Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune 411057. -------------------------------------------------------------------------------------------------------------1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project: Rajiv Gandhi InfoTech Park Phase II, Hinjewadii, Pune- 411 057. Location / site alternatives under consideration: Plot No. 31, Rajiv Gandhi InfoTech Park Hinjewadi, MIDC Phase II, Pune 411057 Size of the Project: * Total Plot Area -- 1, 99,934.05 sqm. Build up Area (cleared) 1, 18,933.36 sqm Expansion Build up area (clearance to be obtained) 1,20,949 sqm Expected cost of the project: 280 Crores. Contact Information: Mr.Regu Raman Manager- Civil Projects Wipro Ltd. Special economic zone Plot No. 31, Rajiv Gandhi InfoTech Park Hinjewadi, Phase II, Pune 411057

F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

  • Upload
    lyliem

  • View
    249

  • Download
    6

Embed Size (px)

Citation preview

Page 1: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------1

APPENDIX I

(See paragraph – 6)

FORM 1

(I) Basic Information

Name of the Project: Rajiv Gandhi InfoTech Park

Phase II, Hinjewadii, Pune- 411 057.

Location / site alternatives under consideration:

Plot No. 31,

Rajiv Gandhi InfoTech Park Hinjewadi, MIDC

Phase II, Pune 411057

Size of the Project: *

Total Plot Area -- 1, 99,934.05 sqm.

Build up Area (cleared) – 1, 18,933.36 sqm

Expansion Build up area (clearance to be obtained) –1,20,949 sqm

Expected cost of the project: 280 Crores.

Contact Information: Mr.Regu Raman

Manager- Civil Projects Wipro Ltd. Special economic zone

Plot No. 31, Rajiv Gandhi InfoTech Park Hinjewadi, Phase II, Pune 411057

Page 2: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------2

Screening Category: Building Construction Project 8(a)

Category B2:> equal to 20,000 Sq.m.< equal to

1,50,000 Sqm.

Capacity corresponding to sectoral activity (such as production

capacity for manufacturing, mining lease area and production

capacity for mineral production, area for mineral exploration, length

for linear transport infrastructure, generation capacity for power

generation etc.,)

(II) Activity

1. Construction, operation or decommissioning of the Project involving

actions, which will cause physical changes in the locality

(topography, land use, changes in water bodies, etc.)

Sr.No. Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities /rates, wherever

possible) with source of

information data

1.1 Permanent or temporary change

in land use, land cover or

topography including increase in

intensity of land use (with

respect to local land use plan).

No No Change in Land use.

Setting up of Sector Specific SEZ

approval Letter enclosed.

Annexure: 3

1.2 Clearance of existing land, Yes This is an expansion project.

Page 3: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------3

vegetation

and buildings?

Clearance already obtained for

existing buildings on the plot.

1.3 Creation of new land uses? No NA

1.4 Pre-construction investigations

e.g. bore houses, soil testing?

Yes Soil Testing Report.

Annexure 8

1.5 Construction works? Yes 1,20949 sq.m.

1.6 Demolition works? No NA

1.7 Temporary sites used for

construction Works Or housing of

construction

workers?

Yes Labor camp will be provided for 300

Workers working within Construction

site. Temporary sheds provided for

their residential purpose, drinking

water facility provided to them.

Water for the drinking and domestic

purpose will be provided through

tankers. Toilet block consisting of 20

toilets will be provided with Septic

tank and soak pit.

1.8 Above ground buildings,

structures or earthworks including

linear structures,

cut and fill or excavations

Yes Excavated material during

construction will be used to filling in

low-lying area within construction

site.

1.9 Underground works including

mining or tunneling?

No NA

1.10 Reclamation works? No NA

1.11 Dredging? No NA

1.12 Offshore structures? No NA

Page 4: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------4

1.13 Production and manufacturing

Processes?

No NA

1.14 Facilities for storage of goods or

materials?

Yes Materials related to construction are

having temporary arrangement for

storage within construction site.

1.15 Facilities for treatment or

disposal of solid waste or liquid

effluents?

Yes a) During Construction

phase:

Construction debris will be used to

backfilling of low-lying area within

construction site. Solid waste that

will be generated from construction

workers working within site will be

dispose through Municipal waste

bins.

Septic tank and soak pit will be

providing for proper dispose of liquid

effluent.

b) During Operation Phase:

(I) Solid waste: ( for expansion )

Total Quantity = 3011.1Kg/day

a) Biodegradable Solid Waste

= 1204.4 kg/day

(Additional 50 Kg/day shall be

accounted by trees, plantation and

landscape trimming.)

Page 5: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------5

= 1254.4 Kg/day

b) Dry waste

= 1806.6 kg/day

Biodegradable and Non-

biodegradable waste will be

segregated. Dry waste will be sent

for recycling and ‘In Vessel Process’

will treat wet waste for composting.

(II) Liquid effluent will be treated in

Sewage treatment Plant will having

capacity = 600 KLD

Schematic diagram of STP:

Annexure- 11

1.16 Facilities for long term housing of

operational workers?

No NA

1.17 New road, rail or sea traffic

during construction or operation?

No NA

1.18 New road, rail, air waterborne or

other transport infrastructure

including new or altered routes

and stations, ports, airports etc?

No NA

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No NA

Page 6: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------6

1.20 New or diverted transmission

lines or pipelines?

No NA

1.21 Impoundment, damming,

culverting, realignment or other

changes to the hydrology of

watercourses or aquifers?

No NA

1.22 Stream crossings? No NA

1.23 Abstraction or transfers of water

form ground or surface waters?

No To accomplish water requirement of

workers working within construction

site for their domestic use will be

available from Tankers.

During operation the water shall be

utilized for domestic and flushing

purpose. Water shall be subjected to

treatment if the need arises.

1.24 Changes in water bodies or the

land surface affecting drainage or

run-off?

No NA

1.25 Transport of personnel or

materials for construction,

operation or decommissioning?

Yes During Construction Phase: Only

Material Transport.

Approximately 3 Tractors/day

2 Trucks/day

During Operation Phase: Vehicular

circulation of the workers which will

be employed within this complex.

1.26 Long-term dismantling or

decommissioning or restoration

No NA

Page 7: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------7

works?

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No NA

1.28 Influx of people to an area in

either temporarily or

permanently?

Yes Influx of People during

Construction Phase:

: 400- 450 workers.

Influx of People during

Operational Phase:

Total 21,807 persons will be

working. For expansion buildings

population is 10,037.

Clearance already obtained for

buildings with population 11,770.

1.29 Introduction of alien species? No NA

1.30 Loss of native species or genetic

diversity?

No NA

1.31 Any other actions? No NA

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply)

Sr.No. Information/checklist confirmation Yes/No Details thereof (with

Page 8: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------8

approximate quantities

/rates, wherever possible)

with source of information

data

2.1 Land especially undeveloped or

agricultural land (ha)

Yes It’s an expansion project,

construction on Undeveloped

land.

2.2 Water (expected source & competing

users) unit: KLD

Yes

During Construction:

Source: Tankers Water requirement=125 KLD. During Operation:

Total Water requirement: (For Domestic, Flushing and irrigation) Total: 1046 KLD

Total domestic water

Requirement: 710 KLD

Landscape : 96 KLD

Total Reused Water = 568 KLD say 570 Air conditioning system = 240

KLD ( 120 KLD fresh & 120

KLD recycled)

Source: MIDC, Treated

Sewage, water from RWH.

2.3 Minerals (MT) No NA

2.4 Construction material: stone,

aggregates, and / soil

(expected source – MT)

Yes

Companies authorized

approval local vendors.

Page 9: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------9

2.5 Forests and timber (source – MT) No NA

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel

(MT), energy (MW)

Yes

Source: MSEB

During Construction: 450 KVA Approx.

DG Sets: 125 KVA, 3 SETS.

75 KVA MSEB Connection

During Operation: 8399 KVA Approx. Nos. of D.G.Sets: 1500 KVA , 6 Sets Fuel Requirement : HSD 250 lit/hr

2.7 Any other natural resources (use

appropriate standard units)

No

-

3. Use, storage, transport, handling or production of substances or

materials, which could be harmful to human health or the

environment or raise concerns about actual or perceived risks to

human health.

Sr.No. Information/Checklist confirmation Yes/No Details thereof (with

approximate

quantities/rates,

wherever possible)

with source of

Page 10: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------10

information data

3.1 Use of substances or materials, which are

hazardous (as per MSIHC rules) to human

health or the environment (flora, fauna, and

water supplies)

No During Construction:

No generation of

hazardous waste.

During Operation:

Approx. 0.5 Ton /Month

of Electronic waste is

likely to be generated.

The electronic waste

will be sent to hardware

unit at Bangalore.

3.2 Changes in occurrence of disease or affect

Disease vectors (e.g. insect or water borne

diseases)

No NA

3.3 Affect the welfare of people e.g. by changing

living conditions?

No It can help in improving

the living standards of

that area.

3.4 Vulnerable groups of people who could be

affected by the project e.g. hospital patients,

children, the elderly etc.,

No NA

3.5 Any other causes No NA

Page 11: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------11

4. Production of solid wastes during construction or operation or

Decommissioning (MT/month)

Sr.No. Information/Checklist confirmation Yes/No Details thereof (with

approximate

quantities/rates,

wherever possible)

with source of

information data

4.1 Spoil, overburden or mine wastes No Excavated material will

be used for backfilling at

the site.

4.2 Municipal waste

(domestic and or commercial wastes)

Yes Solid waste for

Expansion :

Total Quantity = 3011

Kg/day

a) Biodegradable Solid

Waste = 1204.4 kg/day

(Additional 50 Kg/day

shall be accounted by

trees, plantation and

landscape trimming.)

= 1254.4 Kg/day

b) Dry waste = 1806.6

kg/day

Page 12: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------12

4.3 Hazardous wastes (as per Hazardous

Waste

Management Rules)

No NA

4.4 Other industrial process wastes No NA

4.5 Surplus product No NA

4.6 Sewage sludge or other sludge from effluent

treatment

Yes Sludge from biological

treatment process will be

dewatered in filter press

and reused as compost

in-house.

4.7 Construction or demolition wastes Yes During construction

Approx. 40,000 cum

material will be

excavated and used for

backfilling.

4.8 Redundant machinery or equipment No NA

4.9 Contaminated soils or other materials No NA

4.10 Agricultural wastes No NA

4.11 Other solid wastes No NA

5. Release of pollutants or any hazardous, toxic or noxious

substances to air (Kg/hr)

Details thereof (with

Page 13: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------13

Sr.No. Information/Checklist confirmation Yes/No approximate

quantities/rates,

wherever possible)

with source of

information data

5.1 Emissions from combustion of fossil fuels

from stationary or mobile sources

Yes During Construction:

Sources:

Earthmoving Machinery

(Excavator)-

Concrete Pumps

Batching Plant

Hoist Crane

Alfa Crane

vi) Compressor

During Operation:

Sources: D G Sets,

Transformers

During Operation: Nos. of D.G.Sets:

15000 KVA , 6 Sets

Height of Stack and

sampling arrangement

shall be provided as per

emission regulations of

CPCB.

Page 14: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------14

5.2 Emissions from production processes No NA

5.3 Emissions from materials handling including

storage or transport.

Yes Approx. 3 Tractors/day

2 Trucks/day

5.4 Emissions from construction activities

including plant and equipment

Yes Dust during Construction

equipments/Machineries

like

: i) Earthmoving

Machinery (Excavator)-

ii) Concrete Pumps

iii) Batching Plant

iv) Hoist Crane

v) Alfa Crane

vi) Compressor

However there will be

emission of dust during

handling of construction

material.

5.5 Dust or odours from handling of materials

including construction materials, sewage and

waste

No As per Environmental

Management Plan

(EMP) Annexure-16

5.6 Emissions from incineration of waste No NA

5.7 Emissions from burning of waste in open air

(e.g. slash materials, construction debris)

No NA

5.8 Emissions from any other sources No NA

Page 15: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------15

6. Generation of Noise and Vibration, and Emissions of Light and

Heat:

Sr.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g. engines,

ventilation plant, crushers

Yes During Construction

Phase:

Sources of Noise

Pollution and vibration

are machineries like

Earthmoving Machinery

(Excavators), Concrete

Pumps, Batching Plant,

Hoist Crane, Alfa Crane,

Compressors and

transportation materials.

These Machineries will

be used only during

daytime.

During Operation

Phase:

D.G.Sets will be

provided with canopy to

Page 16: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------16

reduce Noise and

vibration.

6.2 From industrial or similar processes No NA

6.3 From construction or demolition Yes As per Environmental

Management Plan

(EMP)

Annexure-16

6.4 From blasting or piling No NA

6.5 From construction or operational traffic

Yes As per Environmental

Management Plan

(EMP) Annexure-16

6.6 From lighting or cooling systems

Yes For the areas requiring

AC It is proposed to

install VRV II advanced

air-cooling system.

6.7 From any other sources No NA

7. Risks of contamination of land or water from releases of pollutants

into the ground or into sewers, surface waters, groundwater,

coastal waters or the sea:

Sr.No. Information/Checklist confirmation Yes/No Details thereof (with

approximate quantities

/rates, wherever

possible) with source

of information data

Page 17: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------17

7.1 From handling, storage, use or spillage of

hazardous materials

No NA

7.2 From discharge of sewage or other effluents

to water or the land (expected mode and

place of discharge)

No Sewage effluents will be

treated and reused for

flushing, gardening and

green belt areas. Hence

there is no risk of

contamination due to

release of sewage or

effluent.

7.3 By deposition of pollutants emitted to air into

the land or into water

No NA

7.4 From any other sources No NA

7.5 Is there a risk of long term build up of

pollutants in the environment from these

sources?

No NA

8. Risk of accidents during construction or operation of the Project,

which could affect human health or the environment

Sr.No. Information/Checklist confirmation Yes/No Details thereof (with

approximate quantities

rates, wherever

possible) with source

Page 18: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------18

of information data

8.1 From explosions, spillages, fires etc from

storage, handling, use or production of

hazardous substances.

No NA

8.2 From any other causes

Yes There is a risk of

accident during

construction however

proper safety measures

will be taken by using

safety Helmets, Safety

belts, safety nets, safety

shoes etc. as per the

requirement.

8.3 Could the project be affected by natural

Disasters causing environmental damage

(e.g. floods, earthquakes, landslides,

cloudburst etc)?

No Floods and landslides

are not expected in the

area.

Earthquake proneness:

The area falls under

Zone III as per IS- 1893-

2002. Hence relevant

design parameters as

per zone III have been

considered for RCC

design of the buildings.

Page 19: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------19

9. Factors which should be considered (such as consequential

development) which could lead to environmental effects or the

potential for cumulative impacts with other existing or planned

activities in the locality

Sr. No. Information/Checklist confirmation Yes/No Details thereof (with

approximate quantities

/rates,wherever

possible) with source

of information data

9.1 Lead to development of supporting cities,

ancillary development or development

stimulated by the project which could have

impact on the environment e.g.:

• Supporting infrastructure (roads, power

supply, waste or waste water treatment, etc.)

• housing development • extractive industries • supply industries • other

No IT Development.

9.2 Lead to after-use of the site, which could

have an impact on the environment

No

NA

9.3 Set a precedent for later developments Yes Successful operation of

this IT park will lead to

similar developments

towards progress.

Page 20: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------20

9.4 Have cumulative effects due to proximity to

other existing or planned projects with similar

effects

No -

(III) Environmental Sensitivity

Sr.No.

Areas Name/

Identity

Aerial distance (within

15km.)Proposed

project location

boundary

1 Areas protected under international

conventions, national or local legislation for

their ecological, landscape, cultural or other

related value

No

NA

2 Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses

or other water bodies, coastal zone,

biospheres, mountains, forests

No

NA

3 Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration.

No NA

4 Inland, coastal, marine or underground

waters

No NA

5 State, National boundaries No NA

6 Routes or facilities used by the public for

Access to recreation or other tourist, pilgrim

areas

No NA

Page 21: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------21

7 Defence installations No NA

8 Densely populated or built-up area

Yes Census Data.

Annexure: 15

9 Areas occupied by sensitive man-made land

Uses (hospitals, schools, places of worship,

community facilities)

Yes Census Data

Annexure: 15

10 Areas containing important, high quality or

Scarce Resources (ground water resources,

Surface resources, forestry, agriculture,

fisheries, tourism, minerals)

Yes

Ground water resources

such as wells are ample

and nearer from site.

11 Areas already subjected to pollution or

environmental damage. (those where

existing legal environmental standards

are exceeded)

No

NA

12 Areas susceptible to natural hazard which

Could cause the project to present

environmental problems

(earthquakes, subsidence, landslides,

erosion, flooding or extreme or adverse

climatic conditions)

No

NA

Page 22: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------22

APPENDIX II

(See paragraph 6)

FORM-1 A

(Only for construction projects listed under item 8 of the Schedule)

CHECK LIST OF ENVIRONMENTAL IMPACTS

1. LAND ENVIRONMENT

(Attach panoramic view of the project site and the vicinity)

1.1. Will the existing land use get significantly altered from the project that is

not consistent with the surroundings? (Proposed land use must

conform to the approved Master Plan / Development Plan of the area.

Change of land use if any and the statutory approval from the competent

authority is to be submitted). Attach Maps of (i) site location, (ii)

surrounding features of the proposed site (within 500 meters) and (iii)

the site (indicating levels & contours) to appropriate scales. If not

available attach only conceptual plans.

Setting up of Sector Specific SEZ approval Letter enclosed. The proposed

land use is in conformity with the DP of the area.

Annexure – I- Panoramic view

Annexure – 2: Master Plan

Annexure – 3: SEZ Approval Letter

Annexure – 4: Site Layout

Annexure – V : Contour map

Page 23: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------23

1.2. List out all the major project requirements in terms of the land area, built

up area, water consumption, power requirement, connectivity,

community facilities, parking needs etc.

Total Plot Area -- 1, 99,934.05 sqm.

Build up Area (cleared) – 1, 18,933.36 sqm

Expansion Build up area (clearance to be obtained) –1,20,949 sqm

The overall area of the plot is 1, 99,934.05 sq. meters of which an area

measuring 1,20,949 sq. meters will be brought under construction, and 16,000

sq. meters will be developed as landscape.

v) WATER REQUIREMENT:

a) During Construction Phase:

Total water requirement during construction phase shall be approximately

125 KLD which will be used for domestic use as well as construction for the

workers working / dwelling on the site. This water will be made available from

MIDC & tankers.

b) During Operational Phase: Proposed expansion project has 1,20,949 sqm Built-up area. Population of

the expansion project would be approximately 10,037.

A) Water requirement for Domestic Purpose= 359 KLD

B) Water requirement for Flushing= 351 KLD C) Water requirement for Irrigation/Gardening= 96 KLD D) Water Requirement for Air Conditioning = 240 KLD Hence,

Page 24: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------24

E) Total Water requirement =1046 KLD.

F) Reused / Recycled Water: a) Watering the trees and green belt = 96 KLD

b) Water for Flushing = 354 KLD

c) Air Conditioning = 240 KLD

Total Reused Water = 568 KLD

VI) POWER REQUIREMENT:

a) During Construction Phase:

Power required for the general purpose will be approx. 450 KVA Approx.

DG Sets: 125 KVA, 3 SETS.

75 KVA will be taken from MSEB Connection.

b) During Operational Phase:

Power requirement during operational phase will be 8399 KVA Approx. Nos. of D.G.Sets:

1500 KVA , 6 Sets

Fuel Requirement : HSD 250 lit/hr

V) PARKING STATEMENT: -

Multi level Car parking will be provided. Some peoples shall be coming

through public transport.

Proposed Parking:

Multilevel Car parking will be provided.

There is provision for 1300 four-wheelers & 1500 two wheelers parking.

100 buses for pick up and drop.

Page 25: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------25

Parking space will be allotted within the campus. There will be no congestion

during working period because adequate space will be providing within plot

area.

(Refer Annexure 6: Map of Parking Plan)

VI) LANDSCAPING AND TREE PLANTATION

The green belt area will be 16,000.00 sq.m. for the expansion area, so as to

to keep the campus green and environment friendly. The Project proponents

have proposed a landscape development plan, which includes planting of

flowering and shady trees, shrubs and lawn within the plot.

Infront of SDB-4 & SDB-5 Along the boundary wall (Compound side)

Sr.No. Name NOs Sr.No. Name NOs

1. Azadiracta indica 10 1. Alistonia scholaris 100

2. Lagestromia thorellia 10 2. Grevillea robusta 75

3. Peltophorum 15 3. Bahunia Blackiana 75

4. Spathodia companulata

15 Around Utility & Logistic Block

5. Michelia champaka 10 1. Jacaranda mimosifolia 20

6. Delonix regia 15 2. Delonix regia 10

7. Tabebuia avalande 20 3. Cordia sabestian 10

8. Rain tree 20 4. Milingtonia hortensis 20

Page 26: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------26

East side of SDB-4 & SDB-5 West side of SDB-4 & SDB-5

Sr. No. Name Nos Sr. No. Name Nos

1. Delonix regia 10 1. Lagestromia indica 15

2. Milingtonia hortensis 15 2. Alistonia scholarsis 15

3. Peltophorum 20 3. Bahunia Blackiana 10

4. Spathodia companulata 10 4. Spathodia companulata 10

5. Jacaranda mimosifolia 15 5. Jacaranda mimosifolia 15

6. Plumeria 10

South side of SDB-4 & SDB-5 Assembly

Sr.No. Name Nos Sr.No. Name Nos

1. Delonix regia 10 1. Delonix regia 20

2. Milingtonia hortensis 10 2. Plumeria 30

3. Peltophorum 15 3. Golden melluluca 40

4. Bahunia Blackiana 10 4. Bottle brush 30

5. Tabebuia avalande 10 5. Rain tree 25

6. Colvella racemeosa 15 6. Michelia champaka 20

Around MLCP Car Parking

Sr. No. Name Nos Sr. No. Name Nos

1. Tabebuia argentia 25 1. Terminalia catappa 100

Page 27: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------27

2. Terminalia catappa 75 2. Delonix regia 50

3. Bahunia Blackiana 25 3. Tabebuia avalande 50

4. Delonix regia 40 4. Colvellea racemosa 25

5. Peltophorum 30

(Annexure 7: Landscaping plan)

1.3. What are the likely impacts of the proposed activity on the existing

facilities adjacent to the proposed site? (Such as open spaces,

community facilities, details of the existing land use, and disturbance to

the local ecology).

Although it is a construction activity, its impact on air quality, water quality,

noise and soil will not be notable. As a matter of fact this activity will have

positive impact on socio-economic culture of people residing in the vicinity of

the proposed area. There will not be any disturbance to the local ecology as

this is the expansion project & selected area for the construction is a

undeveloped land.

The project site has plain land. The whole area will be occupied by

vegetation. The plantations, which would be grown in the commercial area,

will be helpful in increasing green cover of the area. Proposed project will

require manpower during construction phase and operational phase thereby

creating job opportunities. Local skilled and unskilled laborers will have an

opportunity for employment directly or indirectly. There will be additional

employment for the poor strata of society by way of domestic helpers, drivers,

cleaners etc.

Page 28: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------28

Due to the proposed project, facilities are likely to grow in line with the

development. As during the construction and operational phases of the

project a workforce which will be needed which will be including both skilled

and unskilled people. The introduction of workers from areas outside the

region, could introduce a potential effect on the local culture, habits and

economics.

1.4. Will there be any significant land disturbance resulting in erosion,

subsidence & instability? (Details of soil type, slope analysis,

vulnerability to subsidence, seismicity, etc may be given).

A. Details of Soil quality and slope

Generally, soil types found in Pune district are black, copper, red and paddy

soil. Soil blends of variable proportions are modified by sand, gravel, lime

salts and other ingredients. Soil erosion is acute in these soils because of the

sloppy nature of lands mostly unprotected by natural vegetation due to over

grazing.

Samples were collected within a radius of 10 Km in the study area. Soil

samples collected and were analyzed for pH, moisture content, water holding

capacity, organic matter, ammonia nitrogen, potassium, phosphorous,

Magnesium as Mg, Chlorides as Cl-, Sulphates as SO4--using standard

methods of Association of Official Agricultural Chemist. Results of analysis

are presented in Annexure 13.

Land at the project site is tableland and has no major slopes.

(Refer Annexure 5 - Contour map)

Page 29: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------29

The geology of the Pune consists of Deccan traps with inter-trapped beds.

The volcanic lava flows are spread out in the forms Horizontal sheets or beds.

Pune is a plateau city situated near the western margin of the deccan plateau.

The main system of hills is Sahyadri, which run south in the western portion of

the district. Pune is situated at latitude of 18o31’ N and longitude

73o51’east.Mean elevation of the site is 560 meters

Geology of the location includes Hard rock, weathered basalt. Moderately

fractured rock (Hard Murum), weathered rock.

B. Vulnerability to Seismicity and precautions:

As per the Seismic Zoning Map of India (given in Enclosures) Pune region

falls under Zone- 3. Stability Certificate, as per prevalent IS Code will be

obtained for these buildings from registered Consulting Structural Engineer

considering the seismic forces and wind forces etc.

C. Vulnerability to Subsistence

Ground level of the plot is plain land. Backfilling in the vicinity of site is

included in the project plan in order to increase the ground level of the project.

Hence, subsistence is not expected.

1.5. Will the proposal involve alteration of natural drainage systems? (Give

details on a contour map showing the natural drainage near the

proposed project site)

Not Applicable.

Page 30: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------30

1.6. What are the quantities of earthwork involved in the construction activity

cutting, filling, reclamation etc. (Give details of the quantities of

earthwork involved, transport of fill materials from outside the site etc.)

During construction total earthwork involved 40,000 cum.

1.7. Give details regarding water supply, waste handling etc during the

construction period.

Water Requirement during Construction Phase:

Total water requirement during construction phase shall be approximately 125

KLD approximately for construction as well as domestic use for the workers

working /dwelling on the site. This water will be made available from tankers

& from MIDC. Toilet block consisting of 20 toilets will be provided with Septic

tank and soak pit.

The Biodegradable and non-biodegradable solid waste will be sent to

Municipal waste bins.

The construction debris will be used to backfilling at the site.

Water Requirement during Operation Phase:

Total water requirement during operation phase shall be approximately1046

KLD. It will be available from MIDC, treated sewage & water from RWH.

Wastewater generated from this will be treated in Sewage treatment plant will

having capacity 600 KLD.

Page 31: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------31

The Biodegradable and non-biodegradable solid waste will be segregated

and recycled. The ‘In vessel process’ will be used for composting of solid

waste.

1.8. Will the low-lying areas & wetlands get altered? (Provide details of how

low lying and wetlands are getting modified from the proposed activity)

No water logging is expected because no availability of water source in

nearby area.

1.9. Whether construction debris & waste during construction cause health

hazard? (Give quantities of various types of wastes generated during

construction including the construction labor and the means of

disposal)

Construction debris and waste during construction will not cause health

hazard. Temporary housing will be provided at the site for 400 workers. Solid

waste generated during construction is expected to be approx. 40 kg/day.

Solid waste generated during construction will be given to municipal waste

site.

Construction debris generated will be used for back filling on the site.

All the waste generates will be properly treated and taken care of, therefore

will not create any health hazard.

Page 32: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------32

2. WATER ENVIRONMENT

2.1. Give the total quantity of water requirement for the proposed project with

the breakup of requirements for various uses. How will the water

requirement be met? State the sources & quantities and furnish a water

balance statement.

Water Requirement:

a) During Construction Phase:

Total water requirement during construction phase shall be approximately 125

KLD for domestic use for the workers working / dwelling on the site. This

water will be made available from tankers.

b) During Operational Phase:

Proposed project has 1,20,949 sq.m. built-up areas. Total number of persons

will be employed at the commercial complex would be approximately 10, 037.

During Operation

Total: 1046 KLD

Total domestic water Requirement: 710 KLD

Landscape : 96 KLD

Air Conditioning: 240 KLD

Total Reused Water = 568 KLD Source: MIDC, Treated Sewage, water from RWH.

Page 33: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------33

Water Balance Statement

Sr. No.

Description Water Requirement

Loss Treated Waste Water

Generation

Water Use

Fresh Recycled

1. Washing and Drinking( @ 10 LPCD) & 3685 seater Canteen @ 70LPCD per seat

101 + 258 = 359

36 323 359 ---

2. Flushing( @35 LPCD)

351 35 316 Nil 351

3. Landscaping 96 96 Nil Nil 96

4. Water Cooled Chillers

240 240 Nil 119 121

Total 1046 478 568 478 568

Water Supply

This requirement will be met from MIDC as well as recycled wastewater. The

recycled wastewater will be used for watering trees, green belts and for

flushing.

Water Storage capacity:

Water for Domestic purpose: 630 KLD

Water for flushing: 350 KLD

Soft Water: 200 KLD

2.2. What is the capacity (dependable flow or yield) of the proposed

source of water?

The proposed source of water will be MIDC & Recycled wastewater, which will

be generated at the rate of 568 KLD approx.

Page 34: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------34

2.3. What is the quality of water required, in case, the supply is not from a

municipal source? (Provide physical, chemical, biological

characteristics with class of water quality)

The quality of water is as per the Indian Standards. The recycled wastewater,

will be used for flushing, watering the trees and the green belt. The water will

be treated before use to fulfill irrigation standards.

(Refer Annexure 9- Baseline Status of Water Quality)

2.4. How much of the water requirement can be met from the recycling of

treated wastewater? (Give the details of quantities, sources and usage)

Out of Total water requirement 1046KLD, 568 KLD will be available through

recycling of treated sewage as detailed under:

For the treatment of wastewater, sewage treatment plant of capacity 600

cum/day will be used.

Total waste water expected to be generated = 568 KLD

Treated sewage shall be reused for flushing and gardening as follows:

1) Water for flushing – 351KLD

2) Water for gardening- 96 KLD Approx.

3) Water for coolers- 240 KLD

4) Total recycle of wastewater 568 KLD

2.5. Will there be diversion of water from other users? (Please assess the

impacts of the project on other existing uses and quantities of

consumption)

Not Applicable.

Page 35: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------35

2.6. What is the incremental pollution load from wastewater generated from

the proposed activity? (Give details of the quantities and composition of

wastewater generated from the proposed activity)

There will not be any incremental pollution load from the proposed activity.

The wastewater-generated form the proposed activity shall be domestic. Total

quantity of sewage generated shall be approx. 568 KLD.

2.7 Give details of the water requirements met from water harvesting? Furnish

details of the facilities created.

Rain Water Harvesting:

In the Operation Phase the daily water requirement of 1046 KLD. Per day

would reduce availability of the Municipal water supply system. It is

recommended that project proponent should install scientifically designed

Rain Water Harvesting System.

Such rainwater harvesting system should have two-fold objective:

1) To utilize rain water available on the plot in direct way or indirect

way to reduce the load on water supply system.

2) To minimize the storm water drainage load to avoid water logging

locally as well as on larger scale.

Rainwater Harvesting facilities will be created at the project site in the form of

aquifer recharge. However, water requirement for the project will not be met

from groundwater.

Details of facilities created are as follows:

Page 36: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------36

STORM WATER DRAINAGE:

Storm water from roof will be collected in khurras/gutters and then connected

to rain water down take through rigid PVC down take pipes.

Down take pipes will run at shaft to the ground floor from there it will be

connected to the network of collection chambers and overflow will be

connected to nearest storm water drain within the property through hume

pipes.

The external storm water drain will be connected to a large water body, which

acts as a percolation pond & the overflow if any will be finally connected to

storm water drain of MIDC.

Ground landscape drainage will be through Hume pipes to the nearest

collection chamber.

Ground level road & open parking area will be drained through storm water

drains.

RAIN WATER HARVESTING: TERRACE

• Area of Terrace = 12,941 Sq.m.

• Maximum expected flow rate of rainfall in collection area @ 50mm/hr.

• Volume of water for 15 minutes rainfall= 143 m3 (at 90 % efficiency)

• Suggested storage sump for storing &Re-Use = 2 Nos. of 200 m3 SUMPS.

SURFACE RAIN WATER HARVESTING/ STORM WATER DATA FOR AREA OF

EXPANSION ( SDB4 & SDB5)

o Area of Site = 19,121 Sq.m ( excluding Terrace Area)

o Average expected rainfall in collection area @ 50mm/hr.

o Volume of water for 15 minutes rainfall = 215 m3 (At 90 % efficiency)

Page 37: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------37

o NOTE: As the Strata is highly disintegrated lateritic rock, there is almost no

absorbency.

Therefore, towards the front of the property we have Created a large pond of

approximate 3,000 CUM, (Percolation Pond).Where in all the external storm

water is led stored and only the overflow if any led to the external storm

water.

(Refer Annexure 11: Storm Water Drainage Plan)

2.8. What would be the impact of the land use changes occurring due to the

proposed project on the runoff characteristics (quantitative as well as

qualitative) of the area in the post construction phase on a long term

basis? Would it aggravate the problems of flooding or water logging in

any way?

The proposed land use is in conformity with the DP so there will not be any

land use change. The runoff from the project site will be used for recharging

the aquifers.

2.9. What are the impacts of the proposal on the ground water? (Will there be

tapping of ground water; give the details of ground water table,

recharging capacity, and approvals obtained from competent authority,

if any)

Source of water supply will be from MIDC.

Page 38: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------38

2.10. What precautions/measures are taken to prevent the run-off from

construction activities polluting land & aquifers? (Give details of

quantities and the measures taken to avoid the adverse impacts)

The general ground level of the project site will not be elevated. The run off

from the site will be filtered mechanically through recharge pits and then will

reach aquifers thereby preventing direct pollution of land or aquifers.

2.11. How is the storm water from within the site managed?(State the

provisions made to avoid flooding of the area, details of the drainage

facilities provided along with a site layout indication contour levels)

The storm water from the site will be used for recharging the aquifers.

Recharge pits will be created on site.

2.12. Will the deployment of construction laborers particularly in the peak

period lead to unsanitary conditions around the project site (Justify with

proper explanation)

Temporary housing will be provided at the site for 400 workers in the form of

Labor camp. Proper treatment and disposal facility is provided for sewage

during construction phase. So activity will not lead to unsanitary conditions at

the site.

Page 39: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------39

2.13. What on-site facilities are provided for the collection, treatment & safe

disposal of sewage? (Give details of the quantities of wastewater

generation, treatment capacities with technology & facilities for

recycling and disposal)

DETAILS OF SEWAGE TREATMENT PLANT

Sewage Treatment:

Objective of Sewage Treatment should be

To treat sewage so that it can be re-used for toilet flushing/gardening.

In order to treat the sewage effectively, Activated Sludge-Extended Aeration

Type sewage treatment is recommended.

Treated sewage should be re-used to the maximum extent for toilet flushing.

The excess treated sewage should be let out etc to existing sewer line along

backside road.

Salient features of STP

• Totally above ground with adequate ventilation facility

• All equipment are provided with 100 % standby facility

• Complete treatment including tertiary to achieve the best recycle quality for

reuse

• Reused for Gardening & Toilet Flushing

• Treatment Adopted: Activated Sludge-Extended Aeration using ENERGY

efficient diffusers.

• Sludge produced is totally mineralized and used as manure for plantation

Page 40: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------40

Treatment Scheme

Screening of large and floating matters in a Bar Screen Chamber

Dampening of flow fluctuations and preparation in Equalization Tank

Pumping at uniform rate to an Extended Aeration-Activated Sludge

System

Tertiary coagulation and settling to reduce turbidity and color

Pre-chlorination, sand and Activated Carbon filtration for polishing

treatment

Sludge conditioning and dewatering in sludge tank and centrifuge

Anoxic treatment for reducing the total nitrogen

Treated effluent quality: Treated effluent meets the most stringent of

standards Compact and Elegant: The system is elegantly designed with

particular emphasis on compactness, aesthetics and ergonomics.

PARAMETERS

INLET WATER

QUALITY

TREATED WATER

QUALITY

BOD 200 – 300 PPM < 20

COD 200 – 500 PPM < 30

TSS 200 – 300 PPM < 10

OIL & GREASE 25 – 50 PPM < 5

PH 6 - 8 7 - 8

ENVIRONMENTAL IMPACTS AND LIFE CYCLE ASSESSMENT

Positive environmental Impact.

Use treated water for toilet flushing, resulting water conservation.

Page 41: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------41

As the operation is essentially soundless, no adverse noise impacts will be

created.

Use of electrical energy is inevitable as is the use of disinfecting agents.

However, the energy requirement has been kept to a bare minimum by the

use of energy-efficient processes.

Total capacity of the STP shall be 600 KLD.

Treated sewage shall be reused for flushing and gardening as follows:

1) Treated water from STP – 568 KLD

2) Water for flushing – 351 KLD

3) Water for gardening:

Plot area for Gardening16, 000 sq.m.

Total Water required for Gardening = 96 KLD

4 ) Water for chillers : 240 KLD

(Refer Annex 11: Sewage Treatment Plant: Schematic Diagram)

2.14 Give details of dual plumbing system if treated waste is used for

flushing of toilets or any other use.

Treated sewage effluent is to be used for recycling. The treated water will be

stored in a tank. This will then be supplied through a separate pipeline.

Outlets will be provided in the toilets so that the water can be used for

flushing.An outlet from this source will also be provided in the green belt for

watering the green belt.

Page 42: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------42

Overflow from this tank of treated water will be discharged into through a

separate pipeline.

3. VEGETATION

3.1. Is there any threat of the project to the biodiversity? (Give a description

of the local ecosystem with its unique features, if any)

There will not be any threat of the project to the biodiversity. This project is

expansion project. Flowering plants, shrubbery and lawns shall be plated. So,

Biodiversity will turn increase.

3.2. Will the construction involve extensive clearing or modification of

vegetation? (Provide a detailed account of the trees & vegetation

affected by the project)

This project is expansion project. No damage or clearing of vegetation.

3.3. What are the measures proposed to be taken to minimize the likely

impacts on important site features (Give details of proposal for tree

plantation, landscaping, creation of water bodies etc along with a layout

plan to an appropriate scale)

Landscaping and Tree Plantation

The green belt area will be 16,000 sq.m. The Project proponents have

proposed a landscape development plan, which includes planting of flowering

and shady trees, shrubs and lawn within the plot.

Page 43: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------43

List of Trees:

Infront of SDB-4 & SDB-5 Along the boundary wall (Compound side)

Sr.No. Name NOs Sr.No. Name NOs

1. Azadiracta indica 10 1. Alistonia scholaris 100

2. Lagestromia thorellia 10 2. Grevillea robusta 75

3. Peltophorum 15 3. Bahunia Blackiana 75

4. Spathodia companulata

15 Around Utility & Logistic Block

5. Michelia champaka 10 1. Jacaranda mimosifolia 20

6. Delonix regia 15 2. Delonix regia 10

7. Tabebuia avalande 20 3. Cordia sabestian 10

8. Rain tree 20 4. Milingtonia hortensis 20

East side of SDB-4 & SDB-5 West side of SDB-4 & SDB-5

Sr. No. Name Nos Sr. No. Name Nos

1. Delonix regia 10 1. Lagestromia indica 15

2. Milingtonia hortensis 15 2. Alistonia scholarsis 15

3. Peltophorum 20 3. Bahunia Blackiana 10

4. Spathodia companulata 10 4. Spathodia companulata 10

5. Jacaranda mimosifolia 15 5. Jacaranda mimosifolia 15

6. Plumeria 10

Page 44: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------44

South side of SDB-4 & SDB-5 Assembly

Sr.No. Name Nos Sr.No. Name Nos

1. Delonix regia 10 1. Delonix regia 20

2. Milingtonia hortensis 10 2. Plumeria 30

3. Peltophorum 15 3. Golden melluluca 40

4. Bahunia Blackiana 10 4. Bottle brush 30

5. Tabebuia avalande 10 5. Rain tree 25

6. Colvella racemeosa 15 6. Michelia champaka 20

Around MLCP Car Parking

Sr. No. Name Nos Sr. No. Name Nos

1. Tabebuia argentia 25 1. Terminalia catappa 100

2. Terminalia catappa 75 2. Delonix regia 50

3. Bahunia Blackiana 25 3. Tabebuia avalande 50

4. Delonix regia 40 4. Colvellea racemosa 25

5. Peltophorum 30

(Refer Annexure 7: Landscape plan)

Page 45: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------45

4. FAUNA

4.1. Is there likely to be any displacement of fauna- both terrestrial and

aquatic or creation of barriers for their movement? Provide the details.

No.

4.2. Any direct or indirect impacts on the avifauna of the area? Provide

details.

No.

4.3. Prescribe measures such as corridors, fish ladders etc to mitigate

adverse impacts on fauna.

The proposed project will not have any adverse impact on the flora or fauna.

5. AIR ENVIRONMENT

5.1. Will the project increase atmospheric concentration of gases & result in

heat islands? (Give details of background air quality levels with

predicted values based on dispersion models taking into account the

increased traffic generation as a result of the proposed constructions)

As this will be an Info Tech park, air pollution is not expected to be a major

concern. There will not be notable increase in pollution therefore dispersion

model calculations are not done. But the data on Ambient Air Quality have

been collected during the study period.

Air quality is represented generally in terms of concentration of Suspended

Particulate Matter, Sulphur Dioxide and Oxides of Nitrogen and Carbon

Page 46: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------46

Monoxide, lead and Ammonia. A wide variety of sources contribute SPM in

ambient air. Some of them are construction activities, vehicular emissions,

industrial process emissions, dust storms etc.

It is generally observed that SPM levels are higher in dry weather i.e. during

summer and winter seasons. Dust storms generally do not occur. Hence SPM

concentrations are within permissible limit.

It is necessary to monitor the ambient air quality in terms of above said

parameters to establish the background air quality scenario and assess the

impact of construction on the scenario before undertaking any activity.

Ambient air motoring was carried out of 4 stations within core and buffer

zones of the proposed site during December 2007 to February 2008 to

representing winter season.

In view of the revision of national Ambient Air Quality Standards by Central

Pollution Control Board ambient air quality stations were identified and

monitored with high volume sampling apparatus. The sampling locations are

project site, Hinjewadi, Punawale & Bhoirwadi.

The plant site was chosen as the station located near the center of the project

area and sampling stations were located in buffer zone situated at an angle of

30 degrees with respect to the central station.

Page 47: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------47

At each station, ambient air samples monitored for 24-hour duration were

collected at a frequency of every day and analyzed for Suspended Particulate

Matter, Sulphur dioxide and Oxides of Nitrogen, Carbon Monoxide, Lead and

Ammonia.

(Refer Annex 13: Baseline Status of Air Quality)

Concentrations of Suspended Particulate Matter monitored were in the range

of 120 to 130 as against Maharashtra Pollution Control Board standards of

200 g /cu.m. Respirable Suspended Particulate Matter (RSPM) were in the

range of 75 to 90 g /cu.m.

Location

SPM

µg/m3

RSPM

µg/m3

SO2

µg/m3

NOX

µg/m3

CO

ppm

Project site 110.2 86.17 11.4 14.4 0.164

Hinjewadi 95.2 74.54 16.4 21.0 0.16

Punawale 104.3 80.83 12.7 18.6 0.17

Bhoirwadi 113.5 88.16 10.4 12.9 0.17

NAAQ

Standards

200 100 80 80 4

Levels of SO2 and NOX were in the range of 10 to 20 g/cu.m. and 10 to 25

g/cu.m. respectively as against Maharashtra Pollution Control Board

standards for Residential, Rural and Other area.

Page 48: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------48

5.2. What are the impacts on generation of dust, smoke, odorous fumes or

other hazardous gases? Give details in relation to all the meteorological

parameters.

During construction phase, Suspended Particulate Matter, dust, will be the

main pollutant, which could be generated from site development activities.

Concentration of SO2, NO2 and CO may rise a little due to traffic. Proper

upkeep and maintenance of vehicles, sprinkling of water on roads and

construction site and providing sufficient vegetation all around the plant site

are some of the measures that would reduce the impact during construction

phase.

It is generally observed that SPM levels are higher in dry weather i.e. during

summer and winter seasons. Pollutant load of the atmosphere is generally

low during monsoon as the gaseous pollutants tend to dissolve and

particulate pollutants get adsorbed forming aerosols.

Fog formation aggravates the problem as rate of dispersion of pollutants

reduces. High wind velocity is helpful for dispersion of pollutants. Higher

temperature and pressure in the troposphere is helpful for better dispersion of

pollutants. In general, effective dispersion of pollutants in the atmosphere

depends primarily on the degree of stability of the atmosphere and on its

turbulent structure.

Page 49: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------49

5.3. Will the proposal create shortage of parking space for vehicles? Furnish

details of the present level of transport infrastructure and measures

proposed for improvement including the traffic management at the entry

& exit to the project site.

Multilevel Car parking will be provided.

There is provision for 1300 four-wheelers & 1500 two wheelers parking.

100 buses for pick up and drop.

Measures proposed for improvement including traffic management at the

entry and exit to the project site are:

Maintaining flow of traffic for approach roads

Entry and Exit points carefully placed so as not to disturb this flow

One way traffic inside the complex for comfortable movement of vehicles

and reduction in possibility of congestion

Easy movement of fire tender in and around the complex ensuring

accessibility to every building.

During entry time, PUC checked vehicles would be allowed only.

5.4. Provide details of the movement patterns with internal roads, bicycle

tracks, pedestrian pathways, footpaths etc., with areas under each

category.

Area under roads for the total project will be 26,200.32 sqm for 10 & 12 m

wide road while road area under 6 mt width will be 9821 sqm. Proposed plan

has provision for Bicycle tracks, pedestrian pathways and footpaths.

Page 50: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------50

5.5. Will there be significant increase in traffic noise & vibrations? Give

details of the sources and the measures proposed for mitigation of the

above.

The proposed activity being an InfoTech park will not cause a notable

increase in the noise and vibration during operation. However, use of heavy

machinery is inevitable during construction phase of the project. Sources of

noise Pollution during construction phase are machinery like Earthmoving

Machinery (Excavators), Concrete Pumps, Batching Plant, Hoist Crane, Alfa

Crane, Compressors and transportation materials.

Incremental increase in baseline noise levels due to commercial IT complex

will not exceed 65 dBA. The post project noise levels at the nearest habitation

will be less than the stipulated standards of CPCB.

Noise has various adverse effects on workers and their activities. The first

and foremost effect of noise on workers exposed to high noise level over a

long period of severe impulsive noise of short duration is ‘Loss of Hearing’.

This effect is either temporary or permanent in nature depending upon the

length and severity of noise exposure.

Other effects of noise are such as blood pressure, cardiovascular problems

and ulcers. Some studies also point to noise related learning difficulties,

reduced work efficiency, irritation, fatigue, increased accidents and errors and

socially undesirable behavior.

Page 51: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------51

Mitigative measures:

The project proponents have agreed to take precautions to control noise

pollution as mentioned under:

• Use of equipment generating noise of not greater than 90 db (A).

• High noise generating construction activities would be carried out only

during daytime. Also, adequate parking space will be provided to avoid

crowding and noise pollution

• Installation, use and maintenance of mufflers on equipment.

• Workers working near high noise construction machinery would be

supplied with ear muffs/ear plugs.

5.6. What will be the impact of DG sets & other equipment on noise levels &

vibration in & ambient air quality around the project site? Provide

details.

During Construction Phase:

Sources of noise Pollution during construction phase are machinery like

Earthmoving Machinery (Excavators), Concrete Pumps, Batching Plant, Hoist

Crane, Alfa Crane, Compressors and transportation materials.

These Machineries will be used only during daytime.

During Operation Phase:

Sources of Noise Pollution is D.G.Sets

The noise would be created due to standby D.G. sets.

Canopies will be provided to these mechanical devices to reduce noise and

vibration. There will not be any considerable impact on the ambient air quality

Page 52: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------52

around the project site as CPCB approved DG sets along with acoustic room

will be developed and plantations will be provided.

6. AESTHETICS

6.1. Will the proposed constructions in any way result in the obstruction of a

view, scenic amenity or landscapes? Are these considerations taken

into account by the proponents?

Proposed construction will not result in obstruction of a view, scenic amenity

or landscapes.

6.2. Will there be any adverse impacts from new constructions on the

existing structures? What are the considerations taken into account?

Not Applicable

6.3. Whether there are any local considerations of urban form & urban

design influencing the design criteria? They may be explicitly spelt out.

No.

6.4. Are there any anthropological or archaeological sites or artifacts

nearby? State if any other significant features in the vicinity of the

proposed site have been considered.

No.

7. SOCIO-ECONOMIC ASPECTS

7.1. Will the proposal result in any changes to the demographic structure of

local population? Provide the details.

By analyzing the socio-economic baseline in the context of the proposed

project, the impacts of the project could be variable in nature. The rapid socio-

Page 53: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------53

economic impact assessment study carried out incorporating primary data

collected for the project area and also available secondary data.

During construction 300 workers will be provided temporary shelters at the

site. After completion of the project, there will be influx of 10,037 people in the

area. The population of the area is likely to increase.

(Refer Annexure 15:Census data )

7.2. Give details of the existing social infrastructure around the proposed

project.

Proposed Expansion project of Wipro Ltd. is coming up at Hinjewadi, which is

4 km from the Pune Bangalore National Highway in Taluka Mulshi of Pune

District.

Nearest Distances from Proposed site:

1) Railway Station( Akurdi) - 17 Km

2) Pune Airport- 45 Km

(Refer Annexure –15: Census Data)

7.3. Will the project cause adverse effects on local communities, disturbance

to sacred sites or other cultural values? What are the safeguards

proposed?

It could be seen that the over all impact on Socio-Economic Environment is

positive and permanent in nature. The impacts on socio-economic

environment due to the proposed project are listed below:

Page 54: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------54

Positive Aspects of the Projects are as follows

Increase in Income of project village and neighboring villages, thus

reduction in poverty.

Decrease in unemployment (through direct and indirect employment)

Increase in educational facilities and educational level due to further

development.

Improvement in transport, communication facilities.

Improvement in lifestyle and social status, etc.

Increase in revenue generation.

Reduction in below poverty line families.

Due to the proposed project, facilities are likely to grow in line with the

development.

Possible sources of income for this community are direct like Construction

and various job works in IT parks.

Some indirect activities will also increase economic activity like Canteen,

Lodging, Maintenance services and other service industries. For Men job

works will be Driving (heavy and light vehicle), Mechanics & Repairs,

Electrician, Computer operator, Welding & Fitting, Plumbing, Laundry,

Hotel Management & Catering, Typing & Photocopying, Packaging,

Salesmen, Security men, Transportation. For women Computer

Operation, Assembling parts, Hotel Management & Catering, Typing &

Photocopying, Tailoring, knitting and embroidery, Packaging, Cleaning

and household work, Baby Sitting (Crèche), Laundry etc.

Page 55: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------55

As during the construction and operational phases of the project a

workforce will be needed including both skilled and unskilled people. The

introduction of workers from areas outside the region, could introduce a

potential effect on the local culture, habits and economics. Those effects

have both positive and negative elements and will be managed by the

project proponents and developers. The construction phase induces

employment opportunities for the local people. About 400 persons will be

employed during peak period.

8 BUILDING MATERIALS

8.1. May involve the use of building materials with high-embodied energy.

Are the construction materials produced with energy efficient

processes? (Give details of energy conservation measures in the

selection of building materials and their energy efficiency)

Conventional construction materials used from nearest source to minimize

energy consumption for transportation.

8.2. Transport and handling of materials during construction may result in

pollution, noise & public nuisance. What measures are taken to minimize

the impacts?

During construction phase, sources of noise pollution will be due to operation

of machinery like Earthmoving Machinery (Excavator), Concrete Pumps,

Batching Plant, Hoist Crane, Alfa Crane etc. as well as transportation

vehicles. This will cause nuisance to the occupants of the nearby area. The

project proponents have agreed to take precautions to control noise pollution

as mentioned under:

Page 56: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------56

• Use of equipment generating noise of not greater than 90 db(A).

• High noise generating construction activities would be carried out only

during daytime.

• Installation, use and maintenance of mufflers on equipment.

• Workers working near high noise construction machinery would be supplied

with ear muffs/ear plugs.

(Refer Annexure 14- Baseline Status of Noise Quality)

8.3. Are recycled materials used in roads and structures? State the extent of

savings achieved?

Solid waste that would be generated due to excavation will be in the form of

rubble and soil. This soil and rubble would be used for leveling of ground and

recreational area. Construction debris will be reused for backfilling of roads

and other construction.

8.4. Give details of the methods of collection, segregation & disposal of the

garbage generated during the operation phases of the project.

Solid waste will be generated in the campus is domestic type having source

separated dry and wet components. As far as possible the dry waste like

paper, cardboard boxes, thermocol packing, plastics etc. shall be sent to

PMC for recycling purpose. However, wet waste, which is biodegradable,

shall be converted to bio-compost by adopting following aerobic composting

method. The quantity of biodegradable waste generated is about 650 kg per

day. The ‘In vessel process’ will be used for composting of solid waste.

Page 57: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------57

Total Population –10,037 persons

Quantity of solid waste = 3011 kg/day

Quantity of wet waste – 1204.4Kg/day

(50 Kg additional wet wastes shall be accounted by trees and landscape

trimming etc.

Net Quantity of Wet Waste – 1254.4 Kg/day

Quantity of dry waste – 1806 Kg/day

A ‘In vessel process’ is based on the following principles.

(1) Valuable resources must be recovered & reused / recycled.

(2) Biodegradable matter must be composted.

(3) Minimize the material to be disposed off in a landfill.

B Procedure to be followed

1. The segregated wet MSW arrives on site.

2. MSW is screened using vibro sieve.

3. Manual Segregation is done.

4. Non-biodegradable matters if any is separated for reuse &

recycle.

5. Valuable resources are offered to rag pickers.

6. Biodegradable matter undergoes size reduction through a

shredder.

7. Specific Vessels are used in the project.

8. One vessel can accommodate about 5 MT shredded waste.

Page 58: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------58

9. Everyday a specially developed Microbial Inoculant is mixed

with shredded biodegradable matter at the rate of 1 kg/MT. of

biodegradable waste.

10. The bio-degradable matter will remain in the vessel for 10

days(Minimum) The composting system in the Vessel is

maintained aerobic using air supplied by compressor.

11. The organic matter in the vessel undergoes rapid

decomposition due to the secretion of enzymes by microbes

present in microbial inoculant.

12. The organic compost is taken out from vessel after 10 days.

13. The compost is offered for further use in the premises for

gardens, lawns & other plants.

C Benefits of ‘In Vessel Process’

Complete system for treatment & disposal of MSW.

The total MSW arriving on the site is cleared on the same day.

Works round the year.

Provision for recovery from MSW in the form of metals, bottles, Paper,

plastic etc.

Provides a scientific method for the production of organic compost.

Elimination of foul odour.

Elimination of Pathogens and weed seeds.

Problem of rodents and insect pests is avoided.

Aesthetically acceptable.

Treatment time is substantially reduced.

Eco-friendly

Page 59: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------59

Economical

Requires less space for the treatment.

Load on the landfill is reduced, thus requires less land for disposal.

D Organic compost quality parameters:

1. Moisture 15-20%

2. Total Organic Carbon 16-20% (min)

3. C:N < 20:1

4. Nitrogen 0.8 (min)

5. Phosphorus (P2O5) 0.5-0.8%

6. Potassium (K2O) 1-2%

7. pH 6.5 – 7.5

Free from pathogens and weed seeds.

E Benefits of Organic compost:

1. Improves soil structure.

2. Better water holding capacity.

3. Better aeration & exchange of gases in rhizosphere.

4. Buffering of excessive variations in pH.

5. Excellent cation exchange capacity

6. The chemical fertilizers are better conserved hence more easily

available to plants in presence of organic compost.

Page 60: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------60

7. It is a well-known fact that the required dose of synthetic

fertilizer is much higher in lands deficient in organic content than

the compost having high organic content. Thus reduced

expenditure, reduced leachates, and reduced environmental

pollution.

8. Organic compost is essential for beneficial soil micro flora.

F ‘In Vessel Process’ requirements

A) Equipments

1. Sieve 1 No.

2. Shredder 1 No.

3. Compressor 1 No.

4. Squeezer 1 No.

5. Vessels 1 Nos.

6. Required tools & tackles 1 Set

7. Ozonation treatment unit 1 Unit

B) Man power

Workers 4 Nos.

C) Infrastructural facilities

1. Water connection (500 liters. Storage tank)

2. Electrical supply (3 phase 5 HP)

3. Space required – 165 sqm. including Shed.

Page 61: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------61

9. ENERGY CONSERVATION

9.1. Give details of the power requirements, source of supply, backup source

etc. What is the energy consumption assumed per square foot of built-

up area? How have you tried to minimize energy consumption?

a) During Construction Phase:

Power required for the general purpose will be approx. 450 KVA Approx.

DG Sets: 125 KVA, 3 SETS.

75 KVA will be taken from MSEB Connection.

b) During Operational Phase:

Power requirement during operational phase will be 8399 KVA Approx. Nos. of D.G.Sets:

15000 KVA , 6 Sets

Fuel Requirement : HSD 250 lit/hr

Electrical Power Consumption Savings – as per Draft Energy Conservation

Building Codes - 2006

• As per Chap.8 Electrical Power – code section 8.2.5.1- Thermal Monitoring

of Draft Energy Conservation Building Codes – 2006, temp. sensors are

provided in the Main Distribution Board with visible temp. indicators outside.

• As per Chap.8 Electrical Power – code section 8.2.4- Check Metering of

Draft Energy Conservation Building Codes – 2006, Master Meter will be

provided in the main LT kiosk, next to Trr. and individual meters for lighting,

chillers, lifts and pumps etc.

• As per Chap.8 Electrical Power – code section 8.2.5.2- Power distrbn.

Losses of Draft Energy Conservation Building Codes – 2006, suitable size of

Page 62: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------62

cables are selected thereby total distrbn. Loss doesn't exceed 1% of total

power usage.

• As per Chap.7 Lighting– code secn. 7.4 - Exterior lighting control of Draft

Energy Conservation Building Codes – 2006, exterior lights like façade ltg.,

street ltg., landscape ltg. will be on timer which controls the lights on need

basis and there is no uplighter.

• As per Chap.7 Lighting– code secn. 7.3 – Interior lighting of Draft Energy

Conservation Building Codes – 2006, the interior lighting like common area,

basement, etc light power density of the fixtures are as per Table 7.3.1

• As per Chap.8 Electrical Power – code section 8.2.1- Transformer of Draft

Energy Conservation Building Codes 2006– the proposed Trr. max. allowable

losses at full load percentage rating for 3x2000kVA Trrs. is less than 2.2 % of

the total rating of Trr.

• As per Chap.8 Electrical Power – code section 8.2.2 – Energy efficient motors

of Draft Energy Conservation Building Codes 2006– the motors used for lifts,

PHE, Fire Fighting services are of the efficiency 89–92 %. 750 kVAR

capacitor banks are installed in the PHE, Fire, chillers etc to maintain PF of

0.98 and to reduce kVA demand of the system.

Measures to reduce energy consumption -

Minimize use of air-conditioning.

Maximize the use of natural lighting and ventilation through design.

Purchase of energy efficient appliances.

Constant monitoring of energy consumption and defining targets for

energy conservation.

Page 63: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------63

Adjusting the settings and illumination levels to ensure minimum energy

used for desired comfort levels.

Installing programmable on/off timers and sensors for low occupancy

areas.

Use of compact fluorescent lamps and low voltage lighting.

Sunscreen films on windows to reduce heating inside the buildings

9.2. What type of, and capacity of, power back-up do you plan to provide?

During Construction phase electricity demand will be available from MSEB &

D.G Sets. Power required for the general purpose will be approx. 450 KVA

Approx.

DG Sets: 125 KVA, 3 SETS.

75 KVA will be taken from MSEB Connection

During the operation phase, common utilities such as lifts, water pumps,

common lighting will be provided from DG sets. Standby D. G. sets with 100%

power backup will be operated incase of power failure for critical load only.

D.G.Sets- 1500 KVA each - 6 Nos.

9.3. What are the characteristics of the glass you plan to use? Provide

specifications of its characteristics related to both short wave and long

wave radiation?

Normal 6 mm heat strength glass The glass will be used in a way just to

provide optimal light inside. Also the glass used will be energy efficient to

reduce the heat gain inside the building. Excessive use of glass will be

avoided so as to reduce AC loads and to avoid the glare within the campus.

Page 64: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------64

9.4. What passive solar architectural features are being used in the building?

Illustrate the applications made in the proposed project.

Architectural design

Efficient use of Air Conditioning VRV-II advanced AC system.

Maximize the use of natural lighting through design.

Excessive use of glass will be avoided so as to reduce AC loads and to avoid

the glare within campus.

The built form overall will be curved in order to provide self shading, also the

material used outside will be textured paint and excessive use of stone will be

avoided.

9.5. Does the layout of streets & buildings maximize the potential for solar

energy devices? Have you considered the use of street lighting,

emergency lighting and solar hot water systems for use in the building

complex? Substantiate with details.

Street lighting will be considered within the complex. For the emergency

lighting proper provision will make by considering available stocks. Because of

it is commercial complex Solar hot water system will be not used within IT

complex.

9.6. Is shading effectively used to reduce cooling/heating loads? What

principles have been used to maximize the shading of Walls on the East

and the West and the Roof? How much energy saving has been

effected?

The built form overall will be curved in order to provide self shading, also the

material used outside will be textured paint and excessive use of stone will be

avoided.

Page 65: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------65

The construction is designed in order to assure maximum of the natural light

and ventilation in the structure. The basement will be designed as a lower

ground floor and lot of light and ventilation will given with the help of

embankments and using the low level road to make the basement open.

That’s why no separate ventilation system will require for the basement and

also artificial lighting will avoid during daytime.

9.7. Do the structures use energy-efficient space conditioning, lighting and

mechanical systems? Provide technical details. Provide details of the

transformers and motor efficiencies, lighting intensity and air-

conditioning load assumptions? Are you using CFC and HCFC free

chillers? Provide specifications.

The proposed project being an IT park, the proponent shall provide VRV II Air

conditioning system for space cooling. Energy efficiency in lighting and

mechanical systems will be achieved by:

Excessive use of glass is avoided so as to reduce AC loads and the glare

within the campus.

Purchase of energy efficient appliances

Constant monitoring of energy consumption and defining targets for

energy conservation

Adjusting the settings and illumination levels to ensure minimum energy

used for desired comfort levels

Installing programmable on/off timers and sensors for low occupancy

areas

Use of compact fluorescent lamps and low voltage lighting.

Page 66: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------66

9.8. What are the likely effects of the building activity in altering the micro-

climates? Provide a self-assessment on the likely impacts of the

proposed construction on creation of heat island & inversion effects?

The proposed project is of Commercial type and will not have space

conditioners or glass walls. Alteration of microclimate is not notable in this

case. The glass will be used in a way just to provide optimal lights inside. Also

the glass used will be energy efficient to reduce the heat gain inside the

building.

The basement will be designed as a lower ground floor and lot of light and

ventilation will given with the help of embankments and using the low level

road to make the basement open. That’s why no separate ventilation system

will require for the basement and also artificial lighting will avoid during

daytime.

System, design of buildings in order to assure maximum natural ventilation

and light will be considered to reduce the effect of creation of heat island.

Hot air will be discharged up from terrace.

9.9. What are the thermal characteristics of the building envelope? (a) roof;

(b) external walls; and (c) fenestration? Give details of the material used

and the U - values or the R - values of the individual components.

Specifications and U values are as follows:

Roof : U value = 0.16 W/sq.m

External walls: U value: 1.22 W/sq.m

Glass : U value : 3.12 W /sq.m

Page 67: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------67

9.10. What precautions & safety measures are proposed against fire hazards?

Furnish details of emergency plans.

The project proponents shall follow all the safety rules and regulations as

prescribed by regulatory authority as under-

Fire and General Safety Measures:

a. Entrance gates will be provided to the complex.

b. Courtyard fire hydrants will be proposed to use in the complex.

c. Walls enclosing lift shafts shall be fire resistant.

d. Shafts shall have a permanent vent under the machine room.

e. Landing doors and lift car doors will be fire resistant.

f. Electrical meter room shall be on the ground floor and it will be

adequately ventilated. It will also have a fire resistant door.

g. The electrical shaft will be sealed with non-combustible material like

Vermiculite.

h. The lighting of the escape route will be on independent circuit.

i. Fire fighting and fire alarm provisions shall be made within the

complex.

During Construction Phase:

Fire Protection equipments like Sand Buckets and extinguishers will be

installed whenever it required.

During Operation Phase:

Storage Tank- underground and overhead tank.

Landing valves with hose reels within the premises.

External Courtyard hydrant.

Sprinklers in the entire premises.

Pumping arrangement.

(Refer Annexure 18 : Fire and Safety -Drawing)

Page 68: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------68

9.11. If you are using glass as wall material provides details and specifications

including emissivity and thermal characteristics.

The glass will be used in a way just to provide optimal lights inside. Also the

glass used will be energy efficient to reduce the heat gain inside the building.

9.12. What is the rate of air infiltration into the building? Provide details of how

you are mitigating the effects of infiltration.

Not applicable as the proposed project is a Commercial complex with

advanced air conditioning system is going to be utilized within complex.

9.13. To what extent the non-conventional energy technologies are utilized in

the overall energy consumption? Provide details of the renewable

energy technologies used.

The proposed project is of Commercial type and will not utilization of non-

conventional technologies. However, renewable energy is not being used.

10. Environment Management Plan

The Environment Management Plan would consist of all mitigation measures

for each item wise activity to be undertaken during the construction, operation

and the entire life cycle to minimize adverse environmental impacts as a

result of the activities of the project. It would also delineate the environmental

monitoring plan for compliance of various environmental regulations. It will

state the steps to be taken in case of emergency such as accidents at the site

including fire.

(Refer Annex16 – Environment Management Plan)

Page 69: F Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune … · F orm I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057

Form I & IA for Expansion of Rajiv Gandhi InfoTech Park Phase II Hinjewadi Pune – 411057.

-------------------------------------------------------------------------------------------------------------69

LIST OF ANNEXURES

Sr.No. Description Number of Annexure

1 Panoramic View Annexure - 1

2 Master Plan ( Site plan) Annexure –2

3 SEZ Approval Letter Annexure - 3

4 Site layout Annexure – 4

5 Contour map Annexure - 5

6 Map of parking plan Annexure - 6

7 Landscaping plan Annexure - 7

8 Soil testing Report Annexure – 8

9 Baseline Water Quality Annexure - 9

10 Storm Water Drainage Map Annexure - 10

11 Sewage Treatment Plant: Schematic Diagram Annexure - 11

12 Floor plans Annexure - 12

13 Baseline Status of Air Quality Annexure - 13

14 Baseline Status of Noise Quality Annexure – 14

15 Census Data Annexure - 15

16 Environmental Management Plan Annexure - 16

17 Municipal Solid Waste –Schematic Diagram Annexure- 17

18 Drawing for Fire fighting Annexure- 18