EPOS WG7 Keith Jeffery

EPOS WG7 Keith Jeffery. Management 14 members need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Embed Size (px)

Citation preview

Page 1: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

EPOS WG7

Keith Jeffery

Page 2: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Management• 14 members need to register on website as

WG7 – extensible membership• Chair: Keith Jeffery• Vice-Chairs: Jean-Pierre Vilotte, Alberto Michelini• Propose liaison persons with each other EPOS

WGs• WG7 Workshops: separate or linked with other

EPOS events? 6months? Bring in external experts to assist?

• Between workshops: Forum on website

Page 3: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Tasks

• First list of tasks• Need timeline – but related to other WG plans• Essentially 4-year plan

Page 4: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Tasks1• Task1: internal survey services, data/software resources

– WG7 proforma to collect from other WGs and produce repository – prototypical metadata describing available resources

• Task2: external survey (other ESFRI projects and wider) relevant international standards and activities – WG7 proforma to collect and produce repository – prototypical

metadata describing external resources, standards, influences• Task3: definition of conditions & advantages of any

infrastructure (European, national, local) in any relevant discipline joining EPOS. Interoperability criteria, legalities, rights, costs. – Advantages for different stakeholders – access, trustability,

quality...– Tools, services provided at EPOS level from interoperability of

national or project level infrastructures (cooperative operation)

Page 5: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Tasks2

• Task4: work on use cases (requirements) to inform architecture design

• Task5: design architecture (reference model) for EPOS respecting European e-infrastructure (and fully international) and define minimum common functionalities required.

• Task6: gather roadmaps from each other WG and produce a WG7 roadmap for 20 years with conditions/steps for convergence to EPOS platform

Page 6: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Issues around resources

• Objective to encourage data resources, software resources, hardware resources, services to interoperate in EPOS

• Need to define conditions – benefits and expectations

• Traceability and acknowledgement– Usage, ranking?

Page 7: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

EPOS e-Infrastructure within Context

• Rely on other developing e-infrastructures e.g.– EUDAT– PRACE/DEISA– Other ESFRI and other large-scale projects (LSST,

ENVRI...)• Produce virtual customised e-Infrastructure

for EPOS based on this• This is cost-effective and compatible way

assisting sustainability

Page 8: EPOS WG7 Keith Jeffery. Management 14 members  need to register on website as WG7 – extensible membership Chair: Keith Jeffery Vice-Chairs: Jean-Pierre

Other WG7 aspects

• Website development – dissemination, outreach, forums

• Education and training using the e-infrastructure