32
EVALUATING CHLORIDE PERMEABILITY EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUT USED TO SEAL OF A CHEMICAL GROUT USED TO SEAL LEAKS IN POST LEAKS IN POST - - TENSIONING DUCTS: AN TENSIONING DUCTS: AN ACCELERATED TEST METHOD ACCELERATED TEST METHOD Presented by Jack Tinnea, Presented by Jack Tinnea, PO Box 22349 PO Box 22349 Seattle, Washington 98122 Seattle, Washington 98122 206/328 206/328 - - 7872 7872 www.tinnea.net 2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUT IN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD JACK TINNEA © COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 32

EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Embed Size (px)

Citation preview

Page 1: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

EVALUATING CHLORIDE PERMEABILITY EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUT USED TO SEAL OF A CHEMICAL GROUT USED TO SEAL LEAKS IN POSTLEAKS IN POST--TENSIONING DUCTS: AN TENSIONING DUCTS: AN

ACCELERATED TEST METHODACCELERATED TEST METHOD

Presented by Jack Tinnea,Presented by Jack Tinnea,

PO Box 22349PO Box 22349Seattle, Washington 98122Seattle, Washington 98122206/328206/328--7872 7872 www.tinnea.net

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 32

Page 2: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Project – The Need

The old Woodrow Wilson Bridge crosses the Potomac River between Washington, D.C. and Alexandria, VirginiaThe old bridge, completed in 1961, reached its design capacity of 75,000 vehicles per day within eight years of entering serviceToday the bridge carries almost three times that initial design traffic capacity

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 2 of 32

Page 3: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Project – The Need

The new Woodrow Wilson Bridge will double the number of traffic lanes, removing one of the largest traffic bottlenecks in the country.The new bridge will have a higher clearance reducing drawbridge openings about 70%The new bridge will have the option to replace HOV lanes with mass transitTotal costs are approximately $2.5 billion

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 3 of 32

Page 4: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Project – The Neighborhood

Arlington Memorial Bridge

New Woodrow Wilson Bridge

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 4 of 32

Page 5: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Support

Pile Cap

Arches

Roadway

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 5 of 32

Page 6: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Support

Pile Cap

PedestalArch

Roadway

Generalized Bridge Support Elevation

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 6 of 32

Page 7: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – PT Anchorage

Pile Cap

Pedestal

Precast Segments

Restrained by PT

PT Strands

PT Loop Anchors

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 7 of 32

Page 8: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – PT Anchorage

Plan Elevation

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 8 of 32

Page 9: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Construction

Pedestals

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 9 of 32

Page 10: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Construction

PT Loop Anchor Ducts in Pile Cap

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 10 of 32

Page 11: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Construction

PT Loop Anchor

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 11 of 32

Page 12: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Construction

Pedestal Forms

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 12 of 32

Page 13: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Construction

Ducts Exiting Pile Cap

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 13 of 32

Page 14: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Bridge – Construction

Pedestal reinforcementPT ducts visible within the cageLighter ducts are the loops for the first segmentDarker ducts are the loop anchors extending down into the pile cap

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 14 of 32

Page 15: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Problem – Leaks

Joints in post-tensioning ducts allowed brackish Potomac River to seep into the ductsPost-tensioning strands were not yet in place

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 15 of 32

Page 16: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Problem – Likely Site

Cold Joint Below MHW

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 16 of 32

Page 17: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

The Problem – Solution

The water was pumped outPlugs were set in the ducts above and below the suspected jointsThe joints were injected with an acrylic gelThe plugs were removed and the ducts were flushed with clean water, dried, and no leaks

The UnknownThe chloride permeability of the gel

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 17 of 32

Page 18: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – The Basis

Based on the Post-Tensioning Institute’s (PTI) Accelerated Corrosion Test Method (ACTM)Appendix B of the PTI “Specification for Grouting of Post-Tensioned Structures”Used 1000 hours as test time limit per Florida Department of Transportation Standard Specification 938-6

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 18 of 32

Page 19: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method –Specimen Design

Based on PTI’s ACTMPVC tubes were filled with the same grout used on-site with post-tensioning strands in the center of the tubes3½-inches of PVC removedArtificial cracks cut at exposed area midpoint Figure 1

9"

4½"

3½"

1"

7-W irePost-tensioningStrand

Clear PVCTubing

ExposedGroutSurface(Diameter ≅ 1")

End Cap

Cut 'Crack'

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 19 of 32

Page 20: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – Fabrication

Specimens After Assembly and Grouting

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 20 of 32

Page 21: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – Fabrication

Cutting “cracks” in specimens using masonry saw0.012 and 0.025-in. diamond jeweler’s blades were usedProfile showing “crack”before filling with gel

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 21 of 32

Page 22: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – Injecting Cracks

Sections of the PVC tube were used to form injection damsEach half of the dam was fitted with a port and tubeThe gel was injected from belowCrack after injection

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 22 of 32

Page 23: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – Curing

The specimens were cast and cured 10-days in the PVC tubesAfter removing the center section of PVC, the specimens were water-cured for 5 daysThe cracks were cut and the specimens were water-cured for an additional 13 days (28 total)Prior to injecting, the cracks were thoroughly rinsed with clean water.

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 23 of 32

Page 24: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – ACTM

The specimens were placed into large beakers containing a 3% NaCl solutionConnections were through a multiplexer to a potentiostat.Specimens were polarized to +200 mV relative to a SCE reference electrodeSpecimens were considered to “pass” if they did not corrode for 1000 hours

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 24 of 32

Page 25: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – ACTM

Final Test Cell Assembly

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 25 of 32

Page 26: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – ACTM

Test Cells and Potentiostat

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 26 of 32

Page 27: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – ACTM

Under Test After Removal

ExpandingGel

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 27 of 32

Page 28: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – ACTM

When cutting the “cracks” we tried to leave a thin layer, 0.025-in, of grout surrounding the tendonIf the tendon was not well centered, steel could be exposed to gelIn that case failure was quickly apparent.

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 28 of 32

Page 29: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Test Method – ACTM

The nominal resistivity of the cementitious grout is 10,000 ohm-cmThe resistivity of the gel was much lower, less than 150 ohm-cmIf the gel was in immediate contact with the steel tendon it effectively short-circuited the testLeaving a thin layer of grout completely encapsulating the tendon evaluated the grout’s ability to resist chloride ion penetration.

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 29 of 32

Page 30: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Findings

Specimens that had a very thin layer of grout around the strands showed no signs of corrosionThis was after the 1000 hours of anodic polarization

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 30 of 32

Page 31: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Conclusions

The gel itself was able to resist the flow of chloride ions to pass a 1000-hour ACTMThe acrylic gel has a pH of about 7.4 whereas the grout has a pH of about 12.3. This is a difference of 5 orders of magnitudeSuch a difference in pH with the difference in resistivity can cause a differential corrosion cellIt was recommended that the strands and the acrylic gel were not to come into contact

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 31 of 32

Page 32: EVALUATING CHLORIDE PERMEABILITY OF A … Convention/Tinnea... · Title: Microsoft PowerPoint - Tinnea WWB Presentation PTI.ppt Author: Administrator Created Date: 6/16/2006 9:41:08

Special Thanks

Tinnea & Associates extends our thanks toParsons CorporationMaryland State Highway AdministrationFederal Highway Administration

and to you,for your interest

2006 PTI TECHNICAL CONFERENCE-SESSION-6 EVALUATING CHLORIDE PERMEABILITY OF A CHEMICAL GROUTIN POST-TENSIONING DUCTS: AN ACCELERATED TEST METHOD

JACK TINNEA

© COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 32 of 32