WITH WEDGE ANCHORS

INTO SLAB (MIN. 3" EMBED)

CONTINUOUSLY WELDED

8"X8"X5/16" PLATE TO PIPE

3" DIA GALVANIZED

SCHEDULE 40 PIPE

CONCRETE SLAB

WELD PIPE SADDLE SUPPORT TO PIPE.

PROVIDE WATER TIGHT CONNECTION.

HIGH COMPRESSIVE STRENGTH

INSULATION INSERT UNDER SHIELD.

INSULATION SHIELD

(MIN 12" LONG)

PIPE AND INSULATION

7' MIN.

(UNO)

SCALE:

1

INSULATED PIPE SUPPORT DETAIL

NOT TO SCALE

GROUTE SOLID

AFTER ADJUSTMENT

(4) 3/8" BOLTS WITH WEDGE ANCHORS

INTO SLAB (MIN. 3" EMBED)

CONTINUOUSLY WELDED

12"X12"X1/2" PLATE TO PIPE

4" DIA GALVANIZED

SCHEDULE 40 PIPE

CONCRETE SLAB

CONTINUOUSLY WELD

4" WF BEAM TO PIPE

7' MIN.

(UNO)

INSULATION SHIELD

(MIN 12" LONG)

PIPE AND INSULATION

4" GALVANIZED

WF BEAM

HIGH COMPRESSIVE STRENGTH

INSULATION INSERT UNDER SHIELD

NOTES:

1. ALL MATERIALS TO BE HOT DIPPED GALVANIZED.

2. MAX SUPPORTED PIPE SIZE SHALL BE 6".

3/8" U-BOLT

(DRILL BEAM EVENLY)

SCALE:

2

INSULATED PIPE SUPPORT DETAIL - TWO PIPES

NOT TO SCALE

PUMP SUCTION PUMP DISCHARGE

POT FEEDER ASSY

UNION (TYP)

VENT

3/4" DRAIN

ISOLATION

VALVE (TYP)

1-1/2" STUBOUT

CONNECTIONS WITH

THREADED CAP FOR

FILTRATION SYSTEM (TYP)

NOTES:

1. TOP OF FEEDER SHALL BE MAX 3' AFF.

2. POT FEEDER ASSEMBLY AND ALL FEEDER PIPING SHALL BE

INSULATED. POT FEEDER LID INSULATION SHALL BE REMOVABLE

WITHOUT DAMAGE.

SCALE:

4

CHEMICAL POT FEEDER PIPING DETAIL

NOT TO SCALE

2" DIA. & SMALLER

2" DIA. & SMALLER

ABOVE 2" DIA. PIPE

VERTICAL

ABOVE 2" DIA. PIPE

HORIZONTAL

2 1/2" DIA.

2 1/2" DIA.

SCALE:

5

THERMOMETER WELL INSTALLATION DETAIL

NOT TO SCALE

LA

P S

PLIC

E (T

YP

.)

(TYP.)

0"

(TYP.)

0"

2'-6" C

LA

SS

"B

"

LA

P S

PLIC

E

(T

YP

.)

STD. HOOK

(TYP.)

0"

2'-6" C

LA

SS

"B

"

FENCE POST

GRADE

SLOPE 1/8" /FT

4"

2-#5 CONT.

8"

3" CLR.

8" MIN.

12" MIN.

8"

3"

APRON

4"

R/W #4 EA WAY

12" O.C.

3" CLR

CORNER INTERSECTION

NOTE:

1. PROVIDE MATCHING CORNER BARS FOR ALL HORIZONTAL REINFORCING AT

INTERSECTIONS & CORNERS OF ALL: FOOTINGS AND THICKENED SLABS ON GRADE.

2. PROVIDE 95% COMPACTION OF SOIL. OWNER TO PROVIDE TESTING.

SCALE:

3

CONC. PAD THICKENED EDGE REINFORCEMENT

NOT TO SCALE

THICKENED SLAB

CHAMFER EDGES

SECTION

SCALE:

CHAIN LINK FENCE DETAIL

NOT TO SCALE

6

SCALE:

CHAIN LINK FENCE GATE DETAIL

NOT TO SCALE

7

PER PLANS

5" MAX.

WIDTH

42

"

6'

NOTES:

1. GATES TO BE CLEAR OPENING PER THE PLANS

2. PROVIDE PADLOCK LOCKABLE HASP.

3. DOUBLE GATES SHALL HAVE LOCKABLE DROP BAR EXTENDING 6" (MIN)

INTO 1" SCH 40 PIPE RECEIVER SET IN 18"X18"X12" CONC FOOTING.

6'

10' MAX

END OR CORNER BAY

10' MAX

TOP RAIL

GSP, SCH 40

CORNER POST

GSP, SCH 40

NOTES:

1. WOVEN WIRE FABRIC TO BE STRETCHED TAUT WITH STRETCHER BARS AND STRAPS

AND FASTENED TOP AND BOTTOM AT LINE POSTS WITH GALV HOG RING TIES.

2. FABRIC SHALL HAVE KNUCKLED SELVAGES ON TOP AND BOTTOM.

WIRE TIES

DIAG BRACE

W/TURNBUCKLE

STRETCHER BAR

9GA GALV

STEEL FABRIC

LINE POST BRACE

THICKENED EDGE

OF CONC PAD

CROWN

GROUT

7GA AL COATED SPRG

COIL TEN. WIRE

CROWN PAD SLIGHTLY FOR DRAINAGE

1/2" EXP. JT. FILLED

WITH ELASTOMERIC

1-1/2"1-1/2"

3/4" 3/4"

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

M5.02

Mechanical D

etails

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 8: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

NOTES:

1. REFER TO DETAILS FOR INDIVIDUAL EQUIPMENT INSTALLATION

REQUIREMENTS.

2. PROVIDE BACKUP DP SENSOR IN CHILLER PLANT FOR EMS. ADD CONTROL

SEQUENCE TO REVERT TO BACKUP DP SENSOR IF PRIMARY SENSOR FAILS.

3. AHU 1, 2, 4 ARE CURRENTLY 3-WAY VALVES. AHU1 AND AHU 4 SHOULD BE

CONVERTED TO 2-WAY VALVES WHEN MODIFIED.

(57 GPM)

AHU 4

AHU 1

(59 GPM)

dP

dP

T

BY

PA

SS

(75 GPM)

FUTURE

VFD

VFD

FLOW

METER

T

P-1

P-2

EXPANSION TANK, ET-1

AIR SEPARATOR, AS-1

AHU 2

(82 GPM)

BYPASS FLOW

CONTROL VALVE

FLOW

METER

CHILLER ISOLATION

CONTROL VALVE (TYP)

CH-2 (FUTURE)

VFM-2

T

(200 TONS, 343 GPM)

CH-1

VFM-1

T

FM-2

FM-1

(217 GPM MINIMUM)

T

EMS TEMPERATURE

SENSOR (TYP)

(200 TONS, 343 GPM)

(70 GPM)

EXTRA CAPACITY

AT CEP

(217 GPM MINIMUM)

EMERGENCY

CONNECTION (TYP)

SEQUENCE OF OPERATION

1.1 GENERAL REQUIREMENTS:

A. BIDDING PROCEDURES:1. COORDINATION: PRIOR TO SUBMITTING A BID FOR THE WORK, THE CONTROLS

CONTRACTOR SHALL COORDINATE THE INTERCONNECTION OF THE EMS WITHINTERNAL EQUIPMENT CONTROLLERS AND PROVIDE ALL MATERIALS AND LABORNEEDED TO MEET THE SEQUENCES OF OPERATION.

2. THE FOLLOWING SEQUENCE OF OPERATION OUTLINES THE GENERAL MEANS BYWHICH THE EMCS SHALL INITIATE AND RESPOND TO EVENTS. THEREQUIREMENTS FOR THE CONTROL SYSTEM ARE SHOWN ON THE DRAWINGS, INTHE SEQUENCE OF OPERATIONS, IN THE SCHEDULES, AND IN THESPECIFICATIONS.

3. MODIFICATIONS TO THE MEANS OF CONTROL WILL BE CONSIDERED, BUT WILLNOT BE ALLOWED IF ENERGY EFFICIENCY IS DECREASED.

B. SCOPE:1. CONTROL SYSTEM EXPANSION: THE EXISTING CONTROL SYSTEM SHALL BE

EXPANDED TO INCORPORATE THE EQUIPMENT AND SEQUENCES OF OPERATIONCONTAINED IN THIS PROJECT. PROVIDE ALL LABOR, MATERIALS, ANDENGINEERING NEEDED TO PROVIDE A FULLY FUNCTIONAL CONTROL SYSTEM.a. WHERE EXISTING CENTRAL PLANT EQUIPMENT EXISTS THAT IS REQUIRED

FOR NEW EQUIPMENT TO FUNCTION, THE EMCS SHALL ACTIVATE THECENTRAL PLANT EQUIPMENT AS NEEDED.

2. COMMUNICATIONS: EACH PIECE OF EQUIPMENT SHALL BE CONTROLLEDINDEPENDENTLY BY A STAND-ALONE CONTROLLER. IF COMMUNICATIONS ARELOST WITH THE EMCS NETWORK, THE EQUIPMENT CONTROLLER SHALLCONTINUE TO OPERATE THE EQUIPMENT WITHOUT CHANGING OPERATINGMODES OR REDUCING LOCAL FUNCTIONALITY.

1.2 MISCELLANEOUS SEQUENCES:

A. MINIMUM RUN TIMES:1. EQUIPMENT SHALL BE PROGRAMMED TO PROVIDE MANUFACTURER REQUIRED

MINIMUM ON AND OFF TIMES. MINIMUMS SHALL NOT BE LESS THAN THEFOLLOWING.

2. AIR COOLED CHILLERS:a. ON: 5 MINUTESb. OFF: 10 MINUTES

1.3 HEATING AND AIR CONDITIONING EQUIPMENT

A. CENTRAL ENERGY PLANT - GENERAL1. CENTRAL PLANT: THE CENTRAL PLANT SHALL BE CONTROLLED BY A

STAND-ALONE MICROPROCESSOR BASED CONTROLLER WITH RESIDENTCONTROL LOGIC. IF COMMUNICATIONS ARE LOST WITH EMCS NETWORK, LOCALCONTROL SHALL BE MAINTAINED BY THE LOCAL CONTROLLER. THE EMCS SHALLPERFORM THE FOLLOWING CONTROL STRATEGIES, PROVIDE THE POINTSINDICATED ON THE POINTS LIST AND PROVIDE THE SPECIFIED MONITORING ANDDIAGNOSTICS.

2. ENABLE/DISABLE: EACH PIECE OF CENTRAL PLANT EQUIPMENT AND CONTROLSSHALL BE ENABLED/DISABLED BY EMCS. CHILLER AND BOILER INTERNALCONTROLS SHALL OPERATE AUTOMATICALLY WHEN ENABLED.

3. AUTOMATIC START/STOP: THE EMCS SHALL AUTOMATICALLY START AND STOPTHE COOLING AND/OR HEATING EQUIPMENT BASED UPON CALL FOR CENTRALPLANT CAPACITY FROM THE HVAC UNITS.

4. EQUIPMENT FAILURE RESPONSE: THE EMCS SHALL MONITOR STARTUP OFPUMPS. UPON A FAILURE TO RESPOND TO A START SIGNAL, THE FAILEDEQUIPMENT SHALL BE SHUT-DOWN AND LOCKED OUT AND AN "EQUIPMENTFAILURE" ALARM SHALL BE ISSUED. IF A BACKUP IS PROVIDED FOR THE FAILEDEQUIPMENT, THE STARTUP PROCEDURE FOR THE BACKUP DEVICE SHALL BEINITIATED. IF THE FAILED EQUIPMENT IS THE LEAD DEVICE, THE STARTUP OF THELAG DEVICE SHALL BE INITIATED.

5. FREEZE PROTECTION MODE:a. PROVIDE AN INDEPENDENT AMBIENT TEMPERATURE SENSOR IN THE

CHILLER YARD.b. WHEN AMBIENT TEMPERATURE IS BELOW 35 DEG F, THE CHILLED WATER

SYSTEM SHALL START FREEZE PROTECTION MODE AS FOLLOWS:1) CHILLER START SIGNAL SHALL BE OFF2) CHW VALVES FOR ALL AHU'S SHALL OPEN 100%3) ALL CHILLER ISOLATION VALVES SHALL OPEN 100%4) CHW PUMPS OPERATE TO MAINTAIN SYSTEM DP.

B. CHILLED WATER PLANT - VARIABLE PRIMARY PUMPING1. CHILLER PLANT STARTUP: UPON A CALL FOR COOLING, THE EMCS SHALL

PERFORM THE FOLLOWING:a. OPEN THE CHILLER NC CHILLER CONTROL VALVEb. SET THE CHILLER MINIMUM FLOW RATE BASED UPON CHILLER PLANT STAGE.c. WAIT 1 MINUTEd. START THE LEAD PRIMARY CHW PUMP.e. WAIT 5 MINUTES FOR FLOW TO STABILIZEf. START THE LEAD CHILLER

2. CHW PUMP SPEED CONTROL:a. PRESSURE CONTROL: SYSTEM DIFFERENTIAL PRESSURE TRANSMITTER,

LOCATED AT THE MOST HYDRAULICALLY DISTANT AHU SHALLCOMMUNICATE ITS DATA TO THE CENTRAL PLANT EMCS CONTROLLER. THECONTROLLER SHALL ADJUST THE OPERATING SPEED OF THE PUMP (VIA AVFD) TO MAINTAIN THE SYSTEM DIFFERENTIAL PRESSURE AT THE SETPOINT.1) ALARM: PROVIDE A "DP OUT OF RANGE" ALARM IF THE DP IS MORE

THAN 5 PSI FROM SETPOINT FOR MORE THAN 15 MIN.b. BACKUP PRESSURE CONTROL: IF COMMUNICATIONS ARE LOST WITH THE

OUTLYING DP SENSOR, THE EMCS SHALL AUTOMATICALLY REVERT TOUSING THE BACKUP DIFFERENTIAL PRESSURE SENSOR INFORMATION FORCONTROLLING THE PUMP.

c. PUMP BACKUP: IF THE LEAD PUMP FAILS, THE EMCS SHALL AUTOMATICALLYSWITCH TO THE BACKUP PUMP AND ISSUE A "FAILED PUMP" ALARM.

3. BYPASS VALVE CONTROLa. THE TOTAL CHILLER FLOW RATE SHALL BE MONITORED VIA A FLOW METER.

MODULATE THE BYPASS VALVE SLOWLY TO MAINTAIN THE TOTAL CHILLERFLOW RATE HIGHER THAN THE CHILLER MINIMUM FLOW RATE REQUIREDFOR CHILLER OPERATION.

4. CHILLER EVAPORATOR FLOW CONFIRMATION: THE CONTROLS CONTRACTORSHALL CONNECT THE EVAPORATOR FLOW SENSOR TO THE APPROPRIATETERMINALS IN THE CHILLER CONTROL PANEL PER THE MANUFACTURER'SRECOMMENDATION.

5. CHILLER PUMP COMMAND: THE EMS SHALL PROVIDE A PUMP START INPUT FROMEACH CHILLER. THE EMS SHALL NOT STOP A PUMP UNTIL THE CHILLER PUMPSTART SIGNAL IS OFF.

6. CHILLER INTERFACE: THE MECHANICAL CONTRACTOR SHALL BE FULLYRESPONSIBLE FOR COORDINATING WITH THE CHILLER MANUFACTURER ANDENSURING ALL WORK NEEDED TO PROVIDE THE CHILLER INTERFACE ISPROVIDED. ALL WORK (HARDWARE, SOFTWARE, LABOR, ETC.) NOT PROVIDED BYTHE CHILLER MANUFACTURER SHALL BE PROVIDED BY THE CONTROLSCONTRACTOR.a. LIMITED COMMUNICATIONS: THE EMCS SHALL COMMUNICATE INFORMATION

TO AND FROM THE CHILLER(S) USING GENERIC DRY CONTACT POINTS(DIGITAL AND 4-20 MA).

7. PUMP STATUS: PUMP FLOW VERIFICATION SHALL BE OBTAINED VIA FEEDBACKFROM THE VFD OR A C/T SWITCH INSTALLED ON EACH PUMP.

8. ALARMS: THE EMCS SHALL INTERFACE WITH CHILLERS TO PROVIDE ONE FAILUREALARM PER CHILLER.

C. CENTRAL PLANT POINTS1. THE FOLLOWING POINTS SHALL BE DISPLAYED AT THE CENTRAL PLANT IN THE

EMCS:a. SYSTEM CHW EWTb. SYSTEM CHW LWTc. CHILLER STATUS/GENERAL ALARM (ONE FOR EACH CHILLER)d. CHILLER CHW EWTe. CHILLER CHW LWT (EACH CHILLER)f. CHILLER CALL FOR PUMP START (EACH CHILLER)g. CHW PRIMARY PUMP STATUS (ONE FOR EACH PRIMARY PUMP)h. SYSTEM DP SETPOINTi. SYSTEM DP (EACH FIELD SENSOR)j. SYSTEM DP (BACKUP SENSOR)

2. THE FOLLOWING POINTS WILL BE OPERATOR ADJUSTABLE AND/ORAUTOMATICALLY RESET BY A EMCS PROGRAM:a. CHILLER PLANT ENABLE/DISABLEb. CHW SECONDARY PUMP SPEED LIMIT (PERCENT)

CONTROL SYSTEM LEGEND:

DIGITAL POINT - INPUT

DIGITAL POINT - OUTPUT

ANALOG POINT - INPUT

ANALOG POINT - OUTPUT

NO SYMBOL HARDWIRED CONTROL

DRAWING NO.

SHEE

T TI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIS

TORY

RE

VIS

IO

NS

VCS

Proje

ct NO

. 204

7715

Upgr

ade C

hiller

Plan

t

3750 O

LS

ON

D

R,

DA

YT

ON

A B

EA

CH

, F

L 32124

DJS

DJS

190034/20/2020

Engineer

Donald J. Sabiston, P.E.

Facil

ities S

ervic

esNO

.DA

TEDE

SCRI

PTIO

N

SEG

Pro

ject

No.

19003

Sab

isto

n E

ngi

nee

ring

Gro

up, In

c.

ww

w.S

abis

tonE

ngin

eeri

ng.c

omS

tate

of

Flori

da C

erti

fica

te N

o. 9811

P: 407.8

84.6

769

F: 4

07.8

84.6

764

322 K

entu

cky

Blu

e C

ircl

e, A

popk

a, F

L 32712

M6.01

Mechanical S

chedules, P

iping S

chem

atic, and C

ontrols

Do

na

ld

J. S

ab

isto

n, P

.E

.

Sta

te

o

f F

lo

rid

a N

o. 5

48

89

Page 9: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

SHEETNO. ELECTRICAL SHEET INDEX SCALE

E0.01 GENERAL NOTES & ABBREVIATIONS NONE

E0.02 SYMBOL LEGEND NONE

E2.01 CEP ELECTRICAL PLAN - DEMOLITION 1/4" = 1'-0"

E3.01 CEP ELECTRICAL PLAN - RENOVATION 1/4" = 1'-0"

E7.01 MECHANICAL FEEDER SCHEDULE NONE

E9.01 DETAILS NONE

DRAWING NO.

SHEE

TTI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIST

ORY

REV

ISIO

NS

19003

EngineerAdrian Baus, P.E.

NO.

DATE

DESC

RIPT

ION

130 Candace DriveMaitland, FL 32751

VCS

Proje

ctNO

.204

7715

Upgr

adeC

hiller

Plan

t

3750

OLS

ON

DR

,D

AYTO

NA

BEAC

H,F

L32

124

VCSD

Facil

itiesS

ervic

es

4/20/2020

AWB AWB

E0.01

Page 10: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

DRAWING NO.

SHEE

TTI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIST

ORY

REV

ISIO

NS

19003

EngineerAdrian Baus, P.E.

NO.

DATE

DESC

RIPT

ION

130 Candace DriveMaitland, FL 32751

VCS

Proje

ctNO

.204

7715

Upgr

adeC

hiller

Plan

t

3750

OLS

ON

DR

,D

AYTO

NA

BEAC

H,F

L32

124

VCSD

Facil

itiesS

ervic

es

4/20/2020

AWB AWB

E0.02

Page 11: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

UP

RAMP

157A

157

159

RISERLUNCH

ELECT.

158TOILET

OFFICEMANAG'MT.ENERGY

RECEIV.

175 176

DN

1 2 3 4

T

M

EM GEN

DRAWING NO.

SHEE

TTI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIST

ORY

REV

ISIO

NS

19003

EngineerAdrian Baus, P.E.

NO.

DATE

DESC

RIPT

ION

130 Candace DriveMaitland, FL 32751

VCS

Proje

ctNO

.204

7715

Upgr

adeC

hiller

Plan

t

3750

OLS

ON

DR

,D

AYTO

NA

BEAC

H,F

L32

124

VCSD

Facil

itiesS

ervic

es

UTILITY BLDG

MAIN BLDG

LOADING

CEP

AREA OFWORK

KEYPLANNOT TO SCALE

4/20/2020

AWB AWB

E2.01

Page 12: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

RAMP

157A

157

159

RISERLUNCH

ELECT.

158TOILET

OFFICEMANAG'MT.ENERGY

RECEIV.

175 176

DN

1 2 3 4

T

M

EM GEN

UH-11

CHS4"

4"

4" CHR UNDERGROUND

4" CHS UNDERGROUND

CH

R

CH

S

1" CW MAKEUP4"

4"

ELEC

ELEC

ET

AS

DIS

C

VFD

VFD

6" CHWR

6" CHWS

6"CHWS&R

FUTURE PIPING

DRAWING NO.

SHEE

TTI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIST

ORY

REV

ISIO

NS

19003

EngineerAdrian Baus, P.E.

NO.

DATE

DESC

RIPT

ION

130 Candace DriveMaitland, FL 32751

VCS

Proje

ctNO

.204

7715

Upgr

adeC

hiller

Plan

t

3750

OLS

ON

DR

,D

AYTO

NA

BEAC

H,F

L32

124

VCSD

Facil

itiesS

ervic

es

UTILITY BLDG

MAIN BLDG

LOADING

CEP

AREA OFWORK

KEYPLANNOT TO SCALE

4/20/2020

AWB AWB

E3.01

Page 13: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

MECHANICAL EQUIPMENT FEEDER SCHEDULE FOR (9): FACILITIES SERVICES - UPGRADE CHILLER PLANT COPYRIGHT ME, LLC Version : W17f REVISED: September 30, 2019 DATE: April 20, 2020

EQUIPMENT DESCRIPTION VOLTS PH NEUTRALY/N

LARGEST MOTOR COMPRESSOR ADD'L MOTORS HEAT STRIPS MISCAMPS

TOTALFLA

MCA(10)

MOCP(10)

VFDIRC

PANELCB (5)

DISCONNECT SWITCH STARTER WIRE PERPHASE (6)

NEUTRALWIRE (7)

GROUNDWIRE

WIREMATERIAL

# OFRUNS

CONDUITSIZE % VD NOTES

(SEE BELOW)HP FLA LRA FLA(11) LRA FLA LRA KW AMPS CODE SIZE (1) FUSE (2) TYPE (3) CODE TYPE

CH-1 (MSB TO DISCONNECT) 480 3 N 162 1085 200.0 1450.0 2 364 410 500 500 2 600 450 3R #4/0 #2 COPPER 2 3.00CH-1 (DISCONNECT TO CHILLER) 480 3 N 162 1085 200.0 1450.0 2 364 410 500 500 #4/0 #2 COPPER 2 2.00

CH-2 (CONTROL POWER) 120 1 Y 15 15 20 2 30 20 3R #12 #12 #12 COPPER 1 0.75

PUMP P-1 VFD/AFD 480 3 N 15.00 21.0 116.0 21 19.0 45 2 60 40 3R #10 #10 COPPER 1 0.75 0.80 CPUMP P-2 VFD/AFD 480 3 N 15.00 21.0 116.0 21 19.0 45 2 60 40 3R #10 #10 COPPER 1 0.75 0.80 C

NOTES ( ) NOTES:(A)=CONNECT VIA LINE VOLTAGE T'STAT BY DIV. 23 CONTRACTOR.

(1) PROVIDE DISC SW AT ALL PIECES OF EQUIPMENT AS REQUIRED BY THE N.E.C. AND AHJ UNLESS PROVIDED BY OTHERS (INCLUDING AT MOTORS AND AT STARTERS. MCP = MOTOR CIRCUIT PROTECTOR W/COMBINATION STARTER (B)=CONNECT VIA CONTROL DEVICES BY DIV. 23 CONTRACTOR.

(2) FUSES SHOWN FOR REFERENCE ONLY, PROVIDE FUSES AS RECOMMENDED BY EQUIPMENT MANUFACTURER. MMS = MANUAL MOTOR STARTER SWITCH WITH OVERLOADS AND PILOT LIGHT (C)=CONNECT MOTOR(S) VIA VFD/AFD WITH INTEGRAL DISC. SW.

(3) PROVIDE NEMA OUTDOOR RATED ENCLOSURES FOR ALL DISC SWS MOUNTED OUTDOORS. I = NEMA I ENCLOSURE (D)=CONNECT VIA COMBINATION DISC/STARTER BY DIV. 23 CONTRACTOR.

(4) COORDINATE STARTER TYPE WITH MECH EQUIP INSTALLER . 3R = NEMA 3R ENCLOSURE (E)=CONNECT VIA DISC SWITCH AT EQUIP. BY DIV. 23 CONTRACTOR.

(5) CONTRACTOR TO VERIFY THAT C.B. FOR COMPRESSORS IS SUFFICIENT TO ALLOW STARTING OF UNIT, IF REQUIRED FOR STARTING C.B. TO BE INCREASED TO A MAX ALLOWED BYN.E.C. CB TO BE HACR RATED. 4SS = NEMA 4 WATER TIGHT STAINLESS STEEL ENCLOSURE (F)=PROVIDE FULL SIZE NEUTRAL.

(6) #12 FEEDERS SHOWN AND OVER 50FT. LONG TO BE #10 FOR 120V CIRCUITS. #12 FEEDERS SHOWN AND OVER 100 FT. LONG TO BE #10 FOR 277 V CIRCUITS. 4 = NEMA 4 WATER TIGHT NON-CORROSIVE ENCLOSURE (G)=MMS WITHOUT OVERLOADS.

(7) NEUTRAL CONDUCTOR TO BE SAME SIZE AS PHASE CONDUCTORS. VFD/AFD = VARIABLE (ADJUSTABLE-AFD) FREQ DRIVE UNIT (H)=CONNECT VIA STARTER IN MCC (BY DIV 26).

(8) MOTOR CB IS SIZED BASED ON NEMA CODE 'F' OR HIGHER. CHANGE CB SIZE IF REQUIRED DUE TO NEMA CODE OF MOTOR PER N.E.C. NF = NON-FUSED. WHERE ACCEPTABLE TO AHJ, CONTRACTOR MAY USEPROPERLY RATED MOTOR SWITCH FOR DISCONNECT SWITCH

(I)=2 SPEED,1 WINDING MOTOR/STARTER.

(9) ALL FEEDERS 100 AMP AND LESS ARE BASED ON 60 DEGREE CONDUCTOR/TERMINATION RATING. ALL OTHER FEEDERS ARE BASED ON 75 DEGREE CONDUCTOR TERMINATIONS.PROVIDE AND INSTALL PROPER TERMINATIONS ON ALL EQUIPMENT PROVIDED BY ANY DIVISION AND/OR SECTION OF THE CONTRACT DOCUMENTS. PROPER TERMINATIONS TO BE ASREQUIRED TO MATCH CONDUCTOR WITH REQUIRED AMPACITY.

AHJ = AUTHORITY HAVING JURISDICTION. (J)=COORDINATE WITH DIV.15 TO BALANCE LOAD OF 1 PHASE FTB MOTORS.

(10) BASED ON MANUFACTURER'S RECOMMENDATION. FNVR = FULL VOLTAGE NON-REVERSING (K)=PROVIDE NEW STARTER IN MCC TO MATCH EXISTING. SEE MCC SCHED.

(11) OR BRANCH CIRCUIT SELECTION CURRENT WHEN AVAILABLE. DFNVR = DUAL VOLTAGE NON-REVERSING (L)=WHERE MOTOR IS FED FROM MCC, PANEL CB NOT REQUIREDFVC = FULL VOLTAGE CONTACTOR (M)=CONNECT EXIST DISC SWITCH AT MOTOR. MODIFY AS NOTED ON DRWGS

(N)= PROVIDE SHUNT TRIP OPERATED CIRCUIT BREAKER FOR ELEVATOR MOTORS.(O)=(P)=

DRAWING NO.

SHEE

TTI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIST

ORY

REV

ISIO

NS

19003

EngineerAdrian Baus, P.E.

NO.

DATE

DESC

RIPT

ION

130 Candace DriveMaitland, FL 32751

VCS

Proje

ctNO

.204

7715

Upgr

adeC

hiller

Plan

t

3750

OLS

ON

DR

,D

AYTO

NA

BEAC

H,F

L32

124

VCSD

Facil

itiesS

ervic

es

4/20/2020

AWB AWB

E7.01

Page 14: Facilities Services SCHOOL BOARD SEG Project No. MEMBERS ... · donald j. sabiston, p.e. facilities services no. date ... pressure gage strainer with blowdown valve manual air vent

6FT. MIN.

COPPER GROUND WIRE (TYP.)GROUND ROD/WELLS

N.T.S.

FINISHED GRADECONDUIT, TYP.

SEE DETAIL

120V CIRCUIT

6" X 6" (MINIMUM) CONCRETE POST

HEIG

HTAS

REQU

IRED

FOR

EQUI

PMEN

T(12

'MIN

IMUM

)

60" MIN.

DRM3

NOTE:COVERS ON RACK MOUNTED RECEPTACLES TO BE WEATHERPROOF WHEN IN USE TYPE.1)

PROVIDE CONCRETEAROUND POST IFREQUIRED FORSUBSTANTIATION OFSOIL, ETC.

DISCONNECTS AS CALLEDFOR ON DRAWINGS

6" X 6" (MINIMUM)CONCRETE POST

GROUND LUG WITHCRIMP CONNECTION

1-1/2" X 1-1/2" STAINLESS STEELCHANNEL HORIZONTAL BRACESAS REQUIRED FOR EQUIPMENTAND CONDUIT

DUPLEX W.P. GFIRECEPTACLE

DISCONNECT RACK (DOUBLE) -FREESTANDING/GRADE MOUNTED

PROVDE ONE GROUND WELLAT EACH DISCONNECT RACK.INTERCONNECT GROUNDWELLS AT OTHER RACKS ANDMAIN SERVICE GROUNDROD/WELL WITH A #2COUNTERPOISE CONDUCTOR .

GROUND WELL DETAIL FORPAVED OR TRAFFIC AREAS

CHILLER CH-1HEAT TAPE 20 AMP 120V 1PH 2W

FED FROM1L1-73 LOCATED IN

BUILDING 1 ROOM 01-142

GROUND WELL DETAIL FOR GRASSYUNPAVED NON-TRAFFIC AREAS

DRAWING NO.

SHEE

TTI

TLE

AE PROJECT NUMBER

DRAWN BYDESIGNED BY

ARCH/ENGR OF RECORD

ISSUE DATE

DOCU

MENT

HIST

ORY

REV

ISIO

NS

19003

EngineerAdrian Baus, P.E.

NO.

DATE

DESC

RIPT

ION

130 Candace DriveMaitland, FL 32751

VCS

Proje

ctNO

.204

7715

Upgr

adeC

hiller

Plan

t

3750

OLS

ON

DR

,D

AYTO

NA

BEAC

H,F

L32

124

VCSD

Facil

itiesS

ervic

es

4/20/2020

AWB AWB

E9.01