Expo Light Rail Line CONSTRUCTION NOTICE K-Rail Installation: 7th Avenue to La Brea Avenue During the construction of the Expo Light Rail Line it is important to secure the right-of-way (ROW) along Exposition Boulevard for safety reasons. Securing the ROW by installing K-Rail allows the contractor to prepare the ROW for utility relocation and light rail construction. K-Rail are concrete barriers used to separate construction activities from the public. Each K-Rail weighs 8,000 pounds and is 20 feet in length. K-Rail Installation What are the construction hours? Monday - Friday, 7:00 a.m. - 9:00 p.m. If construction needs to take place overnight or during a weekend, the community will be notified in a timely manner. When will the K-Rail installation begin? Installation of the K-Rail will begin on September 22, 2008 and will take approximately 3 weeks to complete. Will there be parking restrictions? Parking will be restricted from 7th Avenue to La Brea Avenue. Please obey all “Tow-Away, No Stopping Any Time” signs. K-Rail currently along the Exposition ROW in the Mid-Corridor. Where will the K-Rail be installed? Angela B. Winston Exposition Construction Authority Tel. 213-243-5506 [email protected] Torri D. Hill FCI/Fluor/Parsons, a Joint Venture Tel. 323-290-7605 [email protected] Expo Light Rail Project Government / Community Relations CONTACT INFORMATION www.BuildExpo.org 213-922-EXPO K-Rail will be installed along Exposition ROW, from 7th Avenue to La Brea Avenue. ROW in the Mid Corridor. ROW in ROW in Corr dor. on ROW in the Mid C Rail currentl alon the Ex osition R K K Rail currently along the Exposition R d ri n the Mid Corridor r . n the M ROW in the M rr or r . Co e n R K K R Rail currently along the Exposition R d ri For more information about the Expo Line, please visit BuildExpo.org or call our hotline at 213-922-EXPO (3976)

Expo Light Rail Line - Metrolibraryarchives.metro.net/DB_Attachments/0908 Mid-Corridor K-Rail Notice.pdf213-922-EXPO Barreras actualmente sobre el derechBarreras actualmente sobre

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Expo Light Rail Line - Metrolibraryarchives.metro.net/DB_Attachments/0908 Mid-Corridor K-Rail Notice.pdf213-922-EXPO Barreras actualmente sobre el derechBarreras actualmente sobre

Expo Light Rail LineCONSTRUCTION NOTICE

K-Rail Installation: 7th Avenue to La Brea Avenue

During the construction of the Expo Light Rail Line it is important to secure the right-of-way (ROW) along Exposition Boulevard for safety reasons. Securing the ROW by installing K-Rail allows the contractor to prepare the ROW for utility relocation and light rail construction. K-Rail are concrete barriers used to separate construction activities from the public. Each K-Rail weighs 8,000 pounds and is 20 feet in length.

K-Rail Installation

What are the construction hours?

Monday - Friday, 7:00 a.m. - 9:00 p.m. If construction needs to take place overnight or during a weekend, the community will be notified in a timely manner.

When will the K-Railinstallation begin?

Installation of the K-Rail will begin on September 22, 2008 and will take approximately 3 weeks to complete.

Will there be parking restrictions?

Parking will be restricted from 7th Avenue to La Brea Avenue. Please obey all “Tow-Away, No Stopping Any Time” signs.

K-Rail currently along the Exposition ROW in the Mid-Corridor.

Where will the K-Rail be installed?

Angela B. WinstonExposition Construction Authority

Tel. [email protected]

Torri D. HillFCI/Fluor/Parsons, a Joint Venture

Tel. [email protected]

Expo Light Rail ProjectGovernment / Community Relations

CONTACT INFORMATIONwww.BuildExpo.org

213-922-EXPO

K-Rail will be installed along Exposition ROW, from 7th Avenue to La Brea Avenue.

ROW in the Mid Corridor.ROW inROW in Corr dor.on ROW in the Mid CRail currentl alon the Expposition RKK Rail currentlyy alongg the Exposition R d rin the Mid Corridorr.n the MROW in the M rr orr.Coe n RKK RRail currently along the Exposition R d ri

For more information about the Expo Line, please visit BuildExpo.org or

call our hotline at 213-922-EXPO (3976)

Page 2: Expo Light Rail Line - Metrolibraryarchives.metro.net/DB_Attachments/0908 Mid-Corridor K-Rail Notice.pdf213-922-EXPO Barreras actualmente sobre el derechBarreras actualmente sobre

AVISO DE CONSTRUCCION

La instalación de las barreras comen-zará el 22 de septiembre de 2008 y tardará aproximadamente 3 semanas.

Línea de Tren Ligero Expo

Instalación de Barreras de Concreto: 7th Avenue a La Brea Avenue

Instalación de Barreras de ConcretoPor razones de seguridad es importante asegurar el derecho-de-paso sobre Exposition Boule-vard durante la construcción del proyecto Línea Expo. El asegurar el derecho-de-paso con la instalación de Barreras de Concreto permite al contratista preparar el derecho-de-paso para la reubicación de utilidades y la construcción de la línea de tren. Las Barreras de Concreto se utili-zan para mantener las actividades de construcción separadas del público. Cada barrera pesa 8,000 libras y mide 20 pies de largo.

¿Cuando comenzará la instalación de barreras?

¿Donde se instalarán las barreras?

¿Cuales son las horas de construcción?

Lunes - viernes, de 7:00 a.m. a 9:00 p.m. Si es necesario trabajar durante la noche o durante un fin de semana, la comunidad será notificada de manera oportuna.

¿Habrán restricciones en cuanto al

estacionamiento ?El estacionamiento será limi-tado entre 7th Avenue y La Brea Avenue. Por favor obedezca los carteles fijados.

Barreras actualmente sobre el derecho-de-paso Exposition

Angela B. WinstonExposition Construction Authority

Tel. [email protected]

Torri D. HillFCI/Fluor/Parsons, a Joint Venture

Tel. [email protected]

Expo Light Rail ProjectGovernment / Community Relations

CONTACT INFORMATIONwww.BuildExpo.org

213-922-EXPO

o de paso Expositiono de po de p sitioecho de paso ExposBarreras actualmente sobre el derechhoBarreras actualmente sobre el derech po onpaso Expositionpaso Eo de paso E ioositob chhoBarreras actualmente sobre el derech po on

Las barreras se instalarán a lo largo del derecho-de-paso Exposition, entre 7th Avenue y La Brea Avenue.

Para más información sobre el proyecto Línea Expo, visite BuildExpo.org

o llame al 213-922-EXPO (3976)