Click here to load reader
Upload
cuthbert-lester
View
215
Download
1
Embed Size (px)
Citation preview
European Public Leadership Award
(EPLA)
Bertelsmann Stiftung - Partner
2Slide12.06.2006
Agenda
Current situation2
Targets3
Added value for participants4
Project design5
Organisation bodies8
Project organisation6
Organisation7
Basic Parameters9
Aims of the European Public Leadership Awards1
3Slide12.06.2006
Aims of the European Public Leadership Award (EPLA)
To foreground public leadership as an engine of innovation and reform
To focus on the leadership dimension from the perspective of innovative reform fields and issues
To focus on forthcoming administrative problems and search for good solutions
4Slide12.06.2006
EPLA targets
Implementing the Lisbon Strategy
Integrating the political level into the dialogue on strengthening European public governance
Creating an EU-level award for structured observation and identification and systematic benchlearning on developing public leadership
Quickly accessing potential international knowledge beyond national borders
5Slide12.06.2006
Added value for participants (1/2)
Feedback and recommendations on national good practices – creating the basis for policy papers at national and European level
Incorporating the political level into benchlearning on good public leadership and on strengthening European public governance
Integrating existing networks and creating new networks
6Slide12.06.2006
Added value for participants (2/2)
Rapidly enabling the systematic search, identification and use of various national reform projects and foster optimization effects at European and national level
Early and rapid identification and systematic use of basic innovations and structured feedback for all participants
7Slide12.06.2006
Project design
— Processes and work phases: responsible parties —
Scientific conference (advisory board)
Phase 1 Phase 2
Confirmation by participating
countries
Phase 3
National selection procedures
Phase 5
Evaluation of country
contributions
Phase 6
Awards ceremony in
Lucerne Reports drafted
Phase 4
BST & partners
Participating countries
BST & partners
Participating countries
BST & partners
BST & partners
8Slide12.06.2006
Project design
— Processes and work phases: timeline —
Scientific conference (advisory board)
Phase 1 Phase 2
Confirmation by participating
countries
Phase 3
National selection procedures
Phase 5
Evaluation of country
contributions
Phase 6
Awards ceremony in Lucerne
Reports drafted
Phase 4
Aug. 06 Sept. 06 March/April 07Jan./Feb. 07 June/July 07 12./13. Nov. 07
9Slide12.06.2006
Organisation
Jury Scientific advisory board
Project management
office
Working groups to evaluate best practices National contact points
Coordinating committeeBST, admin. science partner, country
representatives
Decides on good and best practices Scientific advising and
support for coordinating committee
Evaluate applicationsCoordinate and support project management
at national level
Responsible for project operations
Strategic oversight, makes basic decisions
10Slide12.06.2006
Organising bodies I: Bertelsmann Stiftung
Politik muss ihre Entscheidungen gegenüber der Bürgerschaft begründen
Transparenz und Akzeptanz der getroffenen Entscheidungen
Motivation zur weiteren Mitarbeit / Wir nehmen die Bürgerin, den Bürger ernst
Verbindung von Rechenschaft mit der Haushaltsaufstellung für das folgende Jahr
Manages EPLA together with international partners in the field of administrative sciences
Main responsibility for operations in implementing EPLA
Project management/business management based within BST
National contact point in Germany
Right of initiative on topic areas
Member of coordinating committee
11Slide12.06.2006
Organising bodies II: DHV Speyer and EGPA
Politik muss ihre Entscheidungen gegenüber der Bürgerschaft begründen
Transparenz und Akzeptanz der getroffenen Entscheidungen
Motivation zur weiteren Mitarbeit / Wir nehmen die Bürgerin, den Bürger ernst
Verbindung von Rechenschaft mit der Haushaltsaufstellung für das folgende Jahr
Members of coordinating committee and scientific advisory board
Ensure academic quality
Provide scientific advise for EPLA
Assist with evaluation and scientific processing of results
12Slide12.06.2006
Basic parameters I
BST and its international partners take care of coordination, public communications and quality of work
Participating countries contribute within the framework of the national selection processes
All countries have one representative on the coordinating committee
BST provides 50% of total funding
13Slide12.06.2006
Basic parameters II
Participation of minimum 10 countries
Up to 10 candidates per country
Federal Ministry of the Interior, Berlin, will provide major funding for kick-off event during German EU Presidency
Switzerland will host closing event in Lucerne (12./ 13.11.2007)