F-Liquid Penetran Exam Report Ke2 - Copy

Embed Size (px)

Citation preview

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    1/24

    Client :

    Project Title :

    Name of Equipment : 10" REG -24-1P1

    and Identification No. : 10" (BRANCH)

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    2/24

    Client :

    Project Title : Zr.5800 HYL III

    Name of Equipment : 8"- ECW/PCW

    and Identification No. : 8" (BRANCH) :

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    3/24

    Client :

    Project Title :

    Name of Equipment 8" ECW

    and Identification No. : 8" ( BRANCH )

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    Removal

    24" REG-24"-1P1

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    4/24

    Client :

    Project Title :

    Name of Equipment : 24" NG 8010 NEW PIPEand Identification No. : 24" BRANCH

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    5/24

    Client :

    Project Title :

    Name of Equipment 24" MPS

    and Identification No. : 24" JOINT TAPON

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Removal

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying Penetrants

    Dry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    6/24

    Client :

    Project Title :

    Name of Equipment : 24" MPS

    and Identification No. : 24" JOINT TAPON

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant

    Penetrant Time Minutes

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    7/24

    Client :

    Project Title : Zerro Rofermer 5800

    Name of Equipment : 24" MPS

    and Identification No. : 24" JOINT TAPON

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    Removal

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    8/24

    Client :

    Project Title :

    Name of Equipment 16" PCW 8009 W02

    and Identification No. : 16" (branch)

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    Porosity

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    9/24

    Client :

    Project Title :

    Name of Equipment 16" PCW 8009 W02

    and Identification No. : 16" (branch)

    Applicable code Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    Acc

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    Removal

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    10/24

    Client :

    Project Title :

    Name of Equipment 6" NG-8010-1P4 LINE NEW PIPE

    and Identification No. : 6" (branch) 4joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    11/24

    Client :

    Project Title :

    Name of Equipment 6" NG-8010/ COW 041-1P4 LINE NEW PIPE

    and Identification No. : 6" (branch) : 14 JOINT

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    POROSITY

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    12/24

    Client :

    Project Title :

    Name of Equipment 2" NG 8037-1P2

    and Identification No. : 6" & 2" (branch) 1 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    13/24

    Client :

    Project Title :

    Name of Equipment 6" Netrogen

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    POROSITY

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    14/24

    Client :

    Project Title :

    Name of Equipment 3" IG -SA -SA- ECW

    and Identification No. : 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    15/24

    Client :

    Project Title :

    Name of Equipment 8" PCW/ECW

    and Identification No. : 8" & 3" (branch) 4 joint

    Applicable code Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    16/24

    Client :

    Project Title :

    Name of Equipment 8" COW-041 1S1

    and Identification No. : 8" (branch) 6 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    17/24

    Client :

    Project Title :

    Name of Equipment 8" ECW

    and Identification No. : 8"(branch) 6 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    18/24

    Client :

    Project Title :

    Name of Equipment 6" PCW

    and Identification No. : 6" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    19/24

    Client :

    Project Title :

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

    Temperature

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    20/24

    Client :

    Project Title :

    Name of Equipment 16" PCW- 8009 and 8010 -W02

    and Identification No. : 16" (branch) 4 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    21/24

    Client :

    Project Title :

    Name of Equipment 24"- MPS,24" 1P1

    and Identification No. : 24" (BLIND ) 14 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    22/24

    Client :

    Project Title :

    Name of Equipment 16" PCW-8009-W02

    and Identification No. : 16" (branch) 2joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    Penetrant

    Penetrant Time Minutes

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    23/24

    Client :

    Project Title :

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, CHECKED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report Ke2 - Copy

    24/24

    Project Title Project No.:

    Client Report No.:

    Name of Equipment Date :

    1 60" REG-24-IPI ACC 60 8 480

    2 36" REG-02-1P1 36 15 540

    3 24" MPS-24" REG-69-1P1 24 25 600

    4 20" REG- 11-1P1 28" OG 20 20 400

    5 6" NG8010-1P4 NEW LINE PIPE 6 14 84

    6 16" PCW-8009 W02 16 15 240

    7 12" ECW-8031 12 15 180

    8 10" ECW-8032-W01 10" -PCW 10 25 250

    9 6" COW-041-1S1 6" SW99-W01 6 25 150

    10 2" IG 8037-IP2 2 35 70

    11 3" IG,3-SA ECW 3 15 45

    12 2" MPS-41-1S1-2"DM8007-W01 2 20 40

    13 11/2"-1A 6" SW-99 W01 1.5 25 37.5

    14 72" JOINT BRANCH DUMMY 72 2 144

    15 8" JOINT BRANCH TRANSFERLINE 8 12 96

    16 3" NETROGEN LAND 3 20 60

    17 8" PCW/ECW 8 15 120

    306 3536.5

    note :

    1 WAKTU time price Total

    a Waktu normal 24 hour

    b Over time 36 hour

    60 hour

    2 MAN FOWER

    a Level 2 4 60 25,000.0Rp 6,000,000.0Rp

    b Level 1 4 60 20,000.0Rp 4,800,000.0Rp

    c Helper 5 60 10,000.0Rp 3,000,000.0Rp

    3 MATERIAL

    a Liquit Penetrant 20 Cans 150,000.0Rp 3,000,000.0Rp

    b Liquit Depelover 25 Cans 150,000.0Rp 3,750,000.0Rp

    c Liquit Cleaner 60 Cans 150,000.0Rp 9,000,000.0Rp

    d Wire brush 15 ls 50,000.0Rp 750,000.0Rp

    e Majun 10 kg 10,000.0Rp 100,000.0Rp

    30,400,000.0Rp

    PREPARED BY, INSTRUCTED BY,

    PT. KRAKATAU ENGINEERING

    LIQUID PENETRANT EXAMINATION REPORT

    ACCEPTEDDEFECTNO LINE NOMERQTY

    JOINT

    DIA

    INCH

    WELDED

    BRANCH

    QTY DIA

    INCH