7
Wichita Airport Authority EXECUTIVE SUMMARY AIRPORT MASTER PLANS WICHITA MID-CONTINENT AIRPORT COLONEL JAMES JABARA AIRPORT EXECUTIVE SUMMARY for the AIRPORT MASTER PLANS at

Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

Wichita Airport Authority

EXECUTIVE SUMMARYAIRPORT MASTER PLANS

WICHITA MID-CONTINENT AIRPORT

COLONEL JAMES JABARA AIRPORT

EXECUTIVE SUMMARY for theAIRPORT MASTER PLANS at

Page 2: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

The Airport Master Plans for Wichita Mid-Continent Airport and Colonel James Jabara Airport have been undertaken to evaluate the airports' capabilities and roles, to forecast future aviation demand, and to plan for the timely development of new or expanded facilities that may be required to meet that demand. The ultimate goals for each master plan study is to provide systematic guidelines for each airport's overall maintenance, development, and operation. The decision to update the two plans, last updated in 1998, reflects the City of Wichita's recognition of the importance of air transportation to the community and the associated challenges inherent in providing for their unique operation and improvement needs. With the development of sound and realistic plans, the City of Wichita can maintain each of the airport's links to the national air transportation system and maintain the public and private investments in facilities.

AIRPORT MASTER PLANS

Wichita Mid-Continent AirportColonel James Jabara Airport Wichita Airport Authority

HISTORY Wichita Mid-Continent Airport was opened to general aviation traffic in 1953, while air carrier service was transferred to the new airport on April 1, 1954. Replacing Wichita Municipal Airport, which was purchased by the federal government and subsequently became McConnell Air Force Base, the new facility opened with a two-runway system, a terminal building, and general aviation areas. A steady program of improvements has allowed the airport to keep pace with growing facility needs. Until 1975, the City of Wichita Board of Park Commissioners was responsible for the operation, maintenance, and development of municipal airports in Wichita. On November 1, 1975, the Wichita Airport Authority was created by the City of Wichita. The current 13-member airport advisory board is responsible for providing overall guidance and direction of airport operations. Final decision-making power rests with the Wichita City Council. To provide a general aviation reliever airport to Wichita Mid-Continent Airport, Comotara Airpark was acquired in 1980 by the Wichita

Airport Authority. A new runway was constructed in 1984, providing 5,000 feet in length. In 1985, the airport was officially dedicated as Colonel James Jabara Airport in memory of the Wichita native who became the world's first jet fighter ace during the Korean War. The facility now provides a 6,100-foot runway to users, while a full instrument landing system will be available in early 2005 for Runway 18.

Terminal Building/Air Traffic Control

Tower

Terminal BuildingConcourse

PassengersWaiting to Board

on Ramp

Page 3: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

AVIATION DEMAND FORECASTS The ability of the two facilities to meet changing demands was first examined by preparing reasonable projections of aviation demand, which were approved by the Federal Aviation Administration (FAA). Forecasts were prepared for several indicators, including: annual operations, annual passengers, air freight tonnage, based

aircraft, and annual instrument approaches. While serving as the basis for the evaluation of facility needs, the forecasts are also used to assess environmental factors and future revenue potential. The following graphic summarizes the forecasts prepared for the two airports.

The master plans provide for the orderly expansion of existing facilities, and the replacement of older facilities to meet needs over the next 20 years. While the plans are phased through the short (0-5 year), intermediate (6-10 year), and long term (11-20 year) planning horizons, the plans are demand-based. Facilities will not be constructed until they

are needed for capacity or to replace obsolete facilities. The master plans have identified $305 million in capital needs for Mid-Continent and $28 million for Colonel James Jabara Airports over the 20-year planning periods. The master planning concepts have been depicted on the accompanying exhibits.

Wichita Mid-Continent Airport

Annual Enplanements Forecast Annual Operations Forecast

Base Year 2008 2013 2023Annual Enplanements 750,000 825,000 875,000 950,000Annual Operations 204,007 291,260 314,560 367,140Air Freight (tons) 34,743 43,700 53,000 77,600Annual Instrument Approaches 5,790 6,260 6,670 7,650Based Aircraft 150 150 150 150

Colonel James Jabara Airport

Base Year 2008 2013 2023Annual Operations 38,700 44,200 49,000 60,500Based Aircraft 153 170 185 220Annual Instrument Approaches 526 620 710 980

600,000

800,000

1,000,000

400,000

200,000

1,200,000

20232013 201820082003

AN

NU

AL

EN

PL

AN

EM

EN

TS

20232013 201820082003

200,000

AN

NU

AL

OP

ER

AT

ION

S

250,000

300,000

350,000

400,000

150,000

100,000

50,000

RECOMMENDED DEVELOPMENT PROGRAMS

Page 4: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

Aerial Date: 2003

NORTHSCALE IN FEET

0 1,800

Current Airport Property Line

Potential Land Acquisition

Building Restriction Line (BRL)

Runway Visibility Zone (RVZ)

Passenger Terminal Facilities

General Aviation

Aviation-Related-Airfield Access

Aviation-Related-No Airfield Access

Air Cargo

Airfield, Approach Protection, Open Space

Limits of 100-Year Floodplain

Airport Management, Maintenance

Building To Be Removed

Pavement To Be Removed

New Pavement

Runway Protection Zone (RPZ)

LEGEND

Airside Improvements:

Extension of all parallel taxiways to provide full-length taxiway access along runways.

Extension of Runway 1R-19L to 8,700 feet.

Rehabilitation of Taxiway A, and rehabilitationand expansion of general aviation ramp.

Expansion of air carrier apron (in conjunction with a new terminal).

Expansion of air cargo apron.

Relocation of Airport Surveillance Radar (south side of airfield).

Landside Improvements:

Construction of a replacement terminal facility and reconfiguration of parking andloop road.

Relocation of air cargo building and expansion of facilities to meet demand.

Expansion of general aviation facilities (hangars and maintenance facilities).

Acquisition of land parcels (noted on exhibit) for aviation-related development.

Provision for relocation of Hoover Road.

19R

1 L

1 R

U.S.

54/

400

(Kel

logg

Ave

nue)

U.S.

54/

400

(Kel

logg

Ave

nue)

U.S.

54/

400

(Kel

logg

Ave

nue)

Cowskin Creek

Cowskin Creek

Pueb

lo D

rive

Pueb

lo D

rive

Pueb

lo D

rive

detacoleRrevooH

detacoleRrevooH

Maize RoadMaize RoadMaize Road

31st

Str

eet S

outh

31st

Str

eet S

outh

31st

Str

eet S

outh

31st

Str

eet S

outh

31st

Str

eet S

outh

31st

Str

eet S

outh

Mac

Arth

ur R

oad

Mac

Arth

ur R

oad

Mac

Arth

ur R

oad

Ridge RoadRidge RoadRidge Road

Norman StreetNorman StreetNorman Street

K-42 K-42 K-42

NEW TERMINALNEW TERMINALNEW TERMINAL

GA RAMPGA RAMPEXPANSIONEXPANSION

GA RAMPEXPANSION EXTENSIONEXTENSION

TO 8,700'TO 8,700'EXTENSION

TO 8,700'

CESSNACESSNACESSNA

Hoover RoadHoover RoadHoover Road

Airport RoadAirport RoadAirport Road

K-42 (Cessna Blvd.)

K-42 (Cessna Blvd.)

K-42 (Cessna Blvd.)

Tyler RoadTyler RoadTyler Road

WICHITA MID CONTINENT AIRPORT - Master Plan Concept

RELOCATE ASRRELOCATE ASRRELOCATE ASR

AIR CARGOAIR CARGOEXPANSIONEXPANSIONAIR CARGOEXPANSION

BOMBARDIER/BOMBARDIER/LEARJETLEARJET

BOMBARDIER/LEARJET

Mid-Continent DriveMid-Continent Drive

Harr

y St

reet

Harr

y St

reet

Harr

y St

reet

Tyler RoadTyler RoadTyler Road

Yose

miteStre

et

Yose

miteStre

et

Page 5: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

XX

XX

XX

XX

X

XX X X X X X X X X X X X

X X X X X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

39th Street N.39th Street N.39th Street N.

45th Street N.45th Street N.

Railroad

Railroad

Railroad

NO

RTH

37th Street N.37th Street N.37th Street N.

35th Street N.35th Street N.35th Street N.

34th Street N.34th Street N.34th Street N.

K-96K-96K-96

BBCC

DDDRunw

ay 18-36 (6,100' x 100')Runw

ay 18-36 (6,100' x 100')Runw

ay 18-36 (6,100' x 100')

Greenwich Road

Greenwich Road

Greenwich Road

EE

LL

FF

Webb Road

Webb Road

Webb Road

AVIATION-RELATEDAVIATION-RELATEDAIRFIELD ACCESSAIRFIELD ACCESS

AVIATION-RELATEDAIRFIELD ACCESS

ULTIMATE RPZULTIMATE RPZULTIMATE RPZ

37th Street N.37th Street N.37th Street N.

29th Street N.29th Street N.29th Street N.

43rd Street N.43rd Street N.

45th Street N.

43rd Street N.

EXISTING/ULTIMATE RPZEXISTING/ULTIMATE RPZEXISTING/ULTIMATE RPZ

AA

Taxiway A

Taxiway A

Taxiway A

GLIDESLOPEGLIDESLOPEANTENNAANTENNAGLIDESLOPEANTENNA

PAPI-4PAPI-4PAPI-4

HOLDINGHOLDINGAPRONAPRONHOLDINGAPRON

Aerial Date: 2003

Lindberg AvenueLindberg AvenueLindberg Avenue

ROAD TO BEROAD TO BECLOSEDCLOSEDROAD TO BECLOSED

LOCALIZER ANTENNALOCALIZER ANTENNALOCALIZER ANTENNA

Jabara RoadJabara RoadJabara Road

0 1,500

SCALE IN FEET

E. Greenbriar St.E. Greenbriar St.E. Greenbriar St.

Shannon WoodsShannon WoodsShannon Woods

29th Street N.29th Street N.29th Street N.

MALSRMALSRMALSR

CountyCountyMaintenanceMaintenanceYardYard

CountyMaintenanceYard

FutureFutureLindberg Ave.Lindberg Ave.FutureLindberg Ave.

PAPI-4PAPI-4PAPI-4

HOLDING APRONHOLDING APRONHOLDING APRON

COLONEL JAMES JABARA AIRPORTMaster Plan Concept

LEGENDExisting Airport Property Line

Ultimate Airport Property Line

Potential Airfield Pavement

Potential Roadways

General Aviation

Aviation-Related-Airfield Access

Aviation-Related-No Airfield Access

Airfield, Approach Protection, Open Space

Commercial General Aviation Services

Corporate/Executive Hangars

Airport Maintenance/Administration

T-hangar

Access Control

Runway Protection Zone (RPZ)

Object Free Area (OFA)

Runway Safety Area (RSA)

Building Restriction Line (BRL)

Precision Object Free Area (POFA)

Page 6: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

Colonel James Jabara Airport Improvements:

Full instrument approach on Runway 18 (early 2005).

Land acquisition for future aviation-related development.

Full extension of parallel taxiway on east side of runway.

Development of general aviation facilities to meet future needs.

Relocation of 43rd Street/Lindberg Avenue for taxiway/glideslope clearance.

Reconstruct Jabara Road and 35th Street North.

PLAN IMPLEMENTATION The master plans were a cooperative effort between the City of Wichita, the consultants, and planning advisory committees which were established for each of the master planning studies. The participants met on five occasions to review and discuss the draft planning materials during the 12-month project schedule. The committee consisted of airport users, FAA personnel, local government representatives, and the airport staff. Public workshops were also conducted at three junctures in the study to review critical study recommendations. While the plans have identified extensive capital project needs over the next 20 years, a high percentage of the capital costs will be eligible for grants administered by the FAA. The source for these grants is the Aviation Trust Fund, which is funded with taxes on airline tickets, aviation fuel, aircraft registrations, and other aviation-related fees. The FAA distributes these funds through the Airport Improvement Program (AIP). The Wichita Airport Authority will utilize airport revenues to provide remaining project costs. For Mid-Continent Airport, projects will also be eligible for funding assistance through passenger facility charges (PFCs), which are collected by the airlines on enplaning revenue passengers. For more detailed information on the respective reports, refer to the final technical reports, which are available at the offices of the Wichita Airport Authority.

Mr. Bailis BellDirector of Airports

Mr. Dave FransonFranson Consulting Group

Mr. David RhodesSenior Project Engineer, United Airlines

Corporate Real Estate - DENFP

Mr. Dion AvelloMember, Wichita Airport Advisory Board

Acme Lithographers, Inc.

Mr. Douglas FastFAA - Airport Traffic Control Tower

Mr. Jamsheed MehtaTransportation Supervisor

Metropolitan Area Planning Department

Mr. Jan MonroeFederal Aviation Administration, Airports Division, ACE-611

Mr. John FowlerGroup Leader, Facilities Engineering, Cessna Aircraft Company

Mr. Kenny MathisAOPA

Mr. Lynn NicholsPresident, Yingling Aircraft

Ms. Beth GarrisonMember, Wichita Airport Advisory Board

Ms. Catherine HoldemanAssistant City Manager, City of Wichita

Mr. Bailis BellDirector of Airports

Ms. Catherine HoldemanAssistant City Manager, City of Wichita

Ms. Beth GarrisonMember, Wichita Airport Advisory Board

Mr. Kenny MathisAOPA

Mr. Keith HershbergerCapital Excel

Mr. Jan MonroeFederal Aviation Administration, Airports Division, ACE-611

Mr. Jamsheed MehtaTransportation Supervisor

Metropolitan Area Planning Department

Mr. Douglas FastFAA - Airport Traffic Control Tower

Mr. Dion AvelloMember, Wichita Airport Advisory Board

Acme Lithographers, Inc.

Mr. Bob KarslakeMidwest Corporate Aviation

Mid-Continent Airport Master Plan Committee

Jabara Airport Master Plan Committee

Page 7: Executive Summary for the Airport Master Plans at Wichita ...€¦ · Wichita Mid-Continent Airport Colonel James Jabara Airport Wichita Airport Authority HISTORY ... HOLDING APRON

Wichita Airport Authority

WICHITA MID-CONTINENT AIRPORT

COLONEL JAMES JABARA AIRPORT

Airport Consultants

Mr. John Oswald, P.E.Director of Airport

Engineering and PlanningThe Wichita Airport Authority

2173 Air Cargo RoadWichita, KS 67209

316-946-4715www.flywichita.com

For further information,please contact: