BIRO KLASIFIKASI INDONESIALAPORAN SURVEY
Survey Report
No. Laporan : Report No.
No. Reg.Reg. No.
Nama KapalName of Ship
Nama PanggilanCall Sign
BenderaFlag
Isi KotorGross Tonnage
DayaOutput
INDONESIA GT 3600 HP
Tanda Kelas :Class Character
Tempat & Tgl. Survey :Place & Date of Survey
Pemilik :Owner
Survey Penerimaan Kelas B/BAdmission to Class Survey for new building
Survey PengedokanDocking Survey
Survey Bersambung LambungContinuous Hull Survey
Survey Penerimaan Kelas B/LAdmission to Class Survey for existing ship
Survey Bawah AirIn-water Survey
Survey Bersambung MesinContinuous Machinery Survey
Survey Pembaruan KelasClass Renewal Survey
Penundaan Survey PengedokanPostponement for Docking Survey
Survey KetelBoiler Survey
Survey AntaraIntermediate Survey
Survey Poros Baling-balingPropeller Shaft Survey
Survey OtomasiAutomation Survey
Survey TahunanAnnual Survey
Penundaan Survey Poros Baling-balingPostponement for Propeller Shaft Survey
Survey Instalasi PendinginRefrigerating Survey
Survey Perpanjangan KelasExtention for
Survey KhususOccasional Survey
Lain-lainOthers
No. / Tempat & Tgl. Visa terakhir :No. / Place and Date of Last Visa
No. & masa berlaku Sertifikat :Certificate No. & Validity
Visa No.
Jakarta, KEPALA CABANG UTAMA TG. PRIOK SURVEYOR
Tg. Priok Main Branch Manager
Ir. MUARDY KOBANDAHA A. SOLIHIN RIZAL
F.100-1995 Page : … / …
BIRO KLASIFIKASI INDONESIALAPORAN SURVEY
Survey Report
No. Laporan : Report No.
No. Reg.Reg. No.
Nama KapalName of Ship
Nama PanggilanCall Sign
BenderaFlag
Isi KotorGross Tonnage
DayaOutput
TUNAS INDONESIA GT HP
Tanda Kelas :Class Character
Tempat & Tgl. Survey :Place & Date of Survey
Pemilik :Owner
Survey Penerimaan Kelas B/BAdmission to Class Survey for new building
Survey PengedokanDocking Survey
Survey Bersambung LambungContinuous Hull Survey
Survey Penerimaan Kelas B/LAdmission to Class Survey for existing ship
Survey Bawah AirIn-water Survey
Survey Bersambung MesinContinuous Machinery Survey
Survey Pembaruan KelasClass Renewal Survey
Penundaan Survey PengedokanPostponement for Docking Survey
Survey KetelBoiler Survey
Survey AntaraIntermediate Survey
Survey Poros Baling-balingPropeller Shaft Survey
Survey OtomasiAutomation Survey
Survey TahunanAnnual Survey
Penundaan Survey Poros Baling-balingPostponement for Propeller Shaft Survey
Survey Instalasi PendinginRefrigerating Survey
Survey Perpanjangan KelasExtention for
Survey KhususOccasional Survey
Lain-lainOthers
No. / Tempat & Tgl. Visa terakhir :No. / Place and Date of Last Visa
--- No. & masa berlaku Sertifikat :Certificate No. & Validity
Jakarta, KEPALA CABANG UTAMA TG. PRIOK SURVEYOR
Tg. Priok Main Branch Manager
Ir. MUARDY KOBANDAHA A. SOLIHIN RIZAL
F.100-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 0594-TP/B1/2009
LAMBUNG
1. Pelat lambung diatas garis air diperiksa visual, keadaan umumnya baik
kecuali pelat lambung (Sb) pada daerah kamar mesin, keadaan didoubling.
Pelat linggi haluan yang deformasi (draft ± 4,2 m) telah dipotong dan
diganti baru (t = 10,0 mm). (Pelaksanaan Visa No. 3)
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Pelat lambung (Sb) diatas garis air pada daerah kamar mesin yang
didoubling agar dipotong dan diganti baru.
2. F’castle deck, poop deck dan geladak utama diperiksa visual, keadaan
umumnya baik kecuali pelat poop deck berikut yang tipis telah dipotong
dan diganti baru :
- Pelat poop deck (Sb) lajur III antara aft end – fr. 6/7 (t = 10,0
mm)
(Pelaksanaan Visa No. 2)
3. Ruang mesin, ruang steering gear, ruang store dan ruang palka No. 1 – 3
diperiksa visual, keadaan umumnya baik dan pelat dinding / sisi lajur
teratas (Ps) pada ruang steering gear sesuai Visa No. 2 telah dipotong
dan diganti baru (t = 10,0 mm).
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Bracket antara frame dengan pelat tanktop yang keropos pada palka No.
3 agar dipotong dan diganti baru. (sisa Visa No. 2)
4. Pelat tanktop pada palka No. 1, 2 dan 3 diperiksa visual, keadaan
umumnya baik dan bagian berikut yang tipis telah dipotong dan diganti
baru (t = 10,0 mm) : (Pelaksanaan Visa No. 2)
- Pelat tanktop lajur tengah antara fr. 38/39 – 40/41 ; fr. 58/59 –
60/61 ; fr. 67/68 – 70/71.
- Pelat tanktop lajur I (Ps) antara fr. 66/67 – 67/68 ; fr. 74/75 –
75/76 ; fr. 108/109 – 112/113.
- Pelat tanktop lajur II (Ps) antara fr. 59/60 – 62/63 ; fr. 100/101 –
103/104 ; fr. 108/109 – 112/113.
- Pelat tanktop lajur III (Ps) antara fr. 59/60 – 62/63 ; fr. 108/109 –
115/116.
- Pelat tanktop lajur IV (Ps) antara fr. 66/67 – 67/68 ; fr. 108/109 –
112/113
- Pelat tanktop lajur V (Ps) antara fr. 58/59 – 60/61
- Pelat tanktop lajur I (Sb) antara fr. 59/60 – 67/68 ; fr. 107/108 –
112/113.
F.101-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 0594-TP/B1/2009
- Pelat tantop lajur II (Sb) antara fr. 59/60 – 61/62 ; fr. 94/95 –
96/97 ; 101/102 – 102/103.
- Pelat tanktop lajur III (Sb) antara fr. 79/80 – 85/86 ; fr. 94/95 –
96/97.
- Pelat tanktop lajur IV (Sb) antara fr. 66/67 67/68 ; fr. 75/76 –
77/78 ; fr. 101/102 – 102/103.
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
Pelat tanktop berikut yang tipis agar dipotong dan diganti baru : (sisa
Visa No. 2)
- Pelat tanktop lajur II (Ps) antara fr. 47/48 – 49/50
- Pelat tanktop lajur III (Ps) antara fr. 38/39 – 41/52
- Pelat tanktop lajur IV (Ps) antara fr. 40/41 – 42/43
- Pelat tanktop lajur V (Ps) antara fr. 49/50 – 51/52
- Pelat tanktop lajur I (Sb) antara fr. 49/50 – 51/52
- Pelat tantop lajur II (Sb) antara fr. 49/50 – 50/51
- Pelat tanktop lajur III (Sb) antara fr. 40/41 – 49/50
- Pelat tanktop lajur IV (Sb) antara fr. 49/50 – 50/51
5. Tangki – tangki ballast FPT, WBT No. 1 P/S, No. 2 P/S dan No. 3
P/S, tangki air tawar, tangki APT dan tangki bahan bakar dihydrolik
pressure test, keadaan baik. (Pelaksanaan Visa No. 2)
6. Rantai jangkar segel No. 2 & 3 (Sb) diganti baru dia. 44,0 mm ; grade U2
; sertifikat Class LR No. QDO0851411/6 (Pelaksanaan Visa No. 2)
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Rantai jangkar segel No. 4 – 9 (Ps) dan rantai jangkar segel No. 4 -
8 (Sb) yang telah aus agar diganti baru dengan diameter 44,0 mm
(Grade K2 & bersertifikat Class). (sisa Visa No. 2)
7. Screw down untuk penutupan ventilasi udara P/S palka No. 1 belum dapat
difungsikan.
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Screw down untuk penutupan ventilasi udara P/S palka No. 1 agar
difungsikan kembali. (sisa Visa No. 2)
F.101-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 0594-TP/B1/2009
8. Pelat bulwark diperiksa visual, keadaan umumnya baik dan bagian yang
keropos pada daerah palka No. 1 & 2 (Sb) belum dilaksanakan perbaikan.
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Pelat bulwark (Sb) pada daerah palka No. 1 & 2 yang tipis/keropos
agar dipotong dan diganti baru. (sisa Visa No. 2)
9. Dudukan sepatu container pada hatch cover yang telah aus belum
dilaksanakan perbaikan.
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Dudukan sepatu container pada hatch cover dan pada pillar penyangga
container yang aus agar diganti baru. (sisa Visa No. 2)
Catatan:
- Survey alas terakhir : 12 Mei 2008
----
F.101-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 0594-TP/B1/2009
INSTALASI MESIN
1. Mesin bantu No. 1 (6 cyl.) dibuka lengkap dan diperiksa bagian –
bagiannya, keadaan umumnya baik kecuali bagian berikut yang aus telah
diganti baru :
- Piston ring cyl. No. 1 - 6
- Crankpin bearing cyl. No. 1 – 6
- Crankjournal bearing cyl. No. 1 – 7
- Ball bearing driving gear
Mesin bantu No. 2 diperiksa secara umum dan dicoba dengan beban dikapal,
keadaan baik.(Pelaksanaan Visa No. 3)
Pengukuran crankweb deflection A/E No. 1 dilaksanakan keadaan baik :
(Pelaksanaan Visa No. 2)
- A/E No. 1 maks. : 0,01 mm
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Mesin bantu No. 2 agar dibuka lengkap.(sisa Visa No. 3)
- Pengukuran crankweb deflection A/E No. 2 agar dilaksanakan.
2. Pompa – pompa diperiksa visual, keadaan umumnya baik kecuali auxiliary
sea water pump belum dapat difungsikan.
Rekomendasi berikut agar dilaksanakan paling lambat 24 Mei 2009 :
- Auxiliary sea water pump agar difungsikan.(sisa Visa No. 3)
3. Generator No. 1, 2 & 3 serta instalasi listrik diperiksa dan
dilaksanakan pengukuran megger test, keadaan baik. (Pelaksanaan Visa No.
2)
4. Item CMS berikut telah dilaksanakan dan diperiksa keadaan baik :
(Pelaksanaan Visa No. 2)
1. M3200 No. 1 Auxiliary Engine
2. M3970 Generator and Governors No. 1
3. M4010 Circuit Breaker
4. M2373 Tie rods
Item CMS berikut yang overdue agar dilaksanakan paling lambat 24 Mei
2009 :
No. Code Item
1. M3971 Generator and Governors No. 2
2. M3300 No. 2 Auxiliary Engine
3. M4711 LO Separator Heater
4. M3831 Thrust Shaft & Bearing
F.101-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 0594-TP/B1/2009
Catatan :
a.Jam kerja A/E No. 2 sesuai buku journal mesin s/d Pebruari 2009
adalah 3519 jam.
b.Sesuai surat keterangan dari kapal No. 019/ED/CJN III – 27/II/2009
tanggal 01 Pebruari 2009, Pemilik bermohon agar CMS dengan code item
M7011 dan M7017 dihapuskan dari daftar CMS sehubungan dengan system
sanitary pressure hydrophore tank tidak dipergunakan lagi dikapal.
---
F.101-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 0040-TP/B1/2008
F.101-1995 Page : … / …
BIRO KLASIFIKASI INDONESIA No. Laporan : 1260-TP/B1/20045
F.101-1995 Page : … / …