5
TORE SUPRA Association EURATOM-CEA 3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010 1 EFDA ITER - Goal Oriented Training Program Port Plug Engineering - Maintainability associated to ITER Component Lifecycle - Supervisor : Delphine KELLER - June 2009 to June 2012 - [email protected] EFDA ITER - Goal Oriented Training Program Port Plug Engineering - Maintainability associated to ITER Component Lifecycle - Supervisor : Delphine KELLER - June 2009 to June 2012 - [email protected] EFDA Goal Oriented Training Program Port Plug Engineering TORE SUPRA Association EURATOM-CEA 3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities Grant TBM task T19 TCS study with Samtech The 2010 activities TCS study with Samtech* Grant TBM task T19* TBM Pipe-Forest preliminary handling study TCS - Port tolerancing The 2011 foreseen activities TCS study with Samtech PP11 Cycle

EURATOM-CEA EFDA Goal Oriented Training Program · 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities • Grant TBM task T19 • TCS study

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EURATOM-CEA EFDA Goal Oriented Training Program · 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities • Grant TBM task T19 • TCS study

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

1

EFDA ITER - Goal Oriented Training Program Port Plug Engineering

-Maintainability associated to ITER Component

Lifecycle-

Supervisor : Delphine KELLER-

June 2009 to June 2012-

[email protected]

EFDA ITER - Goal Oriented Training Program Port Plug Engineering

-Maintainability associated to ITER Component

Lifecycle-

Supervisor : Delphine KELLER-

June 2009 to June 2012-

[email protected]

EFDA Goal Oriented Training ProgramPort Plug Engineering

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

2

EFDA Goal Oriented Training ProgramPort Plug Engineering

� Reminder of the 2009 activities• Grant TBM task T19

• TCS study with Samtech

� The 2010 activities• TCS study with Samtech*

• Grant TBM task T19*• TBM Pipe-Forest preliminary handling study

• TCS - Port tolerancing

� The 2011 foreseen activities• TCS study with Samtech

• PP11• Cycle

Page 2: EURATOM-CEA EFDA Goal Oriented Training Program · 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities • Grant TBM task T19 • TCS study

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

3

� Reminder of the 2009 activities• Kinematic & FE Analysis on the Transfer Cask System with Samtech

• Grant TBM Task T19

EFDA Goal Oriented Training ProgramPort Plug Engineering

Cask envelope

Pallet system

Building

AEU

Pipe Forest

Robot Arm

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

4

� The 2010 activities• TCS study with Samtech, the first

reports has been completed and an add-on has been released.

• 2nd TCS study with Samtech, a second analysis has started in October.

Reports given to ITERThe new FEA analysis TCS model

EFDA Goal Oriented Training ProgramPort Plug Engineering

•Interpretation of the ITER models

•Design support to Samtech

•Building of a relevant FEA models following the CAD rules of ITER

Page 3: EURATOM-CEA EFDA Goal Oriented Training Program · 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities • Grant TBM task T19 • TCS study

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

5

EFDA Goal Oriented Training ProgramPort Plug Engineering

� The 2010 activities• Grant TBM task T19

Report sent to F4E and validated in July 2010

•Design (CATIA, SolidWorks)•Models integration

•Building & running simulations using virtual reality tool (MagritteWorks)

•Pipe Forest specifications

Pipe insulation dis/mounting simulation

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

6

EFDA Goal Oriented Training ProgramPort Plug Engineering

� The 2010 activities• TBM Pipe-Forest preliminary

handling study, in the frame of the 3-months period in the HAS-KFKI.

Report given to KFKIIntegration of a tuned TCS for the Pipe

Forest Handling

•Study of the space booking

•Specification of the Pipe Forest•Design (CATIA)

•Static analysis

•Integration of RH equipments•Maintenance strategy

Page 4: EURATOM-CEA EFDA Goal Oriented Training Program · 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities • Grant TBM task T19 • TCS study

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

7

EFDA Goal Oriented Training ProgramPort Plug Engineering

� The 2010 activities• TCS - Port tolerancing, this

study has been presented to the SOFT conference.

Poster presented to the SOFTThe Inverse Geometrical Model

• Inverse Geometrical Model building :> EXCEL

– Building of a method to drive the Port misalignments

– Computation of the results

> CATIA

– Validate the EXCEL model

– Allow to drive the TCS model

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

8

� The 2011 foreseen activities

• 2nd TCS study with Samtech• Design support

• Conceptual design proposal

• PP11, integration of the Port Plug 01• Design of tools• RH study

• Cycle, maintenance of the ICRH antenna• Design of tools

• RH study

EFDA Goal Oriented Training ProgramPort Plug Engineering

Page 5: EURATOM-CEA EFDA Goal Oriented Training Program · 2 EFDA Goal Oriented Training Program Port Plug Engineering Reminder of the 2009 activities • Grant TBM task T19 • TCS study

TORE SUPRA

AssociationEURATOM-CEA

3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010

9

EFDA Goal Oriented Training ProgramPort Plug Engineering

Thank you for your attention.

?Question