CREST SLOPE SLOPE HARBOR EXISTING GRADE PLAN VIEW CREST PATH ACCESS PATH FROM INLAND ADJACENT TO CREST INSPECTION TRENCH 3 1 FILTER FABRIC RIPRAP (SCOUR PROTECTION) EMBANKMENT FILL EXISTING GROUND SURFACE TURF REINFORCEMENT MAT FOR EROSION PROTECTION CRUSHED STONE BEDDING LAYER 1 1 EXISTING STREET ELEVATION ADA ACCESSIBLE ACCESS PATH/ WALKWAY 12' MIN. VARIES VARIES 12' MIN. PERVIOUS TOE DRAIN FOR SEEPAGE CONTROL (OR OTHER SEEPAGE CONTROL MEASURE AS DESIGNED BY ENGINEER) FUTURE BERM ELEVATION (2070 CONDITIONS) PERFORATED DRAIN PIPE (CONNECT TO STORM DRAIN) FINE FILTER MATERIAL COARSE FILTER MATERIAL 6' 2' MIN. ADA ACCESSIBLE CREST PATH INCREMENTAL APPROACH (SHOWN AS 2030 AS-BUILT) HILLSIDE EROSION CONTROL PLANTS, TYP. PLANT SELECTION SHOULD BE APPROPRIATE TO SURROUNDING HABITAT / ECOSYSTEM. BACK FILL AND TOPSOIL FILTER FABRIC: NON-WOVEN MATERIAL WITH O90 VALUE 600 OR LARGER SALT TOLERANT EROSION CONTROL PLANTS, (TYPICAL) URBAN ENVIRONMENT PLANT PALLET SHOULD BE TOLERANT TO POLLUTANTS (EMISSIONS, OILS, ETC.). NATIVE PLANT MATERIALS SHOULD BE CONSIDERED WHERE POSSIBLE. 1 3 1 3 2070 DFE 2030 DFE PRESENT DAY DFE HARBOR CRUSHED STONE BEDDING LAYER RIPRAP SCOUR PROTECTION SALT TOLERANT EROSION CONTROL PLANTING FUTURE BERM ELEVATION (2070 CONDITIONS) TURF REINFORCEMENT MAT SUITABLE EMBANKMENT FILL ADA ACCESSIBLE CREST PATH ADA ACCESS PATH TOE DRAIN EXISTING GRADE HILLSIDE EROSION CONTROL PLANTING 2070 DFE 2030 DFE PRESENT DAY DFE NOTES: FEASIBILITY LIMITED BY SPACE BETWEEN HARBOR AND EXISTING BUILDINGS EMBANKMENTS SHALL BE CONSIDERED A LEVEE AND MEET ALL UNITED STATES ARMY CORPS OF ENGINEERS (USACoE) GUIDANCE ON LEVEE DESIGN LOCATION IN RELATION TO CURRENT HARBOR EDGE MAY VARY FREEBOARD SHOULD BE 12"-24" BASED ON SETTLEMENT ESTIMATE AND CRITICALITY DIMENSIONS ARE BASED OFF ASSUMED SLOPES OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION SAMPLE - NOT TO SCALE SAMPLE NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS 1 CITY HALL SQUARE ROOM 714 BOSTON, MA 02201-2024 PUBLIC WORKS DEPARTMENT (T): 617 635 4900 (E): [email protected] CLIMATE RESILIENT DESIGN STANDARDS AND GUIDELINES FOR PROTECTION OF PUBLIC RIGHTS-OF-WAY B.1 VEGETATED BERM BARRIER Refer to Climate Resilient Design Standards and Guidelines for notes and guidance. DOWNLOADABLE FILES: Standard PWD Details for reference and download can be found here B.1. SAMPLE VEGETATED BERM BARRIER CAD PDF

EXISTING 2070 DFE GRADE 2030 DFE SAMPLE - Boston · as designed by engineer) future berm elevation (2070 conditions) perforated drain pipe fine filter material (connect to storm drain)

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EXISTING 2070 DFE GRADE 2030 DFE SAMPLE - Boston · as designed by engineer) future berm elevation (2070 conditions) perforated drain pipe fine filter material (connect to storm drain)

INSPECTIONTRENCH

31

FILTER FABRIC

RIPRAP (SCOURPROTECTION)

EMBANKMENT FILL

EXISTING GROUND SURFACE

TURF REINFORCEMENT MATFOR EROSION PROTECTIONCRUSHED STONE

BEDDING LAYER

11

EXISTING STREETELEVATION

ADA ACCESSIBLE ACCESS PATH/WALKWAY

12' MIN.VARIES VARIES 12' MIN.

PERVIOUS TOE DRAIN FORSEEPAGE CONTROL (OR OTHERSEEPAGE CONTROL MEASUREAS DESIGNED BY ENGINEER)

FUTURE BERM ELEVATION(2070 CONDITIONS)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)FINE FILTER MATERIAL

COARSE FILTER MATERIAL

6'

2' MIN

.

ADA ACCESSIBLE CREST PATH

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

CONSIDERATIONS (REFER TO CONSIDERATIONS SUMMARY):

NOTES: FEASIBILITY LIMITED BY SPACE BETWEEN HARBOR AND EXISTING BUILDINGS EMBANKMENTS SHALL BE CONSIDERED A LEVEE AND MEET ALL UNITED STATES ARMY CORPS OF ENGINEERS

(USACoE) GUIDANCE ON LEVEE DESIGN LOCATION IN RELATION TO CURRENT HARBOR EDGE MAY VARY FREEBOARD SHOULD BE 12"-24" BASED ON SETTLEMENT ESTIMATE AND CRITICALITY DIMENSIONS ARE BASED OFF ASSUMED SLOPES OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

INCREMENTAL APPROACH(SHOWN AS 2030 AS-BUILT)

VEGETATED BERM BARRIER SAMPLE SECTION

HILLSIDE EROSION CONTROL PLANTS, TYP.PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING HABITAT / ECOSYSTEM.

BACK FILL AND TOPSOIL

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER

SALT TOLERANT EROSION CONTROL PLANTS,(TYPICAL) URBAN ENVIRONMENT PLANT PALLET

SHOULD BE TOLERANT TO POLLUTANTS(EMISSIONS, OILS, ETC.). NATIVE PLANT MATERIALS

SHOULD BE CONSIDERED WHERE POSSIBLE.

CRESTSLOPE SLOPE

HA

RB

OR

EX

ISTI

NG

GR

AD

E

PLAN VIEW

DRAFT

13

13

2070 DFE

2030 DFE

PRESENT DAY DFE

HARBOR

CREST PATH

ACCESS PATHFROM INLANDADJACENT TOCREST

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

INSPECTIONTRENCH

31

FILTER FABRIC

RIPRAP (SCOURPROTECTION)

EMBANKMENT FILL

EXISTING GROUND SURFACE

TURF REINFORCEMENT MATFOR EROSION PROTECTIONCRUSHED STONE

BEDDING LAYER

11

EXISTING STREETELEVATION

ADA ACCESSIBLE ACCESS PATH/WALKWAY

12' MIN.VARIES VARIES 12' MIN.

PERVIOUS TOE DRAIN FORSEEPAGE CONTROL (OR OTHERSEEPAGE CONTROL MEASUREAS DESIGNED BY ENGINEER)

FUTURE BERM ELEVATION(2070 CONDITIONS)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)FINE FILTER MATERIAL

COARSE FILTER MATERIAL

6'

2' MIN

.

ADA ACCESSIBLE CREST PATH

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

CONSIDERATIONS (REFER TO CONSIDERATIONS SUMMARY):

NOTES: FEASIBILITY LIMITED BY SPACE BETWEEN HARBOR AND EXISTING BUILDINGS EMBANKMENTS SHALL BE CONSIDERED A LEVEE AND MEET ALL UNITED STATES ARMY CORPS OF ENGINEERS

(USACoE) GUIDANCE ON LEVEE DESIGN LOCATION IN RELATION TO CURRENT HARBOR EDGE MAY VARY FREEBOARD SHOULD BE 12"-24" BASED ON SETTLEMENT ESTIMATE AND CRITICALITY DIMENSIONS ARE BASED OFF ASSUMED SLOPES OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

INCREMENTAL APPROACH(SHOWN AS 2030 AS-BUILT)

VEGETATED BERM BARRIER SAMPLE SECTION

HILLSIDE EROSION CONTROL PLANTS, TYP.PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING HABITAT / ECOSYSTEM.

BACK FILL AND TOPSOIL

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER

SALT TOLERANT EROSION CONTROL PLANTS,(TYPICAL) URBAN ENVIRONMENT PLANT PALLET

SHOULD BE TOLERANT TO POLLUTANTS(EMISSIONS, OILS, ETC.). NATIVE PLANT MATERIALS

SHOULD BE CONSIDERED WHERE POSSIBLE.

CRESTSLOPE SLOPE

HA

RB

OR

EX

ISTI

NG

GR

AD

E

PLAN VIEW

DRAFT

13

13

2070 DFE

2030 DFE

PRESENT DAY DFE

HARBOR

CREST PATH

ACCESS PATHFROM INLANDADJACENT TOCREST

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

CRUSHED STONE BEDDING LAYER

RIPRAP SCOUR PROTECTION

SALT TOLERANT EROSION CONTROL PLANTING

FUTURE BERM ELEVATION (2070 CONDITIONS)

TURF REINFORCEMENT MAT

SUITABLE EMBANKMENT FILL

ADA ACCESSIBLE CREST PATH

ADA ACCESS PATH

TOE DRAIN

EXISTING GRADE

HILLSIDE EROSION CONTROL PLANTING

2070 DFE2030 DFE

PRESENT DAY DFE

INSPECTIONTRENCH

31

FILTER FABRIC

RIPRAP (SCOURPROTECTION)

EMBANKMENT FILL

EXISTING GROUND SURFACE

TURF REINFORCEMENT MATFOR EROSION PROTECTIONCRUSHED STONE

BEDDING LAYER

11

EXISTING STREETELEVATION

ADA ACCESSIBLE ACCESS PATH/WALKWAY

12' MIN.VARIES VARIES 12' MIN.

PERVIOUS TOE DRAIN FORSEEPAGE CONTROL (OR OTHERSEEPAGE CONTROL MEASUREAS DESIGNED BY ENGINEER)

FUTURE BERM ELEVATION(2070 CONDITIONS)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)FINE FILTER MATERIAL

COARSE FILTER MATERIAL

6'

2' MIN

.

ADA ACCESSIBLE CREST PATH

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

CONSIDERATIONS (REFER TO CONSIDERATIONS SUMMARY):

NOTES: FEASIBILITY LIMITED BY SPACE BETWEEN HARBOR AND EXISTING BUILDINGS EMBANKMENTS SHALL BE CONSIDERED A LEVEE AND MEET ALL UNITED STATES ARMY CORPS OF ENGINEERS

(USACoE) GUIDANCE ON LEVEE DESIGN LOCATION IN RELATION TO CURRENT HARBOR EDGE MAY VARY FREEBOARD SHOULD BE 12"-24" BASED ON SETTLEMENT ESTIMATE AND CRITICALITY DIMENSIONS ARE BASED OFF ASSUMED SLOPES OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

INCREMENTAL APPROACH(SHOWN AS 2030 AS-BUILT)

VEGETATED BERM BARRIER SAMPLE SECTION

HILLSIDE EROSION CONTROL PLANTS, TYP.PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING HABITAT / ECOSYSTEM.

BACK FILL AND TOPSOIL

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER

SALT TOLERANT EROSION CONTROL PLANTS,(TYPICAL) URBAN ENVIRONMENT PLANT PALLET

SHOULD BE TOLERANT TO POLLUTANTS(EMISSIONS, OILS, ETC.). NATIVE PLANT MATERIALS

SHOULD BE CONSIDERED WHERE POSSIBLE.

CRESTSLOPE SLOPE

HA

RB

OR

EX

ISTI

NG

GR

AD

E

PLAN VIEW

DRAFT

13

13

2070 DFE

2030 DFE

PRESENT DAY DFE

HARBOR

CREST PATH

ACCESS PATHFROM INLANDADJACENT TOCREST

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

SAMPLE - NOT TO SCALE

SAMPLE

INSPECTIONTRENCH

31

FILTER FABRIC

RIPRAP (SCOURPROTECTION)

EMBANKMENT FILL

EXISTING GROUND SURFACE

TURF REINFORCEMENT MATFOR EROSION PROTECTIONCRUSHED STONE

BEDDING LAYER

11

EXISTING STREETELEVATION

ADA ACCESSIBLE ACCESS PATH/WALKWAY

12' MIN.VARIES VARIES 12' MIN.

PERVIOUS TOE DRAIN FORSEEPAGE CONTROL (OR OTHERSEEPAGE CONTROL MEASUREAS DESIGNED BY ENGINEER)

FUTURE BERM ELEVATION(2070 CONDITIONS)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)FINE FILTER MATERIAL

COARSE FILTER MATERIAL

6'

2' MIN

.

ADA ACCESSIBLE CREST PATH

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

CONSIDERATIONS (REFER TO CONSIDERATIONS SUMMARY):

NOTES: FEASIBILITY LIMITED BY SPACE BETWEEN HARBOR AND EXISTING BUILDINGS EMBANKMENTS SHALL BE CONSIDERED A LEVEE AND MEET ALL UNITED STATES ARMY CORPS OF ENGINEERS

(USACoE) GUIDANCE ON LEVEE DESIGN LOCATION IN RELATION TO CURRENT HARBOR EDGE MAY VARY FREEBOARD SHOULD BE 12"-24" BASED ON SETTLEMENT ESTIMATE AND CRITICALITY DIMENSIONS ARE BASED OFF ASSUMED SLOPES OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

INCREMENTAL APPROACH(SHOWN AS 2030 AS-BUILT)

VEGETATED BERM BARRIER SAMPLE SECTION

HILLSIDE EROSION CONTROL PLANTS, TYP.PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING HABITAT / ECOSYSTEM.

BACK FILL AND TOPSOIL

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER

SALT TOLERANT EROSION CONTROL PLANTS,(TYPICAL) URBAN ENVIRONMENT PLANT PALLET

SHOULD BE TOLERANT TO POLLUTANTS(EMISSIONS, OILS, ETC.). NATIVE PLANT MATERIALS

SHOULD BE CONSIDERED WHERE POSSIBLE.

CRESTSLOPE SLOPE

HA

RB

OR

EX

ISTI

NG

GR

AD

E

PLAN VIEW

DRAFT

13

13

2070 DFE

2030 DFE

PRESENT DAY DFE

HARBOR

CREST PATH

ACCESS PATHFROM INLANDADJACENT TOCREST

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

1 CITY HALL SQUAREROOM 714BOSTON, MA 02201-2024

PUBLIC WORKS DEPARTMENT(T): 617 635 4900

(E): [email protected]

CLIMATE RESILIENT DESIGN STANDARDS AND GUIDELINES FOR PROTECTION OF PUBLIC RIGHTS-OF-WAYB.1 VEGETATED BERM BARRIERRefer to Climate Resilient Design Standards and Guidelines for notes and guidance.

DOWNLOADABLE FILES:Standard PWD Details for reference and download can be found here

B.1. SAMPLE VEGETATED BERM BARRIERCADPDF

Page 2: EXISTING 2070 DFE GRADE 2030 DFE SAMPLE - Boston · as designed by engineer) future berm elevation (2070 conditions) perforated drain pipe fine filter material (connect to storm drain)

COMPACTED FILL

EXISTING SEAWALL TO REMAIN

TOP OF EXISTING SEAWALL,MAY NEED MODIFICATIONS

2'2'

2'

6'

4' EXISTING GRADE

1

3

HARBORWALK BARRIER SEAWALL SAMPLE SECTION

NOTES:

HANDRAIL DESIGN FOR ASCE 7 LOADS STRUCTURAL DESIGN OF ANCHORAGE IS REQUIRED PERFORM WALL STABILITY CALCULATIONS FOR PROPOSED CONDITION

(BEARING/SLIDING/OVERTURNING/GLOBAL) DIMENSIONS ARE BASED OFF ASSUMED SLOPED OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

15'

VARIES

12' MIN.

REINFORCED HANDRAIL WITH OPTIONFOR DEPLOYABLE FLOOD BARRIER

MATERIAL VARIES

GEOGRID (IF REQUIRED)

ADA ACCESSIBLE CREST PATHHILLSIDE EROSION CONTROL PLANTS, (TYP.)PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING ENVIRONMENT.

VARIES, DEPENDING ONSURROUNDING CONDITIONAND ELEVATIONS

TURF REINFORCEMENT MATFOR EROSION PROTECTION

FILTER FABRIC

BACKFILL AND TOPSOIL

VA

RIE

S

DRAFT

2070 DFE

2030 DFE

PRESENT DAY

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONSSEAWALL IS RAISED 4 FT. WITH 2 FT. GRADE CHANGE IN THIS SAMPLE

FOUNDATIONS TO BE DESIGNEDBASED ON GEOTECHNICAL ANALYSES

PERVIOUS TOE DRAIN FOR SEEPAGE CONTROL(OR OTHER SEEPAGE CONTROL MEASURE ASDESIGNED BY ENGINEER)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER

COMPACTED FILL

EXISTING SEAWALL TO REMAIN

TOP OF EXISTING SEAWALL,MAY NEED MODIFICATIONS

2'2'

2'

6'

4' EXISTING GRADE

1

3

HARBORWALK BARRIER SEAWALL SAMPLE SECTION

NOTES:

HANDRAIL DESIGN FOR ASCE 7 LOADS STRUCTURAL DESIGN OF ANCHORAGE IS REQUIRED PERFORM WALL STABILITY CALCULATIONS FOR PROPOSED CONDITION

(BEARING/SLIDING/OVERTURNING/GLOBAL) DIMENSIONS ARE BASED OFF ASSUMED SLOPED OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

15'

VARIES

12' MIN.

REINFORCED HANDRAIL WITH OPTIONFOR DEPLOYABLE FLOOD BARRIER

MATERIAL VARIES

GEOGRID (IF REQUIRED)

ADA ACCESSIBLE CREST PATHHILLSIDE EROSION CONTROL PLANTS, (TYP.)PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING ENVIRONMENT.

VARIES, DEPENDING ONSURROUNDING CONDITIONAND ELEVATIONS

TURF REINFORCEMENT MATFOR EROSION PROTECTION

FILTER FABRIC

BACKFILL AND TOPSOIL

VA

RIE

S

DRAFT

2070 DFE

2030 DFE

PRESENT DAY

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONSSEAWALL IS RAISED 4 FT. WITH 2 FT. GRADE CHANGE IN THIS SAMPLE

FOUNDATIONS TO BE DESIGNEDBASED ON GEOTECHNICAL ANALYSES

PERVIOUS TOE DRAIN FOR SEEPAGE CONTROL(OR OTHER SEEPAGE CONTROL MEASURE ASDESIGNED BY ENGINEER)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER

HILLSIDE EROSION CONTROL PLANTING

ADA ACCESSIBLE CREST PATH

BACKFILL AND TOPSOIL

TURF REINFORCEMENT MAT

COMPACTED FILL

EXISTING GRADE

GEOGRID (IF REQUIRED)

RAISED SEAWALL

FILTER FABRIC

EXISTING SEAWALL TO REMAIN (MODIFICATION MAY BE REQUIRED)

REINFORCED HANDRAIL WITH OPTION FOR DEPLOYABLE FLOOD BARRIER

2030 DFE

2070 DFE

PRESENT DAY DFE

SAMPLETOE DRAIN

COMPACTED FILL

EXISTING SEAWALL TO REMAIN

TOP OF EXISTING SEAWALL,MAY NEED MODIFICATIONS

2'2'

2'

6'

4' EXISTING GRADE

1

3

HARBORWALK BARRIER SEAWALL SAMPLE SECTION

NOTES:

HANDRAIL DESIGN FOR ASCE 7 LOADS STRUCTURAL DESIGN OF ANCHORAGE IS REQUIRED PERFORM WALL STABILITY CALCULATIONS FOR PROPOSED CONDITION

(BEARING/SLIDING/OVERTURNING/GLOBAL) DIMENSIONS ARE BASED OFF ASSUMED SLOPED OF 3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

15'

VARIES

12' MIN.

REINFORCED HANDRAIL WITH OPTIONFOR DEPLOYABLE FLOOD BARRIER

MATERIAL VARIES

GEOGRID (IF REQUIRED)

ADA ACCESSIBLE CREST PATHHILLSIDE EROSION CONTROL PLANTS, (TYP.)PLANT SELECTION SHOULD BE APPROPRIATETO SURROUNDING ENVIRONMENT.

VARIES, DEPENDING ONSURROUNDING CONDITIONAND ELEVATIONS

TURF REINFORCEMENT MATFOR EROSION PROTECTION

FILTER FABRIC

BACKFILL AND TOPSOIL

VA

RIE

S

DRAFT

2070 DFE

2030 DFE

PRESENT DAY

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONSSEAWALL IS RAISED 4 FT. WITH 2 FT. GRADE CHANGE IN THIS SAMPLE

FOUNDATIONS TO BE DESIGNEDBASED ON GEOTECHNICAL ANALYSES

PERVIOUS TOE DRAIN FOR SEEPAGE CONTROL(OR OTHER SEEPAGE CONTROL MEASURE ASDESIGNED BY ENGINEER)

PERFORATED DRAIN PIPE(CONNECT TO STORM DRAIN)

FILTER FABRIC: NON-WOVEN MATERIALWITH O90 VALUE 600 OR LARGER1 CITY HALL SQUARE

ROOM 714BOSTON, MA 02201-2024

PUBLIC WORKS DEPARTMENT(T): 617 635 4900

(E): [email protected]

CLIMATE RESILIENT DESIGN STANDARDS AND GUIDELINES FOR PROTECTION OF PUBLIC RIGHTS-OF-WAYB.2 HARBORWALK AS FLOOD BARRIER (RAISED SEAWALL)Refer to Climate Resilient Design Standards and Guidelines for notes and guidance.

DOWNLOADABLE FILES:Standard PWD Details for reference and download can be found here

B.2 SAMPLE HARBORWALK AS FLOOD BARRIER (RAISED SEAWALL)CADPDF

SAMPLE - NOT TO SCALE

Page 3: EXISTING 2070 DFE GRADE 2030 DFE SAMPLE - Boston · as designed by engineer) future berm elevation (2070 conditions) perforated drain pipe fine filter material (connect to storm drain)

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

OPTION 1: NO BUILT PROPERTY WITHIN 14' OF EXISTING BACK OF SIDEWALK

NOTES:

OCEANSIDE WALL WOULD NEED WATERPROOF/IMPERVIOUS AND CORROSION RESISTANT DETAILING LESS STRINGENT DETAILING REQUIRED ON LANDSIDE WALL USED WHEN 14'-0” CLEAR SPACE EITHER SIDE OF RIGHT OF WAY DIMENSIONS ARE BASED OFF BPWD ROADWAY STANDARDS - RESIDENTIAL & ASSUMED SLOPE WIDTH OF

3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) IF SLOPES ARE FEASIBLE, WALLS ARE NOT NECESSARY 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

DRAFT

HARBOR

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

RETAINING WALL GUARDRAIL/CRASH

BARRIERS

RIPRAP

2070 DFE

PRESENT DAY DFE

EXISTING WATER

FUTURE WATER

SEWER

PARKING PARKINGTRAVEL LANES

CRASH BARRIER OR GUARDRAIL

EXISTING GRADE

14’ MIN. DISTANCE BETWEEN TOE OF SLOPE

AND ABUTTING BUILDING

RAISED STORMWATER DRAIN MANHOLE

SAMPLE - NOT TO SCALE

SAMPLE

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

OPTION 1: NO BUILT PROPERTY WITHIN 14' OF EXISTING BACK OF SIDEWALK

NOTES:

OCEANSIDE WALL WOULD NEED WATERPROOF/IMPERVIOUS AND CORROSION RESISTANT DETAILING LESS STRINGENT DETAILING REQUIRED ON LANDSIDE WALL USED WHEN 14'-0” CLEAR SPACE EITHER SIDE OF RIGHT OF WAY DIMENSIONS ARE BASED OFF BPWD ROADWAY STANDARDS - RESIDENTIAL & ASSUMED SLOPE WIDTH OF

3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) IF SLOPES ARE FEASIBLE, WALLS ARE NOT NECESSARY 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

DRAFT

HARBOR

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

OPTION 1: NO BUILT PROPERTY WITHIN 14' OF EXISTING BACK OF SIDEWALK

NOTES:

OCEANSIDE WALL WOULD NEED WATERPROOF/IMPERVIOUS AND CORROSION RESISTANT DETAILING LESS STRINGENT DETAILING REQUIRED ON LANDSIDE WALL USED WHEN 14'-0” CLEAR SPACE EITHER SIDE OF RIGHT OF WAY DIMENSIONS ARE BASED OFF BPWD ROADWAY STANDARDS - RESIDENTIAL & ASSUMED SLOPE WIDTH OF

3H:1V (HORIZONTAL:VERTICAL) FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) IF SLOPES ARE FEASIBLE, WALLS ARE NOT NECESSARY 2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVEL

RISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

DRAFT

HARBOR

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

\\wse03.local\WSE\Projects\MA\Boston MA\BPWD - Climate Resilience Guidelines\Deliver-ables\3. Sample Drawings\LINKS

1 CITY HALL SQUAREROOM 714BOSTON, MA 02201-2024

PUBLIC WORKS DEPARTMENT(T): 617 635 4900

(E): [email protected]

CLIMATE RESILIENT DESIGN STANDARDS AND GUIDELINES FOR PROTECTION OF PUBLIC RIGHTS-OF-WAYB.3 RAISED ROADWAY - OPTION 1 NO BUILT PROPERTY WITHIN AT LEAST 14 FEET OF EXISTING RIGHT OF WAYRefer to Climate Resilient Design Standards and Guidelines for notes and guidance.

DOWNLOADABLE FILES:Standard PWD Details for reference and download can be found here

B.3 SAMPLE RAISED ROADWAY- OPTION 1CADPDF

Page 4: EXISTING 2070 DFE GRADE 2030 DFE SAMPLE - Boston · as designed by engineer) future berm elevation (2070 conditions) perforated drain pipe fine filter material (connect to storm drain)

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

NOTES:

OCEANSIDE WALL WOULD NEED WATERPROOF/IMPERVIOUS AND CORROSION RESISTANT DETAILING USED ONLY WITH NEW DEVELOPMENT - BUILDINGS AT BACK OF SIDEWALK DESIGNED FOR RAISED ROADWAY DIMENSIONS ARE BASED OFF BPWD ROADWAY STANDARDS - RESIDENTIAL FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) RECOMMENDED FOR NEW DEVELOPMENT ONLY - EXISTING STRUCTURE MAY NOT BE DESIGNED FOR

INCREASED LOADS ASSOCIATED WITH GRADE CHANGE OR BE ACCESSIBLE TO VEHICULAR AND/ORPEDESTRIANS

2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVELRISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

OPTION 2: NEW DEVELOPMENT DESIGN FOR RAISED ROADWAY/PARTIAL FIRST FLOOR ABANDONMENT DRAFT

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

RAISED STORMWATER DRAIN MANHOLE

RETAINING WALL

NEW BUILDING

STRUCTURAL FILL

SACRIFICED SPACE

NEW BUILDING

EXISTING GRADE

PARKINGPARKING TRAVEL LANES

2070 DFE

PRESENT DAY DFE

EXISTING WATER

FUTURE WATERSEWER

SAMPLE - NOT TO SCALE

SAMPLE

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

NOTES:

OCEANSIDE WALL WOULD NEED WATERPROOF/IMPERVIOUS AND CORROSION RESISTANT DETAILING USED ONLY WITH NEW DEVELOPMENT - BUILDINGS AT BACK OF SIDEWALK DESIGNED FOR RAISED ROADWAY DIMENSIONS ARE BASED OFF BPWD ROADWAY STANDARDS - RESIDENTIAL FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) RECOMMENDED FOR NEW DEVELOPMENT ONLY - EXISTING STRUCTURE MAY NOT BE DESIGNED FOR

INCREASED LOADS ASSOCIATED WITH GRADE CHANGE OR BE ACCESSIBLE TO VEHICULAR AND/ORPEDESTRIANS

2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVELRISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

OPTION 2: NEW DEVELOPMENT DESIGN FOR RAISED ROADWAY/PARTIAL FIRST FLOOR ABANDONMENT DRAFT

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

BPWD - CLIMATE RESILIENT DESIGN STANDARDS + GUIDELINESJUNE, 2018

NOTES:

OCEANSIDE WALL WOULD NEED WATERPROOF/IMPERVIOUS AND CORROSION RESISTANT DETAILING USED ONLY WITH NEW DEVELOPMENT - BUILDINGS AT BACK OF SIDEWALK DESIGNED FOR RAISED ROADWAY DIMENSIONS ARE BASED OFF BPWD ROADWAY STANDARDS - RESIDENTIAL FOR ADDITIONAL CONSIDERATIONS SEE GUIDELINES DOCUMENT DFE - DESIGN FLOOD ELEVATION (FREEBOARD INCLUDED) RECOMMENDED FOR NEW DEVELOPMENT ONLY - EXISTING STRUCTURE MAY NOT BE DESIGNED FOR

INCREASED LOADS ASSOCIATED WITH GRADE CHANGE OR BE ACCESSIBLE TO VEHICULAR AND/ORPEDESTRIANS

2070 DFE: THE DESIGN FLOOD ELEVATION FOR THE 1% ANNUAL FLOOD EVENT WITH 40 INCHES OF SEA LEVELRISE. DESIGN FLOOD ELEVATION (DFE) INCLUDES FREEBOARD ON TOP OF THE BASE FLOOD ELEVATION

OPTION 2: NEW DEVELOPMENT DESIGN FOR RAISED ROADWAY/PARTIAL FIRST FLOOR ABANDONMENT DRAFT

NOTE: 4 FT. IS USED FOR SAMPLE BARRIER FOR 2070 PROJECTIONS

1 CITY HALL SQUAREROOM 714BOSTON, MA 02201-2024

PUBLIC WORKS DEPARTMENT(T): 617 635 4900

(E): [email protected]

CLIMATE RESILIENT DESIGN STANDARDS AND GUIDELINES FOR PROTECTION OF PUBLIC RIGHTS-OF-WAYB.4 RAISED ROADWAY - OPTION 2 RAISED ROADWAY & SIDEWALKS WITH NEW DEVELOPMENTRefer to Climate Resilient Design Standards and Guidelines for notes and guidance.

DOWNLOADABLE FILES:Standard PWD Details for reference and download can be found here

B.4 SAMPLE RAISED ROADWAY- OPTION 2CADPDF

RECOMMENDED FOR NEW DEVELOPMENT ONLY