EXCELLENT GOOD FAIR CRITICAL LOST

❖ Crack seal condition change pending re-assessmentBenton County

ROAD NAME: JP DISTRICT MILEAGE: CONDITION BEFORE: AREA: DESCRIPTION OF WORK: CONDITION AFTER

Aubrey Long Rd. 11 2 Critical Gentry Crack Seal Critical

Battlefield Rd. 1 0.7 Critical Bentonville Crack Seal Critical

Beaty Rd. 11 4.3 Good Gravette Crack Seal Good

Galyean Rd. 11 0.5 Fair Hiwassee Crack Seal Fair

Honey Creek Rd. 11 5.1 Fair Gravette Crack Seal Fair

Peach Orchard Rd. 15 1.1 Good Bentonville Crack Seal Good

Bill Young Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent

Black Oak Dr. 1 1.5 Critical Lost Bridge Asphalt Overlay Excellent

Cedar Forest Dr. 1 1.2 Fair Avoca / Garfield Asphalt Overlay Excellent

Cripps West Rd. 12 1.4 New Construction Gentry Asphalt Overlay Excellent

E. High Meadows Dr. 1 1.5 Fair Avoca / Garfield Asphalt Overlay Excellent

E. McNelly Rd. 1 0.2 Good Bentonville Asphalt Overlay Excellent

Fairmount Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent

Harper Ln. 12 0.12 Good Gentry Asphalt Overlay Excellent

N. Wimpy Jones Rd. 1 1 New Construction Garfield Asphalt Overlay Excellent

N.E. Peach Orchard Rd. 15 1.3 Fair Bentonville Asphalt Overlay Excellent

Point Virgo Rd. 1 0.3 Critical Prairie Creek Asphalt Overlay Excellent

Posy Mountain Rd. 1 1.5 Critical Garfield Asphalt Overlay Excellent

Punkin Hollow Rd. 15 0.8 Critical Bentonville Asphalt Overlay Excellent

S. Peach Orchard Rd. 15 1.1 Fair Bentonville Asphalt Overlay Excellent

S.W. Anglin Rd. 1 1 Good Bentonville Asphalt Overlay Excellent

W. High Meadows Dr. 1 0.9 Fair Avoca / Garfield Asphalt Overlay Excellent

White Oak Dr. 1 0.9 Fair Lost Bridge Asphalt Overlay Excellent

Fairmount Rd. 11 5.8 Good Lowell Fog Seal Good

Indian Creek Rd. 1 4.7 Good Garfield Fog Seal Good

Mill Dam Rd. 9 2.3 Good Bentonville Fog Seal Good

Page 3: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

❖IMPROVED WITH RED DIRT: Approximately 72 roads / portions of road

❖IMPROVED WITH GRAVEL: Approximately 256 roads / portions of road

❖CONCRETE: Approximately 23 roads/projects

❖CULVERTS: Approximately 64 roads/projects

❖IMPROVED WITH GUARDRAIL: Approximately 3,402 Ft.

❖BRUSH CUTTERS: Approximately 4,200 miles

❖POTHOLES: Approximately 500

❖GRADERS: Approximately 5,600 miles

BID PROJECTS:❖ Fog Seal – Completed❖ Pothole – In Progress

❖ Concrete Patching – Completed❖ Guardrail – In Progress

Page 4: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

Page 5: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

“The goal of our conservation and restoration

efforts is to keep the Illinois River and its

tributaries as a fully functioning ecosystem.”

“The purpose of the Unpaved Roads Program is to

create a better unpaved county road system with

a reduced negative environmental impact on

priority water resources in Arkansas.”

❖ YEARLY HAZARD MITIGATION GRANT FROM THE STATE

THAT PROVIDES PERMANENT SOLUTIONS TO FLOOD

PRONE AREAS

❖ COST SHARE: 50% / 50%

❖ SITES COMPLETED:

Punkin Hollow Rd.

❖ TOTAL COST: $180,000.00

❖ NEW SITES SUBMITTED FOR 2020:

Posy Mtn. Rd. & Coose Hollow Ln.

Page 6: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

❖ EMERGENCY WATERSHED PROTECTION PROGRAM THAT HELPS REMOVE HAZARD AND RESTORE STREAM HYDROLOGY BACK TO PRE-DISASTER CONDITIONS

❖ COST SHARE: 75% / 25%

❖ 4 SITES THAT WERE SENT TO THE NATIONAL OFFICE HAVE BEEN APPROVED

❖ FIRST 2 SITES ON SPRING CREEK AND OSAGE CREEK TO ADVERTISE FOR BIDS SUNDAY 10/13/19

❖ TOTAL ESTIMATED COST: $529,401.00

❖ WE HAVE UNTIL 3/20/20 (220 DAYS) TO COMPLETE THE WORK.

Benton County

Page 7: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

❖ OVER 200 BRIDGES,

CULVERTS, & LOW WATER

CROSSINGS.

❖ 98 BRIDGES INSPECTED

BY ARDOT AS PART OF

THE NATIONAL BRIDGE

INSPECTION PROGRAM.

❖ 50+ ARDOT BRIDGE

INSPECTION REPORTS

RECEIVED ANNUALLY.

Benton County

Page 8: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

❖ BRIDGE REPORTS COMPLETED: 25

❖ SCHOOL HOUSE RD.

▪ DESIGN & CONSTRUCT NEW DECK AND

ABUTMENT END WALLS

▪ ADD NEW MIDSPAN LATERAL SUPPORT

▪ REPAINTING WITH INMATE LABOR

❖ PUNKIN HOLLOW RD.

▪ DESIGNED & CONSTRUCTED AS PART OF

HAZARD MITIGATION PROJECT WITH 50%

GRANT FUNDS

❖WISEMAN RD.

▪ DEMOLISHING EXISTING STRUCTURALLY

DEFICIENT STRUCTURE AND CONSTRUCTING

NEW CLEANABLE CULVERT (JULY-AUGUST)

❖ CLOER RD.

▪ COMPLETED DESIGN OF REPLACEMENT FOR

EXISTING BRIDGE. PRECAST BOXES ARE

INSTALLED, WINGWALLS/HEADWALLS TO BE

CONSTRUCTED SOON.

❖O.D. CLARK DR.

❖ BILL YOUNG RD.

Page 9: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

WAGON WHEEL

BRIDGE

COW FACE

BRIDGE

❖ Engineering & Environmental

consultants have began work. 30%

Plans to be submitted to ARDOT this

month.

❖ Plan ROW acquisition in 2020 &

construction in 2021. Const. based

on availability of grant funds

❖ Estimated cost: $1.2 M (80%

Fed/20% local)

❖ Construction began October 1st

completion scheduled for 2/3/20

❖ Pre-fab arch design for cost,

hydraulics, & debris collection

❖ Construction Cost: $932,836

SPANKER CREEK

BRIDGE

❖ Construction completed & new

bridge is open to the public

❖ project cost was $1,100,000 with

50% being paid by EDA Grant

Benton County

Page 10: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

ROBINSON

BRIDGE

❖ Currently being designed in-house for

construction in 2020

❖ Estimated Cost $800,000

OSAGE BRIDGE

(OLD HWY 68)

❖ State Aid bridge

❖ Currently being designed by ARDOT

(possible const. in 2020)

❖ Estimated Cost $3M-$4M

❖ Cost share: 80% fed., 18% State, & 2% County

Benton County

Page 11: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

COLUMBIA HOLLOWCOON HOLLOW

❖ To submit as our next State Aid bridge

project as soon as Osage Bridge is in

construction

❖ $15,000 State Aid design fee

Benton County

❖ To begin design phase in 2020

Page 12: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

❖ We have paid for the design phase on Osage Bridge

ROAD DEPT. BRIDGE PROJECTS:PROJECT

PHASE:

BUDGET

TOTAL:

OFFSETTING

REVENUE:

2019 NET

EXPENSE:STATUS:

ROBINSON ROAD BRIDGE DESIGN $0.00 $0.00 $0.00 DESIGN IN-HOUSE

COW FACE ROAD BRIDGE CONST. $932,836.00 $0.00 $932,836.00

SPANKER CREEK BRIDGE CONST. $1,102,027.00 $551,013.50 $551,013.50EDA GRANT 50/50

COMPLETED

WAGON WHEEL BRIDGE DESIGN $357,900.00 $200,000.00 $157,900.00STBGP-A GRANT

$200,000

$2,392,763 $751,014 $1,641,7502019 PROJECT GRAND TOTALS:

Benton County

Page 13: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

ROAD DEPT. BRIDGE PROJECTS:PROJECT

PHASE:

BUDGET

TOTAL:

OFFSETTING

REVENUE:

2020

CAPITAL

REQUEST

STATUS:

ROBINSON ROAD BRIDGE CONST. $800,000.00 $0.00 $800,000.00

OSAGE CREEK BRIDGE CONST. $4,000,000.00 $3,920,000.00 $80,000.00 STATE AID 98/2

COON HOLLOW BRIDGE DESIGN $15,000.00 $0.00 $15,000.00 STATE AID

WAGON WHEEL BRIDGE ROW $40,000.00 $0.00 $40,000.00

COLUMBIA HOLLOW BRIDGE DESIGN $225,000.00 $0.00 $225,000.00

$5,080,000 $3,920,000 $1,160,0002020 PROJECT GRAND TOTALS:

Page 14: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

2019 2020 2021 2022 202318572

WAGON WHEEL

18577

COON HOLLOW

10626

ROBINSON

ROAD

10643

COLUMBIA

HOLLOW

22196

STONEY POINT

21418

HONEY CREEK

10663

COW FACE

01785

OSAGE CREEK

10643

COLUMBIA HOLLOW

18577

COON HOLLOW

21418

HONEY CREEK

10626

ROBINSON ROAD

18572

WAGON WHEEL

22196

STONEY POINT

DESIGN

CONSTRUCTION

Benton County

Page 15: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

Page 16: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

ROAD NAME: JP DISTRICT: MILEAGE: CONDITIONS: AREA: DESCRIPTION OF WORK: COST:TRAFFIC

COUNTS:SCHOOL BUSES: EMERGENCY CALLS:

Bloomfield North Rd. 9 1 Fair Gentry Crack and Scrub seal $38,000 6 day- 2160 2 7

Spanker Creek Rd. 5 0.5 Fair Bentonville/ Bella Vista Chip-n-Seal $19,000.00 7 day- 2305 12 18

Wpa Rd 9 4.8 Good Gentry Fog Seal $55,756 7 day- 2250 2 29

Ruby Hall Rd 9 1.8 Good Gentry Fog Seal $20,275 7 day- 1502 3 11

Browning Rd. 9, 10 1.3 Fair Gentry Asphalt Overlay $153,000.00 6 day- 3853 1 19

Hickory Dr 5, 12, 14 0.7 Fair Lost Bridge Asphalt Overlay $82,300.00 7 day- 363 2 21

Cottonwood Ln. 5,14 0.3 Fair Beaver Shores Asphalt Overlay $25,900.00 5 day- 135 2 7

Coose Hollow Ln 7 1.4 Fair Gentry Asphalt Overlay $164,600.00 7 day- 1495 4 17

Fain Dr. 15 0.7 Critical HWY 303 Asphalt Overlay $71,300.00 6 day- 758 2 4

Gum Dr. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 5 day- 94 2 2

Gum Ln. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 5 day- 56 2 6

Jack Crabtree Rd. 5 1 Fair Bentonville/Bella Vista Asphalt Overlay $117,600.00 5 day- 4005 5 10

Cedar Dr 8, 14 0.4 Fair Lost Bridge Asphalt Overlay $38,700.00 7 day- 482 2 7

Red Bud St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 6 day- 565 2 6

Old Prairie Creek Rd 14 1.1 Fair HWY 12 Asphalt Overlay $122,570.00 7 day- 4659 6 23

Larue Rd. 15 2.4 Fair HWY 303 Chip-n-Seal $84,480.00 6 day- 1547 3 8

Maple Ln. 15 0.2 Fair Beaver Shores Asphalt Overlay $23,525.00 5 day- 210 2 4

Walnut St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 7 day- 343 1 2

Oakview Rd 11 0.4 Fair Siloam Asphalt Overlay $47,000.00 7 day- 343 2 2

Wann Rd 1, 2 0.2 Critical Gravette Asphalt Overlay $19,350.00 7 day- 486 1 7

Hickory Rd 15 0.3 Fair Rogers Asphalt Overlay $29,000.00 7 day- 210 1 3

Tanglewood Rd. 15 1.8 Fair Hwy 303 Asphalt Overlay $211,300.00 6 day- 1227 2 1

Reed Ave 14 0.5 New Construction Springdale Asphalt $87,500.00 7 day- 1703 5 22

Bloomfield North Rd. 9 1 New Construction Gentry Asphalt $175,000.00 6 day- 2161 2 7

TOTAL MILEAGE: 22.4 TOTAL COST: $1,648,456.00

POT HOLES $50,000.00

LEVEL COATING $100,000

TOTAL ASPHALT BUDGET $1,798,456.00

Page 17: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

▪ Parrick Rd. Sites 1&2 – Install Boxes

▪ Kane Rd. – Install Boxes

▪ Dale Schrader Rd. – Install Low Water Slab

▪ Wann Rd. – Install Low Water Slabs

▪ Limekiln Rd. in Gravette – Install Low Water Slab

▪ Coker Rd. – Install Low Water Slab

▪ 2020 Hazard Mitigation Grant – Posy Mountain Rd. Intersection

Page 18: EXCELLENT GOOD FAIR CRITICAL LOST - Home - Benton County

Benton County

2020 ROAD DEPARTMENT CAPITAL REQUEST

QUANITY: TYPE OF EQUIPMENT: PRICE PER ITEM: TOTAL PRICE:

4 GRADERS $280,000.00 $1,120,000.00

4 DUMP TRUCKS $142,000.00 $568,000.00

1 84" COMPACTOR $80,000.00 $80,000.00

2 TRACTORS W/ SIDBOOM MOWERS $150,000.00 $300,000.00

2 BACKHOE $110,000.00 $220,000.00

1 TRACK SKID STEER $80,000.00 $80,000.00

TOTAL COST: $842,000.00 $2,368,000.00

QUANITY: TYPE OF VEHICLE: PRICE PER ITEM: TOTAL PRICE:

2 1/2 TON 4X4 EXTENDED CAB PICKUPS $30,000.00 $60,000.00

2 3/4 TON 4X4 PICKUPS $30,000.00 $60,000.00

2 19,500 4X4 TRUCKS $51,000.00 $102,000.00

TOTAL COST: $111,000.00 $222,000.00

GRAND TOTALS: $953,000.00 $2,590,000.00

2019 ESTIMATED RETURNS

DESCRIPTION: RETURN AMOUNT:

SALE RETURN $300,000.00

TURN BACK OUT OF CAPITAL $435,000.00

TOTAL AMOUNT: $735,000.00

2020 ESTIMATED RETURNS

DESCRIPTION: TOTAL RETURN AMOUNT:

VEHICLES & EQUIPMENT $800,000.00