5
Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

Embed Size (px)

Citation preview

Page 1: Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

Excel Final Project – Day 4 Notes

DUE TOMORROW!!!!!! You should have 4 reports done by the

end of today…

Page 2: Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

Formatting

All numbers should be in comma style Borders should be nicely done. All spreadsheets should be centered on the

page.

Page 3: Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

Formatting

If you use pivot tables… Many of the titles have “Sum of” – Change the

names of the columns to better reflect the contents.

If Excel complains about duplicate names, Add a space to the end of the name.

Your charts may have buttons on them – Right click on any of the buttons and select “Hide all Fields setting buttons”

Page 4: Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

Formatting

If you use SubTotals… The word “Total” is included on all lines. Remove

it! Replace (CNTL-H), Find What “ Total”, Replace

with left blank and Replace All.

Charts are difficult with Subtotals. Pivot tables work better for the charts

Page 5: Excel Final Project – Day 4 Notes DUE TOMORROW!!!!!! You should have 4 reports done by the end of today…

2

3

4

5

This is what the reports should look like!

1