26
Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central Repository of Data Amman 13-15 March 2007

Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Embed Size (px)

Citation preview

Page 1: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Expected Outputs&

Lessons Learned

Léa Hakim & Neda JafarStatistics Coordination Unit, ESCWA

Workshop on Building Country Capacity to Maintain a Central Repository of Data

Amman 13-15 March 2007

Page 2: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Expected Outputs

By the end of today’s session:

1. Preliminary Report

2. Action plan for clean-up

Page 3: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Expected Outputs

1. Preliminary Report

2. Action plan for clean-up

Page 4: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Preliminary Report

Consolidation of working session outputs as per templates shared:

• Status:– Database Management– DevInfo as a Central Repository of Data (CRD)– Data coverage– Linking producers and users of data– Dissemination

Page 5: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Preliminary Report

• Structure and Content Review Summary:

1. DevInfo summary report (Excel sheets)

2. MDG indicator I-U-S analysis (template provided)

Page 6: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

1. DevInfo summary report:Categories (Current – Proposed)

• Indicator

• Unit

• Subgroup

• I-U-S

• Time period

• Area

• Sector

• Goal

• Framework

• Institution

• Theme

• Convention

• Source

Specify Indicator Classification(s) employed

Page 7: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

1. DevInfo summary report:Review of subgroups

Source: Report on DevInfo 2004 Technical Support for UNDG Project “Building Capactiy and Statistical Literacy for MDG Monitoring”, Community Systems Foundation p.12

Page 8: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

1. DevInfo summary report:Review of sources

Source: Report on DevInfo 2004 Technical Support for UNDG Project “Building Capactiy and Statistical Literacy for MDG Monitoring”, Community Systems Foundation p.9

Page 9: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

2. MDG Monitoring Indicator I-U-S Analysis

Source: Report on DevInfo 2004 Technical Support for UNDG Project “Building Capactiy and Statistical Literacy for MDG Monitoring”, Community Systems Foundation p.19

Page 10: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

2. MDG Monitoring Indicator I-U-S Analysis

• Complete template in reviewing data content

• Customize area categories

• Include review of whether changes implemented for final report [ Column “Action Taken (Y, N)” in template shared]

Note: Electronic I-U-S Analysis template distributed.

Page 11: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Preliminary Report

• Conclusions for next steps

– Outline decisions taken for next steps during this training

• Ex. Focus on MDG indicators only for first launch

• Ex. Establishing area codes at sub-national level

• Ex. Adding proxies/national development indicators

Page 12: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Final Report Outline

I. IntroductionII. ObjectivesIII. Status of CRDIV. Structure and Content

ReviewV. Conclusions VI. Challenges in clean-upVII. Lessons learnedVIII. Evaluation report

(M&E UNICEF)Annexes

Include Action Plan Timetable

Preliminary Report

Note: Electronic report template distributed.

Page 13: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Expected Outputs

1. Preliminary Report

2. Action plan for clean-up

Page 14: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Beyond CRD Training

1. Complete database (DB) Review

2. Complete DevInfo DB cleanup

3. UNICEF M&E officer evaluation

4. Submission of final report

5. Use and dissemination of DB

6. Country Roll-out

Page 15: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

2. Action plan

Main Task Task Components

Person(s) responsible

March April

I. Full conversion to DevInfo v5.0

II. Completion of DB review

III. Implementation of cleanup

IV. Evaluation

V. Submission of report

VI. Launch of national DevInfo DBNote: Detailed electronic action plan template distributed.

Page 16: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Lessons Learned

Page 17: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Strategy and Planning

• Exchange of experiences • Should invest in preparation prior to release:

– Setup (complete DevInfo team w/ clear functions & responsibilities)

– Necessity of Technical/Steering Committee– Establish (feedback between DevInfo team, statistics

producers, UN agencies).– Clear strategy and plan of action– Emphasis on quality– Prioritize MDG DB– Raise awareness of decision-makers to make use of

available statistics

Page 18: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Database Management

• Start with planning process• Start small, think BIG!• Importance of establishing:

– DevInfo team– Committees: Steering and Technical– Formal agreements with line ministries

• Involve users from beginning• DB management requires experts for assessing data and

metadata

Page 19: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

DevInfo as CRD

• DevInfo is user-friendly as a program and interface• Web-enabling option• Institutional link between DBs and DevInfo• Customized national DevInfo• Use of GIS• Mapping facility• Data organized by themes for targeted policy-making• Store other activities’ data such as surveys & censuses• Ready-tailored metadata and indicators of MDG framework• Availability of international sources of data

Page 20: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Data coverage

• Sex disaggregated data• Small area disaggregated data• Time series• Different sources• Strengths and weaknesses of DB• Establish processes for data collection• Review of list of indicators in national database relative to

global MDG list• Addition of country-specific development indicators• Review of meta-data on indicators, sources• Review of geographical areas/maps

Page 21: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Producer – User dialogue

• Establish linkages with line ministries

• Regular forums

• Unification of standards and methods

• Unification of classifications and definitions

• Data-entry by line ministries through web

• Train users to understand statistics, indicators, and analysis of data

Page 22: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Dissemination

• Press releases• Web-enabling• Dissemination through workshops• Addition of DevInfo links to NSO sites (including training

material)• Provision of DevInfo CD with national MDGR• Knowledge transfer• Roll-out advocacy campaign

Page 23: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Structure & Content

• Spell Check• Thematic databases• Always refer to global DB structures - Import MDG indicators and goals

from global DB – do not type.• Planning of DB content is essential• Continuous check of data quality• Metadata• Follow standard naming of source• Document all changes made• Assessment of data availability has to be done BEFORE creating a

template • Source of data should specify the original producer ex. MOH for health

indicators• Naming of source should follow “PAL_MOH_DHS_2003”• Set up different DBs for big amounts of info ex.census & surveys• Remove indicators with no data values to avoid over reporting

Page 24: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Mapping

• Continent and country level: apply ISO coding

• Ensure each area ID is connected to area name and vice versa

• Start working towards a target for infrastructure maps

• Area ID is the key to the mapping

Page 25: Expected Outputs & Lessons Learned Léa Hakim & Neda Jafar Statistics Coordination Unit, ESCWA Workshop on Building Country Capacity to Maintain a Central

Data Quality

• During data entry preferable to insert value not formula

• Review data and consistency – do not rely on automated ways

• Do not include indicators with missing values

• Avoid duplication

• Ensure completeness of data values and time series