70
ERDC/CHL TR-09-13 Port Isabel (GIWW) Channel Improvements at the Queen Isabella Causeway Laguna Madre, Texas, Navigation Improvement Project Timothy W. Shelton, P.E. and Dennis Webb, P.E. September 2009 Coastal and Hydraulics Laboratory Approved for public release; distribution is unlimited.

ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/CH

L TR

-09

-13

Port Isabel (GIWW) Channel Improvements at the Queen Isabella Causeway Laguna Madre, Texas, Navigation Improvement Project

Timothy W. Shelton, P.E. and Dennis Webb, P.E. September 2009

Coa

stal

an

d H

ydra

ulic

s La

bor

ator

y

Approved for public release; distribution is unlimited.

Page 2: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 September 2009

Port Isabel (GIWW) Channel Improvements at the Queen Isabella Causeway Laguna Madre, Texas, Navigation Improvement Project

Timothy W. Shelton, P.E. and Dennis Webb, P.E.

Coastal and Hydraulics Laboratory U.S. Army Engineer Research and Development Center 3909 Halls Ferry Road Vicksburg, MS 39180-6199

Final report

Approved for public release; distribution is unlimited.

Prepared for U.S. Army Corps of Engineer District, Galveston Galveston, TX 77550

Page 3: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 ii

Abstract: Laguna Madre is located on the southern shore of the state of Texas. The Gulf Intracoastal Waterway (GIWW) passes under the Queen Isabella Causeway between Port Isabel and South Padre Island. In 2001, a tow struck the Queen Isabella Causeway collapsing a span of the bridge and resulting in the death of eight motorists. In response to that event, the U.S. Army Engineer District, Galveston, (SWG) was tasked with making channel improvements that would provide for safer navigation through the Queen Isabella Causeway. To assist SWG in evaluating alternatives for the proposed channel improvements, the U. S. Army Engineer Research and Development Center (ERDC) conducted a navigation study utilizing real-time ship simulation modeling. Model development and online testing occurred at the ERDC Waterways Experiment Station (WES) in Vicksburg, MS during the period from August 2005 to May 2007.

DISCLAIMER: The contents of this report are not to be used for advertising, publication, or promotional purposes. Citation of trade names does not constitute an official endorsement or approval of the use of such commercial products. All product names and trademarks cited are the property of their respective owners. The findings of this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED. DO NOT RETURN IT TO THE ORIGINATOR.

Page 4: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 iii

Contents Figures and Tables.................................................................................................................................iv

Preface.....................................................................................................................................................v

Unit Conversion Factors........................................................................................................................vi

1 Introduction..................................................................................................................................... 1 Background .............................................................................................................................. 1 Purpose..................................................................................................................................... 1

2 Proposed Improvements................................................................................................................ 3

3 Reconnaissance Trip...................................................................................................................... 4

4 Database Development ................................................................................................................. 5

5 Analysis of Existing Conditions..................................................................................................... 6

6 Results............................................................................................................................................. 8 Plan 1........................................................................................................................................ 8 Plan 2........................................................................................................................................ 9

7 Recommendations.......................................................................................................................11

Appendix A: Plates 1 – 44 ..................................................................................................................19

Report Documentation Page

Page 5: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 iv

Figures and Tables

Figures

Figure 1. Project Location map. ..............................................................................................................12 Figure 2. Layout of Navigation Channels. ..............................................................................................12 Figure 3. Originally proposed alternative improvements......................................................................13 Figure 4. Queen Isabella Causeway and fender system....................................................................... 14 Figure 5. Visual scene of approach to Queen Isabella Causeway. ...................................................... 14 Figure 6. Modified ECDIS showing bend widener. ................................................................................ 15 Figure 7. Tow captains approaching the swing bridge during existing conditions analysis...............15 Figure 8. CESWG Widener. ...................................................................................................................... 16 Figure 9. Modified Widener..................................................................................................................... 17 Figure 10. 60 FT. Widener. ......................................................................................................................18

Page 6: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 v

Preface

This navigation study was performed at the U.S. Army Engineer Research and Development Center (ERDC), Ship/Tow Simulator Facility, located in the Coastal and Hydraulics Laboratory (CHL), ERDC, Vicksburg, MS, at the request of the U.S. Army Engineer District, Galveston (SWG).

It was conducted by Timothy W. Shelton of the Deep Draft Navigation Group, Navigation Branch, CHL. Assistance with pilot testing was given by Donna Derrick, Danny Marshall, and Peggy Van Norman. Testing was completed in May 2007, under the supervision of Thomas W. Richardson, Director, CHL.

Acknowledgment is made to George Alcala and Baldev Mann of SWG for cooperation and assistance. Special thanks are extended to Captain Raymond Butler of the Gulf Intracoastal Canal Association for help securing experienced tow captains to assist in testing.

COL Gary E. Johnston was Commander and Executive Director of ERDC. Dr. James R. Houston was Director.

Page 7: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 vi

Unit Conversion Factors

Multiply By To Obtain

feet 0.3048 meters

inches 0.0254 meters

knots 0.5144444 meters per second

miles (nautical) 1,852 meters

miles (U.S. statute) 1,609.347 meters

tons (long) per cubic yard 1,328.939 kilograms per cubic meter

tons (2,000 pounds, mass) 907.1847 kilograms

tons (2,000 pounds, mass) per square foot 9,764.856 kilograms per square meter

Page 8: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 1

1 Introduction

Background

Port Isabel is located on the southern shore of the state of Texas, on Laguna Madre, just inland from South Padre Island in close proximity to the United States border with Mexico (Figure 1). South of Port Isabel, the Gulf Intracoastal Waterway (GIWW) intersects the Brownsville Ship Chan-nel forming a “Y” shaped navigation channel. The Queen Isabella Cause-way Bridge connects Port Isabel to South Padre Island. Barge traffic on the GIWW must navigate through one of the bridge deck spans via a fendering system. Southbound traffic must turn sharply to the west immediately after clearing the bridge fenders in order to stay in the navigation channel. Northbound tow traffic is in the process of completing a northern turn when alignment with the opening in the fendering system is necessary. The details of the navigation channels for the area are shown in Figure 2.

The GIWW is an inland navigation channel that runs the length of the United States Gulf Coast. The portion of the GIWW in the vicinity of Port Isabel connects the Ports of Mansfield, Harlingen, Port Isabel, and Brownsville with points in more northern portions of Texas as well as Louisiana, Mississippi, Alabama, and Florida. The GIWW is maintained at 12-ft and basically 100-ft wide across the Laguna Madre. Tonnage along this segment of the GIWW averaged approximately 2,264,000 short tons from 1990 to 1999.

In September 2001, a four barge tow struck one of the Queen Isabella Causeway’s bridge piers and collapsed a 240-ft section of the bridge deck. This resulted in the death of eight motorists who were traversing the bridge and unable to stop prior to driving off the missing portion of the bridge deck and into Laguna Madre.

Purpose

In response to the catastrophic event of 2001, the Galveston District (SWG) is investigating whether a modification to the existing channel alignment is necessary. Two potential channel modifications in the form of wideners have been proposed if modification to the existing proves necessary. The U.S. Army Engineer Research and Development Center

Page 9: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 2

(ERDC) conducted a navigation study utilizing real-time ship simulation modeling to evaluate the existing conditions and proposed modifications to the GIWW alignment with respect to the Queen Isabella Causeway should the existing conditions prove to be inadequate. Model development and online testing occurred at the ERDC Waterways Experiment Station in Vicksburg, MS during the period of August 2005 to May 2007.

Page 10: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 3

2 Proposed Improvements

Originally, SWG proposed three channel re-alignments for the GIWW along the route from Corpus Christ to Brownsville through the Queen Isabella Causeway. In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and a breakwater to dissipate energy. The three original proposed realignments are shown in Figure 3. However, based on industry input and discussions between ERDC and SWG, all alternatives were abandoned in favor of an evaluation of the existing conditions. This evaluation, discussed in section 5 of this report, was used to discern recommendations regarding channel modifications via bend wideners.

Page 11: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 4

3 Reconnaissance Trip

The reconnaissance trip for the Port Isabel study was conducted on April 28, 2005. The purpose of the trip was to ride tows traversing the GIWW through the Queen Isabella Causeway. In addition, ERDC repre-sentatives planned to take digital photographs and video, which would be used for simulation model development. Tow traffic volumes were min-imal during the trip and the only tow that transited the reach in question passed underneath the bridge at night, making it impossible to collect digital photographs and video. Therefore, Kirby Corporation provided a small skiff and boat operator that was used to go out and traverse the reach. Digital photographs were taken from the skiff and used for simu-lation model development. Additional photos were taken from piers extending into Laguna Madre from Port Isabel to ensure model quality. A photograph of the bridge span and fender system taken during the recon-naissance trip is shown in Figure 4.

Page 12: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 5

4 Database Development

Currents for the existing channels were calculated at ERDC using the TABS-MD suite of numerical models. Current data for both flood and ebb tidal currents for both a normal spring tide and a storm condition were extracted and converted into the format required by the ERDC Ship/Tow Simulator for both a normal tide range and a storm tide range.

Several tow models were used for the Port Isabel Navigation Study. The tow models, previously developed by Designers & Planners, included:

Pusher Tow, two loaded 675-x54-x9-ft Pusher Tow, four loaded 1156-x54-x10-ft Pusher Tow, one loaded 357-x54-x9-ft Six Pack, 655-x70-x9-ft Pusher Tow, one empty 368-x54-x4-ft

The visual scene was constructed using photos taken during the recon-naissance trip and encompassed the reach from the “Y” connecting the GIWW to the Brownsville Ship Channel through the Queen Isabella Causeway and out into Laguna Madre. Port Isabel and portions of South Padre Island are both visible in the visual scene. In addition to land features, the visual scene contains all Aids-to-Navigation (ATONS) present in the exiting configurations. Figure 5 shows the approach to the Queen Isabella Causeway as it appears in the visual scene.

The Electronic Chart Display and Information System (ECDIS) was mod-ified to reflect proposed changes to the channel footprints. Figure 6 shows an ECDIS chart modified to reflect changes made to the ATONS and channel along the approach to the Queen Isabella Causeway.

Page 13: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 6

5 Analysis of Existing Conditions

Based on a visual analysis by ERDC and conversations with the towing industry, SWG and ERDC agreed that a week of “pre-testing” should be undertaken in order to analyze the existing navigation conditions along the approach to the Queen Isabella Causeway. The purpose of the pre-testing was to both validate the existing conditions and to determine if testing of some of the alternatives originally proposed by SWG could be eliminated. This existing conditions analysis was conducted using real-time tow simulation exercises conducted at the ERDC Ship/Tow facility in Vicksburg, MS.

The simulations were conducted June 12 – 30 using three tow captains from various towing companies. Figure 7 shows one of the tow captains operating the simulator during this effort. Results from these simulations are shown on plates 1 – 20.

Most of the runs passed safely through the bridge span. However, a few times the flotilla came in contact with the bridge’s eastern fender. One observation seen in several of the runs is that the tows tend to favor the outside of the bend while aligning for the bridge approach. One of SWG’s proposed alternatives is a bend widener in the approach channel as shown in Figure 8. Conversations with the tow captains during this analysis indicated that any problems aligning with the bridge could be resolved with a bend widener on the east side of the channel.

The results of this effort were discussed with Captain Raymond Butler, Executive Director, Gulf Intracoastal Canal Association (GICA). Capt. Butler concurred with the conclusions reached by ERDC concerning the bend widener on the east side of the bridge approach channel. Based on the results of the existing conditions analysis and the aforementioned discussions, the ERDC recommended that the remainder of the study should focus on the widening of the outside of the bend on the southern approach to the Queen Isabella Causeway. ERDC further recommended that all other alternatives as discussed in section 2 of this report be eliminated from further testing. Two alternative bend widener plans were developed as follows:

Page 14: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 7

Plan 1 – 112.5-ft bend widener with tie-in to GIWW at the southern approach, as shown in Figure 9

Plan 2 – 60-ft bend widener with tie-in to GIWW at southern approach, as shown in Figure 10

Page 15: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 8

6 Results

Testing of Plan 1 and Plan 2 was conducted from April 26 – May 1, 2007 at the ERDC Ship/Tow Simulator facility in Vicksburg, MS. Four tow cap-tains familiar with the reach of GIWW through the Queen Isabella Cause-way participated in the testing program. After each run, the tow captain was given a chance to provide written comments concerning the simu-lation. Based on the recommendations of the tow captains and indications derived from the track plots recorded during existing conditions analysis, only two vessels were used during testing of Plans 1 and 2. The two vessels used were:

Six pack, 655-x79-x9-ft Pusher tow, two empty side by side, 368-x108-x4-ft

Results are presented in the form of composite track plots. Track plots are categorized by plan, vessel, direction of motion, and direction of tidal cur-rents. Results will be presented by plan. All runs were conducted with a 20-knot southeast wind, the predominate worst-case wind for the location and alignment.

Plan 1

Plates 21 and 22 show the composite track plots for Plan 1, two empty barge tow, eastbound, under ebb and storm ebb tides, respectively. Both composites show that the tow exited the channel on the eastern side during the approach to the bridge span. Plates 23 and 24 show the com-posite track plots for Plan 1, two empty barge tow, eastbound, under flood and storm flood tides, respectively. Again, both composites show that the tow exited the channel along the eastern side of the channel during the approach to the bridge span. Plates 25 and 26 show the composite track plots for Plan 1, six pack tow, eastbound, under ebb and storm ebb tides, respectively. Under ebb tide conditions, the tow exited the channel on the eastern side during the approach to the bridge span. However, under storm ebb tide, the tow remained in the channel throughout the runs. Plates 27 and 28 show the composite track plots for Plan 1, six pack, eastbound, under flood and storm flood tides, respectively. During flood tide conditions, no tows exited the channel.

Page 16: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 9

However, during storm flood tides, one run shows a significant channel exit while the remaining simulations stayed in the channel throughout the approach. Plates 29 and 30 show the composite track plots for Plan 1, tow empty barge tow, westbound, under ebb and storm ebb tides, respectively. Both composites indicate that the vessel left the channel in the turn south of the bridge. Plates 31 and 32 show the composite track plots for Plan 1, two empty barge tow, westbound, under flood and storm flood tides, respectively. Both track plots show that the tows left the channel south of the bridge on the eastern side of the channel. Plates 33 and 34 show the composite track plots for Plan 1, six pack tow, westbound, under ebb and storm ebb tides, respectively. Both track plots show little, if any, breach of the channel lines during the transit. Plates 35 and 36 show the composite track plots for Plan 1, six pack tow, westbound, under flood and storm flood tides, respectively.

Both track plots show some exiting of the channel south of the bridge along the eastern side of the channel. It should be noted that the tow captains did not indicate having any difficulty with any of the scenarios tested under the Plan 1 configuration. However, in almost all of the composite track plots, the tow left the buoyed channel at some point during the transit. It is likely that due to the pilots’ experience with the difficulty of this turn, they significantly favored the eastern side of the channel, regardless of the width of the widener, based on the fact that in the existing conditions it is critical that the tow “hug” the eastern side of the channel in order to successfully navigation the bridge span. Therefore, the results of the simulation could be highly conservative.

Plan 2

Since results from Plan 1 indicated little if any difference between difficulty of navigation with respect to storm current and normal currents, and since the storm currents have higher magnitudes and similar directions to the spring tide currents, simulation of the normal spring tide currents was eliminated from Plan 2 testing.

Plates 37 and 38 show the composite track plots for Plan 2, two empty barge tow, eastbound, under storm ebb and storm flood tides, respectively. The composites show results similar to those in Plan 1 with channel breach occurring in both ebb and flood tides south of the bridge along the eastern side of the channel. Plates 39 and 40 show the composite track plots for Plan 2, six pack tow, eastbound, under storm ebb and storm flood tides,

Page 17: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 10

respectively. Again, results were similar to those in Plan 1 with channel breach occurring significantly under ebb tide and not at all under flood tide conditions. Plates 41 and 42 show the composite track plots for Plan 2, two empty barge tow, westbound, under storm ebb and storm flood tides, respectively. Again, the track plots show that the tow left the channel significantly under ebb tides and not at all under flood tides. Plates 43 and 44 show the composite track plots for Plan 2, six pack tow, westbound, under storm ebb and storm flood tides, respectively. In both cases, the tow approached the channel lines south of the bridge on the eastern side of the channel and breached the channel only slightly, if any.

Page 18: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 11

7 Recommendations

The results of the testing program indicate both the proposed Plan 1 and Plan 2 channel improvements provide some relief for the navigation difficulties along the approach to the Queen Isabella Causeway. In both Plan 1 and Plan 2, the tow captains were able to navigate through the bridge without impacting any of the fender system components. However, in both plans, the tows left the channel on the eastern side of the channel south of the bridge on both eastbound and westbound runs, under both ebb and flood tides. One item of interest is that when the Plan 2 simu-lations are overlain on the Plan 1 channel limits, instances of channel breach are few. Therefore, it seems that the pilots are favoring the eastern side of the approach channel based on their experience. This is due to the fact that “hugging” the eastern side is essential under the existing con-ditions in order to safely navigate the bridge. “Hugging” the eastern side of the channel is based upon what the captains are used to doing, rather than a deficiency in Plan 1. Therefore, based on the simulation results and pilot input, the following recommendations are made for channel improve-ments for the southern approach to the Queen Isabella Causeway:

The Plan 2 bend widener is not recommended as it does not appear to provide sufficient width for tows to stay inside the channel limits and successfully navigate the bridge.

The Plan 1 bend widener appears to provide enough width for tows to stay inside the channel limits and successfully navigate the bridge. While the Plan 1 simulations indicated that the tows repetitively left the channel limits, the Plan 2 runs indicate that the Plan 1 bend widener would likely be successful. In other words, the Plan 1 bend widener appears to provide enough room, but the captains did not take advan-tage of it. Plates 45 and 46 show the Plan 2 tow tracks imposed on the Plan 1 channel, indicating that the tows can safely navigate the bend with the Plan 1 bend widener.

To ensure the bend widener provides sufficient width to remain in the channel and properly align with and navigate the bridge, the ERDC recommends providing a factor-of-safety to the Plan 1 bend widener by increasing its width from the proposed 112.5-ft width to 125-ft. This

Page 19: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 12

additional width would have provided acceptable width to allow nearly all of the simulations to remain in the channel and successfully align with and navigate the bridge. Plates 46 and 47 show composites of all runs imposed on the recommended 125-ft bend widener. It is not necessary to conduct additional simulations for the 125 ft widener.

Figure 1. Project Location map.

Figure 2. Layout of Navigation Channels.

Page 20: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 13

Figure 3. Originally proposed alternative improvements.

Page 21: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 14

Figure 4. Queen Isabella Causeway and fender system.

Figure 5. Visual scene of approach to Queen Isabella Causeway.

Page 22: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERDC/CHL TR-09-13 15

Figure 6. Modified ECDIS showing bend widener.

Figure 7. Tow captains approaching the swing bridge during existing conditions analysis.

Page 23: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

16

Figure 8

. CESWG

Widener.

Page 24: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

17

Figure 9

. Modified W

idener

Page 25: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

18

Figure 1

0. 6

0 FT. Widener.

Page 26: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

19

Appendix A

: Plates 1 – 4

4

Plate 1

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vesser A, Pusher Tow, two lOQcleci 675-x54-x9-Ft Currents' Norl'lQl Elolo IoIlncl' 20 knots Frol'l southeQst

Page 27: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

20

Plate 2

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vesser A, Pusher Tow, two lOQcleci 675-x54-x9-ft Currentsl NOrMQl Flood "'Incl, 20 knots frOM south"Qst

Page 28: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

21

Plate 3

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel A, Pusher Tow, two IOQcleci 675-x54-x9-Ft Currentsl StorM Ebb IJlncl' 20 knots FrOM southeQst

Page 29: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

22

Plate 4

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel A, Pusher Tow, two IOQcleci 675-x54-x9-Ft Currentsl StorM Flood IJlncl' 20 knots FrOM southeQst

Page 30: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

23

Plate 5

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel C' Push"r Tow, Tour IOQcI"cI 1156-x54-x10-Tt Currentsl NOrMQl Ebb IJlncl' 20 knots frOM southeQst

Page 31: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

24

Plate 6

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel C' Pusher Tow, Tour IOQcleci 1156-x54-x10-Tt Currentsl NOrMQl noad IJlncl' 20 knots frOM southeQst

Page 32: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

25

Plate 7

SCALE IN fEET

o 1500 3000 4500

I I I I ,

DRAFT .K

HeQcllng' EQstloounci Vessel C' Pusher Tow, Tour IOQcleci 1156-x54-x10-Tt Currentsl StorM Ebb IJlncl' 20 knots frOM southeQst

Page 33: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

26

Plate 8

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel C' Pusher Tow, Tour IOQcleci 1156-x54-x10-Tt Currentsl StorM Flood IJlncl' 20 knots frOM southeQst

Page 34: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

27

Plate 9

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel D, Pusher Tow, one 10Qcleci 357-x54-x9-Ft Currentsl NOrMQl Ebb IJlncl' 20 knots FrOM southeQst

Page 35: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

28

Plate 1

0

SCALE IN fEET

o 1500 3000 4500

\\ \\ \\ \\

\\ \\ \\ \\ \ \ \ \ \ \ \ \ \ \

\ \ \ \

\ \.

DRAFT .K

\ '-, ...... -~-

HeQcllng' EQstloounci Vessel D, Pusher Tow, one 10Qcleci 357-x54-x9-Ft Currentsl NOrMQl noad IJlncl' 20 knots FrOM southeQst

Page 36: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

29

Plate 1

1

SCALE IN fEET

o 1500 3000 4500

\\ \\ \\ \\ \\ \\ \\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \. \

I I I I I

DRAFT oN"

HeQcllng' EQstloounci Vessel D, Pusher Tow, one 10Qcleci 357-x54-x9-Ft Currentsl StorM Ebb IJlncl' 20 knots FrOM southeQst

Page 37: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

30

Plate 1

2

SCALE IN fEET

o 1500 3000 4500

I I I I , ,

DRAFT .K

HeQcllng' EQstloounci Vessel D, Pusher Tow, one 10Qcleci 357-x54-x9-Ft Currentsl StorM Flood IJlncl' 20 knots FrOM southeQst

Page 38: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

31

Plate 1

3

SCALE IN fEET

o 1500 3000 4500

DRAFT

HeQcllng' EQstloounci Vessel E, Six PQc:k, 655-x70-x9-ft Currentsl NOrMQl Ebb IJlncl' 20 knots frOM southeQst

.K

Page 39: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

32

Plate 1

4

SCALE IN fEET

o 1500 3000 4500

DRAFT

HeQcllng' EQstloounci Vessel E, Six PQc:k, 655-x70-x9-ft Currentsl NOrMQl noad IJlncl' 20 knots frOM southeQst

.K

Page 40: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

33

Plate 1

5

SCALE IN fEET

o 1500 3000 4500

DRAFT

HeQcllng' EQstloounci Vessel E, Six PQc:k. 655-x70-x9-ft Currentsl StorM Ebb IJlncl' 20 knots frOM southeQst

.K

Page 41: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

34

Plate 1

6

SCALE IN fEET

o 1500 3000 4500

DRAFT

HeQcllng' EQstloounci Vessel E, Six PQc:k. 655-x70-x9-ft Currentsl StorM Flood IJlncl' 20 knots frOM southeQst

.K

Page 42: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

35

Plate 1

7

SCALE IN fEET

o 1500 3000 4500

\\ \\ \\ \\ \\ \\ \\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ , \ \. \

DRAFT

HeQcllng' EQstloounci Vesser f' Pusher Tow - one eMpty 368-54-4-ft Currentsl NOrMQl Ebb \oIlncl' 20 knots frOM south"Qst

Page 43: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

36

Plate 1

8

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel f' Pusher Tow - one eMpty 36B-54-4-ft Currentsl NOrMQl Flood IJlncl, 20 knots froM southeQst

Page 44: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

37

Plate 1

9

SCALE IN fEET

o 1500 3000 4500

DRAFT .K

HeQcllng' EQstloounci Vessel E, Pusher Tow - one e"'pty 36B-54-4-ft Currentsl StorM Ebb IJlncl' 20 knots fro", southeQst

Page 45: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

38

Plate 2

0

SCALE IN fEET

o 1500 3000 4500

DRAFT

HeQcllng' EQstloounci Vessel f' Pusher Tow - one eMpty 36B-54-4-ft Currentsl StorM F'loaa IJlncl' 20 knots froM southeQst

Page 46: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

39

Plate 2

1

SCALE IN fEET

o 1'500 ! !

3000 I

.K

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, EBB TIDE

EMPTY SIDE BY SIDE T~O BARGE TO~ EASTBOUND, 20 KNOT SOUTHEAST ~IND

Page 47: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

40

Plate 2

2

SCALE IN fEET

o 1500

I I 3000

I

K

COMPOSITE TRACK PLOTS PLAN I CONDITIONS, STORM EBB TlDE

EMPTY SIDE BY SIDE T~O BARGE TO~ EASTBOUND, 20 KNOT SOUTHEAST \.lIND

Page 48: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

41

Plate 2

3

SCALE IN FEET

o 1500 ! !

3000

I

.N"

COMPOSITE TRACK PL OTS PLAN 1 CONDlTIONS, FLOOD TIDE

EMPTY SIDE BY SIDE TIJO BARGE TOIJ EASTBOUND, 20 KNOT SOUTHEAST IJIND

Page 49: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

42

Plate 2

4

o !

SCALE IN fEET

1500 !

3000

I

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, STORM FLOOD TIDE EMPTY SIDE BY SIDE T'.IO BARGE TO'.I EASTBOUND, 20 KNOT SOUTHEAST '.lIND

Page 50: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

43

Plate 2

5

o I

SCALE IN FEET

1500 :

3000

I

COMPOSITE TRACK PLOTS PLAN I CONDITIONS, EBB TIDE LOADED SIX PACK BARGE TO"

EASTBOUND, 20 KNOT SOUTHEAST "IND

Page 51: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

44

Plate 2

6

SCALE IN fEET

o 1500 3000 ' ___ It' ===:::JI .K

COMPOSI TE TRACK PLOTS PLAN 1 CONDITIONS, STORM EBB TIDE

LOADED SIX PACK BARGE TOW EASTBOUND, 20 KNOT SOUTHEAST 'HIND

Page 52: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

45

Plate 2

7

SCALE IN fEET

o 1500 3000 ' ___ It'===::J1

, " " " , , " " " " " , , , , , ' , ' , ' , ' , ' , ' , '

\ \,' ,

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, FLOOD TIDE

LOADED SIX PACK BARGE TOl.' EASTBOUND, 20 KNOT SOUTHEAST \.lIND

Page 53: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

46

Plate 2

8

o !

SCALE IN fEfT

1500 !

3000

I

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, STORM FLOOD TIDE

LOADED SIX PACK BARGE TOV EASTBOUND, 20 KNOT SOUTHEAST VIND

Page 54: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

47

Plate 2

9

o I

SCALE IN FEET

1500 , 3000 I

.K

COMPOSITE TRACK PLOTS PLAN 1 CDNDITlONS, EBB TIDE

EMPTY SIDE BY SIDE TVO BARGE TOV VESTBOUND, 20 KNOT SOUTHEAST VIND

Page 55: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

48

Plate 3

0

o !

SCALE IN fEET

1500 !

3000 I

j(

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, STORM EBB TlDE

EMPTY SIDE BY SIDE TIJO BARGE TOIJ IJESTBOUND, 20 KNOT SOUTHEAST IJIND

Page 56: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

49

Plate 3

1

o !

seAL E IN fEET

1500 !

3000 I

, , , ,

J(

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, FLOOD TIDE

EMPTY SIDE BY SIDE T"'o BARGE TO'" "'EST BOUND, 20 KNOT SOUTHEAST "'IND

Page 57: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

50

Plate 3

2

o !

SCALE IN EEET

1500 !

3000 I

COMPOS ITE TRACK PLOTS PLAN 1 CONDITIONS, STORM FLOOD TIDE EMPTY SIDE BY SIDE T\:IO BARGE TO\:I \:IESTBOUND, 20 KNOT SOUTHEAST \:lIND

Page 58: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

51

Plate 3

3

SCALE IN

0 1500 ! !

EEEI

3000

I .H'

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, EBB TlDE LOADED SIX PACK BARGE TO~

~ESTBOUND, 20 KNOT SOUTHEAST ~IND

Page 59: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

52

Plate 3

4

seAl E IN fEET

o 1500 3000 ' ___ 't:==::::::J1 .K

COMPOSITE TR ACK PLOTS PLAN 1 CONDITIONS, STORM EBB TIDE

LOADED SIX PACK BARGE TOV \JES TBOUND, 20 KNOT SOUTHEAST 'WIND

Page 60: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

53

Plate 3

5

o I

seAl t: I N Et:t:T

1500 !

30aa

I

, , \ , ,

\ , , , , , , , , , , , , , , \ ' \ \ .. ,

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, FLOOD nDE

LOADED SIX PACK BARGE TO\:I \:IESTBOUND, 20 KNOT SOUTHEAST \:lIND

Page 61: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

54

Plate 3

6

o :

SCALE IN fEET

1500 :

3000 I

COMPOSITE TRACK PLOTS PLAN 1 CONDITIONS, STORM FLOOD TIDE

LOADED SIX PACK BARGE TO~ ~ESTBOUND, 20 KNOT SOUTHEAST ~IND

Page 62: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

55

Plate 3

7

o I

SCALE IN fEET

1500 !

3000 I

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM EBB TIDE EMPTY SIDE BY SIDE HID BARGE TO\'! EASTBOUND, 20 KNOT SOUTHEAST \.lIND

Page 63: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

56

Plate 3

8

o !

SCALE IN fEET

1500 !

3000 I

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM FL OOD TIDE EMPTY SIDE BY SIDE T\:/o BARGE TO'" EASTBOUND, 20 KNOT SOUTHEAST "'IND

Page 64: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

57

Plate 3

9

o I

SCALE IN fEET

1500 !

3000 I

.H'

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM EBB TIDE

LOADED SIX PACK BARGE TO~ EASTBOUND, 20 KNOT SOUTHEAST \lIND

Page 65: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

58

Plate 4

0

SCALE IN f EET

o 1500 3000 ' ___ 't:==:=:J1 J(

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM FLOOD TIDE

LOADED SIX PACK BARGE TO~ EASTBOUND, 20 KNOT SOUTHEAST \.lIND

Page 66: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

59

Plate 4

1

o !

SCALE IN fEET

1500 !

3000

I

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM EBB TIDE EMPTY SIDE BY SIDE T'.IO BARGE TO'.I '.IESTBOUND, 20 KNOT SOUTHEAST '.lIND

Page 67: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

60

Plate 4

2

SCALE IN fEET

o 1500 3000 ' ___ Ii:'==:=:J1

COMPOSI TE TRACK PLOTS PLAN 2 CONDITIONS, STORM FLOOD TIDE

EMPTY SIDE BY SIDE TVO BARGE TOV \.IESTBDUND, 20 KN OT SOUTHEAST \.lIND

Page 68: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

61

Plate 4

3

SCALE IN fEET

o 1:500 ! !

3000 f

j(

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM EBB TIDE

LOADED SIX PACK BARGE TO~ '.IESTBOUND, 20 KNOT SOUTHEAST '.lIND

Page 69: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

ERD

C/C

HL TR

-09-13

62

Plate 4

4

SCALE IN fEET

o 1500 3000 ' __ ..... 'I::::::=::::C:JI

COMPOSITE TRACK PLOTS PLAN 2 CONDITIONS, STORM FLOOD TIDE

LOADED SIX PACK BARGE TO~ 'W ESTBOUND, 20 KNOT SOUTHEAST 'WIND

Page 70: ERDC/CHL TR-0-13 Port Isabel (GIWW) Channel Improvements ...In addition, SWG originally considered extending the existing fender system, an underwater berm to modify currents, and

REPORT DOCUMENTATION PAGE Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing this collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.

1. REPORT DATE (DD-MM-YYYY) September 2009

2. REPORT TYPE Final report

3. DATES COVERED (From - To)

5a. CONTRACT NUMBER

5b. GRANT NUMBER

4. TITLE AND SUBTITLE Port Isabel (GIWW) Channel Improvements at the Queen Isabella Causeway Laguna Madre, Texas, Navigation Improvement Project

5c. PROGRAM ELEMENT NUMBER

5d. PROJECT NUMBER

5e. TASK NUMBER

6. AUTHOR(S)

Timothy W. Shelton, P.E. and Dennis Webb, P.E.

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER

Coastal and Hydraulics Laboratory U.S. Army Engineer Research and Development Center 3909 Halls Ferry Road Vicksburg, MS 39180-6199

ERDC/CHL TR-09-13

9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public distribution; distribution is unlimited.

13. SUPPLEMENTARY NOTES

14. ABSTRACT

Laguna Madre is located on the southern shore of the state of Texas. The Gulf Intracoastal Waterway (GIWW) passes under the Queen Isabella Causeway between Port Isabel and South Padre Island. In 2001, a tow struck the Queen Isabella Causeway collapsing a span of the bridge and resulting in the death of eight motorists. In response to that event, the U.S. Army Engineer District, Galveston, (SWG) was tasked with making channel improvements that would provide for safer navigation through the Queen Isabella Causeway. To assist SWG in evaluating alternatives for the proposed channel improvements, the U. S. Army Engineer Research and Development Center (ERDC) conducted a navigation study utilizing real-time ship simulation modeling. Model development and online testing occurred at the ERDC Waterways Experiment Station (WES) in Vicksburg, MS during the period from August 2005 to May 2007.

15. SUBJECT TERMS Accident Brownsville, TX

Causeway Laguna Madre Navigation

Port Isabel Simulation Towboat

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

18. NUMBER OF PAGES

19a. NAME OF RESPONSIBLE PERSON

a. REPORT

UNCLASSIFIED

b. ABSTRACT

UNCLASSIFIED

c. THIS PAGE

UNCLASSIFIED 70 19b. TELEPHONE NUMBER (include area code)

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std. 239.18