EXPANSION FOR THE UPPER MINING/LOGGING LOOP ON THE NEW PCSRR

  • Upload
    berit

  • View
    29

  • Download
    2

Embed Size (px)

DESCRIPTION

A PowerPoint presentation of the. EXPANSION FOR THE UPPER MINING/LOGGING LOOP ON THE NEW PCSRR. WINTER 2006. Use the right arrow key on your keyboard to advance the images. Building. Bents. Bridges and. Trestles. Cribbing& Berms. Bare Jig for making bents all the same. - PowerPoint PPT Presentation

Citation preview

Page 1: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

A PowerPoint presentation of the

Use the right arrow key on your keyboard to advance the images

Page 2: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR
Page 3: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Bare Jig for making bents all the same.

I use the nailer without glue.

The bents are extremely

strong.

The use of an air nailer speeds the process greatly

Finished 12 inch bent

By pre-cutting all the wood, each bent takes about a minute to build.

Page 4: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

After assembly, the bents were “dip

stained” by dunking them in a Turkey

roasting pan filled with Behr Deck Stain.

The bents were then set out to dry.

Now, rather than dipping the entire bent in stain, I soak the cut pieces prior to assembly. It works much better that way.

Page 5: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Bents installed on the new loop

Page 6: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

A 4 foot bridge was needed on the loop so a jig was built and construction started.

Bridge done, stained and installed

Page 7: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

For extra variety and support, a 7 foot

section of “cribbing” was added.

Cribbing stained, bents

and bridge installed.

Page 8: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

The snow started quite slow when we

brought out the plow. However, the

snow fell much faster than the plow

could handle.

So we parked it.

Construction was slowed during the first weeks of March by two 12 inch snowfalls.

Page 9: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Because the upper loop is 15 to 18 inches above the lower level of the layout, modified “bench” work was added at the “North” end turn-a-round. It’s not as neatly crafted as Richard Smith would do, but it worked for us here in the high desert…

Stakes were driven into the ground, leveled and 2x6 road bed attached to the top. Most of the wood used for the construction of the benchwork and roadbed was rescued from the

“Cull Bin” at Home Depot for 51 cents per piece. No expense was spared.

Page 10: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Pieces of exterior siding (again from the “Cull Bin” at HD) were added to the sides of the 2X6 roadbed and lava rock was added to complete the berm. Most of the decorative rock

on the property is various sizes of lava rock which is quite plentiful in the Prescott area.

Page 11: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

To complete the loop, an 18 inch high trestle was needed to connect the main straightaways at the “South End. So……

it was back to the bent jig and air nailer.

Page 12: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

18 inch bents were constructed.

…….and a jig was made for the needed laminated

eight foot diameter curved stringers.

Page 13: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

The stringers were constructed by cutting 1/8 inch strips of pine,

bending them into the jig, gluing with polyeurthane glue, clamping

into the jig,then …..

……..wedging them into the blocks to allowing for 24 hours.

Page 14: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Track has now been laid on the entire loop so it’s time for a test run..

The loop has been designed for continuous running or trains can run on the outer mainline, up through the loop, then connect back

with the outer mainline. The addition of the loop has added almost 200 feet to the layout.

The return spur can be seen in the top and right of the image.

Page 15: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

To help contain the ballast on the raised 2x6 roadbed, ½ x ½ inch stringers were attached at the edges of the boards. The track is floating on the wood and lava rock dust is used for ballast. It’s a very attractive effect.

Page 16: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

New bents and stringers installed……

Page 17: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Cribbing and piers built…….

Page 18: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

Rock work done and ballast spread

Page 19: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

The upper loop is 99% done…….

Entry to the upper loop is through the switch shown at the lower left of the image. The access track is actually level even though it looks like it has a grade. The return spur can be seen in the upper part of the image.

Page 20: EXPANSION FOR THE  UPPER MINING/LOGGING LOOP  ON THE NEW PCSRR

And trains are running……

Even though the upper loop is 99% done, it will always be 99% done and never quite finished……