11
Facilities Management Engineering Projects 1 America’s 3.0 America’s 3.0 Development Project Development Project Business Deployment Plan G The SAP and Business Process Redesign started in 1997. G Development of the Facility Management module started in April 1998. G Development of the Project Systems module started in November 1998. G Deployments are planned by business groups: l Rubber Products global deployment: June 2000 l Pharmaceutical deployments: July 2001 and October 2001 l Polychem global deployments: July 2003 l Crop Protection global deployments: January 2004

ERP Rollout

  • Upload
    sam

  • View
    1.747

  • Download
    0

Embed Size (px)

DESCRIPTION

ERP-SAP

Citation preview

Facilities M anagementEngineering Projects 1

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Business Deployment Plan

� The SAP and Business Process Redesign started in 1997.

� Development of the Facility Management module started in April 1998.

� Development of the Project Systems module started in November1998.

� Deployments are planned by business groups:

� Rubber Products global deployment: June 2000

� Pharmaceutical deployments: July 2001 and October 2001

� Polychem global deployments: July 2003

� Crop Protection global deployments: January 2004

Facilities M anagementEngineering Projects 2

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Project Team Structure

SUPPLY CHAIN MANAGEMENT

SUPPLY CHAIN MANAGEMENT

SAP STRATEGYSAP STRATEGY P S I P S I BASISBASISQA / QCQA / QCINFO EXCHANGEINFO EXCHANGEMETHODOLOGYMETHODOLOGY SVC MANAGEMENTSVC MANAGEMENT

ENTERPRISEENTERPRISE

APPLICATIONDEVELOPMENTAPPLICATION

DEVELOPMENTMASTER

DATAMASTER

DATA

FINANCEFINANCE

APPLICATIONDEVELOPMENTAPPLICATION

DEVELOPMENTMASTER

DATAMASTER

DATA

PROCUREMENTPROCUREMENT

APPLICATIONDEVELOPMENTAPPLICATION

DEVELOPMENTMASTER

DATAMASTER

DATA

FAMOUSFAMOUS

APPLICATIONDEVELOPMENTAPPLICATION

DEVELOPMENTMASTER

DATAMASTER

DATA

EDUCATIONEDUCATIONSECURITYSECURITYB T IB T IMASTER DATA

MASTER DATA

APPLICATIONDEVELOPMENTAPPLICATION

DEVELOPMENT

CUSTOMERCUSTOMER

APPLICATIONDEVELOPMENTAPPLICATION

DEVELOPMENTMASTER

DATAMASTER

DATA

Facilities M anagementEngineering Projects 3

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Pharmaceutical Deployment Scope

� Create a Capital Project and a Work Breakdown Structure

� Purchase Equipment on a WBS

� Create a Capital Project and a Network / Schedule

� Purchase Equipment on a Network / Schedule

� Perform Planning, Tracking and Cost Controlling

� Implement Cross Application Time Sheets (CATS)

� Implement Standard Reporting (Planned and Actual)

� Combine a Capital and Expense Project

� Perform Collective Processing - Settlement / Closure

Facilities M anagementEngineering Projects 4

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Deployment Plan Milestones

� Develop the BPR Process, Business Requirements and Scope

� Prepare Scripts and Configuration Documents

� Review and Revise Standards and Procedures

� Demonstrate SAP and BPR Functionality to the Customer

� Perform Data Cleansing

� Perform Unit, Integration, and User Acceptance Testing

� Train Key Users and End Users

� “Go Live” with the SAP Deployment

� Post “Go Live” Support

Facilities M anagementEngineering Projects 5

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Scripting/ Config

Technical Objects

America’s 3.0 Development Project Timeline for PH and DS Implementation

M J J A S O N D J F M A M J J A S O N D 2000 2001

M J J A S O N D J F M A M J J A S O N D

DS UATDS End User

Training

Go-Live Week

DS Post Deployment

Support

DS Final Data Cutover

UAT Planning

DS ValidationPH Validation

PH Post Deployment

Support

PH End User Training

Go-Live Week

PH Final Data Cutover

PH UAT

UAT Planning

Development Frozen

Integration Test

Q Box Prep Data Cutoverto Q

Merge Client/ALE Test/Unit Test

Integration Test Planning

Validation

Dev Box Prep

Facilities M anagementEngineering Projects 6

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

High Level Deliverable ActivitiesDeliverable Complete

� Demonstrate business scenarios (Design Demos) 09/29/00 � Scripts written, configured and sand box tested 08/31/00� Merge client, ALE and unit test 11/17/00� Integration testing for (PH, DS) 03/02/01� User Acceptance testing (PH) 03/30/01� End user training (PH) 05/25/01� Final Production Load (PH) 05/25/01� Go Live (PH) 06/04/01� Post Deployment support (PH) 08/31/01� User Acceptance testing (DS) 07/27/01� End user training (DS) 09/21/01� Final Production Load (DS) 09/21/01� Go Live (DS) 10/01/01� Post Deployment support (DS) 12/21/01

Facilities M anagementEngineering Projects 7

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Project Management Concepts and Tools� Initial summary and milestone schedules are developed by each

team leader using MS Power Point.� Resource and cost plans are developed using MS Excel.� Budgets for each team are established, compiled with other

team budgets and submitted for approval.� Budgets are managed using the legacy accounting system.� Each team presents its list of detail activities and reviews the list

with the other team’s list.� The total list of activities is compiled into a MS Project Plan.� Each activity represents a deliverable.� Team representatives meet to establish relationships between

activities. � The project plan is driven primarily by predecessors and

successors. � Scorecards are developed to monitor detail progress for scripts,

technical objects, test completion progress, etc.

Facilities M anagementEngineering Projects 8

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Project Management Concepts and Tools (Continued)� The scorecard data is summarized and manually entered into

the project plan.� Scripts, configuration documents, test documents, etc. are

stored in an electronic project notebook. This is used to validate actual completion of data.

� The project plan is updated weekly. Scorecard data may be updated daily, if necessary.

� Each team develops its own detail work plan.� Personal “one on one” contact is the method used to update the

work plan.� Project progress is measured by completion of deliverable

activities. � Resource planning is managed at a team level. Teams, not

names are assigned to activities.� Actual Costs are collected and reviewed monthly using the

legacy accounting program.

Facilities M anagementEngineering Projects 9

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Examples - MS Project Work Plan

Facilities M anagementEngineering Projects 10

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Examples - Script and KIA ScorecardScript Scorecard

POINT 136 33 24% 44 32%Dialog 233 52% 121 52% 133 57%EF&A 439 2% 9 2% 17 4%EPP 247 72% 177 72% 177 72%Famous 163 47% 76 47% 66 40%Total 1218 22% 416 34% 437 36%

Notes: 1) Progress overall is based on the status of each scriptStatus Value DefinitionIntialized 0% Script "shell" in EPNDraft in Progress 10% Some fair amount of work has been done Documented 40% Script and confiuration doucments are written but not yet in DevelopmentDraft Complete 70% Reviewed and approved by the team Unit Tested 100% Unit testing complete and successful

2) Total Complete is based only on the number of scripts that are successfully unit tested

Key Integration Areas#

# % # % # % # % # %POINT 490 263 53.7% 97 19.8% 77 15.7% 53 10.8% 148 30.2%EF&A 29 22 75.9% 6 20.7% 0 0.0% 1 3.4% 1 3.4%EPP 24 11 45.8% 13 54.2% 0 0.0% 0 0.0% 0 0.0%Famous 19 19 100.0% 0 0.0% 0 0.0% 0 0.0% 1 5.3%IT 2 2 100.0% 0 0.0% 0 0.0% 0 0.0% 0 0.0%Total 564 317 56.2% 116 20.6% 77 13.7% 54 9.6% 150 26.6%

Planned CompleteBlank Open Testing Complete

Team Total Scripts

% Complete Actual

Total Complete Planned

% Complete Planned

Progress Overall (%)

Total Complete Actual

Facilities M anagementEngineering Projects 11

America’s 3.0 America’s 3.0 Development ProjectDevelopment Project

Questions