Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Expense New Items Agency: DPR
Contract Start Contract End Procurement MethodFiscal
Quarter Job Titles HeadcountFY16NDPRE2 Maintenance of compressed natural gas stations 2/24/2016 2/23/2018 Competitive Sealed Bid 3 none 0FY16NDPRE3 Maintenance and Support of Enterprise Asset Management Software 8/28/2015 8/27/2017 Intergovernmental 1 none 0FY16NDPRE4 Removal and Storage of Floating Pool 7/1/2016 6/30/2018 Competitive Sealed Bid 1 none 0
FY16NDPRE7 Installation and Maintenance of Video Surveillance and Recording System 8/1/2016 7/31/2018 Intergovernmental 1 none 0FY16NDPRE8 Fire Alarm Installation, Monitoring, Maintenance and Repair 1/1/2016 12/31/2017 Competitive Sealed Bid 3 none 0FY16NDPRE9 HVAC Maintenance and Repair 12/28/2016 12/27/2018 Competitive Sealed Bid 2 none 0FY16NDPRE12 Block Pruning in Queens 11/1/2016 10/31/2018 Competitive Sealed Bid 2 Climber/Pruner 114FY16NDPRE15 Block Pruning in the Bronx 2/1/2016 1/31/2018 Competitive Sealed Bid 3 Climber/Pruner 114FY16NDPRE17 Flagpole Painting and Repair 2/1/2016 1/31/2018 Competitive Sealed Bid 3 none 0FY16NDPRE18 Specialized Vehicle And Equipment Repair 7/1/2015 6/30/2016 Task Order 1 none 0FY16NDPRE20 Upgrade Parks Telephone System to VOIP 9/1/2015 8/31/2017 Intergovernmental 2 none 0FY16NDPRE22 Upgrade to Parks Phone System - Ethernet Access, Citywide 7/1/2015 6/30/2017 Intergovernmental 1 none 0
FY16NDPRE23 Poster advertising for various Parks events in NYC subway and bus stations 1/1/2016 12/31/2017 Sole Source 3 none 0
FY16NDPRE24 Block Pruning in Brooklyn 7/1/2015 6/30/2017 Competitive Sealed Bid 1 Climber Pruner 114
FY16NDPRE25Custimization of Advanced Mobile software and Enterprise Advanced Management software 1/1/2016 12/31/2017 Sole Source 3 none 0
FY16NDPRE26 Repair of Sewer Water Main Breaks 10/1/2015 9/30/2017 Competitive Sealed Bid 2 none 0FY16NDPRE27 Xerox Enterprise Print Management for Parks printing and copying 7/1/2015 6/30/2016 Task Order 1 none 0FY16NDPRE28 Installation and Repair of Synthetic Turf 1/1/2016 12/31/2017 Competitive Sealed Bid 3 none 0FY16NDPRE29 Perform office space survey and create floor plans and layouts 1/1/2016 12/31/2017 Request for Proposal 3 none 0FY16NDPRE31 Agency Assets Management Study 3/1/2016 2/28/2018 Request for Proposal 3 none 0FY16NDPRE32 Parks Usership Survey Study 3/1/2016 2/28/2018 Request for Proposal 3 none 0FY16NDPRE33 Treatment and Removal of Trees with Dutch Elm Disease 1/1/2016 12/31/2017 Competitive Sealed Bid 3 none 0FY16NDPRE34 Tree Removal in Queens 1/1/2016 12/31/2017 Competitive Sealed Bid 3 Climber Pruner 114FY16NDPRE35 Tree Removal in Brooklyn and Staten Island 1/1/2016 12/31/2017 Competitive Sealed Bid 3 Climber Pruner 114
Plan ID # Description of Services to be Procured
Anticipated Contract Info
Similar Agency Roles (Answer only if procurement will be subject
to LL63)
FY16NDPRE36 Tree Removal in Bronx and Manhattan 1/1/2016 12/31/2017 Competitive Sealed Bid 3 Climber Pruner 114
Expense
Agency Vendor Description Award Method Contract Type End Date R/E Method
Modifications to
Scope (if any)
New Start Date
New End Date Reason Job Titles
Headcount
FY16RDPR647 DPRDOM'S LAWN MAKER INC
BLOCK PRUNING OF TREES IN THE BOROUGH OF QUEENS
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 10/31/2015 Renewal None 11/1/2015 10/31/2016
Agency exercises its option to renew Climber/Pruner 114
FY16RDPR654 DPRCENTRAL ABSORTION INC
Maintain the HVAC Systems, Citywide Maintenance of HVAC & R System
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 12/27/2015 Renewal None 12/28/2015 12/27/2016
Agency exercises its option to renew none 0
FY16RDPR656 DPREXCEL ELEVATOR & ESCALATOR CORP.
Monthly maintenance and repairs of elevators, Citywide Excel Elevator
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 4/3/2016 Renewal None 4/4/2016 4/3/2017
Agency exercises its option to renew none 0
FY16RDPR658 DPRNORMANDEAU ASSOCIATES INC
Impact study of Floating Pool Barge at Barretto Point Park NORMANDEAU ASSOCIATES, INC
REQUEST FOR PROPOSAL (RFP)
REQUIREMENTS-SERVICES 5/31/2016
Amendment Extension None 6/1/2016 5/31/2017
Additional time required to complete project none 0
FY16RDPR662 DPRPROSPECT ELECTRIC SERVICE INC
Maintenenance of the flood light Systems, Citywide FLOODLIGHTS RENEWAL OF CONTRACT
REQUIREMENTS-SERVICES 6/29/2015
Amendment Extension None 6/30/2015 12/31/2015
Additional time required to complete project none 0
FY16RDPR679 DPR WEEKS MARINE INCREMOVAL AND STORAGE OF FLOATING POOL
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 6/30/2016 Renewal None 7/1/2016 6/30/2017
Agency exercises its option to renew none 0
FY16RDPR680 DPREmerald Tree & Shrub Care, Inc Block Pruning in Manhattan
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 6/30/2016 Renewal None 7/1/2016 6/30/2017
Agency exercises its option to renew Climber Pruner 114
FY16RDPR681 DPRBEUCLER TREE EXPERTS LLC Block Pruning in Staten Island
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 6/30/2016 Renewal None 7/1/2016 6/30/2017
Agency exercises its option to renew Climber Pruner 114
FY16RDPR682 DPR TREES "R" US Block Pruning in BrooklynCOMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 6/30/2016 Renewal None 7/1/2016 6/30/2017
Agency exercises its option to renew Climber Pruner 114
FY16RDPR683 DPR SECUREWATCH24 LLCVideo Surveillance System SECUREWATCH24 LLC
INTERGOVERNMENTAL PROCUREMENT
REQUIREMENTS-SERVICES 7/31/2016
Amendment Extension None 8/1/2016 7/31/2017
Additional time required to complete project none 0
FY16RDPR684 DPRNASSAU AUTO SPRING CO INC
WHEEL ALIGNMENTS & INSTALL AUTO SPRINGS CITYWIDE
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 8/19/2016 Renewal None 8/20/2016 8/19/2017
Agency exercises its option to renew none 0
Renewals/ Extensions (L
Plan ID #
Expiring Contract Info Renewal or Extension Info Similar Agency Roles
FY16RDPR685 DPRLEWIS TREE SERVICE INC
Pruning, Tree Removal and Stump Removal in MN, BK, BX and SI Emergency Tree & Stump Services - 4 Borough
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 8/31/2016 Renewal None 9/1/2016 8/31/2017
Agency exercises its option to renew Climber Pruner
FY16RDPR686 DPRDOM'S LAWN MAKER INC
Emergency Tree & Stump Services in Queens Emergency Tree & Stump Services - Queens
COMPETITIVE SEALED BIDDING
REQUIREMENTS-SERVICES 8/31/2016 Renewal None 9/1/2016 8/31/2017
Agency exercises its option to renew Climber Pruner 114
FY16RDPR688 DPRBEUCLER TREE EXPERTS LLC
Block Pruning of Trees in the Borough of the Bronx Bronx Block Pruning RENEWAL OF CONTRACT
REQUIREMENTS-SERVICES 1/31/2016
Amendment Extension None 2/1/2016 7/31/2016
Additional time required to complete project Climber Pruner 114
5
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head count
FY16NDPR001 On-Call Master Agreement for Architectural Design Services 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR002 On-Call Master Agreement for Landscape Architectural Services 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR003 On-Call Master Agreement for Structural Engineering Services 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR004 On-Call Master Agreement for Civil Engineering Services 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR005On-Call Master Agreement for Construction Management Services under $3,000,000
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR006On-Call Master Agreement for Construction Management Services over $3,000,000
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR007Construction supervision services for the reconstruction of Historic House Trust sites Citywide (1)
7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
Plan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
6
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR008Construction supervision services for the reconstruction of Historic House Trust sites Citywide (2)
7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR009Construction supervision services for the reconstruction of Historic House Trust sites Citywide (3)
7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR010Construction supervision services for the reconstruction of Historic House Trust sites Citywide (4)
7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR011Construction supervision services for the reconstruction of Historic House Trust sites Citywide (5)
7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR012Construction supervision services for the reconstruction of Historic House Trust sites Citywide (6)
7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR013Architectural design services for the reconstruction of Historic House Trust sites Citywide (1)
7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR014Architectural design services for the reconstruction of Historic House Trust sites Citywide (2)
7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR015Architectural design services for the reconstruction of Historic House Trust sites Citywide (3)
7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
7
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR016Architectural design services for the reconstruction of Historic House Trust sites Citywide (4)
7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR017Architectural design services for the reconstruction of Historic House Trust sites Citywide (5)
7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR018Architectural design services for the reconstruction of Historic House Trust sites Citywide (6)
7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR019Engineering design services for the reconstruction of Historic House Trust sites Citywide (1)
7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR020Engineering design services for the reconstruction of Historic House Trust sites Citywide (2)
7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR021Engineering design services for the reconstruction of Historic House Trust sites Citywide (3)
7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR022Engineering design services for the reconstruction of Historic House Trust sites Citywide (4)
7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR023Engineering design services for the reconstruction of Historic House Trust sites Citywide (5)
7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
8
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR024Landscape architectural design services for the reconstruction of Historic House Trust sites Citywide (1)
7/1/15 7/1/16 Sole Source 1Landscape architects, Assistant Landscape Architects, Landscape Architects Interns, project Managers, Associate Project Managers
148
FY16NDPR025Landscape architectural design services for the reconstruction of Historic House Trust sites Citywide (2)
7/1/15 7/1/16 Sole Source 1Landscape architects, Assistant Landscape Architects, Landscape Architects Interns, project Managers, Associate Project Managers
148
FY16NDPR026 Architectural Design Services for community parks Group 1 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR027 Architectural Design Services for community parks Group 2 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR028 Architectural Design Services for community parks Group 3 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR029 Architectural Design Services for community parks Group 4 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR030 Architectural Design Services for community parks Group 5 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR031 Architectural Design Services for community parks Group 6 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
9
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR032 Architectural Design Services for community parks Group 7 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR033 Architectural Design Services for community parks Group 8 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR034 Architectural Design Services for community parks Group 9 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR035 Architectural Design Services for community parks Group 10 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR036 Engineering Design Services for community parks Group 1 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR037 Engineering Design Services for community parks Group 2 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR038 Engineering Design Services for community parks Group 3 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR039 Engineering Design Services for community parks Group 4 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
10
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR040 Engineering Design Services for community parks Group 5 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR041 Engineering Design Services for community parks Group 6 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR042 Engineering Design Services for community parks Group 7 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR043 Engineering Design Services for community parks Group 8 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR044 Engineering Design Services for community parks Group 9 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR045 Engineering Design Services for community parks Group 10 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR046 Landscape Architectural Design Services for community parks Group 1 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR047 Landscape Architectural Design Services for community parks Group 2 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR048 Landscape Architectural Design Services for community parks Group 3 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR049 Landscape Architectural Design Services for community parks Group 4 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
11
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR050 Landscape Architectural Design Services for community parks Group 5 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR051 Landscape Architectural Design Services for community parks Group 6 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR052 Landscape Architectural Design Services for community parks Group 7 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR053 Landscape Architectural Design Services for community parks Group 8 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR054 Landscape Architectural Design Services for community parks Group 9 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR055 Landscape Architectural Design Services for community parks Group 10 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR056Architectural design services for a new tennis building in Union Terrace Park.
11/1/15 11/1/18 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
12
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR057Architectural Design Services for bid documents for three (3) sets of modular units at Midland Beach, Staten Island and two (2) sets of modular units at Cedar Grove Beach, Staten Island
3/1/16 3/1/17 Task Order 3Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR058 Architectural Design Services for Cadman/Walt Whitman Park 7/1/15 9/30/17 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR059 Architectural Design Services for Canarsie Park Comfort Station 2/1/16 2/1/19 Task Order 3Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR060
Architectural Design Services for Maintenance Facility to serve Monuments and Antiquities, Manhattan Forestry, Manhattan Operations, and 5-Boro Operations, Located east of the RFK Bridge on Ward’s Island, Borough of Manhattan M107-110M
4/1/16 4/1/18 Task Order 4Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR061 Architectural Design Services for Queens County Farm (Q453-114M) 7/15/15 1/15/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR062Architectural Design Services for reconstruction of Corlears Hook Comfort Station located in the Borough of Manhattan
1/3/16 4/3/17 Task Order 3Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR063Architectural Design Services for Storm Related Damage to Cedar Grove, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR064Architectural Design Services for Storm Related Damage to Oakwood Beach, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR065Architectural Design Services for Storm Related Damage to the Asser Levy Recreation Center, Manhattan
7/1/15 6/30/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
13
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR066Architectural Design Services for the construction of a comfort station at Luther Gulick Playground
7/1/15 7/1/19 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR067Architectural Design Services for the reconstruction of De-Commissioned Buildings in the Borough of Queens
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR068Architectural Design Services for the reconstruction of De-Commissioned Buildings in the Boroughs of Brooklyn and Staten Island
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR069Architectural Design Services for the reconstruction of De-Commissioned Buildings in the Boroughs of The Bronx and Manhattan
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR070Architectural design services for the reconstruction of the Fulton Park Comfort Station in Brooklyn
11/1/15 11/1/18 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR071Architectural Design Services for the Reconstruction of Tony Dapolito Recreation Center in Manhattan
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR072Architectural design services for the replacement of a comfort station in Queensbridge Park, Queens
9/1/15 9/1/18 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR073Architectural Design Services to undertake a comprehensive plan for Staten Island's East Shore parks
7/1/15 5/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
14
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR074Negotiated Acquisition Extension of Master Agreement for Architectural Design Services for Projects = $2,000,000
8/5/15 8/5/16Negotiated Acquisition Extension
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR075Architectural design services to inspect and provide construction documents to open closed comfort stations in the five boroughs (1)
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR076Architectural design services to inspect and provide construction documents to open closed comfort stations in the five boroughs (2)
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR077Architectural design services to inspect and provide construction documents to open closed comfort stations in the five boroughs (3)
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR078Architectural design services to inspect and provide construction documents to open closed comfort stations in the five boroughs (4)
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR079Architectural design services for the reconstruction of the Shore Road Park Field House in Brooklyn
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR080Architectural design services for the reconstruction of the Forest Park Greenhouse, Queens
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR081Architectural design services for the reconstruction of the comfort station and playground in Lawrence Playground, Borough of Queens
7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR082 Construction Supervision Services for Bill Brown Park Comfort Station 7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR083Construction Supervision Services for Calvert Vaux Comfort Station and M7O Building
4/1/15 3/31/16 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR084 Construction Supervision Services for Conference House Pavilion 1/1/16 12/31/16 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR085 Construction Supervision for Freshkills Park North Park R017-308M 2/1/16 6/30/18 Task Order 3
Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers Interns, Environmental Engineers
138
FY16NDPR086Construction Supervision services for East Park in Freshkills Park, Staten Island
7/1/15 6/15/17 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
15
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR087Construction Supervision Services for Fort Totten Administration Building and Chapel
1/1/16 12/31/16 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR088 Construction Supervision Services for Freshkills North Park 5/1/16 5/1/18 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR089Construction Supervision Services for FY16 NRG Prep, Plant, & Seeding Contracts Citywide- total construction value $2,000,000.00
12/1/15 6/30/18 Task Order 2Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR090Construction Supervision Services for FY16 Trees and Sidewalks Contract Citywide - total construction value $2,750,000.00
4/1/16 6/30/18 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR091 Construction Supervision Services for Gateway Estates Comfort Station 4/1/16 3/31/17 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR092 Construction Supervision Services for Gravesend Park Comfort Station 4/1/16 4/1/17 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR093 Construction Supervision Services for Greencroft Park, Staten Island 3/1/16 12/31/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR094Construction Supervision Services for Highland Park Dam Decommissioning
10/1/15 3/20/17 Task Order 2Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR095Construction Supervision Services for Hurricane Sandy Repairs (RG-114M) Staten Island, NY
3/1/16 12/31/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR096Construction Supervision Services for Morris Jumel Exterior Renovation Ph-2
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR097Construction Supervision Services for Pelham Bay Landfill - Post Closure Consultant Management Services
12/6/15 12/6/16 Task Order 2Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR098 Construction Supervision Services for Putnam Rail Trail 7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR099Construction Supervision Services for Q001 - Alley Pond Park Environmental Center
11/1/15 11/1/18 Task Order 2Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR100 Construction Supervision Services for Q392-210M Idlewild Nature Center 7/1/15 7/1/18 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
16
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR101Construction Supervision Services for Riverside South Phase V M353-112M
1/1/16 12/31/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR102Construction Supervision Services for Storm Related Damage to Cedar Grove, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR103Construction Supervision Services for the Reconstruction of the Hellgate Pathway - Ward's Island
9/15/15 9/15/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR104 Construction Supervision Services For Valentino Park Comfort Station 9/1/15 9/1/18 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR105Construction supervision for Q004-113M Astoria Pool Performance Amphitheatre
8/1/15 8/1/18 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR106 Construction Supervision for Roy Wilkins Recreation Center Phase 3 1/1/16 12/31/16 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR109Construction Supervision for Type 2 Contract for Reconstruction of Park Elements at Wolfe's Pond Park, Borough of Staten Island
8/12/15 2/6/17 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR110Construction Supervision Services as needed for the construction or reconstruction of retaining walls and seawalls, Citywide
1/5/16 12/30/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR111 Construction Supervision Services for Fairview Park, Staten Island 3/1/16 6/30/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR112 Construction Supervision Services for Von King Cultural Arts Center 10/1/15 9/30/16 Task Order 2Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR113Construction Supervision Services for the environmental remediation of Red Hook Ballfields
11/1/15 11/1/16 Task Order 2Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR114Construction supervision services for the reconstruction of the comfort station and playground in Lawrence Playground, Borough of Queens
7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR115Engineering Services for Pelham Bay Landfill - Operations, Maintenance, and Monitoring
4/1/16 4/1/18 Task Order 4Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR116Engineering Design Services for bid documents for three (3) sets of modular units at Midland Beach, Staten Island and two (2) sets of modular units at Cedar Grove Beach, Staten Island
3/1/16 3/1/17 Task Order 3Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
17
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR117 Engineering and Environmental Services for Staten Island Tree Plantings 5/15/16 5/15/17 Task Order 4Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR118 Engineering Design Services for Fairview Park Fields (R153) 7/12/15 7/12/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR119Engineering Design services for the Reconstruction of the West 69th Street Transfer Bridge, phase 2
1/1/16 4/1/17 Task Order 3Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR120Engineering Design Services to undertake a comprehensive plan for Staten Island's East Shore parks
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR121Engineering Services for Survey and Geotechnical Services Includes borings and permeability tests for green infrastructure locations in the Bronx
5/15/16 5/15/17 Task Order 4Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR122Structural Engineering Design Services for Storm Related Damage to Cedar Grove, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR123Structural Engineering Design Services for Storm Related Damage to Oakwood Beach, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR124Structural Engineering Design Services for the reconstruction of the perimeter fencing and walls at Crotona Pool
9/8/15 9/8/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR125Civil Engineering Design Services for Storm Related Damage to Cedar Grove, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR126Civil Engineering Design Services for Storm Related Damage to Oakwood Beach, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
18
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR127Engineering services to inspect and provide construction documents to open closed comfort stations in the five boroughs (1)
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR128Engineering services to inspect and provide construction documents to open closed comfort stations in the five boroughs (2)
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR129Engineering services to inspect and provide construction documents to open closed comfort stations in the five boroughs (3)
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR130Engineering services to inspect and provide construction documents to open closed comfort stations in the five boroughs (4)
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR131Engineering design services for the reconstruction of the Shore Road Park Field House in Brooklyn
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR132Engineering design services for the reconstruction of the Fulton Park comfort station, Brooklyn
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR133Engineering design services for the reconstruction of the comfort station and playground in Lawrence Playground, Borough of Queens
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR134 Engineering design services for five sites in Queens and Staten Island 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
19
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR135Independent Environmental Monitoring for the construction of a comfort station at Owl Hollow Fields, in the Borough of Staten Island RG-12450-106MA1, 206MA1, 306Ma1 & 406MA1
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR136 On-Call Master Agreement for General Environmental Services 9/1/15 9/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR137 Environmental Remediation of Red Hook Ballfields 9/1/15 9/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineer Interns, Environmental Engineers
103
FY16NDPR138Landscape Architectural Design Services for the reconstruction of the courts and mini-pool in Edenwald Park in the Bronx
3/1/16 3/1/17 Task Order 3Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR139Landscape Architectural Services for designing a waterfront passive recreational park on urban fill in Regatta Park, Bronx
7/1/15 7/1/16 Task Order 4Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR140 Landscape Architectural Services for Queens County Farm (Q453-114M) 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR141Landscape Design and Ecological Services for landscape restoration at Gerritsen Inlet, located along the Belt Parkway between Knapp Street and Flatbush Avenue, Borough of Brooklyn
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR142Landscape architectural design services for the reconstruction of the comfort station and playground in Lawrence Playground, Borough of Queens
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR143Landscape architectural design services for the reconstruction of Morningside Park 123rd Street Playground
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR144 On-Call Master Agreement for Special Inspection Services 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
20
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR145 Special Inspection for Freshkill North Park R017-308M 2/1/16 6/30/18 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associate Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR146 Special Inspection Services for Highland Park Dam Decommissioning 10/1/15 3/20/17 Task Order 2
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associate Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR147Special Inspection Services for Storm Related Damage to Cedar Grove, Staten Island (Sandy Type 3)
7/1/15 6/30/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associate Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR148Special Inspection Services for the construction or reconstruction of retaining walls and seawalls, Citywide
1/5/16 12/30/17 Task Order 3
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associate Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR149 Special Inspections Services for East Park in Freshkills Park, Staten Island 7/1/15 7/15/17 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associate Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR150Landscape architectural services for the reconstruction of the ballfield with synthetic turf and walking track at Paerdegat Park in the Borough of Brooklyn
7/1/15 6/30/16 Sole Source 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
21
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR151Engineering design services for the reconstruction of the Van Cortlandt Greenhouse, located in The Bronx
7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR152Engineering design services for new water service to the Van Cortlandt Greenhouse, located in The Bronx
7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR153Architectural design services for the reconstruction of the Van Cortlandt Greenhouse, located in The Bronx
7/1/15 6/30/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR154Landscape architectural design services for designing multiple sport fields, located in Van Cortlandt Park, Borough of the Bronx, Project #: X092-215M
7/6/15 7/5/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR155Landscape design services for General Douglas Mac Arthur Park, Staten Island
8/1/15 2/1/18 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR156Environmental monitoring services for Freshkills Park, North Park, Staten Island
2/1/16 6/30/18 Task Order 3
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
22
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR157 Landscape architect services for Bloomingdale Park, Staten Island 8/1/15 12/30/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR158Landscape architectural design services for the reconstruction of the Fountains of the Fairs at Flushing Meadows-Corona Park, Borough of Queens
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR159Engineering design services for the reconstruction of the Foundations of the Fairs at Flushing Meadows-Corona Park, Borough of Queens
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR160Landscape architectural design services for the reconstruction of the Baisley Tennis Courts, Highland Basketball Court, and Demitus Basketball Courts and ramps, Borough of Queens
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR161Landscape architectural design services for the reconstruction of the multi-use asphalt field in Evergreen Courts, Borough of Queens
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR162Negotiated Acquisition Extension of master agreement for landscape architectural design services for projects = $4,000,000 (1)
6/24/16 6/23/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
23
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR163Negotiated Acquisition Extension of master agreement for landscape architectural design services for projects = $4,000,000 (2)
6/24/16 6/23/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR164Negotiated Acquisition Extension of master agreement for landscape architectural design services for projects = $4,000,000 (3)
6/24/16 6/23/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR165Negotiated Acquisition Extension of master agreement for landscape architectural design services for projects = $4,000,000 (4)
6/24/16 6/23/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR166Negotiated Acquisition Extension of master agreement for landscape architectural design services for projects = $4,000,000 (5)
6/24/16 6/23/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR167Negotiated Acquisition Extension of master agreement for landscape architectural design services for projects = $4,000,000 (6)
6/24/16 6/23/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR168
Landscape architecture design services for the reconstruction of the existing asphalt playground into multi-use site with play structures, water play, seating, plantings basketball and synthetic turf play area in Bildersee Playground (B335), in the Borough of Brooklyn
7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
24
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR169
Engineering design services for the reconstruction of the existing asphalt playground into multi-use site with play structures, water play, seating, plantings basketball and synthetic turf play area in Bildersee Playground (B335), in the Borough of Brooklyn
7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR170On-Call Master Agreement for Mechanical Electrical and Plumbing Services
7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR171Engineering design services for the reconstruction of the Inwood Hill Nature Center, Manhattan
7/1/15 6/30/17 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR172Engineering design services for storm related damage at Red Hook Recreation Center and Pool Filter Plant, Borough of Brooklyn
7/1/15 6/30/17 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR173Engineering design services for storm related damage to the West 25th Street maintenance office, Borough of Brooklyn
7/1/15 6/30/17 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR174Engineering design services for storm related damage at Beach 75th Street Rockaway garage, Borough of Queens
7/1/15 6/30/17 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR175Engineering design services for storm related damage at Asser Levy Recreation Center, Borough of Manhattan
7/1/15 6/30/17 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR176Construction supervision services for Green Central Knoll comfort station, Brooklyn
6/1/16 6/30/18 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
25
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR177Architectural design services for storm related damage at Beach 75th Street at Rockaway garage, Borough of Queens
7/1/15 6/30/17 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR178Architectural design services for storm related damage to the West 25th Street maintenance office, Borough of Brooklyn
7/1/15 6/30/17 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR179Architectural design services for storm related damage at Red Hook Recreation Center and Pool Filter House, Borough of Brooklyn
7/1/15 6/30/17 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR180
Architectural design services for the renovation of the bandshell structure to include electrical, storm, sewer, site drainage, building renovations, stage work, plumbing, electrical, roof and surrounding site work, located at Prospect Park in the Borough of Brooklyn
8/1/15 4/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR181Architectural design services for the new maintenance and operations garage (garage compound) located within Prospect Park, Borough of Brooklyn
8/1/15 4/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR182
Landscape architectural design services for the renovation of the bandshell structure to include electrical, storm, sewer, site drainage, building renovations, stage work, plumbing, electrical, roof and surrounding site work, located at Prospect Park in the Borough of Brooklyn
7/1/15 7/1/16 Sole Source 1Landscape architects, Assistant Landscape Architects, Landscape Architects Interns, project Managers, Associate Project Managers
148
FY16NDPR183 Architectural Design Services for community parks Group 11 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR184 Architectural Design Services for community parks Group 12 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR185 Architectural Design Services for community parks Group 13 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR186 Architectural Design Services for community parks Group 14 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR187 Architectural Design Services for community parks Group 15 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR188 Architectural Design Services for community parks Group 16 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR189 Architectural Design Services for community parks Group 17 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
26
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR190 Architectural Design Services for community parks Group 18 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR191 Architectural Design Services for community parks Group 19 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR192 Architectural Design Services for community parks Group 20 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR193 Engineering Design Services for community parks Group 11 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR194 Engineering Design Services for community parks Group 12 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR195 Engineering Design Services for community parks Group 13 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR196 Engineering Design Services for community parks Group 14 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR197 Engineering Design Services for community parks Group 15 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR198 Engineering Design Services for community parks Group 16 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR199 Engineering Design Services for community parks Group 17 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR200 Engineering Design Services for community parks Group 18 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
27
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR201 Engineering Design Services for community parks Group 19 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR202 Engineering Design Services for community parks Group 20 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR203 Landscape Architectural Design Services for community parks Group 11 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR204 Landscape Architectural Design Services for community parks Group 12 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR205 Landscape Architectural Design Services for community parks Group 13 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR206 Landscape Architectural Design Services for community parks Group 14 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR207 Landscape Architectural Design Services for community parks Group 15 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR208 Landscape Architectural Design Services for community parks Group 16 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR209 Landscape Architectural Design Services for community parks Group 17 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
28
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR210 Landscape Architectural Design Services for community parks Group 18 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR211 Landscape Architectural Design Services for community parks Group 19 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR212 Landscape Architectural Design Services for community parks Group 20 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR213 Construction supervision Services for community parks Group 1 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR214 Construction supervision Services for community parks Group 2 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR215 Construction supervision Services for community parks Group 3 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR216 Construction supervision Services for community parks Group 4 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR217 Construction supervision Services for community parks Group 5 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR218 Construction supervision Services for community parks Group 6 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR219 Construction supervision Services for community parks Group 7 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR220 Construction supervision Services for community parks Group 8 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR221 Construction supervision Services for community parks Group 9 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR222 Construction supervision Services for community parks Group 10 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR223 Construction supervision Services for community parks Group 11 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
29
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR224 Construction supervision Services for community parks Group 12 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR225 Construction supervision Services for community parks Group 13 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR226 Construction supervision Services for community parks Group 14 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR227 Construction supervision Services for community parks Group1 5 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR228 Construction supervision Services for community parks Group 16 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR229 Construction supervision Services for community parks Group 17 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR230 Construction supervision Services for community parks Group 18 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR231 Construction supervision Services for community parks Group 19 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR232 Construction supervision Services for community parks Group 20 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR233 Special Inspections Services for community parks Group 1 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR234 Special Inspections Services for community parks Group 2 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR235 Special Inspections Services for community parks Group 3 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
30
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR236 Special Inspections Services for community parks Group 4 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR237 Special Inspections Services for community parks Group 5 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR238 Special Inspections Services for community parks Group 6 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR239 Special Inspections Services for community parks Group 7 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR240 Special Inspections Services for community parks Group 8 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR241 Special Inspections Services for community parks Group 9 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR242 Special Inspections Services for community parks Group 10 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR243 Special Inspections Services for community parks Group 11 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
31
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR244 Special Inspections Services for community parks Group 12 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR245 Special Inspections Services for community parks Group 13 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR246 Special Inspections Services for community parks Group 14 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR247 Special Inspections Services for community parks Group 15 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR248 Special Inspections Services for community parks Group 16 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR249 Special Inspections Services for community parks Group 17 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR250 Special Inspections Services for community parks Group 18 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR251 Special Inspections Services for community parks Group 19 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
32
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR252 Special Inspections Services for community parks Group 20 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR253 Environmental Services for community parks Group 1 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR254 Environmental Services for community parks Group 2 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR255 Environmental Services for community parks Group 3 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR256 Environmental Services for community parks Group 4 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR257 Environmental Services for community parks Group 5 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR258 Environmental Services for community parks Group 6 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR259 Environmental Services for community parks Group 7 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
33
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR260 Environmental Services for community parks Group 8 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR261 Environmental Services for community parks Group 9 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR262 Environmental Services for community parks Group 10 7/1/15 7/1/16 Task Order 1
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineers, Environmental Engineers Interns
103
FY16NDPR263Construction Services for FY16 NRG Prep, Plant, & Seeding Contracts CNYG-tbd1M and CNYG-tbd2M - total construction value $2,500,000.00
2/1/16 7/30/18 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR264Construction Supervision Services for FY16 Trees and Sidewalks Contract - Contracts 84613B0028 year 3, 84613B0029 year 3, - total construction value $1,550,000.00
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR265Construction Supervision Services for FY16 Trees and Sidewalks Contract - Contracts 846FY16tbd1 and 846FY16tbd2 - total construction value $3,760,000.00
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR266
Construction Supervision for FY16 Street Tree Planting Contracts - Consultant Supervision - contracts XG-515M cb's 1-8, XG-615M cb's 9-12, BG-1015M cb's 1,2,3,4, BG-1115M cb's 5,8,9,16,17 BG-1215M cb's 6,7,10,12, BG-1315M cb's 11,13,14,15,18, MG-715M cb's 1-12, QG-1115M cb's 1-6, QG-1215M cb's 7,8,11,12, QG-1315M cb's 9,10,13,14, RG-615M cb's 1-3 - total construction value $18,050,000.00
2/1/16 7/31/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR267Construction Supervision for Q392-115M - contract for NRG Prep, Plant, & Seeding Contract in Idlewild Park - total construction value $1,700,000.00
9/1/15 2/28/18 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
34
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR268Engineering Services for Survey and Geotechnical Services Includes borings and permeability tests for green infrastructure locations Citywide
12/1/15 11/30/16 Task Order 2Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR269Negotiated Acquisition Extension of master agreement for architectural design services (2)
5/15/16 5/15/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR270Negotiated Acquisition Extension of master agreement for architectural design services (3)
5/24/16 5/24/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR271Negotiated Acquisition Extension of master agreement for architectural design services (4)
5/1/16 5/1/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR272Negotiated Acquisition Extension of master agreement for architectural design services (5)
6/1/16 6/1/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR273Negotiated Acquisition Extension of master agreement for architectural design services (6)
5/23/16 5/22/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR274Negotiated Acquisition Extension of master agreement for architectural design services (7)
6/1/16 5/31/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
35
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR275Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects less than $3,000,000 - (1)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR276Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects less than $3,000,000 - (2)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR277Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects less than $3,000,000 - (3)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR278Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects less than $3,000,000 - (4)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR279Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects less than $3,000,000 - (5)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR280Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects less than $3,000,000 - (6)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR281Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects Over $3,000,000 - (1)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR282Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects Over $3,000,000 - (2)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
36
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR283Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects Over $3,000,000 - (3)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR284Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects Over $3,000,000 - (4)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR285Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects Over $3,000,000 - (5)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR286Negotiated Acquisition Extension of Master Agreement for Construction Management Services for Projects Over $3,000,000 - (6)
12/1/15 12/1/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR287 Construction supervision services for Prospect Park Alliance (1) 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR288 Construction supervision services for Prospect Park Alliance (2) 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR289 Construction supervision services for Prospect Park Alliance (3) 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR290 Construction supervision services for Prospect Park Alliance (4) 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
37
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR291 Landscape architectural design services for Prospect Park Alliance (1) 7/1/2015 7/1/2016 Sole Source 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR292 Landscape architectural design services for Prospect Park Alliance (2) 7/1/2015 7/1/2016 Sole Source 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR293 Landscape architectural design services for Prospect Park Alliance (3) 7/1/2015 7/1/2016 Sole Source 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR294 Architectural design services for Prospect Park Alliance (1) 7/1/2015 7/1/2016 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR295 Architectural design services for Prospect Park Alliance (2) 7/1/2015 7/1/2016 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR296 Architectural design services for Prospect Park Alliance (3) 7/1/2015 7/1/2016 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR297 Engineering design services for Prospect Park Alliance (1) 7/1/2015 7/1/2016 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR298 Engineering design services for Prospect Park Alliance (2) 7/1/2015 7/1/2016 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR299 Engineering design services for Prospect Park Alliance (3) 7/1/2015 7/1/2016 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
38
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR300 On-Call Master Agreement for Architectural Design Services - 2 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR301 On-Call Master Agreement for Architectural Design Services - 3 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR302 On-Call Master Agreement for Architectural Design Services - 4 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR303 On-Call Master Agreement for Architectural Design Services - 5 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR304 On-Call Master Agreement for Architectural Design Services - 6 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR305 On-Call Master Agreement for Architectural Design Services -7 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR306 On-Call Master Agreement for Architectural Design Services - 8 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
39
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR307 On-Call Master Agreement for Landscape Architectural Services - 2 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR308 On-Call Master Agreement for Landscape Architectural Services - 3 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR309 On-Call Master Agreement for Landscape Architectural Services - 4 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR310 On-Call Master Agreement for Landscape Architectural Services - 5 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR311 On-Call Master Agreement for Landscape Architectural Services - 6 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR312 On-Call Master Agreement for Landscape Architectural Services - 7 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR313 On-Call Master Agreement for Landscape Architectural Services - 8 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR314 On-Call Master Agreement for Structural Engineering Services - 2 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
40
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR315 On-Call Master Agreement for Structural Engineering Services - 3 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR316 On-Call Master Agreement for Structural Engineering Services - 4 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR317 On-Call Master Agreement for Civil Engineering Services -2 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR318 On-Call Master Agreement for Civil Engineering Services - 3 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR319 On-Call Master Agreement for Civil Engineering Services - 4 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR320On-Call Master Agreement for Construction Management Services under $3,000,000 - 2
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR321On-Call Master Agreement for Construction Management Services under $3,000,000 - 3
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR322On-Call Master Agreement for Construction Management Services under $3,000,000 - 4
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
41
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR323On-Call Master Agreement for Construction Management Services under $3,000,000 - 5
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR324On-Call Master Agreement for Construction Management Services under $3,000,000 - 6
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR325On-Call Master Agreement for Construction Management Services under $3,000,000 -7
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR326On-Call Master Agreement for Construction Management Services under $3,000,000 - 8
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR327On-Call Master Agreement for Construction Management Services over $3,000,000 - 2
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR328On-Call Master Agreement for Construction Management Services over $3,000,000 - 3
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR329On-Call Master Agreement for Construction Management Services over $3,000,000 - 4
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR330On-Call Master Agreement for Construction Management Services over $3,000,000 - 5
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
42
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR331On-Call Master Agreement for Construction Management Services over $3,000,000 - 6
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR332On-Call Master Agreement for Construction Management Services over $3,000,000 - 7
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR333On-Call Master Agreement for Construction Management Services over $3,000,000 - 8
7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR334 On-Call Master Agreement for General Environmental Services - 2 9/1/15 9/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR335 On-Call Master Agreement for General Environmental Services - 3 9/1/15 9/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR336 On-Call Master Agreement for General Environmental Services - 4 9/1/15 9/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR337 On-Call Master Agreement for Special Inspection Services - 2 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR338 On-Call Master Agreement for Special Inspection Services - 3 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
43
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR339 On-Call Master Agreement for Special Inspection Services - 4 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR340 On-Call Master Agreement for Special Inspection Services - 5 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR341On-Call Master Agreement for Mechanical, Electrical and Plumbing Services
7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR342On-Call Master Agreement for Mechanical, Electrical and Plumbing Services
7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR385 Special Inspections Services for Prospect Park Alliance -1 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR386 Special Inspections Services for Prospect Park Alliance -2 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR387 Special Inspections Services for Prospect Park Alliance -3 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR394 Construction Supervision Services for WCS - 1 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
44
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR395 Construction Supervision Services for WCS - 2 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR396 Construction Supervision Services for WCS - 3 7/1/15 7/1/16 Sole Source 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR397 Landscape Architectural Design Services for WCS - 1 7/1/15 7/1/16 Sole Source 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR398 Landscape Architectural Design Services for WCS - 2 7/1/15 7/1/16 Sole Source 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR399 Landscape Architectural Design Services for WCS - 3 7/1/15 7/1/16 Sole Source 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR400 Architectural Design Services for WCS - 3 7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR401 Architectural Design Services for WCS - 2 7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
45
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR402 Architectural Design Services for WCS - 1 7/1/15 7/1/16 Sole Source 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR403 Engineering Design Services for WCS - 1 7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR404 Engineering Design Services for WCS - 2 7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR405 Engineering Design Services for WCS - 3 7/1/15 7/1/16 Sole Source 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR406 Special Inspections Services for WCS - 1 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR407 Special Inspections Services for WCS - 2 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
46
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR408 Special Inspections Services for WCS - 3 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR415 Special Inspections Services for Historic House Trust - 1 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR416 Special Inspections Services for Historic House Trust - 2 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR417 Special Inspections Services for Historic House Trust - 3 7/1/15 7/1/16 Sole Source 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR418Negotiated Acquisition Extension of Master Agreement for Structural Engineering Services (McLaren)
6/1/16 6/1/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR419 Negotiated Acquisition Extension for Civil Engineering Serivces (Silman) 6/1/16 6/1/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
47
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR420 Negotiated Acquisition Extension for Civil Engineering Serivces (HAKS) 6/1/16 6/1/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR421Negotiated Acquisition Extension of Master Agreement for Civil Engineering Services (KS Engineers)
6/1/16 6/1/17Negotiated Acquisition Extension
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR422 Negotiated Acquisition Extension of Master Agreement for Arcadis 12/6/15 12/5/16Negotiated Acquisition Extension
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR423 Negotiated Acquisition Extension of Master Agreement for HHT 9/22/15 9/21/16Negotiated Acquisition Extension
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR424 Negotiated Acquisition Extension of Master Agreement for Stratis 1/1/16 12/31/16Negotiated Acquisition Extension
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR425On-Call Master Agreement for design, construction and construction management for various Historic Houses
7/1/15 7/1/16 Sole Source 1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
48
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR426 On-Call Master Agreement for Prospect Park Alliance 7/1/15 7/1/16 Sole Source 1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR427On-Call Master Agreement for design, construction and construction management services for Wildlife Conservation Centers in the Boroughs of the Bronx, Queens, Manhattan and Brooklyn
7/1/15 7/1/16 Sole Source 1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order.
TBD
FY16NDPR428 Architectural design services for Baruch comfort station 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR429 Engineering design services for Baruch comfort station 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR430Architectural design services for the reconstruction of Flushing Meadows Corona Park garage Building, Queens
10/1/15 10/1/17 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR431 Engineering design services for Flushing Meadows Corona Park garage 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
49
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR432 Special Inspections Services for Prospect Park Alliance -1 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR433 Special Inspections Services for Prospect Park Alliance -2 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR434 Special Inspections Services for Prospect Park Alliance -3 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR435 Construction Supervision Services for WCS - 1 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR436 Construction Supervision Services for WCS - 2 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR437 Construction Supervision Services for WCS - 3 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
50
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR438 Landscape Architectural Design Services for WCS - 1 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR439 Landscape Architectural Design Services for WCS - 2 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR440 Landscape Architectural Design Services for WCS - 3 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR441 Architectural Design Services for WCS - 3 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR442 Architectural Design Services for WCS - 2 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR443 Architectural Design Services for WCS - 1 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
51
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR444 Engineering Design Services for WCS - 1 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR445 Engineering Design Services for WCS - 2 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR446 Engineering Design Services for WCS - 3 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR447 Special Inspections Services for WCS - 1 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR448 Special Inspections Services for WCS - 2 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
FY16NDPR449 Special Inspections Services for WCS - 3 7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
52
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR450 Construction Supervision Services for Prospect Park Alliance - 1 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR451 Construction Supervision Services for Prospect Park Alliance - 2 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR452 Construction Supervision Services for Prospect Park Alliance - 3 7/1/15 7/1/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR453 Landscape Architectural services for Prospect Park Alliance - 1 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR454 Landscape architectural design services for Prospect Park Alliance - 2 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR455 Landscape Architectural servcies for Prospect Park Alliance - 3 7/1/15 7/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR456 Architectural Design services for Prospect Park Alliance - 1 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR457 Architectural Design services for Prospect Park Alliance - 2 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR458 Architectural Design services for Prospect Park Alliance - 3 7/1/15 7/1/16 Task Order 1Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR459 Engineering Design Services for Prospect Park Alliance - 1 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR460 Engineering Design Services for Prospect Park Alliance - 2 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
53
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR461 Engineering Design Services for Prospect Park Alliance - 3 7/1/15 7/1/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR462Construction Supervision Services for the reconstruction of the Brownsville Recreation Center
5/1/16 5/1/18 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR463Construction Supervision Services for the reconstruction of the New York State Pavilion Observation Towers in Flushing Meadows Park, Queens
5/1/16 5/1/18 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR464Construction Supervision services for the reconstruction of the brick façade, roof and elevator at the Arsenal Building, Central Park, Manhattan
5/1/16 5/1/18 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR465Architectural design services for the exterior restoration of the Morris Jumal Mansion, Manhattan
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR466Architectural design services for the reconstruction of the Nautilus Playground comfort Station, Brooklyn
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR467Engineering design services for the reconstruction of the Nautilus Playground comfort station, Brooklyn
10/1/15 10/1/17 Task Order 2Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR468 Landscape design services for Playground 124 in The Bronx 9/1/15 9/1/16 Task Order 1Landscape Architects, Assistant landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers
148
FY16NDPR469Architectural design services for the reconstruction of the Alice Austin House, Staten Island
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR470Architectural design services for the design of a new comfort station in Fort Four Playground, Bronx
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR471 On-Call Master Agreement for structural/civil engineering services 1 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
54
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR472 On-Call Master Agreement for structural/civil engineering services 2 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR473 On-Call Master Agreement for structural/civil engineering services 3 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR474 On-Call Master Agreement for structural/civil engineering services 4 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR475 On-Call Master Agreement for structural/civil engineering services 5 7/1/15 7/1/18Request for Proposal
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR476 On-Call Master Agreement for Mechanical Electrical Plumbing Services 2 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR477 On-Call Master Agreement for Mechanical Electrical Plumbing Services 3 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR478 On-Call Master Agreement for Mechanical Electrical Plumbing Services 4 7/1/15 7/1/18Request for Proposal
2
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR479Special inspections for the reconstruction of Marine Park Bocce Court and Sport Court
7/1/15 7/1/16 Task Order 1
Civil Engineers, Assistant Civil Engineers, Assistant Electrical Engineers, Associated Engineering Technicians, Mechanical Engineers, Assistant Mechanical Engineers, Mechanical Engineer Interns
20
55
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR480Negotiated Acquisition Extension for Woodard and Curran for Ferry Point Park Golf Course
9/1/15 9/1/16Negotiated Acquisition Extension
1
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract
TBD
FY16NDPR481Construction Supervision for FY16 Street Tree Planting Contracts - 13 contracts - total construction value $21,000,000.00
2/1/16 1/31/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR482
Construction Supervision Services in relation to furnishing an artwork in conjunction with the reconstruction of McCarren pool and Bathhouse, as part of the Percent for Art Program, Borough of Brooklyn, as it relates to Project #: B058-114M
1/15/16 1/15/18 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR483Construction Supervision Services for FY16 Trees and Sidewalks Contract Citywide - total construction value $2,750,000.00
4/1/16 6/30/17 Task Order 4Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR484Construction Supervision Services for the reconstruction of Dock "A" at Riverside Park 79th Street Boat Basin Project #: M071-310M
9/1/15 12/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR485Construction Supervision of the Reconstruction of the Olmsted Center, Queens
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR486 Engineering design services for fire alarms at various sites citywide 7/1/15 6/30/16 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR584Engineering design services for total replacement of the Tide Gate Bridge, including replacement of tide gates and sluice gates, Flushing Meadows-Corona Park, Queens
9/1/15 12/31/21 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR585Engineering design services for the replacement of the Tide Gate Bridge, including removal, storage and reinstallation of the the tide gates and sluice gates, Flushing Meadows-Corona Park, Queens
9/1/15 12/31/21 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
56
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR586Engineering design services for the replacement of tide gates and sluice gates, and modification to support frames, Flushing Meadows-Corona Park, Queens
9/1/15 12/31/21 Task Order 1Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR587Architectural design services for the reconstruction of the Allen Street comfort station, Manhattan
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR588Landscape architectural design services for a neighborhood-wide resiliency planning study for Manhattan's East Harlem neighborhood
4/1/16 4/1/18 Task Order 4Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR589Engineering design services for a neighborhood-wide resiliency planning study for Manhattan's East Harlem neighborhood
4/1/16 4/1/18 Task Order 4Civil Engineers, Assistant Civil Engineers, Project Managers, Associate Project Managers
67
FY16NDPR590Landscape architectural design services for a neighborhood-wide resiliency planning study for Manhattan's East Harlem neighborhood
4/1/16 4/1/18Request for Proposal
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR591Engineering design services for a neighborhood-wide resiliency planning study for Manhattan's East Harlem neighborhood
4/1/16 4/1/18Request for Proposal
4
This is a task order contract that does not simultaneously result in the award of a first task order; therefore, this information will be determined in conjunction with the issuance of each task order pursuant to this contract.
TBD
FY16NDPR592Landscape Architectural design services for Harlem River Park Greenway Link between East 125th Street and East 132nd Streets, East of the Harlem River Drive, Manhattan
11/15/15 12/1/16 Task Order 2Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR593Landscape design services for the reconstruction of a basketball court and play equipment, in Grant Park in The Bronx. X271-115M
9/1/15 9/1/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR594Architectural design services for the reconstruction of the McCarren Park Recreation Center, Brooklyn
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
57
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPR595Architectural design services for the reconstruction of McCarren Pool, Brooklyn
10/1/15 10/1/17 Task Order 2Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
71
FY16NDPR596Landscape architectural design services for Pier 42 master plan and Phase 1 - Project M369-115M
9/15/15 3/15/16 Task Order 1Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR597Construction Supervision services for FY16 Street Tree Planting Contracts for contracts XG-515M cb's 1-8, XG-615M cb's 9-12 - total construction value $2,990,000.00;
2/1/16 7/31/17 Task Order 3Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR598
Construction Supervision for FY16 Street Tree Planting Contracts: for contracts BG-1015M cb's 1,2,3,4, BG-1115M cb's 5,8,9,16,17 BG-1215M cb's 6,7,10,12, BG-1315M cb's 11,13,14,15,18, RG-615M cb's 1-3 - total construction value $8,950,000.00
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR599
Construction Supervision for FY16 Street Tree Planting Contracts: for contracts MG-715M cb's 1-12, QG-1115M cb's 1-6, QG-1215M cb's 7,8,11,12, QG-1315M cb's 9,10,13,14, - total construction value $7,260,000.00
7/1/15 6/30/16 Task Order 1Project Managers, Associate Project Managers, Construction Project Managers, Construction Project Manager Interns
126
FY16NDPR600Landscape architecture design services for the reconstruction of baseball fields located at Cypress Hill Park - work to include design, construction of synthetic turf, stormwater and site furniture
10/1/15 9/1/16 Task Order 2Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPR601Landscape architectural design services for the renovation of the basketball court and handball court and the addition of sports lighting in Nostrand Park, Brooklyn
12/1/2015 12/1/2016 Task Order 2Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project Managers, Associate Project Managers
148
FY16NDPRE2 Maintenance of compressed natural gas stations 2/24/2016 2/23/2018Competitive Sealed Bid 3 none 0
FY16NDPRE3 Maintenance and Support of Enterprise Asset Management Software 8/28/2015 8/27/2017Intergovernmental 1 none 0
FY16NDPRE4 Removal and Storage of Floating Pool 7/1/2016 6/30/2018Competitive Sealed Bid 1 none 0
FY16NDPRE7 Installation and Maintenance of Video Surveillance and Recording System 8/1/2016 7/31/2018Intergovernmental 1 none 0
FY16NDPRE8 Fire Alarm Installation, Monitoring, Maintenance and Repair 1/1/2016 12/31/2017Competitive Sealed Bid 3 none 0
FY16NDPRE9 HVAC Maintenance and Repair 12/28/2016 12/27/2018Competitive Sealed Bid 2 none 0
FY16NDPRE12 Block Pruning in Queens 11/1/2016 10/31/2018Competitive Sealed Bid 2 Climber/Pruner 114
FY16NDPRE15 Block Pruning in the Bronx 2/1/2016 1/31/2018Competitive Sealed Bid 3 Climber/Pruner 114
FY16NDPRE17 Flagpole Painting and Repair 2/1/2016 1/31/2018Competitive Sealed Bid 3 none 0
FY16NDPRE18 Specialized Vehicle And Equipment Repair 7/1/2015 6/30/2016 Task Order 1 none 0
58
New Procurements: DPR
ContractStart
Contract End
Procurement Method
Fiscal Quarter Job Titles Head countPlan ID # Description of Services to be Procured
Anticipated Contract Info Similar Agency Roles
FY16NDPRE20 Upgrade Parks Telephone System to VOIP 9/1/2015 8/31/2017Intergovernmental 2 none 0
FY16NDPRE22 Upgrade to Parks Phone System - Ethernet Access, Citywide 7/1/2015 6/30/2017Intergovernmental 1 none 0
FY16NDPRE23 Poster advertising for various Parks events in NYC subway and bus stations 1/1/2016 12/31/2017 Sole Source 3 none 0
FY16NDPRE24 Block Pruning in Brooklyn 7/1/2015 6/30/2017Competitive Sealed Bid 1 Climber Pruner 114
FY16NDPRE25Custimization of Advanced Mobile software and Enterprise Advanced Management software 1/1/2016 12/31/2017 Sole Source 3 none 0
FY16NDPRE26 Repair of Sewer Water Main Breaks 10/1/2015 9/30/2017Competitive Sealed Bid 2 none 0
FY16NDPRE27 Xerox Enterprise Print Management for Parks printing and copying 7/1/2015 6/30/2016 Task Order 1 none 0
FY16NDPRE28 Installation and Repair of Synthetic Turf 1/1/2016 12/31/2017Competitive Sealed Bid 3 none 0
FY16NDPRE29 Perform office space survey and create floor plans and layouts 1/1/2016 12/31/2017Request for Proposal 3 none 0
FY16NDPRE31 Agency Assets Management Study 3/1/2016 2/28/2018Request for Proposal 3 none 0
FY16NDPRE32 Parks Usership Survey Study 3/1/2016 2/28/2018Request for Proposal 3 none 0
FY16NDPRE33 Treatment and Removal of Trees with Dutch Elm Disease 1/1/2016 12/31/2017Competitive Sealed Bid 3 none 0
FY16NDPRE34 Tree Removal in Queens 1/1/2016 12/31/2017Competitive Sealed Bid 3 Climber Pruner 114
FY16NDPRE35 Tree Removal in Brooklyn and Staten Island 1/1/2016 12/31/2017Competitive Sealed Bid 3 Climber Pruner 114
FY16NDPRE36 Tree Removal in Bronx and Manhattan 1/1/2016 12/31/2017Competitive Sealed Bid 3 Climber Pruner 114
Agency: DPR
Contract Start Contract End Procurement Method Job Titles Headcount
DPR
Landscape architectural design services for the reconstruction of Ballfield No. 4 and the construction of a synthetic turf multi-purpose field No. 5 and related site work at Crotona Park North and Prospect Avenue, in the Bronx 2/1/2016 1/1/2017 Task Order
Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Project 169 9/14/2015
DPR Environmental remediation of Red Hook Ballfields, Brooklyn 1/1/2016 1/1/2017 Task Order
Landscape Architects, Assistant Landscape Architects, Landscape Architects Interns, Civil Engineers, Assistant Civil Engineers, Environmental Engineer Interns, Environmental Engineers 122 9/14/2015
DPR-C Building Fire Alarm Design and Filing 2/1/2016 1/31/2018 Competitive Sealed Bid None 0 10/8/2015
DPR Engineering Design Services for Lasker Pool and Ice Rink 5/1/2016 5/1/2020 Task Order
Civil Engineers, Assistant Civil Engineers, Project Managers, Associated Project Managers 71 10/26/2015
DPR
Environmental services for the operation, maintenance, and monitoring of engineering contracts at Pelham Bay Landfill
1/1/2016 12/31/2016 Task Order
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Environmental Engineer Interns, Environmental Engineers
122 10/28/2015
DPREnvironmental monitoring of groundwater, landfill gas, and settlement at Ferry Point Park Golf Course 1/1/2016 12/31/2016 Task Order
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Civil Engineers, Environmental Engineer Interns, Environmental Engineers 122 10/28/2015
Plan ID # Description of Services to be ProcuredAnticipated Contract Info Similar Agency Roles
New Procurements Added During the Fiscal YearNotice Posted to
MOCS Website by
DPRLandscape design services for the construction of a new park and associated environmental remediation at 140 West 20th Street, Manhattan 3/1/2016 6/1/2019 Task Order
Landscape Architects, Assistant Landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers 169 10/28/2015
DPR
Engineering design services for the demolition of existing building and associated environmental remediation at 140 West 20th Street, Manhattan 3/1/2016 6/1/2019
Task Order
Civil Engineers, Assistant Civil Engineers, Project Managers, Associated Project Managers 71 10/28/2015
DPRArchitectural design services for the demolition of existing building and associated environmental remediation at 140 West 20th Street, Manhattan
3/1/2016
6/1/2018 Task Order
Architects, Assistant Architects, Landmark Preservationists. Project Managers, Associate Project Managers 72 10/28/2015
DPR
Landscape Architecture Design Services for the reconstruction of the existing multi-use synthetic turf athletic field located on Lorimer Street between Driggs Ave and Bayard Street in McCarren Park, Borough of Brooklyn. 3/15/2016 12/15/2016 Task Order
Landscape Architects, Assistant Landscape Architects, Landscape Architecture Interns, Project Managers, Associate Project Managers 169 11/10/2015
DPR
Architectural design services for Lasker Pool and Ice Rink
5/1/2016 5/1/2020 Task Order
Architects, Assistant Architects, Landmarks Preservationists, Project Managers, Associate Project Managers
72 12/2/2015
DPREngineering design services for revetment at Pelham Bay Landfill to support mitigative protection 2/15/2016 9/15/2016 Task Order
Civil Engineers, Assistant Civil Engineers, Project Managers, Associated Project Managers 71 12/8/2015
DPRLandscape architectural design services for the construction of Overlook Park improvements and East Elmhurst Dog Run 3/2/2016 3/1/2017 Task Order
Landscape Architects, Asst. Landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers 169 12/9/2015
DPRLandscape architectural design services for the Bronx River Greenway Shoelace Link, in Shoelace Park, which is part of the Bronx Park 4/1/2016 4/1/2017 Task Order
Landscape Architects, Asst. Landscape Architects, Landscape Architect Interns, Project Managers, Associate Project Managers 169 12/28/2015