ETACONS - Vito Prato . “ The role of the Engineer –Consultant in the railway infrastructure projects implementation process ” Primo Stasi Sofia 10 november 2011. ETACONS - Vito Prato . PROJECT: - PowerPoint PPT Presentation
Citation preview
ETACONS - Vito Prato
“ The role of the Engineer –Consultant in the railway infrastructure projects
implementation process ”
Primo Stasi
Sofia 10 november 2011
ETACONS - Vito Prato
PROJECT:Estimation of the correspondence and construction supervision of the project:”Rehabilitation of the railway infrastructure on sections of railway line Plovdiv – Bourgas”
EMPLOYER:NATIONAL RAILWAY INFRASTRUCTURE COMPANY
ENGINEER:DZZD “ETACONS-VITO PRATO”
ETACONS - Vito Prato
Experiences
Design,
construction management
and safety coordinator
underground railway in
Novoli
EUR 16 million
Experiences
Works
for"Renewal of the railway in
the south east of Bari and
Salento Area with a doubling
of the Bari Mungivacca railway and
undergrand in the City of
Adelfia”
EUR 100 million
Experiences
Experiences
Final design for
the reconstruction and expansion
of railway bridges in
Martina Franca. Commissioned
by the South-Eastern
Railways.
EUR 6 million
Experiences
Final design of elimination of
50 crossing level in Salento .
EUR 22 million
Experiences
Supply and
installation of noise barriers
along the railway line TS .
EUR 35 million
Final design for the elimination
level crossing and improving
security - Salento area
EUR 22 million
Functions
Functions of a consulting engineer:
Designer;
Employer’s agent;
Supervisor;
Certifier
Quasi - arbitrator.
Designer
Technical Specification for interoperabilty regarding
infrastructure:
Track works( track gauge , gabarit, etc)
Control and command and signalling
Energy
Employer’s agent
Engineer as Employer’s agent:
Design
Quality control
Administration and Management;
Cost accounting and certification
Certifier
Main certification duties of engineer:
Interim payments certificates;
Taking over certificate;
Date of completion of the works certificate;
Final payment certificate;
Defects liability certificate;
Engineer’s staff