Upload
others
View
7
Download
2
Embed Size (px)
Citation preview
Fabrika mernih transformatora Zaječar d.o.o
01About usGeneral information about our company – ourcore business, our history, present and future.
02FMT ZajecarFactory and offices locations, products’ design,manufacturing and testing.
03Minel EnergyFactory and offices locations, products’ design,manufacturing and testing.
04Onicom and CVMOnicom – electrical installation and assemblyCVM – treading company
01 02 03
ZAJEČAR
FMT Zaječar d.o.o
Head office and factory
BELGRADE
Onicom d.o.o
CVM d.o.o
FMT Zaječar d.o.o
Onicom d.o.o
CVM d.o.o
ZRENJANIN
Minel Energy d.o.o
Factory and office
01 ABOUT US : OUR LOCATIONS
ZAJEČAR
ZAJEČAR – Factory location
City of Zaječar (1969/2005)- 230 km from Belgrade (3 hrs drive)- Population : ~ 42 000
City of Belgrade (2005)- Country’s capital- International airport
BELGRADE – Office location
ZRENJANIN
ZRENJANIN – Factory location
City of Zrenjanin (1956/2018)- 82 km from Belgrade (1.5 hrs drive)- Population : ~ 75 000
01 ABOUT US : OUR LOCATIONS
ABOUT US : FMT Zaječar02
200
35km2
1969 ESTABLISHED
EMPLOYEES
REAL ESTATE
62kpieces
500pieces
€8million
ANNUAL
TURNOVER
INSTRUMENT
TRANSFORMERS
ENERGY
TRANSFORMERS
02 ABOUT US : FMT Zaječar
INSTALLATION
55kpieces
LV CTs
OUTDOOR
AND INDOOR
02 ABOUT US : Instrument transformers
7kpieces
MV CTs and VTs
150pieces
250pieces
100pieces
TES 10 and 20 kV; 20-2000 kVA;
MTES – single phase10 and 20 kV; 0.5-100 kVA
TTES – three phase10 and 20 kV; 1.25- 250 kVA
02 ABOUT US : Power transformers
02 ABOUT US : Certifications
02 ABOUT US : Our customers
21 countries in Europe
11 countries in Asia
5 countries in Africa
USA
2 countries in S. America
Australia
03 MINEL ENERGY
40
1956 ESTABLISHED
EMPLOYEES
04 ONICOM
40
1990 ESTABLISHED
EMPLOYEES