Upload
nevaeh
View
29
Download
1
Embed Size (px)
DESCRIPTION
EU Developments. August Update. European Network Code Workshop held 15 th July Slides have been published on JO website Draft Vision European Gas Target Model Council of European Energy Regulators (CEER) Public Consultation launched 5 th July Consultation deadline: 20 th September 2011 - PowerPoint PPT Presentation
Citation preview
EU Developments
August Update
European Network Code Workshop held 15th July
Slides have been published on JO website
Draft Vision European Gas Target Model
Council of European Energy Regulators (CEER) Public Consultation launched 5th July
Consultation deadline: 20th September 2011
Ofgem Workshop planned 1st September 2011
ACER Framework Guidelines on interoperability rules
Scoping consultation to be published 4th August 2011
Consultation deadline: 15th September 2011
Moffat Physical Reverse Flow (PRF): Market Assessment
EU Regulation 994/2010 to ‘Safeguard Security of Gas Supply’ includes an infrastructure obligation, that states that all European cross border points should have bi-directional flow capability, or for an exemption to be granted
As part of the process to either gain an exemption or agree a viable proposal for PRF at Moffat, National Grid, along with Gaslink and Mutual Energy are undertaking a Market Assessment to assess the market demand for PRF at Moffat
The Market Assessment includes a supply and demand outlook, a high level technical feasibility study, along with a questionnaire that allows market participants to express their interest in a non-binding manner
The Market Assessment is expected to be published imminently, and will be available for a 2 month window on both the National Grid and Gaslink websites