POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Facilities Team School Board LiaisonSchool Board Liaison
Mr. David WilensMr. David Wilens Committee MembersCommittee Members
Rachel Gumina PTA PresidentRachel Gumina PTA President John ConradJohn Conrad Stephen DaveyStephen Davey Mark FanteMark Fante Patricia WhitePatricia White
District AdministrationDistrict Administration Dr. Thomas C. Elliott, Superintendent/PrincipalDr. Thomas C. Elliott, Superintendent/Principal Mr. Jay Scotto-Friedman, Assistant Mr. Jay Scotto-Friedman, Assistant
SuperintendentSuperintendent
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Consultant Team
Architect, SEI Design GroupArchitect, SEI Design Group Brian CieslinskiBrian Cieslinski
Construction Manager, SavinConstruction Manager, Savin Joe TolaJoe Tola Gail PerogineGail Perogine
Financial Advisor, Bernard P. DoneganFinancial Advisor, Bernard P. Donegan Charles BastianCharles Bastian
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Our Charge
To review the documents prepared by To review the documents prepared by the architect and the work of the the architect and the work of the previous committee.previous committee.
Make a recommendation of work scope Make a recommendation of work scope that is critical to the success of the that is critical to the success of the school for the next three to five years. school for the next three to five years.
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Stepping Stones
5 Year Capital Plan 5 Year Capital Plan Done in 2005 Done in 2005 Reviewed Infrastructure Work to be Reviewed Infrastructure Work to be
AddressedAddressedPrior Facilities Review CommitteePrior Facilities Review CommitteeReviewed capital items in 5yr planReviewed capital items in 5yr planDiscussed additional work to be Discussed additional work to be
reviewedreviewedMade recommendations to the BOE Made recommendations to the BOE
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Moving Forward
Reviewed all previous work Reviewed all previous work Discussed life cycle of infrastructureDiscussed life cycle of infrastructure Analyzed impacts of component partsAnalyzed impacts of component parts Addressed accessibility items and Addressed accessibility items and
future planning to adaptfuture planning to adapt Determined health and safety risksDetermined health and safety risks Defined a composite plan and Defined a composite plan and
recommendationrecommendation
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
GeneralGeneralAddress sagging cubbies Address sagging cubbies
in the 1953 wingin the 1953 wingAdd fire separation from Add fire separation from
storage areas to the attic storage areas to the attic spacespace
$24,747
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
Windows/DoorsWindows/DoorsRestoration of leaded glass Restoration of leaded glass
windows and doorswindows and doorsAdd electronic release and Add electronic release and
cameras to the main cameras to the main entranceentrance
Replace aging doors in the Replace aging doors in the 1953 wing1953 wing
Repair worn seals Repair worn seals
$178,797
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
Exterior EnvelopeExterior EnvelopeSlate roof repairSlate roof repairGutter and downspout Gutter and downspout
replacementreplacementReplace roofing Replace roofing
material on 1953 and material on 1953 and 1971 building structure1971 building structure
$1,941,403
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
AccessibilityAccessibility Install an elevator in the 1953 wing to Install an elevator in the 1953 wing to
gain access to the first and second gain access to the first and second floorsfloors
Add a stair lift to the 1971 corridorAdd a stair lift to the 1971 corridorProvide accessibility for the nurses Provide accessibility for the nurses
office and toilet room within office and toilet room within Generate long term Generate long term
plan for full adaptation plan for full adaptation of the facility of the facility
$388,528
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
ProgramProgram Library space utilization, technology, Library space utilization, technology,
windows, and climate controlwindows, and climate control Shop area reconfigured to increase Shop area reconfigured to increase
utilizationutilization Home Economics area reconfigured to Home Economics area reconfigured to
increase utilizationincrease utilization Auditorium enhancementsAuditorium enhancements Gymnasium floor, bleachers, Gymnasium floor, bleachers,
lockers, and skylightslockers, and skylights Expand guidance area & middle school Expand guidance area & middle school
special education classroomspecial education classroom
Recommendations$3,352,601
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
Mechanical ItemsMechanical ItemsReplace heating systems Replace heating systems
for the entire building for the entire buildingReplace and update ventilation Replace and update ventilation
per new codeper new codeAdd air conditioning to center Add air conditioning to center
core spaces, including the library, core spaces, including the library, cafeteria, and Auditorium.cafeteria, and Auditorium.
Provide DDC control system for Provide DDC control system for entire buildingentire building
$3,287,640
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
Electrical/CommunicationsElectrical/CommunicationsReplace outdated service panels and Replace outdated service panels and
distribution boardsdistribution boardsReplace emergency generatorReplace emergency generatorUpdate emergency lighting system Update emergency lighting system
per code per codeReplace the public address Replace the public address
system system
$539,485
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
Fire ProtectionFire Protection Install a dry-type sprinkler Install a dry-type sprinkler
system in the attic spacesystem in the attic spaceProvide lightning protection Provide lightning protection
on the upper roof section of on the upper roof section of the buildingthe building
$210,350
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
Plumbing & Plumbing & EnvironmentalEnvironmentalPipe insulation on water Pipe insulation on water
lineslinesAsbestos Abatement on Asbestos Abatement on
HVAC systemsHVAC systems
$259,844
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Recommendations
SiteworkSiteworkPool and pool pump room replacementPool and pool pump room replacement
$4,208,605
POCANTICO HILLS CENTRAL SCHOOL Savin/JMOA
Budget
Construction Budget Construction Budget $14,391,999$14,391,999
Incidental BudgetIncidental Budget $ 3,598,000$ 3,598,000
Project TotalProject Total $17,989,999$17,989,999
$18,000,000