EXCELLENT GOOD FAIR CRITICAL LOST
❖ Crack seal condition change pending re-assessmentBenton County
ROAD NAME: JP DISTRICT MILEAGE: CONDITION BEFORE: AREA: DESCRIPTION OF WORK: CONDITION AFTER
Aubrey Long Rd. 11 2 Critical Gentry Crack Seal Critical
Battlefield Rd. 1 0.7 Critical Bentonville Crack Seal Critical
Beaty Rd. 11 4.3 Good Gravette Crack Seal Good
Galyean Rd. 11 0.5 Fair Hiwassee Crack Seal Fair
Honey Creek Rd. 11 5.1 Fair Gravette Crack Seal Fair
Peach Orchard Rd. 15 1.1 Good Bentonville Crack Seal Good
Bill Young Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent
Black Oak Dr. 1 1.5 Critical Lost Bridge Asphalt Overlay Excellent
Cedar Forest Dr. 1 1.2 Fair Avoca / Garfield Asphalt Overlay Excellent
Cripps West Rd. 12 1.4 New Construction Gentry Asphalt Overlay Excellent
E. High Meadows Dr. 1 1.5 Fair Avoca / Garfield Asphalt Overlay Excellent
E. McNelly Rd. 1 0.2 Good Bentonville Asphalt Overlay Excellent
Fairmount Rd. 11 0.2 Good Siloam Springs Asphalt Overlay Excellent
Harper Ln. 12 0.12 Good Gentry Asphalt Overlay Excellent
N. Wimpy Jones Rd. 1 1 New Construction Garfield Asphalt Overlay Excellent
N.E. Peach Orchard Rd. 15 1.3 Fair Bentonville Asphalt Overlay Excellent
Point Virgo Rd. 1 0.3 Critical Prairie Creek Asphalt Overlay Excellent
Posy Mountain Rd. 1 1.5 Critical Garfield Asphalt Overlay Excellent
Punkin Hollow Rd. 15 0.8 Critical Bentonville Asphalt Overlay Excellent
S. Peach Orchard Rd. 15 1.1 Fair Bentonville Asphalt Overlay Excellent
S.W. Anglin Rd. 1 1 Good Bentonville Asphalt Overlay Excellent
W. High Meadows Dr. 1 0.9 Fair Avoca / Garfield Asphalt Overlay Excellent
White Oak Dr. 1 0.9 Fair Lost Bridge Asphalt Overlay Excellent
Fairmount Rd. 11 5.8 Good Lowell Fog Seal Good
Indian Creek Rd. 1 4.7 Good Garfield Fog Seal Good
Mill Dam Rd. 9 2.3 Good Bentonville Fog Seal Good
❖IMPROVED WITH RED DIRT: Approximately 72 roads / portions of road
❖IMPROVED WITH GRAVEL: Approximately 256 roads / portions of road
❖CONCRETE: Approximately 23 roads/projects
❖CULVERTS: Approximately 64 roads/projects
❖IMPROVED WITH GUARDRAIL: Approximately 3,402 Ft.
❖BRUSH CUTTERS: Approximately 4,200 miles
❖POTHOLES: Approximately 500
❖GRADERS: Approximately 5,600 miles
BID PROJECTS:❖ Fog Seal – Completed❖ Pothole – In Progress
❖ Concrete Patching – Completed❖ Guardrail – In Progress
Benton County
Benton County
“The goal of our conservation and restoration
efforts is to keep the Illinois River and its
tributaries as a fully functioning ecosystem.”
“The purpose of the Unpaved Roads Program is to
create a better unpaved county road system with
a reduced negative environmental impact on
priority water resources in Arkansas.”
❖ YEARLY HAZARD MITIGATION GRANT FROM THE STATE
THAT PROVIDES PERMANENT SOLUTIONS TO FLOOD
PRONE AREAS
❖ COST SHARE: 50% / 50%
❖ SITES COMPLETED:
Punkin Hollow Rd.
❖ TOTAL COST: $180,000.00
❖ NEW SITES SUBMITTED FOR 2020:
Posy Mtn. Rd. & Coose Hollow Ln.
❖ EMERGENCY WATERSHED PROTECTION PROGRAM THAT HELPS REMOVE HAZARD AND RESTORE STREAM HYDROLOGY BACK TO PRE-DISASTER CONDITIONS
❖ COST SHARE: 75% / 25%
❖ 4 SITES THAT WERE SENT TO THE NATIONAL OFFICE HAVE BEEN APPROVED
❖ FIRST 2 SITES ON SPRING CREEK AND OSAGE CREEK TO ADVERTISE FOR BIDS SUNDAY 10/13/19
❖ TOTAL ESTIMATED COST: $529,401.00
❖ WE HAVE UNTIL 3/20/20 (220 DAYS) TO COMPLETE THE WORK.
Benton County
❖ OVER 200 BRIDGES,
CULVERTS, & LOW WATER
CROSSINGS.
❖ 98 BRIDGES INSPECTED
BY ARDOT AS PART OF
THE NATIONAL BRIDGE
INSPECTION PROGRAM.
❖ 50+ ARDOT BRIDGE
INSPECTION REPORTS
RECEIVED ANNUALLY.
Benton County
Benton County
❖ BRIDGE REPORTS COMPLETED: 25
❖ SCHOOL HOUSE RD.
▪ DESIGN & CONSTRUCT NEW DECK AND
ABUTMENT END WALLS
▪ ADD NEW MIDSPAN LATERAL SUPPORT
▪ REPAINTING WITH INMATE LABOR
❖ PUNKIN HOLLOW RD.
▪ DESIGNED & CONSTRUCTED AS PART OF
HAZARD MITIGATION PROJECT WITH 50%
GRANT FUNDS
❖WISEMAN RD.
▪ DEMOLISHING EXISTING STRUCTURALLY
DEFICIENT STRUCTURE AND CONSTRUCTING
NEW CLEANABLE CULVERT (JULY-AUGUST)
❖ CLOER RD.
▪ COMPLETED DESIGN OF REPLACEMENT FOR
EXISTING BRIDGE. PRECAST BOXES ARE
INSTALLED, WINGWALLS/HEADWALLS TO BE
CONSTRUCTED SOON.
❖O.D. CLARK DR.
❖ BILL YOUNG RD.
WAGON WHEEL
BRIDGE
COW FACE
BRIDGE
❖ Engineering & Environmental
consultants have began work. 30%
Plans to be submitted to ARDOT this
month.
❖ Plan ROW acquisition in 2020 &
construction in 2021. Const. based
on availability of grant funds
❖ Estimated cost: $1.2 M (80%
Fed/20% local)
❖ Construction began October 1st
completion scheduled for 2/3/20
❖ Pre-fab arch design for cost,
hydraulics, & debris collection
❖ Construction Cost: $932,836
SPANKER CREEK
BRIDGE
❖ Construction completed & new
bridge is open to the public
❖ project cost was $1,100,000 with
50% being paid by EDA Grant
Benton County
ROBINSON
BRIDGE
❖ Currently being designed in-house for
construction in 2020
❖ Estimated Cost $800,000
OSAGE BRIDGE
(OLD HWY 68)
❖ State Aid bridge
❖ Currently being designed by ARDOT
(possible const. in 2020)
❖ Estimated Cost $3M-$4M
❖ Cost share: 80% fed., 18% State, & 2% County
Benton County
COLUMBIA HOLLOWCOON HOLLOW
❖ To submit as our next State Aid bridge
project as soon as Osage Bridge is in
construction
❖ $15,000 State Aid design fee
Benton County
❖ To begin design phase in 2020
❖ We have paid for the design phase on Osage Bridge
ROAD DEPT. BRIDGE PROJECTS:PROJECT
PHASE:
BUDGET
TOTAL:
OFFSETTING
REVENUE:
2019 NET
EXPENSE:STATUS:
ROBINSON ROAD BRIDGE DESIGN $0.00 $0.00 $0.00 DESIGN IN-HOUSE
COW FACE ROAD BRIDGE CONST. $932,836.00 $0.00 $932,836.00
SPANKER CREEK BRIDGE CONST. $1,102,027.00 $551,013.50 $551,013.50EDA GRANT 50/50
COMPLETED
WAGON WHEEL BRIDGE DESIGN $357,900.00 $200,000.00 $157,900.00STBGP-A GRANT
$200,000
$2,392,763 $751,014 $1,641,7502019 PROJECT GRAND TOTALS:
Benton County
Benton County
ROAD DEPT. BRIDGE PROJECTS:PROJECT
PHASE:
BUDGET
TOTAL:
OFFSETTING
REVENUE:
2020
CAPITAL
REQUEST
STATUS:
ROBINSON ROAD BRIDGE CONST. $800,000.00 $0.00 $800,000.00
OSAGE CREEK BRIDGE CONST. $4,000,000.00 $3,920,000.00 $80,000.00 STATE AID 98/2
COON HOLLOW BRIDGE DESIGN $15,000.00 $0.00 $15,000.00 STATE AID
WAGON WHEEL BRIDGE ROW $40,000.00 $0.00 $40,000.00
COLUMBIA HOLLOW BRIDGE DESIGN $225,000.00 $0.00 $225,000.00
$5,080,000 $3,920,000 $1,160,0002020 PROJECT GRAND TOTALS:
2019 2020 2021 2022 202318572
WAGON WHEEL
18577
COON HOLLOW
10626
ROBINSON
ROAD
10643
COLUMBIA
HOLLOW
22196
STONEY POINT
21418
HONEY CREEK
10663
COW FACE
01785
OSAGE CREEK
10643
COLUMBIA HOLLOW
18577
COON HOLLOW
21418
HONEY CREEK
10626
ROBINSON ROAD
18572
WAGON WHEEL
22196
STONEY POINT
DESIGN
CONSTRUCTION
Benton County
Benton County
Benton County
ROAD NAME: JP DISTRICT: MILEAGE: CONDITIONS: AREA: DESCRIPTION OF WORK: COST:TRAFFIC
COUNTS:SCHOOL BUSES: EMERGENCY CALLS:
Bloomfield North Rd. 9 1 Fair Gentry Crack and Scrub seal $38,000 6 day- 2160 2 7
Spanker Creek Rd. 5 0.5 Fair Bentonville/ Bella Vista Chip-n-Seal $19,000.00 7 day- 2305 12 18
Wpa Rd 9 4.8 Good Gentry Fog Seal $55,756 7 day- 2250 2 29
Ruby Hall Rd 9 1.8 Good Gentry Fog Seal $20,275 7 day- 1502 3 11
Browning Rd. 9, 10 1.3 Fair Gentry Asphalt Overlay $153,000.00 6 day- 3853 1 19
Hickory Dr 5, 12, 14 0.7 Fair Lost Bridge Asphalt Overlay $82,300.00 7 day- 363 2 21
Cottonwood Ln. 5,14 0.3 Fair Beaver Shores Asphalt Overlay $25,900.00 5 day- 135 2 7
Coose Hollow Ln 7 1.4 Fair Gentry Asphalt Overlay $164,600.00 7 day- 1495 4 17
Fain Dr. 15 0.7 Critical HWY 303 Asphalt Overlay $71,300.00 6 day- 758 2 4
Gum Dr. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 5 day- 94 2 2
Gum Ln. 14 0.1 Critical Beaver Shores Asphalt Overlay $11,800.00 5 day- 56 2 6
Jack Crabtree Rd. 5 1 Fair Bentonville/Bella Vista Asphalt Overlay $117,600.00 5 day- 4005 5 10
Cedar Dr 8, 14 0.4 Fair Lost Bridge Asphalt Overlay $38,700.00 7 day- 482 2 7
Red Bud St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 6 day- 565 2 6
Old Prairie Creek Rd 14 1.1 Fair HWY 12 Asphalt Overlay $122,570.00 7 day- 4659 6 23
Larue Rd. 15 2.4 Fair HWY 303 Chip-n-Seal $84,480.00 6 day- 1547 3 8
Maple Ln. 15 0.2 Fair Beaver Shores Asphalt Overlay $23,525.00 5 day- 210 2 4
Walnut St 8 0.2 Fair Lost Bridge Asphalt Overlay $19,350.00 7 day- 343 1 2
Oakview Rd 11 0.4 Fair Siloam Asphalt Overlay $47,000.00 7 day- 343 2 2
Wann Rd 1, 2 0.2 Critical Gravette Asphalt Overlay $19,350.00 7 day- 486 1 7
Hickory Rd 15 0.3 Fair Rogers Asphalt Overlay $29,000.00 7 day- 210 1 3
Tanglewood Rd. 15 1.8 Fair Hwy 303 Asphalt Overlay $211,300.00 6 day- 1227 2 1
Reed Ave 14 0.5 New Construction Springdale Asphalt $87,500.00 7 day- 1703 5 22
Bloomfield North Rd. 9 1 New Construction Gentry Asphalt $175,000.00 6 day- 2161 2 7
TOTAL MILEAGE: 22.4 TOTAL COST: $1,648,456.00
POT HOLES $50,000.00
LEVEL COATING $100,000
TOTAL ASPHALT BUDGET $1,798,456.00
▪ Parrick Rd. Sites 1&2 – Install Boxes
▪ Kane Rd. – Install Boxes
▪ Dale Schrader Rd. – Install Low Water Slab
▪ Wann Rd. – Install Low Water Slabs
▪ Limekiln Rd. in Gravette – Install Low Water Slab
▪ Coker Rd. – Install Low Water Slab
▪ 2020 Hazard Mitigation Grant – Posy Mountain Rd. Intersection
Benton County
2020 ROAD DEPARTMENT CAPITAL REQUEST
QUANITY: TYPE OF EQUIPMENT: PRICE PER ITEM: TOTAL PRICE:
4 GRADERS $280,000.00 $1,120,000.00
4 DUMP TRUCKS $142,000.00 $568,000.00
1 84" COMPACTOR $80,000.00 $80,000.00
2 TRACTORS W/ SIDBOOM MOWERS $150,000.00 $300,000.00
2 BACKHOE $110,000.00 $220,000.00
1 TRACK SKID STEER $80,000.00 $80,000.00
TOTAL COST: $842,000.00 $2,368,000.00
QUANITY: TYPE OF VEHICLE: PRICE PER ITEM: TOTAL PRICE:
2 1/2 TON 4X4 EXTENDED CAB PICKUPS $30,000.00 $60,000.00
2 3/4 TON 4X4 PICKUPS $30,000.00 $60,000.00
2 19,500 4X4 TRUCKS $51,000.00 $102,000.00
TOTAL COST: $111,000.00 $222,000.00
GRAND TOTALS: $953,000.00 $2,590,000.00
2019 ESTIMATED RETURNS
DESCRIPTION: RETURN AMOUNT:
SALE RETURN $300,000.00
TURN BACK OUT OF CAPITAL $435,000.00
TOTAL AMOUNT: $735,000.00
2020 ESTIMATED RETURNS
DESCRIPTION: TOTAL RETURN AMOUNT:
VEHICLES & EQUIPMENT $800,000.00