ESTEC Test Centre Division Directorate of Technical and Quality Management

HYDRA PLC Replacement

Debriefing Meeting

Page 2: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 2 11 June 2009

Agenda

14:00 Introduction

14:15 Overview of the scope of the contract

14.30 Visit of the Hydra basement (PLC cabinets)

15:00 Clarifications on technical matters.

16:00 End of the Meeting

Page 3: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 3 11 June 2009

System overview (1/3)

Hydra (Hydraulic shaker facility) 6DOF Mechanical vibration facility

Built of:

Seismic Foundation

Test Table

Hydraulic supply

Servo Actuators

Vibration and Control Computer

Electrical Equipment Hardware

Page 4: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 4 11 June 2009

System overview (2/3)

PLC assembly is part of the Electrical Equipment Hardware

Main features:

Siemens 6ES5 family

4 control cabinets (R8, R9, R9.1 and R10)

416D + 64A Input lines

64(0.5A) + 112(2A) Digital Output lines

I/F with Watchdog 1 serial port + 16 digital lines to be upgraded to 1 Ethernet port + 16 digital lines.

I/F with MMI 2 serial ports to be upgraded to 2 Ethernet ports

Page 5: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 5 11 June 2009

System overview (3/3)

Page 6: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 6 11 June 2009

Scope of the contract (1/3)

Replacement of the content of the Control cabinet R8 of the PLC assembly with Simatic S7-400 family (PLC and I/O cards).

Identification and replacement of parts of Control cabinet R9, R9.1 and R10 which are found to be obsolete/inadequate and that need to be refurbished to allow proper functioning of the system.

Identification of the parts to be replaced and of the activities to be done to put the Control cabinets R8, R9, R9.1 and R10 inline with the current legal safety standards once modified. The replacement/upgrade of this part is outside the baseline scope of this Contract.

Page 7: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 7 11 June 2009

Scope of the contract (2/3)

Migration and adaptation of the existing PLC SW to the new PLC

Porting of the existing RS232 interface with the Master Pilot block to an Ethernet one to communicate with the Watchdog block of the renewed Hydra Control System.

Connecting the PLC to the MMI by means of 2 Ethernet links and port the existing serial protocol

The renewed PLC assembly once installed and connected to the Hydra facility shall be able to reproduce the same functionalities and performance of the facility as they are today.

Page 8: ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting

TEC-TC

page 8 11 June 2009

Scope of the contract (3/3)

Documentation prepared according to tailoring of ECSS standards:

Q30, Q40, E40, Q80

Special care of safety aspects:

FMECA

Hazard analysis

Reliability prediction