Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana D.O.O. SCIRO S.r.l. TECNOSISTEMI S.p.A. TLC Engineering & Services SIGMA Conseil S.a.r.l. Università degli Studi di Genova F-MAN Project - 3 nd Annual Review SYSTEM Architecture Genova, December 2 & 3, 2004

F-MAN Project - 3 nd Annual Review

Embed Size (px)

DESCRIPTION

F-MAN Project - 3 nd Annual Review. Genova, December 2 & 3, 2004. SYSTEM Architecture. Event Messages. Data Base. The fleet management concept. Tracking System. FleeMan data input. External data input. Position Status Events. Geo data, timetable. GNSS/GSM. Sensors. - PowerPoint PPT Presentation

Citation preview

Page 1: F-MAN Project  -  3 nd  Annual Review

Caminhos de FerroPortugueses E.P.

EuropeanDatacomm NV

IVU TrafficTechnologies AG

National TechnicalUniversity of Athens

Prometni InstitutLjubljana D.O.O.

SCIRO S.r.l. TECNOSISTEMI S.p.A.TLC Engineering & Services

SIGMAConseil S.a.r.l.

Università degli Studidi Genova

F-MAN Project - 3nd Annual Review

SYSTEM Architecture

Genova, December 2 & 3, 2004

Page 2: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 2

The fleet management conceptFleeMandata input

Tracking System Externaldata input

GNSS/GSMSensors

Geo data,timetable

Data Processing

Event Messages

- F-Man Pool formulation - ETA- Technical availability of wagons

Train Control info

Wagon related info

Asset Management

Data Base

- Decision Support Financial targetsCommercial,controlling datas

- Position- Status- Events

Page 3: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 3

System Architecture: Module overview•Tracking System Module (TSM)

OBT communicationTracking & TracingMap module

•Data Processing Module (DPM)Management of Users, ItinerariesMaintenance dataETA

•Asset Management Module (AMM)ReservationDecision Support SystemETA/Maintenance affecting the processUser-Interface concepts

Page 4: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 4

Tracking System Module: Overview

NON F - MAN OBT

F - MAN OBT 1

F - MAN OBT n

Modem

INTERNET

HUB

+32 123 456 789 F-MAN

DPM

Other

Message

Page 5: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 5

Tracking System Module: OBT devices

On-Board Terminals (OBTs) mounted on wagons

Loading Sensor apparatus

Micro controller & Mobile

Communication

XML standards for data exchange from Ground Station

> GPS receiver

> mobile communication system

> a loading sensor

(allows the F-man tool to be compliant with OBT devices produced by other companies)

Page 6: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 6

Tracking System Module: Ground Station

Cent

Country A

Country B

Country C

OBT

International provider

OBT

National provider

International provider

Roaming

OBT

Users’ premises Users’

premises Users’ premises

Internet connection

Internet connection

Internet connection

Roaming

A central ground station concentrates and elaborates all information entering the system (SMS messages from OBTs, user queries, etc.) and distributes the required information to the users’ premises.

Page 7: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 7

Fleet Managersasking for wagons

Fleet Managersoffering wagons to the pool

Wagon LeasingCompaniesOrder Manager

WagonsMaintenance Managers

OperationalManagers,Infrastructure managers & other authorisedactors

Authorised station staff

Data Processing Module: Actors Involved

Page 8: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 8

Data Processing Module: Information Flow

Empty wagons path and timetable data

Wagons Running

OPM FM F-Man toolOM

time

Wagons request in coded form (O/D, loading, departure and delivery dates,

wagons quantity and type)

Wagons request (O/D, loading, departure and delivery dates,

wagons quantity and type)

F-Man options: alternative sets of empty wagons (criteria: cost,

wagons location, time availability…)

A request for verification of the OPM availability to move wagons to the transportation

origin

The OPM confirmation of availability

Order confirmation

Wagons are empty and again available

F-Man action perimeter

1 2

4

Order for the sending of empty wagons

Information to release the other alternative

6

5

Transport request

Transport confirmation

3

Wagon

Delay*: a delay compared to a given time but also a damage

9

11

12

CSTransport request including :•O/D,•loading, departure and delivery dates, •freights type and quantityor•wagon types and quantity

Real time events

16

14

87

13

14Delay * detection

10

15

Wagons movement confirmation

Wagons identification numbers

Loaded wagons path and timetable data

Event messages ( departure and arrival dates, delivery, restitution…)

Page 9: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 9

Data Processing Module: User Management

Select language

Allocate privileges

Page 10: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 10

Data Processing Module: other aspects

Agreements

Itineraries

Information

Page 11: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 11

Data Processing Module: ETA Management

A B C D

Re

al w

ag

on

p

osi

tio

n

Wa

go

n

po

siti

on

a

cco

rd. t

o

sch

ed

ule

Time

Railw.

nodes

Page 12: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 12

Asset Management:  State Machine

Page 13: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 13

Technical Approach

HTML client

JSP

HTML / DHTML

HTTP / SSL

firewall

RMI-IIOP RMI-IIOP

EJB session bean

EJB entity bean

RMI-IIOP

application server

web servers

database

JDBC JDBC

database-layer

business-layer

presentation-layer

CommunicationServer servlet

Page 14: F-MAN Project  -  3 nd  Annual Review

Final Review

Genoa, December 2nd - 3rd, 2004 14

OBT functionality and limitations: SCIRO, EDC, TechnosistemiOBT to Ground Station communication: EDC, SCIRO

User (national FMs) dependences and hostilities F-Man system role in the FMs Decision support PI, CP, SigmaRealistic level of procedure automation SCIRO Business rules NTUA IVU

ETA algorithm: NTUAState of the art software solutions: IVU NTUA SCIRO (map viewer)

Simulation analysis of management aspects: UGDIE, NTUA

Acknowledgement of Partners Contribution The high-level architecture of the system has already been defined in the Technical annex of the project.

System architecture at a more detailed level required the synthesis of the complimentary knowledge and qualification of all partners as well as the work performed in previous work-packages (user requirements, AFNOR analysis) for the analysis of the following aspects

Page 15: F-MAN Project  -  3 nd  Annual Review

Caminhos de FerroPortugueses E.P.

EuropeanDatacomm NV

IVU TrafficTechnologies AG

National TechnicalUniversity of Athens

Prometni InstitutLjubljana D.O.O.

SCIRO S.r.l. TECNOSISTEMI S.p.A.TLC Engineering & Services

SIGMAConseil S.a.r.l.

Università degli Studidi Genova

Thank you for your attention