This map shows the U.S. EPA's conceptual sampling plan for the Creese and Cook Tannery Superfund Site in Danvers. Field work to determine the extent of contamination on the east side of the Crane River is scheduled to begin in May and take four to six weeks.

Citation preview

Page 1: EPA sampling plan for Danvers, Mass., Superfund site

CLINTON AVENUE

ENDICOTT STREET

WATE

RST

REET

HIGH STREET

HUTCHINSON DRIVE

PERR

Y STR

EET

NEEDHAM ROAD

YANKEE DIVISION HIGHWAY

CHEEVER STREET ME

RRILL

STRE

ET

HOOD TE

RRAC

E

PERR

Y DRIVE

PERRY TERRACE

HIGH STREE

T COURT

CRANERIVER

Notes: 1. Actual soil boring locations will be determined based on observations made during Study Area reconnaissance,geophysical investigation results, and field screening results for previous borings during the same sampling event. 2. Actual groundwater monitoring well locations will bedetermined based on observation made during Study Area reconnaissance, geophysical investigation results, and initial results of soil sampling program.

3. Only 60 soil borings are illustrated. Up to 15 more soilborings will be advanced based on field observations during the soil investigation.

4. Location of site features depicted hereon is approximate and given for illustrative purposes only.

LegendProposed MW Installation 0 75 150 300 CONCEPTUAL SAMPLING PLAN

CREESE & COOK TANNERY (FORMER)Proposed DPT Soil Boring FeetExisting MWs SUPERFUND SITE

1 inch = 300 feetSediment & Seepage DANVERS, MASSACHUSETTSWater Sampling Area