Excluding journey period) at the cost of Bangladesh Army if desired. Suppliers should inform about...
10
Excluding journey period) at the cost of Bangladesh Army if desired. Suppliers should inform about the date of pre-shipment inspection at least 08 weeks to 15 weeks (In respect of