Upload
the-architects-newspaper
View
221
Download
5
Tags:
Embed Size (px)
DESCRIPTION
Facades+ Chicago 2013 Michael Rostkowski Powerpoint Presentation
Citation preview
heintges
BU I L DI NG BU R B E R RY C HI C AG O
B U I L D I N G B U R B E R RY C H I C A G O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
Michael Rostkowski Karen Brandt
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Unique Company Culture
• Employees
• Customers
• Consultants
Client Relationship
• Started working with Burberry in
2000
• Since 2000, we have been the
architect for every Retail and Outlet
store in the US and Canada
• We have worked on over 100 stores
during this period of time
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
First Projects
• Ironically in 2000 we were hired for
three initial stores:
– The Mall at Short Hills
– The Westchester
– Chicago Flagship
• Since 2000 we renovated the
Chicago store three times
2010
• New Building
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Design
• All designs are done by Burberry
• Interior of the stores are a global
Image
• Interior to match online shopping
experience
• Facades are the differential factor
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Classic Check Modern Check
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Rendering February 2011 Actual Photo November 2, 2012
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Decorative Stair
• Vertical element linking all 5 floors
• Floating stone threads
• A Structural Aluminium Tube
provides support and cooling for
the LED Light fixtures Drivers
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Decorative Stair
• 16’-0” Acrylic Rods
• 8 Tons of cooling
• 330 Custom LED light fixtures
• 660 LED Drivers
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
January 2011
• Heintges joins team
• SD-DD
• CD
• Competitive Bid
• Shop drawing development
with the successful bidder
PROJECT TIMELINE
heintges
BU I L DI NG BU R B E R RY C HI C AG O
PROJECT TIMELINE
heintges
BU I L DI NG BU R B E R RY C HI C AG O
January 2012
• Facade subcontractor out
of business
PROJECT TIMELINE
heintges
BU I L DI NG BU R B E R RY C HI C AG O
June 2012
• Visual mock-up with new
facade subcontractor
PROJECT TIMELINE
heintges
BU I L DI NG BU R B E R RY C HI C AG O
June 2012
• Visual mock-up with new
facade subcontractor
PROJECT TIMELINE
November 2012
• Store opens for the Holiday
Season
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10
Interesting Building Facts
• Used 8,250 linear feet of LED Lighting to edge lit
the façade
• There is over 18,000 feet of low voltage cabling
used to wire the LED lights (that is over 3.4 miles)
• 809 pieces of ‘Black’ glass were used to create the
façade.
• 154 different sizes of ‘Black’ glass
• 1,288 pieces of polished ‘Black Chrome’
• Largest glass is 9’-0” x 13’-4 and weighs
approximately 1,700 lbs.
• Used 371 tons of steel
• 1,500 Cubic Yards of concrete
• Over 280 Sq. Ft. of videos
• 50,000 feet of Cat6A cabling with over 300 total
terminations
• 11,000 feet of Cat6A shielded cabling with over 100
terminations
heintges
BU I L DI NG BU R B E R RY C HI C AG O
PROJECT DESIGN TEAM
Design Architect – Burberry
Owners Representative – Watershed Partners
Architect of Record – Callison
Local Consulting Architect – SCB
Structural Engineer – CEA&A
Mechanical Engineer – Rosini Engineering
Façade – Heintges & Associates
Waterproofing – Wiss, Janney, Elstner
Lighting – Callison
LEED – Stephen Winter Associates
heintges
BU I L DI NG BU R B E R RY C HI C AG O
1.10