Estero Boulevard I t P j t Improvements Project Lee County DOT In Cooperation with Town of Fort Myers Beach February 18, 2014 Draft 30% Plan Status Summary

Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

Estero BoulevardI t P j tImprovements ProjectLee County DOTIn Cooperation with Town of Fort Myers Beach

February 18, 2014Draft 30% Plan Status Summary

Page 2: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

l d

Estero Blvd  ROW Survey

Estero Blvd. Analysis & 

Design Phase 1Segment 1Final Design

Town of Fort Myers Beach Incorporated

y

S

19??1995 20082000 2013 20152014

Segment 1

2007 2010

Streetscape Master

Plan Adopted

Preliminary PlanSegment 1Construction

Joint T/FMB –BOCC MeetingBOCC Meeting

Begin Estero Blvd Project

Page 3: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Currently in Preliminary Design Process• Picked up from 2008 effort that was halted inPicked up from 2008 effort that was halted in

order to complete the ROW survey• Based on cross sections in Town’s• Based on cross sections in Town s

Streetscape Master Plan with changes approved by Town Council in August 2013approved by Town Council in August 2013

Page 4: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Will result in 30% Design Plans for entire six miles from Crescent Street to Big Carlos Pass Bridge

• Public Workshop held on Beach in Feb 2013p• Based on Comments, presented

options/limitations to Town Council Augustoptions/limitations to Town Council August 2013

Page 5: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Town Council provided direction on PlansTown Council provided direction on Plans in August 30, 2013 letter:– Sidewalks-both sides entire lengthSidewalks both sides entire length – Dedicated bike lanes where Right-of-Way allows– Use shared bicycle lanes “Sharrows” and wider

sidewalks where separate bike lane can’t be provided– Center lane/three lane section entire length

Mi i i i t ti d i t i t– Minimize interruption during tourist season

Page 6: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Sidewalks – Both sides entire lengthSidewalks Both sides entire lengthIncluded, Widths vary – 9’ to 6’

• Dedicated Bike Lanes where ROW allowsI l d d i ll t t f th 1 4Included in all segments except for the 1.4 miles of the Core/Civic Section

Page 7: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Shared Bicycle Lanes “Sharrows” withShared Bicycle Lanes Sharrows with wider sidewalks where Bike Lanes can’t be providedbe provided

Included Sharrows in Core/Civic Section9’ sidewalks typically9 sidewalks typically

Page 8: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Center-Lane/3 Lane Section Entire LengthCenter Lane/3 Lane Section Entire LengthIncluded except for:

• Locations where Chicanes used for Trolley StopsLocations where Chicanes used for Trolley Stops • Quiet Center 50’ ROW section – Avenida

Pescadore to Lazy Way (1/3 mile approx.)

• Minimize Interruption during Tourist Season– Will be a goal, but Construction will carry

into season

Page 9: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• DrainageDrainage• Trolley Stops

St t Li hti• Street Lighting• Landscaping• Overhead Utilities• ROW EncroachmentsROW Encroachments

Page 10: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Issues can be resolved in subsequentIssues can be resolved in subsequent design phases.

• Assistance from Construction Manager at• Assistance from Construction Manager at RiskWill i i ifi t di ti ith• Will require significant coordination with Town, possible amendments of Interlocal A tAgreement

Page 11: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Sequential Design and Construction forSequential Design and Construction for each segment, starting at north and working south.working south.

• Funding every other yearI t d t hi C t ti M t• Intend to hire a Construction Manager at Risk to oversee efforts, ensure

di ticoordination

Page 12: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Finalize Preliminary Design PlansFinalize Preliminary Design Plans• Segment 1 selection consistent with Town

Council 2008 recommendationCouncil 2008 recommendation• Funding for Segment 1 Design and

C t ti Ph i C t Fi lConstruction Phases in Current Fiscal Year

Page 13: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Contract with TYLin allows issuing STA toContract with TYLin allows issuing STA to proceed with Final Design of first segment

• Design Scope drafted being finalized• Design Scope drafted, being finalized• STA Requires BOCC approval

– 2 months– Funds remaining in Preliminary Design allows

TYLi t t t t d hil iti STATYLin to get started while awaiting STA approval

Page 14: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

• Proceed with advertising for and hiringProceed with advertising for and hiring Construction Manager at Risk – Process can take 6 months betweenProcess can take 6 months between

advertising/selection/approval process• Want them to participate in the Segment 1Want them to participate in the Segment 1

Design Process• Scope for RFQ drafted and being refined• Scope for RFQ drafted, and being refined• Will hire for Segment 1 with option to add

dditi l tadditional segments

Page 15: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt
Page 16: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt

(Wilson Miller)

North End

Civic ComplexHigh Rise Resort

Quiet Center

Core Area

South End

Page 17: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt
Page 18: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt
Page 19: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt
Page 20: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt
Page 21: Estero Boulevard t j P ItI mprovements Project file/Estero Blvd Project/Proj… · Final Design Town of Fort ... Microsoft PowerPoint - EB Presentation Feb182014-TownCouncilMeeting.ppt