Upload
phamnhi
View
216
Download
2
Embed Size (px)
Citation preview
- Consulting
Profile of expertise of:
Dieter RieserJohann-Sebastian-Bach-Str. 3761250 UsingenTelephone: 0049 6081 6889 13Fax : 0049 6081 6889 11Cell phone: 0049 172 6107551
Born on: July 16th, 1955 in Frankfurt am Main
Professional training: telecommunications technicianhead of computer centreSystem analystProgrammer
Foreign languages: English
Self-employed since: January 1st, 1980
Main areas of expertise: Leasing according to German and American law,Automobile industry: accounting of new and second-hand carsPublishing industryAccounting Insurance applicationsMigration Project managementInternational project management (Mexico / Brazil/ Germany)
Detailed descriptions enclosed:
1. project management2. processing guidelines 3. wholesale bakery4. car financial accounting5. publishing6. insurance7. list of projects in chronological order
- Consulting
International SAP rollout
Period: October 2007 until October 2008Nations: Brazil, Germany, Mexico, additionally employees from UK, US
and Hungary Project language: EnglishTitle of project: logistic rollout of an Oracle database according to SAP standardsPosition: project coordinatorBusiness Environment: the software which is used in Mexico was originally developed in
BrazilTasks: creating a field mapping with the developers in Brazil and the
users in Mexico.Developing rules and a template database to automated the creation of load files. Creating a program requirement for unload programs.Develop a balancing tool for FiCo.Develop (design) an error management database to track migration errors which have been found in a test protocol
- Consulting
Project management
I both manage projects from the part of a executive user and IT-developing projects. Therefore a consequent coordination with the management is required.
Concerning the user area, I am responsible for coordinating the individual requirements. Those are balanced with the user as regards content. After the exact content is defined, the coordination is created concerning the statutory framework. Finally, the requirement is placed in the accounting organization. After the technical content is coordinated, the expense is estimated together with the developing department and a break-even calculation is worked out. My task is to find the easiest and most effective method during the negotiations with the developers. In all my projects, this procedure is the same. Together with my employees, the most effective procedure is chosen within the available resources. As I work out my approaches together with my employees, the highest possible motivation of my employees is ensured because finding a resolution is part of my employees and not an abstract work of art.
My philosophy of project management means to appoint each employee in the position where he or she can attain the highest possible achievement. Because of my long IT-experience, I am capable of fulfilling the professional requirements in the way that they can be fulfilled with a minimum expense. My consulting is to be aimed at solving the professional problem and does not follow hardware or software guidelines.
In my projects I was responsible for up to 30 external employees (freelancer). The decisive factor of success was the fact that we were capable of providing products always together on schedule which had to be completed in critical terms of time. In these periods, I motivated my employees in the way that the projects could be completed in time.
Because my field of experience covers all fields of business, I am capable of recognizing a problem at short notice and creating solutions. By implementing appropriate tools and procedures the projects will be successfully completed and completed on schedule. In my projects I’m the responsible for the budget, the employee and project plan.
Dieter Rieser
name Dieter Rieserborn in 1955position Project managerIT- experience since 1974
- Consulting
Creating processing guidelines
At the beginning, the function volume of the individual systems is analyzed.The different systems’ intersections are determined and documented.
In addition, the requirements/applications are established and documented. This happens in close coordination with the operating department. Furthermore, it is determined which functions are multiply existent in the individual systems and which requirements/applications are covered by these functions..
On the basis of these results, processing guidelines for individual systems and information paths to integrate the systems involved are created.
It has to be analyzed which modules have to be centralized and which modules will have to communicate with the interfaces of the individual systems in the future.
The usage of a source administration tool is essential to prevent multiple processing in a program. This tool serves to control the following phases:
- processing- testing- testing special fields- integration testing- release of
o development documentationo test documentationo release documentation
- implementation
The usage of an implicational, functional and system database is also important.
In principle, it has to be analyzed which functions of special fields are necessary and in which way these functions can be completed by this application.
The task descriptions from the users’ point of view have to be connected with the objects of the individual systems.
When the task description has been created and the function volume has been set, this system will be analyzed which is the most appropriate to fulfill the task.
name Dieter Rieserborn in 1955position project managerIT- experience since 1974
Dieter Rieser
- Consulting
The last project contained the following systems:
- AS/400 INAS insurance of property with all insurances included- Host brokerage- Host central customer base- Host remaining insurance application if there is not any connection with the
insurance property - PC-network document management- PC-network data warehouse- PC-network collection invoice of insurance of property
In this project, the decision has not been made on the basis of which system is the most appropriate for this function but a strict division by systems was provided. If an insurance of property is involved, this function was integrated in INAS even double development on the host and on AS/400 was necessary for this.
- Consulting
Großbäckerei
project’s aim developing a software which supports all procedures containing production up to administration
featuresresponsibility selection of the hardware and developing the individual
systems
my tasks The first development was completed on an IBM 5280 system. Bills of delivery were registered and printed daily. This application had to process its data very quickly because there was a period of only two hours between entering the last order and the beginning of the production. Loading and delivery started at night. There were goods which had to be produced and delivered at the same night, other goods were ordered and some of the goods were ordered in advance and produced in the following day. When the scope of the orders increased and the processing time took too long, the IBM system /34 software was installed. The order maintenance was added the sections production planning and planning of rounds. Financial accounting and a payroll accounting system were developed.Because of increasing orders, the system’s capacity became too low. Therefore, the IBM /36 were installed. The entire software was now developed in COBOL. PC’s were connected with the IBM /36 software and the clients placed their order via DFÜ with it. In the expedition, the production variances were registered and bills of deliveries corrected. The statistical data was improved. Three years later, an AS/400 was installed. The entire transaction was redesigned and redeveloped. The stock containing finished and intermediate goods was administered via data processing. Goods were automatically added to the supply book according to planning of the production. To places of production were connected via DATEX-P to the AS/400 software.This system was installed on a service date processing center in 1991 and in an wholesale bakery in Riesa.
name of project developing and implementing ITposition analyst, programmerbranch wholesale bakeryhardware IBM 5280; /34; /36; AS/400 and PC-network for workstationsoftware OS/400, WINDOWS, DOSprogramming language
RPG / COBOL
period 1981 - 1994
- Consulting
KFZ Automotive
project’s aim The implemented financial accounting had to be revised. I developed a large part of it in the early 80s with RPG II. The financial accounting had to cover several companies. The entry dialog had to be reduced to a one dialog. Until that time, different menu items had to be launched dependent on the position type. All accumulated requirements to a new Financial Accounting system had to be involved in the design.
features The ability to cover several companies had to be realized by renaming the filenames. Therefore a complete redevelopment of the accounting area was performed. Because it was an integrated system, the changes had to take minor effect on the whole system. The clientele and the supplier base were not changed. An appropriate interface for the debtor and creditor area was created. There was only a small amount of time left to realize this change. 20 MM had to be realized within six calendar months. The new COBOL-programs had to work accurately both on the AS/400, the /36 and the NCR-system without any changes.
responsibility Implementation of the primary installation on time. Training of marketing staff and service employees. Coordinating the tasks in such a way that each programmer can be appointed to perform balancing jobs in the short term. Creating and updating project schedule.
my tasks Creating a new accounting design (FiBu). Not renaming the files for the ability to cover several companies. Within the framework of the documentation, all record layouts were compared with old data and documentation was created in order that programmers without any accounting knowledge were able to balance the existing COBOL-programs and OCL. I created and tested newer programs. The company number (plant) was added to all databases. The entire accounting procedure was developed into a real-time procedure. I was the contact person und coordinator concerning any questions containing the new accounting system. I took over the hotline during the pilot phase.
Dieter Rieser
name of project software upgrading (maintenance) position analyst/programmerbranch Daimler-Chrysler FiBUhardware AS/400 and PC-network for workstation; IBM /36software OS/400, WIN-NTprogramming language
COBOL
period April 1994 – November 1997
- Consulting
Verlagswesen
project’s aim to immediately implement the publishing industry’s transaction
features Because of misinvestments in the previous software package, the publisher had not very much time left for extended testing and developing. The subscribers had been supplying wrongly for a half year.
responsibility The first delivery had to take place within four weeks.
my tasks The existing software covering storage and order processing was modified accordingly. At first, the doublets in the addresses were deleted and the subscriptions were balanced with the original stock (older than a half year). Variances were documented and reentered. The first delivery took place in time after three weeks. The invoice’s production was now continued. The most difficult task was to update the accounting software because the invoices generated by the previous system were not booked correctly. Therefore, the previous system’s errors had to be analyzed in order to develop an algorithm to correct the false entries. A mailing system was developed to evaluate the mailings’ success. The publisher not only delivered its subscribers but also delivered books (goods) to private persons and book stores. The book stores’ bills and statistics could be provided. Mass data capture took externally place via an ACCESS program which we developed. This took access to the master data of the AS/400 software. The system administered the subscribers, trial subscriptions, gift subscriptions and shipping of sample magazines. All incoming shipping lists could be managed including optimizing postage accounting.
Großbäckerei
name of project implementing IT-solutionsposition analyst, programmer, project coordinatorbranch publishing industryhardware AS/400; PC-integration with ACCESSsoftware OS/400, WINDOWSprogramming language
COBOL / RPG
period July 1993 – November 1994
- Consulting
Versicherungproject’s aim For an amalgamation of five property insurance companies,
standard software (INAS) was installed. This software had to be adapted to satisfy the needs of the company. This concerned above all the areas counter insurance, co-insurance business, claims settlement, contract management and creating policies. In order to migrate the individual company data, it was arranged that no data had to be lost (even it was not needed in the new system). Minimal requirements to the data could partially not be guaranteed. Therefore, a special contract management had to be developed and to be integrated into the existing modules counter insurance, pre-debiting premiums, premium adjustment and policy printing.
features None of the programmers had knowledge of the software (INAS). The existing software was poorly documented.
responsibility For more than 30 external (freelancer) and internal programmers, coordination of the subproject managers, migration and balancing the requirements with the operation departments.
my tasks Analyzing the range of activities of the individual INAS modules. Working out guidelines of software changes and the modules which had to be recreated. Therefore, an extensive analysis of program codes was required. According to the individual programmers’ experiences, the fields of activity were defined. After having worked out the requirements with the special departments, I started to find a solution with the responsible programmers, which corresponded to the programmer’s skill. Therefore, one had to especially turn one’s attention to the available resources and to ensure the meeting of the deadline. Because many employees developed different modules and it was also an integrated user package, it was important to ensure that all employees were informed of possible influences. That was guaranteed by a weekly meeting, in which everyone was able to explain the possible effects to the INAS-system.
I was notified of all error messages of the current operation and they were analyzed accordingly. After the analysis a date was arranged to correct the error and the appropriate employee was appointed to correct the error. After the employee corrected the error and tested its changes, I and the special department ran an integration test. The integration test served to locate the effects on the changes to the whole
Dieter Rieser
name of project migration, software upgrading (maintenance)position project coordinatorbranch insurancehardware AS/400 and PC-network for workstationsoftware OS/400, WIN-NT, INAS, ARUBAprogramming language
RPG, COBOL
period November 1997 – November 2002
- Consulting
system. I successfully managed to realize the given schedules and the guidelines to change the programs.
-Consulting Dieter RieserJohann-Sebastian-Bach-Str. 37
61250 UsingenGermany
telephone.: 0049 6081 / 6889 - 0fax: 0049 6081 / 6889 - 11
cell phone: 0049 172 / 61 07 55 1e-mail: [email protected]
HomePage: www.DR-Consulting.deUSt-IdNr.: DE211168661
Projekte mit Jahreszahl year title of project branch system programming
languageoperating system
software package
2009/07 until
International migration. Develop the migration programs und the job streams. Development from migration programs for names.Design and developed a new validation process for the addresses.Design and developed the MasterMaster process.Design and developed JARO Process.Update the MATCH-FILE (MADEDF00) after a GoLive.Developed data fixes after GoLive mostly with SQL.Create a skeleton -process (program) to create a environment for INC Data fixes including the Journal SaveDesign consolidated Migrations.Run the migrations to DTM, DTU and Livedeveloped a RPG program to create the UUID.Design the VVO-Process .Create interfaces for ABS and ABV.Design a process for the after work by ABV insert the error log and the COGNOS reportRedesign the upload process for names.
Incurrence AS/400VVOABVABS
FreeRPGXML
OS/400CL400 DB400SQL
Genius SharePointThenonSkeletonJIRA
2008/03until 2009/04
Migration of an individual PPS-system according to SAPBalancing load structures and implementing uploading programs for LUK South Africa (PDM)Implementing a documentation and archiving system for rollout
automotive AS/400 ILE RPG OS/400CL400 DB400SQL
SAP R/3ACCESSAPM400SAP WM/IMAccounting
2008/01until
Migration of an individual PPS system according to SAPBalancing load structures and implementing uploading
automotive AS/400 ILE RPG OS/400CL400
SAP R/3ACCESS
2008/11 programs for LUK Brazil (PDM)Implementing a documentation and archiving system for rollout
DB400SQLPL/SQL
APM400SAP WM/IM
2007/12 until 2008/10
Project manager rollout:Migration of an individual PPS-system in Mexico (Puebla)the development is performed in BrazilProject language: EnglishDesigning rules and processing to automate the rollout process. Balancing between Germany, Brazil, project support in Brazil or Mexico
automotive COBOLSQL
Oracle SAP R/3ACCESSOracleSAP WM/IMPL/SQL
2007/11until2008/07
Migration of an individual PPS system according to SAPBalancing load structures and implementing uploading programs for TruckPart (PDM)Implementing a documentation and archiving system for rollout
automotive AS/400 ILE RPG OS/400CL400 DB400SQL
SAP R/3ACCESSAPM400SAP WM/IM
2007/03until 2007/11
Migration of an individual PPS system according to SAPBalancing load structures and implementing uploading programs for the USA (logistics) and India (PDM)Implementing a documentation and archiving system for rollout
automotive AS/400 ILE RPG OS/400CL400 DB400SQL
SAP R/3ACCESSAPM400SAP WM/IM
2006/10until2007/03
Migration of an individual PPS system according to SAPBalancing load structures and implementing uploading programs for Mexico and the USAImplementing a documentation and archiving system for rollout
automotive AS/400 ILE RPG OS/400CL400 DB400SQL
SAP R/3ACCESSAPM400SAP WM/IM
2005/08until2006/10
Migration of an individual PPS system according to SAPBalancing load structures and implementing uploading programs for Mexico, Hungary and England Implementing a documentation and archiving system for rollout
automotive AS/400 ILE RPG OS/400CL400 DB400SQL
SAP R/3ACCESSAPM400SAP WM/IM
2004/08until2005/07
Migration of an individual PPS system according to SAPBalancing load structures and implementing uploading programs. Rollout planning for migration rules area. Implementing a documentation which converts the migration rules into load file data.
automotive AS/400 ILE RPG OS/400CL400 DB400SQL
SAP R/3ACCESSAPM400SAP WM/IM
2001/01 Level 1, 2 and 3 support hospital PC WIN2000 MS-Office
until 2007/052003/01until 2003/07
Maintenance/ administration of data processing in a car dealership. Setup of the individual applications.Hotline
automobile trade
IBM AS/400 WIN-networkXPW2K
OS400 CL400 DB400 DB2 TCP/IP PROXY-Server
CARE DKS DIALOGYS
2002/10 until2002/12
Maintenance/ Administration of the data processing in a car dealership
automobile trade
IBM AS/400
COBOL RPG400DB2
OS400 CL400 DB400 DB2
CARE DKS Star-account
2002/01 until2002/11
project management for maintenance INAS, preparing migration to ICIS
insurance IBM AS/400
RPG 400DB2
OS400 CL400 DB400 DB2
INASICIS SAP
2001/01 until2001/12
Project manager for maintenance and migration of property insurance. Developing methods for EURO currency transition
insurance IBM AS/400
RPG 400DB2
OS400 CL400 DB400 DB2
INAS
2000/01 until2000/12
Project manager for maintenance and migration of property insurance
insurance IBM AS/400
RPG 400DB2
OS400 CL400 DB400 DB2
INAS
1999/01 until1999/02
Project manager for maintenance and migration of property insurance
insurance IBM AS/400
RPG 400 OS400 CL400 DB400 DB2
INAS
1998/01 until1998/12
Migration of several property insurers.Usage of a change management systemImplementing programming guidelines and a system of programming guidelines. The technical implementation of the organization was realized with APM
insurance IBM AS/400
RPG 400 OS400 CL400 DB400 DB2
INAS
1998 storage administration and statistics waffle bakery PC-networks
ACCESS WINDOWS MMIS
1997/11 until1997/12
Maintenance of an insurance package for property insuranceThe current software package was analyzed according to the requirements of the upcoming migrations.This project with up to more than 30 employees took more
insurance IBM AS/400
RPG 400 OS400 CL400 DB400 DB2
INAS
than five years. My tasks contained the migration of four connected insurance companies. Regarding maintenance, the modules counter insurance; co-insurance including underwriting, claims settlement and policy printing were balanced together with the users to the new requirements.
1997 Updating engineering standard software. engineering PC-networks
ACCESS WINDOWS MMIS
1997 Updating and redesigning accounting of the Mercedes contractual partners. The FiBu company became multitenant during the change. I performed the analysis. On the basis of this analysis I created the design, implemented processing guidelines and test documentations. I also created central modules in COBOL
automobile trade
IBM /36 COBOL
1996 Implementing a PC-network and an administration software including a mailing system for MUSICAL-management
MUSICAL PC- networks
ACCESS WINDOWS
1995 PC support and maintenance in the office area of government departments.Creating WORD-Macros to generate proper blanks according to their department
government PC WORD-Basic WINDOWS FILE-NET
1995 Redevelopment of the MMIS-software by adding a hotel administration software
hotel PC-network
ACCESS WINDOWS MMIS
1994 Redesigning standard software for NT-networks and SQL-servers.
PC-network
SQL ACCESS
WINDOWS MMIS
1993 Updating software for publishing, subscriber administration and shipping
publisher AS/400 COBOL RPG400UNIX
OS400 CL400 DB400 DB2ORACLE
MMIS
1990 Usage of the software in the newly-formed German states and upgrade for construction companies.
constructionwholesale bakerysteel construction
PC AS/400
COBOL RPG400
MD-DOS OS400 CL400 DB400 DB2
MMIS
1989 Development and redesign of standard software; Payroll accounting DÜVo approval
wholesale bakery engineering trade
IBM AS/400
COBOL RPG400
OS400 CL400 DB400 DB2
MMIS
1988 Redevelopment of standard software textile PC IBM /36
COBOL MS-DOS MMIS
1988 Redevelopment of standard software travel agency PC COBOL MS-DOS MMIS1987 Development of a leasing selling tool for portable PCs.
A program was developed for each seller with C-programming language, with which offers could be provided on-site. These programs used formulas and data of the /38 application.
IBM IBM C MS-DOS
1987 Redevelopment of standard software wholesale bakerypharmaceutical wholesale
IBM /36 RPGII COBOL
MMIS
1984 until1988
Developing and balancing leasing accounting according to German and American law. I took over the position of a project manager of the users. My task contained system analysis and implementing the programming guidelines. I performed the entire test documentation and test coordination. Under my guidance, balancing with the individual departments was performed
IBM IBM /38 project manager of users
1983 inventory control and software maintenance MAS /34 engine trade IBM /34 RPG II MAS/34
1983 management consulting, vulnerability analysis and corporate consulting services
tobacco wholesale
1982 Redeveloping standard software of storage administration, route planning, accounting, production planning
wholesale bakery
IBM /34 RPG II MMIS
1982 Development of an insertion system (advertisement administration)
advertising agency
IBM /38 RPG III MMIS
1981 Development of the own standard software MMIS wholesale bakery
IBM 5280 DE-RPG MMIS
1981 Development of statistic tools for the Mercedes contractual partners
automobile trade
IBM /34 RPG II
1980 Beginning of self-employment1980 Development of a wage analysis application paper
wholesaleSiemens ASSEMBLER BS-2000 PAISY
1980 Development of a second-hand car and new car administration
Renault IBM /34 RPG II
1980 Development of a medical application package OCR ASSEMBLER1978 system analysis, head of programming, data recording,
operating and program developing, financial accounting of the European subsidiary companies and the film distributors UA and CIC. Development of an accounting system for the four greatest film distributors. Development of a poster controlling system
film distribution advertising agency
IBM- 370 Nixdorf
RPG II COBOL ASSEMBLER
DOS/VSE
1974 apprenticeship as operator, interim head of data processing center
wholesaleMetro Frankfurt- Rödelheim
IBM-360 IBM-370
DOS