The execution of a Complex Project
A guided tour
HERVE
BARON
HERVE
BARON
20
13
H
erv
B
aro
n
The actors
The COMPANY
Client The EPC Contractor
The suppliers
The sub-contractors
HERVE
BARON
20
13
H
erv
B
aro
n
Conceptual evaluation+ Pre-Project
By COMPANY
Basic EngineeringBy ENGINEERING
Project Executionby EPC CONTRACTOR
Sanction Sanction
The phases
HERVE
BARON
20
13
H
erv
B
aro
nDesign Procurement Manufacturing Shipping
Installation Construction & erectionInspection &
testsHand-over
HERVE
BARON
20
13
H
erv
B
aro
nThe multiple sides of a Project
Hu
man
Reso
urces
Man
agem
ent
Project ControlPROJECT
HERVE
BARON
20
13
H
erv
B
aro
n
Engineering Sub-Contractor
(India)
Detail Engineering (part)
Shipyard (Korea)
Hull Engineering & Fabrication
Shipyards (Singapore &
Malaysia)
Topsides Fabrication & Integration
Home office (Paris)Project management
Detail Engineering (part)
Procurement
Satellite office
Detail Engineering (part)
Fabrication yard (Nigeria):Fabrication (part)
Offshore (Nigeria):Installation, commissioning, start-up
The multiple sites of a Project
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
Process facilities:
Feedstock and products flow
Feedstock composition
Battery limit conditions
Equipment Spare
Performance:
Products specifications
Energy efficiency, emissions
Utilities:
Electric power supply
Other utilities
Systems:
Process control
Fire/gas alarm
Public address, LAN, PABX
Infrastructure:
Administrative and technical buildings
Control room
Access road
Site fencing, gates, check point
Design criteria:
% of over design
Environment data:
Min/max temperature
Rain/snow fall
Wind
Geological conditions
Applicable codes and standards:
International standards
Local rules
0
5
10
15
20
25
30
35
40
45
50
-85 -80 -75 -70 -65 -60 -55 P
r
e
s
s
u
r
e
(
b
a
r
)
The facilities design basis
HERVE
BARON
20
13
H
erv
B
aro
n
EngineeringDocuments for Purchase:
bill of quantity & specification
Documents for Construction:
Construction drawings & specifications
Design basis:
- Functional requirements
- Client specifications
- Design codes
Engineeringin the Project
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
nProcess simulations
HERVE
BARON
20
13
H
erv
B
aro
nHeat & Material balance
Thermodynamic calculations
Process Flow Diagram (PFD)
HERVE
BARON
20
13
H
erv
B
aro
nEquipment list
HERVE
BARON
20
13
H
erv
B
aro
n
Equipment duty
HERVE
BARON
20
13
H
erv
B
aro
n
Process data sheet
HERVE
BARON
20
13
H
erv
B
aro
nProcess Flow Diagram (PFD)
HERVE
BARON
20
13
H
erv
B
aro
n
Piping & Instrumentation Diagram (P&ID)
HERVE
BARON
20
13
H
erv
B
aro
n
Piping & Instrumentation Diagram (P&ID)
HERVE
BARON
20
13
H
erv
B
aro
nProcess control
HERVE
BARON
20
13
H
erv
B
aro
nEmergency shut down
HERVE
BARON
20
13
H
erv
B
aro
nEmergency relief
HERVE
BARON
20
13
H
erv
B
aro
nOperating manual
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
Rotating machinery
HERVE
BARON
20
13
H
erv
B
aro
nPressure vessels
HERVE
BARON
20
13
H
erv
B
aro
n
Heat exchangers
HERVE
BARON
20
13
H
erv
B
aro
nPackages,
Fired Equipment
HERVE
BARON
20
13
H
erv
B
aro
n
Process data sheet
Mechanical data sheet
HERVE
BARON
20
13
H
erv
B
aro
nMaterial Requisition
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
nFire fighting
HERVE
BARON
20
13
H
erv
B
aro
nPassive fire protection
HERVE
BARON
20
13
H
erv
B
aro
nFire & Gas detection layout
HERVE
BARON
20
13
H
erv
B
aro
n
Environmental Impact Assessment
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Equipment supporting structures
HERVE
BARON
20
13
H
erv
B
aro
n
Piping supporting structures (pipe-racks)
HERVE
BARON
20
13
H
erv
B
aro
nStructural design
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Structural drawings
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Architectural drawings
Equipment layout drawing
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Layout/
principles
HERVE
BARON
20
13
H
erv
B
aro
nLayout/consideration for all networks
HERVE
BARON
20
13
H
erv
B
aro
n
General Plot Plan
HERVE
BARON
20
13
H
erv
B
aro
n
Piping Layout drawing
HERVE
BARON
20
13
H
erv
B
aro
n3D modelling
HERVE
BARON
20
13
H
erv
B
aro
n
3D model review
3D model clash check
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Piping DesignANSI B31.8 (for gas pipelines and compressor stations)
HERVE
BARON
20
13
H
erv
B
aro
n
Piping DesignANSI B31.8 (for gas pipelines and compressor stations)
HERVE
BARON
20
13
H
erv
B
aro
nThickness (mm) Number of passes
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
nIsometric drawing
HERVE
BARON
20
13
H
erv
B
aro
n
Piping Pre-fabrication
HERVE
BARON
20
13
H
erv
B
aro
n
Piping General Arrangement drawing
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
nStandard Pipe Support drawings
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
nMaterial Selection
HERVE
BARON
20
13
H
erv
B
aro
nMaterial Specification
HERVE
BARON
20
13
H
erv
B
aro
n
Material Specification
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
Instrument data sheet
HERVE
BARON
20
13
H
erv
B
aro
n
Process Control System
HERVE
BARON
20
13
H
erv
B
aro
n
System architecture drawing
HERVE
BARON
20
13
H
erv
B
aro
n
Mechanical Equipment Control
HERVE
BARON
20
13
H
erv
B
aro
n
PT JB
Process line
Marshalling
cabinet
Controller
cabinet
Instrument room Control room
VDU
CPU
LANSecondary cable
Multi cable
The instrumentation hardware
HERVE
BARON
20
13
H
erv
B
aro
n
Building detail drawing/
Telecom and PAGA layout
HERVE
BARON
20
13
H
erv
B
aro
n
Cable routing drawings
Cable list
HERVE
BARON
20
13
H
erv
B
aro
nCable routing inside technical room
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering
Instruments& Control
Layout& Piping Process Electrical Equipment Civil Safety
Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
n
Electrical consumer list
HERVE
BARON
20
13
H
erv
B
aro
n
Electrical Load Summary
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
n
General One Line Diagram
HERVE
BARON
20
13
H
erv
B
aro
n
Generators
Switchgear
Transformer
Single line diagram
HERVE
BARON
20
13
H
erv
B
aro
nElectrical equipment layout
HERVE
BARON
20
13
H
erv
B
aro
n
Electrical Control System
HERVE
BARON
20
13
H
erv
B
aro
n
Process design
PFDs
H&M balance
HERVE
BARON
20
13
H
erv
B
aro
n
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
Process
data sheet
Equipment specification
HERVE
BARON
20
13
H
erv
B
aro
n
Process design
PFDs
H&M balance
P&IDs
HERVE
BARON
20
13
H
erv
B
aro
n
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
P&IDs
Piping
Instrumentation
Layout
Civil
Electrical
Process
data sheet
Equipment specification
Vendor
drawings
HERVE
BARON
20
13
H
erv
B
aro
n
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
P&IDs
Piping
Instrumentation
Layout
Civil
Electrical
Process
data sheet
Equipment specification
Vendor
drawings
HERVE
BARON
20
13
H
erv
B
aro
n
Vendor
Instrumentation &
Control
Electrical
Layout
Civil
PipingProcess
HERVE
BARON
20
13
H
erv
B
aro
n
What Engineering designed
What the Vendor supplied
HERVE
BARON
20
13
H
erv
B
aro
n
Field Engineering
HERVE
BARON
For more information and
to get on top of Engineering in hours, not years!
A unique synthesis and
reference manual
200 pages, 250 illustrations
To browse the book:
http://goo.gl/dfDrS
To order with a 30% discount:
http://goo.gl/J3TkE
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
nProcurement
HERVE
BARON
20
13
H
erv
B
aro
n
Inquiry (Call for Tender)Short listing
Bid analysis
Clarifications
Negotiations
Purchase Order
Expediting
Inspection
Delivery
Warranty Period
Procurement / Steps
HERVE
BARON
20
13
H
erv
B
aro
nProcurement / Supplier selection criteria
Technical Compliance
Price
Qualification of supplierSchedule
Load of workshop
References
References with final Client
Financial situation
Annual turn-over
Internal feed-back
HERVE
BARON
20
13
H
erv
B
aro
nProcurement
HERVE
BARON
20
13
H
erv
B
aro
nExpediting
HERVE
BARON
20
13
H
erv
B
aro
nExpediting
HERVE
BARON
20
13
H
erv
B
aro
nInspection
HERVE
BARON
20
13
H
erv
B
aro
nInspection
HERVE
BARON
20
13
H
erv
B
aro
nShipping
HERVE
BARON
20
13
H
erv
B
aro
nShipping
HERVE
BARON
20
13
H
erv
B
aro
n
Shipping
HERVE
BARON
20
13
H
erv
B
aro
n
Project
Engineering Procurement Construction
HERVE
BARON
20
13
H
erv
B
aro
nEarthworks
HERVE
BARON
20
13
H
erv
B
aro
nPipeline
HERVE
BARON
20
13
H
erv
B
aro
nPipeline
HERVE
BARON
20
13
H
erv
B
aro
nRoads
HERVE
BARON
20
13
H
erv
B
aro
nBuildings
HERVE
BARON
20
13
H
erv
B
aro
n
Admixtures
Sand
Aggregate
Cement
Civil Works
HERVE
BARON
20
13
H
erv
B
aro
nCivil Works
HERVE
BARON
20
13
H
erv
B
aro
nCivil Works
HERVE
BARON
20
13
H
erv
B
aro
nCivil Works
HERVE
BARON
20
13
H
erv
B
aro
nCivil Works
HERVE
BARON
20
13
H
erv
B
aro
nCivil Works
HERVE
BARON
20
13
H
erv
B
aro
nPre-fabrication
HERVE
BARON
20
13
H
erv
B
aro
nErection
HERVE
BARON
20
13
H
erv
B
aro
nUnderground networks
HERVE
BARON
20
13
H
erv
B
aro
nPlant erection
HERVE
BARON
20
13
H
erv
B
aro
nSteel structure erection
HERVE
BARON
20
13
H
erv
B
aro
nEquipment installation
HERVE
BARON
20
13
H
erv
B
aro
nEquipment installation
HERVE
BARON
20
13
H
erv
B
aro
nPiping Pre-fabrication
HERVE
BARON
20
13
H
erv
B
aro
nPiping erection
HERVE
BARON
20
13
H
erv
B
aro
nPiping erection
HERVE
BARON
20
13
H
erv
B
aro
nField Instrumentation Installation
HERVE
BARON
20
13
H
erv
B
aro
nElectrical equipment connection
HERVE
BARON
20
13
H
erv
B
aro
nCable pulling
HERVE
BARON
20
13
H
erv
B
aro
nArrangement of Technical rooms
HERVE
BARON
20
13
H
erv
B
aro
nCable connections
HERVE
BARON
20
13
H
erv
B
aro
nOther Systems Field Equipment Installation
HERVE
BARON
20
13
H
erv
B
aro
nControl room consoles installation
HERVE
BARON
20
13
H
erv
B
aro
nTesting
HERVE
BARON
20
13
H
erv
B
aro
n
Sub-System
Junction
Box
Instrument
Loop
Instrument
Cable
Mech Equip
Document Folder
Handover System
Elect EquipCircuit
Instrument
Tag
Commissioning
HERVE
BARON
20
13
H
erv
B
aro
nThe multiple sides of a Project
Hu
man
Reso
urces
Man
agem
ent
Project ControlPROJECT
HERVE
BARON
20
13
H
erv
B
aro
nProject Organisation
Project Manager
Engineering Manager
Project Engineers
Discipline Engineers
Process
Civil
Instrumentation
Electrical
Equipment
Procurement Manager
Purchasers Expediters Inspectors
Site Manager
Construction Manager
Construction Superintendent
Construction supervisor
Construction superintendent
Construction supervisor
Project Control Manager
Contract Manager
Scheduling Manager Cost Control
HERVE
BARON
20
13
H
erv
B
aro
nProject procedures
HERVE
BARON
20
13
H
erv
B
aro
nProject temporary facilities
HERVE
BARON
20
13
H
erv
B
aro
nProject temporary facilities
HERVE
BARON
20
13
H
erv
B
aro
nProject temporary facilities
HERVE
BARON
20
13
H
erv
B
aro
nProject temporary facilities
HERVE
BARON
20
13
H
erv
B
aro
nProject temporary facilities
HERVE
BARON
20
13
H
erv
B
aro
nConstruction Procedures
HERVE
BARON
20
13
H
erv
B
aro
n
HERVE
BARON
20
13
H
erv
B
aro
nQuality Control
HERVE
BARON
20
13
H
erv
B
aro
n
SlumpSampling
Temperature
Quality Control
HERVE
BARON
20
13
H
erv
B
aro
nQuality Control
HERVE
BARON
20
13
H
erv
B
aro
nCost Control
HERVE
BARON
20
13
H
erv
B
aro
nInsurance
HERVE
BARON
20
13
H
erv
B
aro
nContracts
P.O.
Sub
P.O.
P.O.
Main Contract
Purchase
Orders
Sub-Contracts
EPC
Sub
HERVE
BARON
20
13
H
erv
B
aro
nContracts
Main Contract
EPC
Terms and Conditions
PriceSchedule
Performance guarantees
Technical basis
Specifications, codes & stds
HERVE
BARON
20
13
H
erv
B
aro
nContracts
E
HERVE
BARON
20
13
H
erv
B
aro
nContracts
E P
HERVE
BARON
20
13
H
erv
B
aro
nContracts
E P C
HERVE
BARON
20
13
H
erv
B
aro
nContracts
+ x%
HERVE
BARON
20
13
H
erv
B
aro
nConstruction contracts
Civil
HERVE
BARON
20
13
H
erv
B
aro
nConstruction contracts
Mechanical
HERVE
BARON
20
13
H
erv
B
aro
nConstruction contracts
E&I
HERVE
BARON
20
13
H
erv
B
aro
nConstruction contracts
General Contractor
HERVE
BARON
20
13
H
erv
B
aro
n
ContractsTerms and Conditions
Main Contract
EPC
Obligations of the 2 parties
Limit of liability
Penalties in case of bad performance
Conflict resolution
HERVE
BARON
20
13
H
erv
B
aro
nQuality Assurance (QA)
HERVE
BARON
20
13
H
erv
B
aro
nQuality Assurance (QA)
HERVE
BARON
20
13
H
erv
B
aro
n
Quality Assurance (QA)
HERVE
BARON
20
13
H
erv
B
aro
nQuality Assurance (QA)
HERVE
BARON
20
13
H
erv
B
aro
n
Discipline codeA Instrumentation & Control
C Civil engineering
E Electrical
G Project general documentsJ Mechanical
K Safety
M Piping & Layout
P Processes
S Steel Structures
V Vessels Heat exchangers
W Materials Welding
Document code1 Installation drawings
2 Detail drawings
3 Diagrams
4 Lists Bill of Quantities5 Isometrics
6 Calculation notes
7 Specifications
8 Data sheets
9 Requisitions
Document Control
HERVE
BARON
20
13
H
erv
B
aro
nDocument Control
HERVE
BARON
20
13
H
erv
B
aro
nDocument Control
Engineering
Documents submitted to client
Client
Approval/
Comments
Vendors
Documents submission Comments
HERVE
BARON
20
13
H
erv
B
aro
n
Intranet / Internet
Intranet / Internet
Breakdown structures
Projects
Interfaces
Reports
Satellite Engineering
Center
Center 1 Sr. Mgmt Center 2 Sr.
Mgmt
Construction Site
Electronic Document
Management System
Engineering
documents
Vendor
documents
Correspondence
etc.
Electronic Document Management System
HERVE
BARON
20
13
H
erv
B
aro
n
Interface Management
HERVE
BARON
20
13
H
erv
B
aro
n
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36PLANT START-UPPIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X XPIPING MATERIAL & DRAWINGS AT SITEPIPING MATERIAL MANUFACTURING & SHIPPING X X X X X XPURCHASE OF PIPING MATERIALTECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIALPREPARE PIPING MATERIAL TAKE-OFF XPIPING ROUTING STUDIES X X XPIPING & INSTRUMENTATION DIAGRAMS (PIDs)
PROJECT SCHEDULEMONTH
1
1
2 3
3
45
2
4 5
5
Scheduling
HERVE
BARON
20
13
H
erv
B
aro
nScheduling
HERVE
BARON
20
13
H
erv
B
aro
n
Progress Monitoring
How would you measure progress?
HERVE
BARON
20
13
H
erv
B
aro
n
Progress Monitoring
HERVE
BARON
20
13
H
erv
B
aro
n
Progress Monitoring
HERVE
BARON
20
13
H
erv
B
aro
n
Progress Monitoring
HERVE
BARON
20
13
H
erv
B
aro
n
15 years ago: 2D
Today: 3D
Tomorrow:
3D & data
IT
HERVE
BARON
20
13
H
erv
B
aro
n
IT
HERVE
BARON
20
13
H
erv
B
aro
n
Safety
HERVE
BARON
20
13
H
erv
B
aro
n
Safety
Guard Rail System with ToeBoards
Cross Bracing
Planking
Runner
Bearer
Longitudinal Brace
Post
Sill
HERVE
BARON
20
13
H
erv
B
aro
nSafety
HERVE
BARON
20
13
H
erv
B
aro
n
Human resources / career path
3-5 yrs
5 yrs
Graduate Engineer, 25 years old
5-7 yrs
40-45 yrs oldProject Manager
Engineering Manager/Deputy Project Manager
Project Engineer
Process Engineer
Note: the career pattern shown here is a very fast track one to the PM position... One would enjoy oneself just as well taking more time!
HERVE
BARON
20
13
H
erv
B
aro
n
Beyond this presentation