1 EQUIPMENT QUALIFICATION MISS SYEDA RIMA ISHAQ Atco Laboratories Limited

Equipment Qualification

Embed Size (px)

DESCRIPTION

Presentation on Equipment Qualification

Citation preview

Page 1: Equipment Qualification

1

EQUIPMENT QUALIFICATION

MISS SYEDA RIMA ISHAQ

Atco Laboratories Limited

Page 2: Equipment Qualification

2

EQUIPMENT QUALIFICATIONS

Frequency:

Whenever it is planned to purchase/Install a new plant/machinery/equipment.

Page 3: Equipment Qualification

3

EQUIPMENT QUALIFICATIONS

There are four phases of Equipment Qualification

1. Design Qualification(DQ)

2. Installation Qualification(IQ)

3. Operation Qualification(OQ)

4. Performance Qualification(PQ)

Page 4: Equipment Qualification

4

DESIGN QUALIFICATION

It is the first phase of Equipment Qualification for the approval of Purchasing an equipment and selection of the vendor.

Page 5: Equipment Qualification

5

DESIGN QUALIFICATION

1. Concerned department shall establish the user requirement/specification.

2. Quotations will be collected from different manufacturer/supplier.

3. Vendor selection will be done.4. Concerned department will be

responsible for gathering all technical information in a file.

5. 5.Copy of Indent/requisition shall be attached.

Page 6: Equipment Qualification

6

CHECK LIST FOR DQ

Required specification/user requirementApproval from Concerned departments,Production,QC ,QA and Higher authorities.Comaparision data of quotations from different manufacturers/suppliers.Vendor selection CriteriaName of selected manufacturer/supplier and its quotation copy.

Page 7: Equipment Qualification

7

CHECK LIST FOR DQ

Correspondence related to technical discussion between company and manufacturer/supplier.

Copy of approved requisition

Copy of technical data regarding the equipment.

Page 8: Equipment Qualification

8

INSTALLATION QUALIFICATION

Installation Qualification consists of Instrument calibration/inspection to verify that equipment is ok and installation meets the design requirement.

Page 9: Equipment Qualification

9

INSTALLATION QUALIFICATION

Concerned department will collect the copy of purchase order and Material receiving note.

The installation area equipment and its requirement will be reviewed by the concerned department to verify that it is in accordance with the specifications

Page 10: Equipment Qualification

10

INSTALLATION QUALIFICATION

The physical condition of equipment at the time of receiving will be checked

Following documents will be collected from supplier

1.Service and operators manual

2.Recommended spare parts list

3.Calibration certificates of monitoring and measuring devices

Page 11: Equipment Qualification

11

INSTALLATION QUALIFICATION

Installation drawing shall be made

Concerned department/Engg. Department will review the spare parts list.

Page 12: Equipment Qualification

12

CHECK LIST OF IQ

Copy of purchase order and material receiving note.

Installation area and equipment review report

Physical condition of the unit at the time of receiving

Documents collected from the supplier:

Services and Operational Mannual

Recommended Spare parts list

Calibration Certificates

Installation Drawing

Page 13: Equipment Qualification

13

Installation Area & Equipment Review Report

Utilities and building services:

-Compressed air

-Electricity

-Electrical Back up system

-Plumbing and drains

Lighting

Steam

Vacuum

Ventilation air filtration

Pest Control

Page 14: Equipment Qualification

14

Installation Area & Equipment Review Report

Equipment Features:

Model No.

Serial No

Capacity /speed

Location

Name of constrction material of product contact surface

Utilization

Filters

Lubricants

Page 15: Equipment Qualification

15

OPERATION QUALIFICATION

It consists of tests and inspections to verify that the equipment,system alerts and controls are operating reliably

Page 16: Equipment Qualification

16

OPERATION QUALIFICATION

Concerned Department will make all the standard Operating Procedures related to operations such as Operation,Sanitation,preventive maintenance etc.

Log book for Preventive maintenance programme , cleaning and utilization shall be made.

Page 17: Equipment Qualification

17

OPERATION QUALIFICATION

All the operations will be checked and verified.

A list shall be made of all the critical operating parameters which have significant impact on the equipment’s ability, and their testing methods.

Sampling and testing schedule and acceptance criteria shall be agreed.

Page 18: Equipment Qualification

18

OPERATION QUALIFICATION

Concerned department shall make a list of all the instruments and their calibration record utilized to conduct test functions prescribed in the protocol.

A summary report shall be made with conclusion and the concerned department will issue acceptance report of equipment.

Page 19: Equipment Qualification

19

CHECK LIST OF OQ

1. SOPs and Log books2. Check list of Operations to be checked3. List the critical Operating Parameters and

its testing method4. Sampling and testing schedule and

acceptance criteria5. List of the instrument to be used for

testing and their calibration6.Testing results and summary report7.Acceptance report of Equipment Qualification

Page 20: Equipment Qualification

20

Performance Qualification

This qualification will allow the project to move close to final close out and transfer the entire project to the operating department

Page 21: Equipment Qualification

21

Performance Qualification

A performance qualification protocol will describe the detailed sample locations frequencies and acceptance criteria over an appropriate time period

Action and alert limit shall be mentioned.

Page 22: Equipment Qualification

22

CHECK LIST OF PQ

Validation Protocol

Alert and action limit

Testing results and summary report

Any recommendations and suggestions

Page 23: Equipment Qualification

23