ENVIRONMENTAL ASPECTS ONBUCHAREST BRASOV MOTORWAY
NATURA 2000
Claudiu BALANRomanian National Company of Motorway and National Roads
Claudiu BALANRomanian National Company of Motorway and National Roads
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
2/26
I.I. GENERALGENERAL INFORMATIONINFORMATION
II.II. ENVIRONMENTAL REQUIREMENTSENVIRONMENTAL REQUIREMENTSACOMPLISHEDACOMPLISHED UNDER THEUNDER THE PROJECT FRAMEPROJECT FRAME
III.III. PROTECTED AREAS. NATUR PROTECTED AREAS. NATUR EE 20002000 SITESSITES
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
3/26
Motorway
BUCHAREST BRASOV
MOTORWAY
Motorway Network
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
4/26
I. GENERAL INFORMATIONI. GENERAL INFORMATION
The motorThe motor wayway isis part of part of thethe developmentdevelopment strategystrategy plan inplan in thetheNationalNational MotorwaysMotorways ProgramProgram frame, and itframe, and it fitsfits inin thethe NationalNationalSpatialSpatial PlanPlan -- RoadsRoads sectionsection ,, approvedapproved byby LawLaw 363/2006.363/2006.
It representsIt represents thethe middlemiddle areaarea of of thethe PP anan --EuropeanEuropean TransportTransportCorridor no. IV,Corridor no. IV, whichwhich crossescrosses RomaniaRomania fromfrom easteast toto westwest ,,betweenbetween NadlacNadlac andand Constanta.Constanta.
TheThe areaarea isis one of theone of the croudedcrouded routeroute inin RomaniaRomania ,, having traffichaving trafficvaluesvalues overover 50,000 MZA50,000 MZA ..
The rThe r outeoute (174 km)(174 km) crosscross eses thethe followingfollowing countcount iesies ::-- BucharestBucharest almost 1,6 kmalmost 1,6 km-- IlfovIlfov almost 30,1 kmalmost 30,1 km-- PrahovaPrahova almost 115,3 kmalmost 115,3 km-- BrasovBrasov almost 26,3 kmalmost 26,3 km
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
5/26
II.II. ENVIRONMENTAL REQUIREMENTSENVIRONMENTAL REQUIREMENTS REALIZEDREALIZED UNDER THEUNDER THEPROJECT FRAMEPROJECT FRAME
LEGISLATIONLEGISLATION
METHODS OF ENVIRONMENTAL IMPACT ASSESSMENTMETHODS OF ENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTALENVIRONMENTAL PROTECTIONPROTECTION WORKSWORKS
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
6/26
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
7/26
AppliedApplied legislationlegislation
Air AirOrder Order no. 592/2002no. 592/2002 onon thethe establishment of establishment of limitlimit valuesvalues ,, thethe thresholdthreshold valuesvalues andand ,,
methodsmethods of of assessmentassessment of of sulfur sulfur dioxidedioxide , nitrogen, nitrogen dioxidedioxide andand nitrogennitrogen oxidesoxides ,, particulate particulate matter matter ss,, leadlead , benzene, carbon, benzene, carbon monoxidemonoxide andand ozoneozone in ambientin ambient air air ;;Order Order no. 462/1993no. 462/1993 -- TechnicalTechnical conditionsconditions for for atmosphereatmosphere protection protection .. RulesRules toto limitlimitemissionsemissions of of pollutants pollutants for for combustioncombustion instalationsinstalations ..
Noise NoiseSTAS 10009/1988STAS 10009/1988 UrbanUrban acousticsacoustics .. Noise Noise limitslimits ;;GovernmentGovernment DecisionDecision no. 539 of April 7, 2004no. 539 of April 7, 2004 onon thethe limitationlimitation of of noisenoise emissionsemissionsintointo thethe environmentenvironment , noise generated by the, noise generated by the equipmentequipment for for outdoorsoutdoors useuse ;;GovernmentGovernment DecisionDecision no. 321/2005no. 321/2005 aboutabout thethe assessmentassessment andand management of management of environmentalenvironmental noisenoise ;;GuideGuide -- 30/06/200630/06/2006 -- InterimInterim MethodsMethods for for calculatingcalculating thethe noisenoise indicatorsindicators made bymade byroadroad s,s, railrail andand air air traffictraffic inin thethe vicinityvicinity of of airportsairports , along industrial areas., along industrial areas.
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
8/26
AppliedApplied legislationlegislation
WaterWaterWater Water LawLaw no. 107/1996,no. 107/1996, withwith subsequentsubsequent additionsadditions andand amendmentsamendments ;;LawLaw no. 458/2002no. 458/2002 -- ConditionsConditions for for drinkingdrinking water water qualityquality ;;LawLaw no. 311/2004no. 311/2004 amendingamending andand supplementingsupplementing LawLaw no. 458/2002no. 458/2002 -- ConditionsConditions for for drinkingdrinking water water qualityquality ;;
GovernmentGovernment DecisionDecision no. 930/2005no. 930/2005 -- SpecialSpecial rulesrules onon thethe naturenature andand sizesize of of sanitarysanitary protection protection areasareas ;;Order no. 161/2006Order no. 161/2006 Rules for Rules for clasifyingclasifying the surface water quality, in order tothe surface water quality, in order toestablish the ecological status of water particles;establish the ecological status of water particles;
NTPA 001/2002 NTPA 001/2002 -- regulatoryregulatory framework framework for for settingsetting limitslimits toto polluting polluting loadload ss of of thetheindustrialindustrial andand municipalmunicipal wastewater wastewater ,, which can bewhich can be dischargedischarge dd intointo naturalnatural receiversreceivers ;;
NTPA 002/2002 NTPA 002/2002 -- actsacts regardingregarding conditionsconditions of of wastewater wastewater dischargedischarge intointo thetheseweragesewerage networksnetworks inin villagesvillages ;;GovernmentGovernment DecisionDecision no. 352/2005no. 352/2005 -- amendingamending andand supplementingsupplementing GovernmentGovernment no.no.188/2002 for 188/2002 for approvingapproving thethe rulesrules onon thethe conditionsconditions of of dischargedischarge wastewater wastewater intointo thetheaquaticaquatic environmentenvironment ;;
STAS 9450STAS 9450 --19881988 -- TechnicalTechnical conditionsconditions of of water water qualityquality for for irrigationirrigation of of cropscrops ..
Soil Soil Order Order no. 756/1997no. 756/1997 -- Order Order approvingapproving thethe regulationregulation onon thethe assessmentassessment of of
environmentalenvironmental pollution pollution ..
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
9/26
ImpactImpact AssessmentAssessment MethodsMethodsCollecting dataCollecting data
Site visitsSite visits
AA nalysisnalysis of of existingexisting documentationdocumentation (General Urban Plans., Area(General Urban Plans., Area
Urban Plan,Urban Plan, DirectoriesDirectories -- environmentalenvironmental factorsfactors , management, managementplansplans forfor forestforest rangesranges , etc., etc. ))
PublicPublic consultationsconsultations ((interviewsinterviews withwith thethe populationpopulation fromfrom thethe
affectedaffected areaarea s,s, meetingsmeetings ))
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
10/26
PublicPublic consultationsconsultations
PublicPublic debatedebate ledled toto majormajor environmentalenvironmental issuesissues throughthrough punctuallypunctually solutionssolutions andandspecificspecific treatmenttreatment toto ensureensure optimaloptimal environmentalenvironmental conditionsconditions ..
ThusThus , for, for thethe informationinformation andand consultationconsultation of public, thereof public, there werewere mademade thethe followingfollowing ::ThereThere werewere publishedpublished inin thethe presspress announcementsannouncements relatingrelating toto : fi: fi lllingling applicationapplicationforfor obtainingobtaining thethe environmentalenvironmental agreementagreement ss,, elaboration of elaboration of thethe reportreport aboutabout thetheenvironmentalenvironmental impactimpact assessmentassessment ,, submitingsubmiting thethe reportreport toto thethe environmentalenvironmentalauthoritiesauthorities andand thethe possibilitiespossibilities of of consultationconsultation ,, meetingsmeetings of of publicpublic debatedebate of of thethe
Report,Report, date anddate and locatilocati on of theon of the sessionssessions andand publicpublic debatedebate ,, thethe decisiondecision of anof anenvironmentalenvironmental issueissue ;;TT hehe aboveabove --mentionedmentioned announcementsannouncements were posted at city mayorwere posted at city mayor ;;MayorsMayors havehave beenbeen submittedsubmitted toto thethe projectproject documentationdocumentation for publicfor public informationinformationandand questionnairesquestionnaires toto recordrecord observationsobservations andand proposalsproposals of of thethe public;public;WhereWhere heldheld publicpublic consultationconsultation sessionssessions inin additionaddition toto thosethose stipulatedstipulated byby thethelegislationlegislation ((atat thethe Bucharest 2Bucharest 2 --nd Sector Mayor, atnd Sector Mayor, at BarcanestiBarcanesti , Sinaia, Poiana, Sinaia, PoianaCampinaCampina ))..
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
11/26
poster poster questionnairequestionnaire aannouncementnnouncement
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
12/26
Works forWorks for environmentalenvironmental protectionprotection
WorksWorks to to protect protect wildlifewildlife ::FencingFencing : eliminate: eliminate thethe risk risk of of vehiclesvehicles collisionscollisions withwith wildwild animalsanimals ..
WorksWorks that that allow allow wild wild animals animals to to cross cross the the motor motor waywayCulvertsCulverts forfor largelarge wildlifewildlife ;;CulvertsCulverts toto draindrain waterwater andand toto restorerestore thethe locallocal roadsroads ,, especiallyespecially forfor smallsmallfauna;fauna;NumerousNumerous worksworks of of artart ((bridgesbridges andand viaductsviaducts )) thatthat allowallow highwayhighway crossingcrossingbyby wildlifewildlife ..
WorksWorks to to protect protect waterwater qualityquality and and soil soil ::sedimentarysedimentary basinsbasinsfatfat ss separatorseparator ,,
pp oolsools of of dispersiondispersion ,,cleaningcleaning servicesservices constructionsconstructions providedprovided toto maintenancemaintenance areasareas ,, basesbases andandcoordinationcoordination centerscenters ..
WorkWork s s provided provided for for protection protection against against noise noise ::
nn oiseoise protectionprotection panelspanels ..
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
13/26
III.III. ProtectedProtected areasareas . N. N ATURAATURA 20002000 sitessites
ProtectedProtected areasareas
NATURE 2000 SiteNATURE 2000 Site GradisteaGradistea --CaldarusaniCaldarusani --DriduDridu
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
14/26
Natural Natural ProtectedProtected AreasAreas
BucharestBucharest MunicipalityMunicipality :: MotorwayMotorway willwill notnot passpass throughthrough protectedprotected
areasareas or goor go throughthrough thethe vicinityvicinity of of protectedprotected areasareas ..
IlfovIlfov CountyCounty :: HighwayHighway willwill crosscross thethe Natura 2000 siteNatura 2000 site -- thethe specialspecialprotected areasprotected areas GradisteaGradistea -- DidruDidru .. ThisThis areaarea ,, laterlater in 2008,in 2008, whenwhen waswasdevelopeddeveloped aa biodiversitybiodiversity studystudy whichwhich waswas thethe basisbasis forfor obtainingobtaining thetheenvironmentalenvironmental agreementagreement forfor clearingclearing thethe site.site.
PrahovaPrahova CountyCounty :: HighwayHighway willwill notnot passpass throughthrough protectedprotected areasareas , but, butnear of near of ::
Sinaia Alder GroveSinaia Alder GroveBucegi National Park Bucegi National Park
BrasovBrasov CountyCounty :: HighwayHighway willwill notnot passpass throughthrough protectedprotected areasareas
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
15/26
BucharestBucharest --MoaraMoara VlasieiVlasiei sectionsection
LEGENDA - LEGEND
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
16/26
MoaraMoara VlasieiVlasiei --PloiestiPloiesti sectionsection
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
17/26
Natur Natur ee 20002000 sitesite SPASPA Gr diGr di teatea --ClClddruru aniani --DriduDridu
Motorway route Bucharest - Ploiesti crosses forest Surlari
designates as special protected areas (bird conservation) SPA -
Gr di tea-Caldarusani-Dridu included in NATURA 2000 network.
Affected forest area that needs to be cleared is 4.24 ha (50 mwide and 850 m long) between km 22+150 - 23+000, land that belongs
to Snagov Forest (Ilfov county) and the site is about 0.14% of total.
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
18/26
Nature 2000 HabitatNature 2000 Habitat
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
19/26
SPASPA Gr diGr di teatea -- CaldarusaniCaldarusani -- DriduDridu waswas designateddesignated as a special protectedas a special protected
areaarea by by RomanianRomanian OrnithologicalOrnithological SocietySociety ((thatthat part of Ilfov EPA) part of Ilfov EPA) ,, in order in order to conserve aboutto conserve about 2020 bird bird speciesspecies mentioned inmentioned in AnnexAnnex 11 of of BirdsBirds DirectiveDirective(79/409/EEC), as(79/409/EEC), as itit followsfollows ((exceptexcept fromfrom AnnexAnnex 44 toto GovernmentGovernment DecisionDecisionno. 1284/2007):no. 1284/2007):
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
20/26
Ciconia ciconia
Circus aeruginosus
Ixobrychus minutus
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
21/26
ImpactImpact mitigationmitigation measuresmeasures
thethe roadroad areaarea which crossing thewhich crossing the SPA'sSPA's ,, thethe
fencingfencing isis additionaladditional lyly mademade -- toto wirewire meshmeshpanelspanels onon metalmetal postsposts of 1.80 mof 1.80 m highhigh ,, locatedlocated
atat thethe motorwaymotorway limitlimit profileprofile -- andand nettingnetting itit
withwith aa heightheight similarsimilar toto thethe sizesize meshmesh
maximummaximum 5 cm,5 cm, toto avoidavoid directdirect flightflight of of smallsmall birdsbirds inin thethe roadroad collisioncollision area;area;
installationinstallation of of twotwo "bat"bat ss bridgesbridges "" inin thisthis
sectionsection in order toin order to helphelp themthem crossingcrossing thethehighwayhighway ((ramoseramose linearlinear structuresstructures overover thethe
roadroad ))
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
22/26
ImpactImpact mitigationmitigation measuresmeasures
along the wholealong the whole areaarea , which is, which is crossingcrossing SPASPA , will be, will be
placedplaced noisenoise bareersbareers in orderin order toto minimizeminimize thethe effecteffect ss of of
noisenoise onon biodiversitybiodiversity
replanting thereplanting the motorwaymotorway slopesslopes withwith typicaltypical speciesspecies --
nativenative from the areafrom the area crossedcrossed byby thethe roadroad
constructionconstruction of of 44 wildlifewildlife ecoductsecoducts forfor smallsmall andandmediummedium fauna.fauna.
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
23/26
Impact compensation measuresImpact compensation measures
In order to maintainIn order to maintain thethe favorable conservation statusfavorable conservation status of of speciesspeciesandand offsettingoffsetting negativenegative impactsimpacts of of highwayhighway constructionconstruction isis
necessarynecessary toto compensatecompensate thethe loss of theloss of the habitathabitat throughthrough
afforestationafforestation of of agriculturalagricultural land,land, withwith a specifica specific forestforest
compositioncomposition ,, similarsimilar toto adjacentadjacent habitatshabitats andand theirtheir integrationintegrationSPASPA Gr diGr di teatea --CaldarusaniCaldarusani --DriduDridu
aa rearea whichwhich isis goinggoing toto bebe replantedreplanted isis aboutabout 29 ha of 29 ha of farmlandfarmland
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
24/26
Compensationarea 29ha
Highway
Compensation area 29 ha
Crossing Nature 2000 Habitat
8/7/2019 Environmental Problems Along the Bucharest Ploiesti Motorway
25/26
MonitoriMonitori ngng
identifyingidentifying andand monitoringmonitoring sourcessources of of pollutionpollution
establishestablish inging a program of a program of measurementsmeasurements toto determinedetermine thethe noisenoise
monitoringmonitoring thethe operationoperation of of facilitiesfacilities
periodicperiodic evaluationevaluation of of park park equipmentequipment
ccontrolledontrolled wastewaste managementmanagement
establishestablish inging a programa program toto preventprevent andand control accidentalcontrol accidental pollutionpollution
landland monitoringmonitoring areasareas in order toin order to actact againstagainst invasiveinvasive speciesspecies ,, if if
necessarynecessary
avifaunaavifauna monitoringmonitoring in orderin order toto ensureensure a lowa low impactimpact