Experimental study of prequalified status of flush end plate connections Sherif H.M. Hassanien a, * , Hazem M. Ramadan b , M. Nabil Abdel-Salam c , Sherif A. Mourad d a Structures and Metallic Construction Institute, Housing and Building National Research Center, HBRC, Egypt b Structural Engineering Department, Faculty of Engineering, Cairo University, Egypt c Structural Engineering, Structures and Metallic Construction Institute, Housing and Building National Research Center, HBRC, Egypt d Faculty of Engineering, Cairo University, Egypt Received 18 June 2014; revised 29 June 2014; accepted 30 June 2014 KEYWORDS Flush end-plate connection; Seismic performance; Steel structures; Experimental testing; Prequalified connections Abstract Seismic design of steel structures is an essential part of the design process. Egyptian load- ing code development process continues in a high rate to catch up with emerging new concepts and standards. Steel design codes (ASD and LRFD) are not developing in the same speed, which prevents the full utilization and application of loading code. The above reason leads to the need for evaluating flush end plate connections from prequalification point of view according to interna- tional standards. Due to the lack of sufficient experimental data on flush end-plate connections, an experimental program was conducted to investigate this topic. Six flush end-plate samples were designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam and column sections, bolt diameters and grades. A cyclic loading pattern defined by international standards was used in the testing process, and the performance was evaluated accordingly. Evaluation of MU curves showed that in some cases flush end plate connections satisfy the strict requirements for prequalification. However, beam sections having limited depth fail to achieve prequalification criteria for the connections. Reduced web may be used to enhance the connection status and is investigated in one of the samples to evaluate its impact on connection performance and the failure mode. The proposed staggered hole configuration showed a promising performance. ª 2014 Production and hosting by Elsevier B.V. on behalf of Housing and Building National Research Center. Introduction Seismic design of steel structures has taken major steps since the 1994 Northridge earthquake Tremblay [1]. Seismic design codes try to cope with the rapid changes in seismic design procedures and concepts. Current codes utilize the design spectrum method * Corresponding author. Peer review under responsibility of Housing and Building National Research Center. Production and hosting by Elsevier HBRC Journal (2016) 12, 25–32 Housing and Building National Research Center HBRC Journal http://ees.elsevier.com/hbrcj http://dx.doi.org/10.1016/j.hbrcj.2014.06.013 1687-4048 ª 2014 Production and hosting by Elsevier B.V. on behalf of Housing and Building National Research Center.

Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

  • Upload
    lekhanh

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

HBRC Journal (2016) 12, 25–32

Housing and Building National Research Center

HBRC Journal

http://ees.elsevier.com/hbrcj

Experimental study of prequalified status

of flush end plate connections

* Corresponding author.

Peer review under responsibility of Housing and Building National

Research Center.

Production and hosting by Elsevier

http://dx.doi.org/10.1016/j.hbrcj.2014.06.013

1687-4048 ª 2014 Production and hosting by Elsevier B.V. on behalf of Housing and Building National Research Center.

Sherif H.M. Hassanien a,*, Hazem M. Ramadan b, M. Nabil Abdel-Salam c,

Sherif A. Mourad d

a Structures and Metallic Construction Institute, Housing and Building National Research Center, HBRC, Egyptb Structural Engineering Department, Faculty of Engineering, Cairo University, Egyptc Structural Engineering, Structures and Metallic Construction Institute, Housing and Building National Research Center,HBRC, Egyptd Faculty of Engineering, Cairo University, Egypt

Received 18 June 2014; revised 29 June 2014; accepted 30 June 2014

KEYWORDS

Flush end-plate connection;

Seismic performance;

Steel structures;

Experimental testing;

Prequalified connections

Abstract Seismic design of steel structures is an essential part of the design process. Egyptian load-

ing code development process continues in a high rate to catch up with emerging new concepts and

standards. Steel design codes (ASD and LRFD) are not developing in the same speed, which

prevents the full utilization and application of loading code. The above reason leads to the need

for evaluating flush end plate connections from prequalification point of view according to interna-

tional standards. Due to the lack of sufficient experimental data on flush end-plate connections, an

experimental program was conducted to investigate this topic. Six flush end-plate samples were

designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam

and column sections, bolt diameters and grades. A cyclic loading pattern defined by international

standards was used in the testing process, and the performance was evaluated accordingly.

Evaluation of M–U curves showed that in some cases flush end plate connections satisfy the strict

requirements for prequalification. However, beam sections having limited depth fail to achieve

prequalification criteria for the connections. Reduced web may be used to enhance the connection

status and is investigated in one of the samples to evaluate its impact on connection performance

and the failure mode. The proposed staggered hole configuration showed a promising performance.ª 2014 Production and hosting by Elsevier B.V. on behalf of Housing and Building National Research

Center.

Introduction

Seismic design of steel structures has takenmajor steps since the

1994 Northridge earthquake Tremblay [1]. Seismic design codestry to cope with the rapid changes in seismic design proceduresand concepts. Current codes utilize the design spectrummethod

Page 2: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

26 S.H.M. Hassanien et al.

to estimate seismic forces on structures.One of the key aspects ofthe response spectrum analysis is the response modification fac-tor (RMF), which reduces earthquake loads due to the nonlin-

ear structural behavior. Two values of RMF can be used formoment resisting frames. Using a high RMF value requires thatthe frame possesses sufficient ductility. Ductility requirements

for steel structures are defined in international codes such asAISC [2] and standards like FEMA350 [3]. The requirementsvary from one country to another according to loads, factor of

safety, design methods, and construction methods. To date,Egyptian steel structure design codes ECP-ASD [4] and ECP-LRFD [5] do not include any seismic provisions to ensure theductility of steel structures. Lack of seismic provisions leads to

twomajor problems; the first is that the designer is unable to uti-lize a high value of theRMF, resulting in an uneconomic design.The second problem is that evaluation and retrofitting of exist-

ing steel structures are limited to the use of the smaller RMF,which constrains the assessment. Each country has its ownmethods of erection and construction, which are reflected on

the standards of the country. AISC [6] and RCSC [7] definethe state of snug tightened connection and the installation pro-cedure for bolts. ECP-ASD [4], which is the most used code for

steel design in Egypt, does not address the installation, plate sur-face condition and the definition of bearing type connection.

AISC [2] lists three major conditions that must be fulfilledin moment resisting frames in order to be considered special

moment frames and to achieve high ductility. These conditionsare: members slenderness, column stress ratio and connectionability to sustain predefined percentage of beam moment

capacity combined with certain rotation angle. Connectionsfulfilling previous requirements are said to be ‘‘prequalified’’.FEMA350 [3] demonstrates how to prequalify a connection

or define its status. The process requires performing quasi-sta-tic test with predefined loading pattern such as SAC97 [8] onthe joint. Researches in end plate moment connection have

been initiated in the last century, however, limited number ofexperimental researches in the area of flush end plate connec-tions have been conducted. Experimental work and proposedbasis of design were presented by Jenkins et al. [9] and Thom-

son and Broderick [10,11] have studied seismic response offlush end plate connections experimentally, and concluded thatconnection stiffness is overestimated while its moment capacity

is underestimated using a proposed Eurocode model. Thepapers presented a test setup that was modified and used in thiscurrent experimental program. Hedayat [12] presented a

reduced web technique to enhance post-Northridge connectionductility, which triggered the idea of staggered web configura-tion, which is tested in this paper.

This paper presents an experimental program, which is a

part of a comprehensive research conducted by Hassanien[13] including six samples designed according to ECP [4] andAISC [14] to evaluate its seismic performance. The test results

are used to verify the numerical models, which were developedin that research. The design is based on thick plate assumption,which limits the failure of the connection to bolt failure and

prevents the formation of any plastic hinges in plate.

Fig. 1 Experimental test set up (dimensions in mm).

Experimental program

A series of six tests designed to investigate the behavior, loadcapacity and failure mode of flush end plate connections were

carried out. The tests were conducted at the laboratory of theHousing and Building Research Center (HBRC), Egypt. Thestudied parameters were bolt diameters, bolt grades and

arrangements. The connections were designed such that thehead plate does not reach its yield stress, hence, the plate thick-ness was conservatively chosen to ensure such assumption and

match AISC requirements for thick end plates. IPE 160 andHE120A beam sections were selected to study different boltspacings and arrangements. Both beams have the same bend-

ing strength since their section moduli are almost equal toavoid its effect on connection strength. Fig. 1 shows a generallayout of the test setup. The specimen dimensions and compo-nents are summarized in Tables 1 and 2. Beam length in all

specimens was 1000 mm from the point of load applicationto the column face. This distance was chosen as the least prob-able distance in order to decrease the moment applied on the

specimens to the least value. Butt welds were used to join theend plate to the steel beam. To examine the effect of web holeson connection behavior and plasticity, one sample, S4, was

designed considering staggered holes in its web as shown inFig. 1.

Instrumentation

The instrumentations were designed to measure the appliedloads, deformations along the specimen and strains at specific

locations in the specimens as shown in Fig. 2. Electrical straingauges, with 10 mm grid length, were glued to measure strainsat different locations at the connection zone during differentstages of loading. Four linear variable displacement transduc-

ers (LVDTs), with an accuracy of 0.01 mm, were used tomeasure displacements at different locations in the specimens.

Page 3: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

Table 1 Sample dimensions.

Test tp (mm) H (mm) B (mm) e1 (mm) e2 (mm) e3 (mm) e4 (mm)

S1 25 142 120 14.5 35 48 0

S2 25 188 117 14 33.5 44 0

S3 33 137 120 11.5 35 38.5 0

S4 33 188 117 14 33.5 44 50

S5 22 190 118 15 34 45 50

S6 15 190 118 15 34 45 50

Table 2 Sample components.

Test Number of bolts Bolt grade Bolt diameter (mm) Beam Col. Web holes

S1 4 10.9 16 HE120A HE140A No

S2 4 10.9 20 IPE160 HE120A No

S3 4 8.8 20 HE120A HE140A No

S4 6 10.9 20 IPE160 HE140A Yes

S5 6 10.9 16 IPE160 HE140A No

S6 6 8.8 16 IPE160 HE120A No

Fig. 2 Instrumentation layout.

Experimental study of prequalified status of flush end plate connections 27

Two of them were attached to the column flange to obtain col-

umn rotation while the others were attached to the beamflanges to measure the whole connection rotation. The valueof the applied load was measured directly by a load cell

attached to the actuator.

Loading procedure

Column was supported laterally at both ends through existinglateral frames. Axial constant load of 98.1 KN was applied onthe column top to support them vertically during the applica-

tion of cyclic vertical load at the beam tip. The load value isestimated based on the maximum predicted cyclic load valueduring test in order to keep the column under compression.All tests are subjected to a loading history which includes

successive different displacement cycles according to the step-

wise loading protocol as shown in Fig. 3 (SAC97 [8]). Theapplied displacement rate was chosen the slowest as possiblein order to preclude any impact or dynamic effects and

guarantee better observation of the testing procedure, whilepreserving a reasonable testing period. The applied displace-ment was gradually increased until the specimen showed large

deformations (one-tenth of beam length) or failure of one ofthe connection components.

Results and discussion

All samples were tested till applied displacement limit of 1/10of beam span except two samples S3 and S4. The test of sampleS3 was terminated after 40 mm displacement due to an error in

Page 4: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

Fig. 3 Sample of cyclic loading pattern.

Fig. 5 S2 moment-rotation curve.

30.0

45.0

ent

(KN

.m)

28 S.H.M. Hassanien et al.

the data logger device, whereas S4 test ended after 80 mmdisplacement due to observation of beam instability. Dataextracted from the tests are used to obtain connection capacity

curves, hysteresis responses and level of ductility.

Moment-rotation curves

Figs. 4–9 show the resulting moment-rotation curves for all

samples. The moment values are calculated as the product ofthe load times its lever arm of 1000 mm, which is the distancefrom the loading point to the column flange. The rotation val-

ues are calculated using the relative displacements of the beamtop and bottom flanges and the column to account for the col-umn panel zone rotation and the end gap rotation caused by

the relative deformation between the end plate and the columnflange. Close examination of these curves highlights the follow-ing notes:

� The hysteresis loops of the specimens are un-pinched andvery stable.� Connections behave in a stiff linear manner at the begin-

ning of loading till reaching yield strength of either headplate or bolts. Then the behavior changes to non-linearfor all values of head plate thicknesses and bolt diameters.

Fig. 4 S1 moment-rotation curve.

-45.0

-30.0

-15.0

0.0

15.0

-150 -100 -50 0 50 100 150

Mom

Rotation (m.rad)

Fig. 6 S3 moment-rotation curve.

� The initial rotational stiffness defined as the slope of

moment-rotation curve linear stage varies for the samples,as shown in Table 3.

Page 5: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

-45.0

-30.0

-15.0

0.0

15.0

30.0

45.0

-150 -100 -50 0 50 100 150

Mom

ent

(KN

.m)

Rotation (m.rad)

Fig. 7 S4 moment-rotation curve.

Fig. 8 S5 moment-rotation curve.

-45.0

-30.0

-15.0

0.0

15.0

30.0

45.0

-150 -100 -50 0 50 100 150

Mom

ent

(KN

.m)

Rotation (m.rad)

Fig. 9 S6 moment-rotation curve.

Experimental study of prequalified status of flush end plate connections 29

� On comparing the samples having the same beam depth,HE120A, sample S3 shows a higher ductility while sampleS1 develops the highest moment. For samples with beam

section IPE 160, values of resisting moments and ductilityare close.� It is apparent that end plate thickness affects the behavior

of flush end plate connections significantly, and whenit increases, the workability and deformability of this

Table 3 Initial rotational stiffness.

Sample S1 S2

Initial rotational stiffness (KN m/mrad) 1.14 0.94

Table 4 Measured moment values at 40 m rad.

Sample S1 S2

Measured moment (KN m) 21 32

Beam plastic capacity (KN m) 31.70 32.84

connection improve remarkably. This is clear since themoment capacity and stiffness of the flush end plate connec-tion increase with thicker end plates. However, increase inthe endplate thickness did not result in an increase in con-

nection ductility.� To examine the connection prequalification status in accor-dance to FEMA 350 [3], the applied moments were calcu-

lated at different levels of rotation. As per AISC [2]requirements, the connection should sustain moment witha value higher than 80% of beam plastic capacity at

40 m rad rotation. The measured moment values are listedin Table 4 which show that specimens S2, S4, S5 and S6satisfy the code requirements while S1 and S3 fail.

Strain measurements

Strain measurements at different locations of the specimens are

plotted versus the lateral applied displacements in Figs. 10–18.The main observations are summarized as follows:

� Strain values measured at the top and bottom of the beam,Gauges 8 and 9, reverse at the connection zone according tothe direction of loading (Figs. 10 and 13).

� Compared to the beam yield strain (1.42 · 10�3), which wasobtained from the coupon test results, it is clear that yieldstrain was recorded at gauge 8 at high loading displacements

S3 S4 S5 S6

0.59 0.77 1.61 1.37

S3 S4 S5 S6

18 31 34 28

31.70 32.84 32.84 32.84

Page 6: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

-120

-80

-40

0

40

80

120

-2 -1.5 -1 -0.5 0 0.5 1 1.5 2

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 10 Specimen S4 strains at gage-8.

-120

-80

-40

0

40

80

120

-2 -1.5 -1 -0.5 0 0.5 1 1.5 2

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 11 Specimen S5 strains at gage-8.

-120

-80

-40

0

40

80

120

-2 -1.5 -1 -0.5 0 0.5 1 1.5 2

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 12 Specimen S6 strains at gage-8.

-120

-80

-40

0

40

80

120

-1.2 -0.6 0 0.6 1.2

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 13 Specimen S4 strains at gage-9.

-120

-80

-40

0

40

80

120

-0.45 -0.35 -0.25 -0.15 -0.05 0.05 0.15D

ispl

acm

ent

(mm

)

Strain x 1000

Fig. 14 Specimen S4 strains at gage-6.

-120

-80

-40

0

40

80

120

-0.45 -0.35 -0.25 -0.15 -0.05 0.05 0.15

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 15 Specimen S5 strains at gage-6.

30 S.H.M. Hassanien et al.

Page 7: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

-120

-80

-40

0

40

80

120

-0.45 -0.35 -0.25 -0.15 -0.05 0.05 0.15

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 16 Specimen S6 strains at gage-6.

-120

-80

-40

0

40

80

120

-0.3 -0.2 -0.1 0 0.1 0.2 0.3

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 17 Specimen S4 strains at gage-24.

-120

-80

-40

0

40

80

120

-0.3 -0.2 -0.1 0 0.1 0.2 0.3

Dis

plac

men

t (m

m)

Strain x 1000

Fig. 18 Specimen S4 strains at gage-25.

Experimental study of prequalified status of flush end plate connections 31

for S5 and S6 (Figs. 11 and 12) and at a lower one for S4

(Fig. 10). This indicates that with web hole configuration,the plastic hinge moves away from connection toward theconnecting beam. This is very desirable in seismic design

provisions where the formation of the plastic hinges at thelocation of connection and its vicinity must be avoided.� On comparing the direction of strains measured by gauge 6(Figs. 14–16), it is found that the presence of web holes in

test S4 changes the load transfer mechanism. Gauge 6measures the strain along the beam web.� Specimen S4 diagonal strains were measured through

gauges 24 and 25 (Figs. 17 and 18) to investigate its varia-tion with loading between the holes. It is apparent thatgauge 25 shows higher strain values compared to gauge

24 readings at the same level of displacement or loadingwhich may be attributed to higher stresses at the locationof gauge 25.

Conclusions

An experimental program including six samples was conductedto investigate the behavior of flush end-plate connections whensubjected to cyclic loading. The samples were designed accord-ing to the Egyptian code of steel construction (ECP205-ASD)

using different beam and column sections, bolt diameters andgrades. A cyclic loading pattern defined by international stan-

dards was used in the testing process and the performance wasevaluated accordingly. Analyzing the obtained results, thefollowing could be concluded:

(1) The end plate thickness affects the behavior of flush end-plate connections significantly. This is clear since the

moment capacity and stiffness of the flush end plateconnection increase with thicker end plates. However,the increase in the end plate thickness did not result in

an increase in connection ductility.(2) The initial rotational stiffness of flush end-plate connec-

tions depends significantly on the connection parameterssuch as end plate thickness, bolt diameter and grade.

(3) The designed flush end plate connections have satisfiedthe strict requirements of FEMA 350 prequalificationcriteria except for beam sections with limited depth.

(4) The presence of beam-web holes may change the loadtransfer mechanism and increase the web strains.

(5) Beam web hole configuration in flush end plate connec-

tions allows the plastic hinge to move away from theconnection zone toward the connecting beam, which isdesirable in seismic design provisions.

Conflict of interest

None.

References

[1] R. Tremblay, P. Timler, M. Bruneau, A. Filiatrault,

Performance of steel structures during the 1994 Northridge

earthquake, Can. J. Civ. Eng. 22 (1995) 338–360.

[2] ANSI/AISC. Seismic Provisions for Structural Steel Buildings.

ANSI/AISC 341–05. Chicago: The American Institute of Steel

Construction; 2002.

[3] FEMA. Recommended Seismic Design Criteria for New Steel

Moment-Frame Buildings. FEMA-350. Washington: Federal

Emergency Management Agency; 2000.

[4] ECP. Egyptian Code of Practice for Steel Construction and

Bridges (Allowable Stress Design). ECP-205 ASD. Egypt:

HBRC; 2007.

Page 8: Experimental study of prequalified status of flush end ... · designed according to the Egyptian code for steel construction (ECP205 ASD) using different beam ... Egyptian steel structure

32 S.H.M. Hassanien et al.

[5] ECP. Egyptian Code of Practice for Steel Construction and

Bridges (Load and Resistance Factor Design). ECP-205 LRFD.

Egypt: HBRC; 2012.

[6] ANSI/AISC 360–05. Specification for Structural Steel Buildings.

American Institute for Steel Construction. ANSI/AISC 360–05.

Chicago: The American Institute of Steel Construction; 2005.

[7] RCSC. Specification for Structural Joints Using ASTM A325 or

A490 Bolts. Chicago: Research Council on Structural

Connection; 2004.

[8] SAC97. Protocol for Fabrication, Inspection, Testing, and

Documentation of Beam-Column Connection Tests and other

Experimental Specimens. SAC/BD-97/02. California: Sac Joint

Venture and Its Organization; 1997.

[9] W.M. Jenkin, C.S. Tong, A.T. Prescott, Moment-transmitting

endplate connections in steel construction and a proposed basis

for flush endplate design, Struct. Eng. 5 (64A) (1986) 121–132.

[10] A.W. Thomson, B.M. Broderick, Seismic resistance of flush

endplate connections, Struct. Eng. 17 (78) (2000) 28–33.

[11] B.M. Broderick, A.W. Thomson, The response of flush end-

plate joints under earthquake loading, J. Constr. Steel Res. 58

(2002) 1161–1175.

[12] A. Hedayat Amir, Celikag Murude, Post-Northridge connection

with modified beam end configuration to enhance strength and

ductility, J. Constr. Steel Res. 65 (2009) 1413–1430.

[13] S. H. Hassanien, Prequalification status of ECP designed flush

end plate connection and staggered web holes retrofitting

technique. (Ph.D. dissertation), Cairo University, Faculty of

Engineering, Egypt (in progress).

[14] American Institute of Steel Construction. Flush & Extended

Multiple Row Moment End Connections. Steel Design Guide

No16. Chicago; 2002.