Erosion and Sediment Control Programs at the
Cities of Colleyville, Keller, Grapevine,
Southlake, and Trophy Club
Jimmy Brock, City of ColleyvilleKeith Fischer, City of Keller
Dewey Stoffels, City of GrapevineChristi Upton, City of SouthlakeMary Moore, City of Trophy Club
Clean Water Act – Why New Regulations 36 years later? Clean Water Act – 1972
Regulates discharges into Waters of the US Goal – Waters that are Fishable, Swimmable, Navigable
Non-Point Source Pollution – late 1980’s Amendments to the Act – regulation of NPS General Permits for:
Construction Municipal Separate Storm Sewer (MS4) Industry
TCEQ to Implement CGP – March 5, 2003 MS4 – August 13, 2007
MS4 Permit Overview TXR04000 – Phase II MS4 Regulations
MS4 – Municipal Separate Storm Sewer System Similar to CGP, a general permit issued Five years to fully implement all Goals for: Six Minimum Control Measures
Public Education Public Involvement Illicit Discharge Detection and Elimination Construction Discharges Post-Construction Discharges Municipal Good-Housekeeping
Addressing Construction Discharges Municipalities must develop, implement
and enforce a program that: Includes an ordinance to require erosion and
sediment controls as well as sanctions to ensure compliance
Requirements for construction sites to: Implement appropriate control BMPs Control wastes
Develop procedures to: Review site plans Receive and consider public input Inspect and enforce the use of control measures
City of Southlake - Submitting an Erosion and Sediment Control Plan Any site that disturbs more than an acre or
is in a Common Plan of Development disturbing more than an acre The Submittal will include a map:
BMPs for erosion and sediment controls Waste controls Other related items, e.g. concrete wash-out
Details of BMPs Related documents
Review Required
Southlake cont. - Owner/Operator to Conduct Regular Inspections Only for those sites required to submit
plans for ESC Same schedule choices as CGP Report on website program provided by
the City of Southlake Training and/or guidance on using this
program to be provided by Southlake
Southlake cont. - Contractors to Attend Pollution Prevention Training Starting May, 2009 Includes all contractors who register with
Building Inspections Training to be provided by Southlake Or certificate of acceptable training
accepted
Southlake cont. - Final Acceptance of Public Improvements in a Land Development
Requirements for either: Permanent erosion controls Or, maintenance of temporary controls until
final or permanent controls are established