Environmental Monitoring Report This report has been submitted to ADB by the Himachal Pradesh Power Corporation Limited, Shimla and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Project Number: 41627-043 September 2015 Period: April 2015 June 2015 IND: MFF - Himachal Pradesh Clean Energy Development Investment Program - Tranche 3 Submitted by Himachal Pradesh Power Corporation Limited, Shimla

Environmental Monitoring Report - Asian … PRADESH POWER CORPORATION LTD. (A State Government Undertald11g) Uttam Bhawan Dogra Lodge), Below 103 Tunnel,Shimla-171004 HP h1dia Phone:

  • Upload
    lediep

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

Environmental Monitoring Report

This report has been submitted to ADB by the Himachal Pradesh Power Corporation Limited, Shimla and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Number: 41627-043 September 2015 Period: April 2015 – June 2015

IND: MFF - Himachal Pradesh Clean Energy Development Investment Program - Tranche 3

Submitted by

Himachal Pradesh Power Corporation Limited, Shimla

HIMACHAL PRADESH POWER CORPORATION LTD. (A State Government Undertald11g)

Uttam Bhawan Dogra Lodge), Below 103 Tunnel,Shimla-171004 HP h1dia Phone: 0177-2658397 Fax :0177-2659899

No.HPPCL/ESMU/Sainj HEP/QR/2015- 538- l/. f Dated: 2.l-0~ - :J.o/~

To 4 Teresa Kho,

Country Director, South Asia Department, India Resident Mission, 4 San Martin Marg, Chanakyapuri, New Delhi-110021

Subject: Submission of 211d Quarterly (w.e.f. 1.04.15 to 30.06.2015) Compliance

Status Report on Envirnnmcnt Management Plan alongwith six monthly (w.e.f. 1.01.15 to 30.06.2015) compliance status report on Environment Clearance, Forest Clearance and Public Hearing - Sainj HEP

Madam, Please find enclosed herewith 211

d Quarterly (w.e.f. 01.04.2015 to

30.06.20I5) Compliance Status Repo1t on Environment Management Plan including six

monthly (w.e.f. 1.01.15 to 30.06.2015) compliance status report on Environment

Clearance, Forest Clearance and Public Hearing in respeCt of Sainj HEP.

This is for yow· information and record pl~ase.

Encl: As above ASIAN OEVELOF't~: l:NT BANK INRM

CC:

COllNTPV nu~i:-r.rn~·~ 0FF1Ct::

2 6 AU:3 ~~o? R ECEIVE D

Yours faithfully,

')O's .,_1.oS · Sood IFS) nment Specialist

I. Mr. V. R. Karbar, Team Leader, South Asia Depm1ment, India Resident Mission, 4 San Martin Marg, Chanakyapuri, New Delhi- I I 002 I for infonnation, please.

2. Mr. Ralf Starkloff, Senior Safeguard Specialist, South Asia Department, India Resident Mission, 4 San Martin Marg, Chanakyapuri, New Delhi-110021 for information, please.

3. The General Manager, Sainj HEP, HPPCL, Sarabai (Bhuntar), Distt. Kullu, HP for infonnation please.

~J DEVELOPMENT BANI< .. 1 iNRM

I~ ~l) f ~~ 2 7 AUG Z015

L HECEIV ED -~'"1'1)~

HP POWER CORPORATION .LTD ..

~~O~&

OOD7_W!2@ mlb&@umo© !Pm@c:.£J&©u ((v@@ !IWWJJ

Environmental Management Plan Monitoring Report

(Second Quarter (Q2) Report 2015) SAINJ HEP (WO MW)-Environment Monitoring Report No. S-2015/ (Q2) Page 1

I

. \ ... List of abbreviations and colloquial terms used

ADB Asian Development Bank AY Academic Year Bigba Unit for measuring land (One Bigha =about 800 sq mtr) Biswa Unit for measuring land (One Biswa = about 40 sq mtr) CA Compensatory Afforestation CAMPA Compensatory Afforestation Management and Planning Agency CAT Catchment Area Treatment CBO Community Based Organization CES Chief Environment Specialist CMO Chief Medical Officer CSR Coroorate·Social Responsibility DC Deputy Commissioner DFO Divisional Forest Officer DGM Deputv General Manager distt. District DPR Detailed Project Report EIA Environment Impact Assessment

.

EMP Environment Management Plan Go HP Government of Himachal Pradesh Go I Government of India HCC Hindustan Construction Company (Ltd) HDPE High-Density Poly-Ethylene HEP Hydro-Electric Project HFL Highest Flood Level . HoP Head of Project HP Himachal Pradesh HPCEDlP Himachal Pradesh Clean Energy Development Investment Programme HPFD Himachal Pradesh Forest Department HPPCL Himachal.Pradesh Power Corporation Limited HPPWD Himachal Pradesh Public Works Department HPSEB Himachal Pradesh State Electricity Board . HPSFDC Himachal Pradesh State Forest Development Corporation

SAlNJ HEP (100 MW)-Environment Monitoring Report No. S-2015/ (Q2) Page 2

ITI Industrial Training Institute LADA Local Area Development Agency

LADC Local Area Development Committee LADF Local Area Development Fund LWSS Lift Water Supply Scheme M Meter MoEF Ministrv of Environment & Forests MW Megawatt NPV Net Present Value NRRP National Rehabilitation and Resettlement Plan PAA Project Affected Area PAF Proj~t Affected Family Panchayat Lower most tier (at cluster of village level) of governance in India Parivar Family PAZ Project Affected Zone PCC Project Construction Circle PHC Primary Health Centre R&R Resettlement and Rehabilitation RoR Run-of-the-River Rs. Indian Rupees/INR SC Scheduled Caste SOM Sub Divisional Magistrate SE Superintending Engineer SPCB State Pollution Control Board Sq kms Square Kilometer Sq Mtr Square Meter ST Scheduled Tribe

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/ (Q2) Page 3

..

INDEX

S.N. CONTENT PAGE Name of Project & Other Details 1-5

1 Status of Implementation of Environment Management Plan 6-20 2 Status of compliance to the stipulations under Forest Clearance 21-23 " Status of compliance to the stipulations under Environment Clearance 24-33 ~

4 Fulfillment of Commitments of Public Hearing 34-40 5 ADB Stipulations/ Safeguarding Measures 41-42 6 Complaints received from locals durin~ the reporting period 43-47 7 Others . 48

8 Staffing Position 49 9 Annexure

EMR-I 51 EMR-II 52-53 EMR-III 54-55 EMR-IV 56 E:MR-V 57-59 EMR-VI 60-73 EMR-VII 74 EMR-VIII 75-79

SAINJ HEP ( 100 MW)-Environment Monitoring Report No. S-2015i (Q2) Page4

SAINJ (IOOM\V) HYDRO-ELECTRIC PROJECT

ENVIRONMENT SAFEGCARDING AND MANAGEMENT REPORT

The Sainj (100 M\V) Hydro-Electric Project is being funded by rhe Asian Development Bank, which is covered under HPCEDIP Tranche-3.

I Name of Project Sainj Hydro Electric Project (100 MW)

II Name of Monitoring/Reporting Agency and Internal Monitoring report of HPPCL. General Manager, Sainj address Hydroelectric Project, HPPCL, Sarabai (Bhuntar), Distt. Kullu

<H.P)-175125

III ~fonitoring Period (season/month) E:VIR 2°a quarter (April-Jun2, 2015) and Half yearly compliance status report forthe period January-June, 2015

IV Report No. HPPCL-ESMU-Sainj-Env.Comp.Rprt-2015/2

v Report for the period Upto 30.06.2015

VI Date of reporting 11.08.2015

SAINJ HEP (100 !vIWJ-Environment Monitoring Report No. S-2014/ (Q4) Page 5

1. Status of Implementation of Environment Management Plan The abstract of various provisions in the approved EMP of Sainj HEP along with their implementation status is tabulated below.

SN Component of EMP

Institutional responsibility

Status upto date 30.06.2015 Activities done I developments Remarks

l. Compensatory Affore..~tation and Biodiversity Conservation Plan

• Afforestation Forest For Compensatory Afforestation (CA) over 96 ha land of 96.00 ha Department, i.e. twice the area of forestland diverted (47.993 ha) in

Director GHNP lieu of diversion of forestland for the Project, Rs 92.50 lacs have been deposited during Sept., 2009 with Himachal Pradesh Forest Depaitment.

• In situ State Forest The matter has been taken up with Forest Department. relocation of Department/ Betula alnoides HPPCL

• Ex situ conservation measures (seed collection in vitro seed germination and nursery establishment, including setting up of Jab. and offices etc and 5 year maintenance)

The matter has been taken up with G.B. Pant Institute of Himalayan Environment & Development, Kullu.

SAINJ HEP ( l 00 MW)-Environment Monitoring Report No. S-2015/ (Q2)

during reporting period (Apr. to June., 2015)

No funds have released to this office from competent authority

A comprehensive proposal was received from G.B. Pant Institute of Himalayan Environment and Development, Mohal for Ex-situ conservation measures and the work agreement for the ex-situ conservation measures has been signed with the institute.

DFO, Shamshi bas intimated that no fund has been released by CAlv1P A authority for year 2013-14 so far.

DFO, Shamshi has been again requested to submit a comprehensive proposal on the conservation of Betula Alnoides species. The proposal is still awaited.

Page6

\... SN Component of

EMP

• Conservation of fauna: restrictions on noise levels during March-June and Oct-Dec shall be followed and this information should be included in tender documents for contractors.

Institutional responsibility

HPPCL/ Contractor

• Conservation HPPCL/ of fauna: labourers Contractor should be made a•vare of conservation, notice boards near Jabour camps, no fireanns allowed in the Sainj valley, strict restrictions on laborers to ensure no they do not harvest any products from the forests

St.atus upto date 30.06.2015

The machinery being used for the project work is fully mollified. Regular checks are being made to limit their noise level as per the pennissible limits notified by the manufacturer.

Labours has been made aware of conservation during the celebration of Environment Day, World Water Day etc. Notice board has been placed near labour camp. Three Nos. of check post has been maintained near the project site and fifteen Nos. of Home Guards has been deployed in these check posts. The main duty of these. home guards is to check all illegal activities in the GHNP area.

SAINJ HEP (IOO MW)-Environment Monitoring Report No. S-2015/ (Q2)

Activities done I developments Remarks during reporting period (Apr. to June., 2015) Copy of noise level monitoring report during the reporting period. (Annexure is attached as EMR-I).

Noise measured values are within the limits specified by Central Pollution Control Board.

Page 7

SN Component of EMP

Institutional responsibility

• Fuel for HPPCL/ laborers should be Contractors provided from plantations or provision should be made for free kerosene/LPG

Status upto date 30.06.2015

Fuel arrangement (LPG) is being made by the contractor for its labour and staff free of cost.

Acmities done I developments Remarks during reporting period (Apr. to June., 2015)

LPG Cylinder has been provided by contractor for its labour and staffs free of cost and an expenditure amounting to Rs. 3, 32, 731/- has been made during the repmt ing quarter (Annexure is attached as El\IR- II).

• Creation and Forest funding of a ·Sainj Department,

Four No. computers and one no. Vehicle has already During reporting period nothing provided to Forest Department under this plan. Fifteen has been paid on account of salary

Valley Director GHNP No. Home guard has been deployed in Great of home guards. Conservation Cell; Himalayan National Park at the project cost during which will monitor Oct, 2012 to ensme regulatory provisions to protect and enforce the existing biodiversity. regulatory provisions to protect the existing biodiversity

• Environmental Support to Provided financial support to :-Awareness for existing state • Greenson, A social, Environment Tourism & Conservation - government Development Concern organization, Manali during development of agencies a workshop on Environment protection, educational • H.P.Forest Deptt for publication of a Wildlife awareness packages, workshops. The project authorities will bring out a monthly publication in local language '\Vi.th progress and future programme.

souvenir.

SAINJ HEP (lOO MW)-Environment Monitoring Report No. S-20151 (Q2)

An amount of Rs 15000 have been utilized on \Vorld Environment

Day Awareness programme-2015 at he Public place & project area

by the support of Local Administrative Officers & Local Villagers. Tree Plantation in Sainj Officers Camp by all the age type of people & done the Quarterly

Environment Monitoring through third party for confonnity of all

parameters.

Page8

\

SN Component of EMP

• Anti-poaching measures: one check post to be constructed near the intake and one near the powerhouse site. Each check post shall have 3 guards and adequate communication equipment.

Institutional responsibility

2 Catchment Area Treatment Plan

• Biological Forest meas mes: Department

o 101 ha afforestation

o 195ha gap plantation

o 15 0 ha pasture development

o 40 ha fuel wood plantation

o 40 ha fodder plantation

p 90 ha social forestry

o 5 new nurseries

Status upto date 30.06.2015 Activities done I developments Remarks during repo11iog period (Apr. to June., 2015)

Three no. of check posts are being maintained to No Utilization Certificate received regulate movement of forest produce as suggested by during the period. Forest Deptt. 15 No. home guard has been deployed at Ropa Complex, Barishisharan and Bah Complex during Oct, 2012 in Great Himalayan National Park at the project cost . Bed & Beddings and kitchen utensils have been provided for the home guards. An amount of Rs. 48, 07,000/- has been deposited with DFO, Shamshl for maintenance of labour shed, construction of kitchen, toilet b.ath and water supply fitting etc. during August, 2012 for the execution of check posts. Emergency light, High Beam torches, Search light has been provided to the forest department for the working of check posts.

The funds in phased manner (in five years) are being

released to HP Forest Deptt. (CAMPA account) for

implementing CAT Plan. The total provision

allocated for CAT Plan is Rs 111.54 million.

Annexure is attached as EMR-ID. Following payment has been done in favour of

Forest Deptt:-

s. Amount Date Remarks N. Deposited

(in Rs.) 1 5,20,75,000/ 3/04/2010 Rs. 185.14 lakh

for 0 year and

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/ (Q2) Page9

) . SN Component of Institutional Status upto date 30.06.2015 Activities done I deYelopments Remarks

EMP lresponsibility during reporting period (Apr. to June., 2015)

• Engineering Rs. 335.61 lakh measures: for 1st year.

o 40 l ha contour 2 2,75,86,000/ 30/03/2012 2"a year bunding implementation 0 105 Rmt of CAT Plan. stepped drain .... _, . 2,42,98,000/ 29/03/2013 3 rc1 year o 15 check dams implementation

• Wildlife GHNP will ofCATPlan.

improvement and prepare detailed development: action plan -o Survey of flora & fauna in catchment o Incentives to local communities for fire prevention o lncentives to local communities for wildlife protection

o lncenti ves to Joe.al communities to regulate local and migratory grazers o Habitat improvement in Sainj WLS o Wildlife census Forest

o Capacity Department building of staff and community

SAlNJ HEP (JOO MW)-Environment Monitoring Report No. S-2015/ (Q2) Page 10

... '

SN Component of Institutional Status upto date 30.06.2015 EMP responsibility

o Support for comm uni cation o Nursery establishment and maintenance o Soil & moisture conservation o Monitoring, evaluation and impact assessment study o Support for vennin-compost development o Support for intro of LPG for poor household o Socio-economic survey o Ex-situ support for Himalayan Thar breeding/ conservation of GHNP

• Joint Forest Forest M anagernent Department Process, training and awareness

•. Silt observatory Forest Department

• Promotion of eco-tourism, oavment

SAlNJ HEP (100 MW)-Envirorunent Monitoring Report No. S-2015/ (Q2)

Activities done I developments Remarks during reporting period (Apr. to June., 2015)

Page 11

SN Component of Institutional Status upto date 30.06.2015 Activities done I developments Remarks EMP responsibility during repo11ing period (Apr. to

June., 2015) for environmental services, monitoring

.., :> Fisheries Management Plan

• Provision of HPPCL/ Provision of fish ladder has been made in the barrage -fish ladder in the Contractor of Sainj HEP. Some biological data of fish of Sainj barrage river required for fish ladder design, but the data was

not available with the Fisheries Deptt. as intimated by Deputy Director of Fisheries, Pat likulah vi de his office · letter No. TFP-5-202-D-l-1989 dated 2110912012.Due to non availability of the biological data the design of fish ladder has been prepared a<; per IS Code 13877.

• Construction of Fisheries Deptt. Yet to be done additional rearing space for trout -hatchlings at Hamini farm

• Construction of Fisheries Deptt. First installment of Rs 5.0 million has been released to Director of Fisheries, Bilaspur has Deputy director has angling lake at HP fisheries Department during April, 2010 for the submitted utilization certificate been requested to Nagini construction of angling lake at Nagini. Dy. Director amounting to Rs. 37, 39,500/-. No intimate cun-ent status

(Fisheries) has intimated that the estimate is being Utilisation certificte received of construction of prepared by IPR. during the reporting period. angling lake.

4 Public Health Delivery System

• Construction of HPPCL/ Provision of Rs. 50 lacs has been kept for construction Frequent health checkups are Medical examination one Dispensary, Contractor of Hospital at Sainj (Rs. 25 lakh under LADF & Rs. being carried out during the of the labourers have including staffing, 25 lakh under R&R Plan) Scheme submitted to GoHP reporting period. been canied out at the hospital by Health Department, outcome awaited. Payment time of new joining equipment and will be· released after approval by Govt. of Himachal and then as and when supplies Pradesh. required. Records are

HPPCL is maintaining a dispensary. One No. Doctor being maintained by and one No. Pharmacists are posted in the dispensary. the contractor.

SAINJ HEP (100 MW)-Envirorunent Monitoring Report No. S-2015/ (Q2) Page 12

... -'

SN Component of Institutional Status upto date 30.06.2015 EMP iresponsibility

Health checkups are carried out by the Doctor posted in the dispensary during various camps organized in the project area.

• A first-aid post at Contractor Two no. First aid posts have been constructed by the each of the major contractor near Barrage and Power House sites. construction sites (two in total), including staffing, equipment and supplies

• Two ambulances Contractor Two numbers of full Equipped Ambulances provided at Project Site used for betterment of Workmen and Local Villagers.

5 Environmental Contractor The labour camp has been constructed at Jangla near Management in Adit - II by the contractor. Labor Camps

• Provision of Contractor The contractor has provided heating arrangements to heating (chapter the .labourers. Heaters and coal was provided for the does not have heating during the winter. clear measures; please describe what source of heating is used)

• Provision of Contractor The contractor has provided water purifiers in all water supply messes.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/ (Q2)

Activities done I developments Remarks during reporting period (Apr. to June., 2015)

Presently four numbers of Pharmacists are being deployed in two post<> in day and Night Shifts. An amount of Rs 3, 29,279/- has been spent on the medical staff (salary of medical staff) and amount of Rs. 42,681.99/- on medicine in the reporting quarter by the contractor (already attached as annexure EMR-H). The detail of expenditure on Ambulance drivers, hired ambulance, fuel Cost and maintenance cost to the Ambulances from Apr to June, 2015 is already attached as annexure EMR-U.

-

-

An expenditure of Rs. 23,226 I -has been done by the contractor to

Page 13

SN Component of EMP

Institutional responsibility

• Sanitation and Contractor sewage facilities: please describe current status per camp, and the periodic monitoring results of the quality of effluent from the oxidation ditches, to ensure that the sewage from the labor camps does not pollute the nver water (measure pH, BOD, COD, TSS and TDS as per EMP chapter 14 ).

• Solid waste management: o Report progress on the location, construction and use of the designated landfill site according to international good practice. o Report progress

Contractors/ HPPCL

Status upto date 30.06.2015

Comrnw1ity toilets have been provided and in the labor camp and septic tank has been provided for the sewage from the toiiets. Waste Water, Drinking Water, Ambient Air Quality, Noise Levels were being monitored periodically at the Project Site by the External party and records being maintained.

Wastage has been carried out by contractor own vehicle. The process of Composting has been established by the contractor. The bio- degradable waste from labour camp has been disposed off in four composting pits and later it is being used as Fertilizers to plants.

SAINJ HEP (100 MW)-Enviromnent Monitoring Report No. S-2015/ (Q2)

Activities done I developments Remarks during reporting period (Apr. to June., 2015) provide drinldng water facility to the labourers during the reporting quarter.

All the parameters were monitored \Vhich is under control and the reports are being maintained. An expenditure of Rs 3, 29,267 /- has been done by the contractor for the construction of septic tank maintenance of septic tank in the labour camp during the reporting quarter.

Page 14

SN Component of El\iP

6

on the disposal of biodegradable waste: preferably through the use of composting pits. Disposal of biodegradable waste at the muck disposal sites, as mentioned in the EMP, should be discouraged). o Commissioning and use of a waste collection truck

Muck Management Plan

DI: max. quantity to be dwnped =

116864 cum D2: max. quantity to be dumped =

113226 cum

D3: max. quantity to be dumped =

41439 cum

Institutional responsibility

Contractor/ HPPCL

Status upto date 30.06.2015

The Muck dumping sites are being prepared/constructed as per norms of H.P. State Pollution Control Board for dumping. Presently muck ts being dumped in five dumping sites only and protection works has been provided at these dumping sites.

Activities done I de,·elopments Remarks during reporting period (Ap.r. to June, 2015)

Proper monitoring and inspe..-:tion i:s being canied out by HPPCL and HP State Pollution Control Board as per EMR-IV.

76.24 % dumped to date; Ret2ining wall has been Dl: No muck dumped during this provided to the dwnping site all along the river. period.

43.72% dumped to date; Retaining wall has been D2: No muck dumped during this provided to the dumping site all along the Ka.--taul period ~ allah. A stone crusher has been set up at this site.

This site is not being used so far. -

SAINJ HEP (100 IvfW)-Enviromnent Monitoring Report No. S-2015/ (Q2) Page 15

.. SN Component of Institutional Status upto date 30.06.2015 Activities done I developments Remarks

EMP responsibility during rep011ing period (Apr. to June., 2015) lh~

D4: max. quantity 39.95% muck dumped so far. A stone crusher 04: No muck durnpedthis period. to be dumped = (20TPH) has been set up at this site and crushing of 231306 cum muck from site no. 7 is being ca1Tied out.

D5: max. quantity 17.62% muck dumped so far; proper protection is 05: 22746 Cum muck dumped to be dumped = being provided to this dumping site. this period 507035 cum

D6: max. quantity This site is not being used so far. -to be dumped = 42323 cum

D7: max. quantity 100% muck dumped Proper protection · has already Muck is being used in the crusher. to be dumped = provided to this dumping site.

42323 cum 7. Restoration and Landscaping of Construction Sites

•Use & HPPCL/ Quarry site is not being used so far. restoration of Contractor -quarry sites

• Beautification HPPCL Beautification of the barrnge site, power house

of the barrage site, complex and the colony area will be done after -power house construction works.

complex and the colony area

8. Environmental Management in Proposed road length reduced due to change in road alignment. HPPCL was completed

Road Construction. 9.13 km length of and remaining road has been completed by HCC Ltd. 4 No. bridges ( Steel bridge at Sui.nd, Steel bridge at Sambha, RCC bridge at Kartaul khad, RCC bridge at Kotlu Nallah) and 2 No. highway traffic tunnels has also been constructed to avoid the cutting of trees. An amount of Rs 55,000 ahas been utilized for the sprinkling of water along the Hall road.

• 4 km: 5/7 m Cutting road from Neuli to Barrag~ has been Maintenance of road is being

wide road from completed. Breast wall and retaining walls has been carried out by HCC Ltd.

Neuli to Barrage provided wherever required. Drainage system has

been provided to the entire road length.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/ (Q2) Page 16

(_

SN Comp<ment of EYIP

9

2.75/5m to 5/7m)

Greenbelt Development Plan: 40 ha. Around reservoir area. This includes nursery advance plantation

creatino, works,

and maintenance

Institutional responsibility

Forest iHPPCL

Deptt.

10 Control of Air Contractors. Pollution (for /HPPCL monitoring requirements see chapter 14 of EMP: once every season at major construction sites. SPM. RPM, S02 andNOx):

Control of emissions of equipment, vehicles and

Status upto date 30.06.2015

28.02.2012 and it was agreed that balance work from Suind to Neuli shall be done by HPPCL after taking over site from HPPWD. Revised utilization certificate amounting to Rs. 8-1. 82 lacs up to May, 2012 has been received from HPPWU. Secretary, PWD has accord~d his consent for handing over of road from Suind to Neuli road to HPPCL. The balance work of improvement of road has been taken up by HPPCL work is in progress.

The project contractor has implamed 1000 plants on both banks of the Sainj River.

Ambiem air sampling 1s being c.:atTied out by Environment Engineer, H.P. State Pollution Control Board, Kullu once in every three montbs at the major construction sites and analysis report is being submitted.

Every vehicle is being checked for pollution tmder control certificate regularly.

SAINJ HEP (100 I\.fW)-Environment l\fonitoring Repo1t No. S-20 L5/ \Q2)

· Activities done I developments Remarks during reporting period (Apr. to June, 2015)

Green belt is tmder development in the batching plant and crushing plant.

Monitoring for the 2n<1 quarter of 20 ! 5 has been carried out by Startech Labs, Hyderabad in the month of J um~. 20 l 5 and the report is attached as EMR-V.

Page 18

SN Component of EMP

11

12

13

generators;

Dust control: sprinkling, covering stockpile, effective traffic man.agement

lvieasures for Noi$e Control: see chapter 11. Monitoring as per EMP chapter 14: once every three months, at the major construction sites.

Water Pollution Control

Environmental !\foni toring Programme: • Water quality

• Air quality and meteorology

•Noise

Institutional responsibility

Contractors i HPPCL

Contractors/ HPPCL

H.P. Pollution Control ~oard

Status upto date 30.06.2015

;r Sprinkling of water is being done regularly along the PWD roads

~ Effective traffic management is being maintained at site.

:;.. Truck hauling soil, sand & other loose material is being maintained at least tv.ro feet of freeboard.

> Maintenance of construction equipment is being carried out regularly.

~ Provision of ear plug /ear muff has been made to the labourers.

The sedimentation/ settling tanks have been provided for the batching plant near Power House, Adit -1 and Adit-3, in all rhe tunnels and also for vehicle \•.;ashi;;ig ramps. Regular monitoring of 'vVater quality is being done by HP SPCB. ·And report is attached as EMR­VI.

r An amount of Rs. 3.05 lacs. 5 lacs and 5.24 lacs was released in the year 2010-11, 2011-12 and 2012-13 respectively to HP State Pollution Control Board w1der Environmental Monitoring Plan.

;.. An amount of Rs. 15 lacs have been deposited with Environment Department, GoHP for E:\1P monitoring during March, 2012.

SALi\J"J HEP ( l 00 M\V)-Environmeot ::Vlonitoring Report No. S-2015/ (Q2)

Activities done / developments Remarks duriilg reporting period (Apr. to June, 2015)

".\loise level monitoring is being carried out Scartech Labs. Hyderabad once m -every three months at the major constrnction sites and report is already attached as E~IR-I.

During the reporting period regular cleaning and maintenance of these settling tanks has been carried out. An amount of Rs. 32,946/ - has been spellt during the reporting period for construction/ maintenance of these tanks.

Quarterly monitoring of air. \'Varer quality and noise level is being can·ied out by H.P. State Pollution Control Board, Kullu. :\-1onitoring for the 2°0 quart~r of 2015 has been carried 0ut in the month of May & June, 2015 and the report is attached as EMR- VII & VIII

At al! the locations the level of air. \Vater and noise quality parameters have been observed m be i<vithin the limits as per CPCB norms.

Page 19

SN Component of Ins ti tu tional Status upto date 30.06.2015 Activities done I developments Remarks EMP responsibility during reporting period (Apr. to

June., 2015) • Soil erosion and Yet to be done - No monitoring siltation programme is

suggested for project construction stage. Monitoring of Soil erosion and siltation will be carried out during operation phase.

-

•Ecology Yet to be done - Monitoring of restoration of muck disposal area will be carried out after completlon of excavation work.

•Incidence of Yet to be done -water-related diseases

i. Land use Yet to be done - No monitoring

!Pattern progmmme is suggested for project

construction stage Monitoring of land use pattern will be carried out during operation phase.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/ (Q2) Page 20

/. I 2. Forest Clearance.

Forest Clearance received vide order .F.No.8-93/2008-FC Govt of India, Ministry of Envfronment &

Forests (FC Division) Paryavarnn Rhawan, CGO Complex, Lodhi Road New Delhi l 10 003 dated 26"' Oct,

2009 from Sr. Assistant rnspcctor General of Forests.

Compliance status for the conditions included in this c learance letter is given below. Area is given in ha

(hectares) and amount in Indian Rupees (Rs.). The unit used is Lakh/lac (One lakh is equal to One hundred

thousand or 0. J 0 million) and Crnrc (one crore is equal to 10 million or 100 lakh).

S.N. Measures/ .stipulations Compliance Status

I Legal status of the diverted forest land shall HPPCL will not seek changes in the legal status

remain unchanged.

2 The Compensatory Afforestation (CA) will be For Compensatory Afforestation (CA) over 96 ha

raised and maintained by the State Forest land i.e. twice the area of forestland diverted

Department at the project cost. (47.993 ha) in lieu of diversion of forestland for

the Project, Rs 92.50 lacs have been deposited

during Sept., 2009 with Himachal Pradesh Forest

Department.

3 The User Agency shall furnish an undertaking HPPC.L will pay the additional NPV as per the

to pay the additioqal NPV, if so determined, as final decision of Hon'blc Supreme Cou1t of India

per the final decision of ·Hon 'ble Supreme and an unde1taking to· this effect has been

Court of India. su bmitted to Forest DoptL

4 The User Agen<;y shalJ implement 1111 the The Muck Rehabilitation Plan is being

conditions of the Muck Rehabilitation Plan implemented with due diligence. The

under the supervision of State Forest Deptt. at engineering measures are be ing executed by

the project cost. HPPCL concurrent to the muck dumping.

However, t11e biological measures will be taken

on completion of muck dumping, with assistance

and guidauce of HP Forest Department. After

stabilization, all the muck dumping sites located

on forest land shal l be handed over back to HP

Forest Department.

SAJNJ HEP (100 MW)-Environmcnt Monitoring Report No. S-2015/2 Page 21

1 s i) The user agency shall ensure that muck does Proper Protection methods are provided to avoid

not roll down the slopes. All such areas where the rolling down of muck whenever required.

muck has rolled down the slopes shall be

rehabilitated at the cost of user agency and

under the supervision of State forest

department.

ii) Construction of check dams, retention/toe Retain ing walls have been constructed to avoid

walls to arrest sliding down of the excavated sliding down of excavated material along the

material along the contour. slopes.

iii) The dumping area of muck disposal shall The dumping sites have been protected as per

be stabilized and re-claimed and plantation of norms of State pollution control board. Moreover

suitable species shalt be carried out over stabilization, reclamation and plantation etc. will

dumping areas at the cost of user agency under be done after completion of excavation work.

supervision of State Forest Department.

Stabilization and reclamation of such dumping

sites shall be completed as soon as the

excavation work is over, before the c]oser of

the project.

6 The entire reservoir area shall be declared as a The entire reservoir area will be got declared as a

Reserved forest under Indian Forest Act, 1927. Reserved Forest under Indian Forest Act, 1927

However, regulated fish ing shall be allowed. by State Govt. with regulated fisbing rights after

commissioning of the prnject.

7 Green belt of adequate width shall be raised by Green belt of adequate width will be raised by

the user agency around the reservoir at the cost the HPPCL around the reservoir as per the

of project. availability of suitable area in consultation with

Forest Department at the cost of project.

.However~ plantation near project appurtenance

is being carr.ied out by the contractor

8 The User Agency shall facilitate a study on the The matter was taken up with G.B. Pant Institute

impact of this project on the GHNP in general of Himalayan Research & Development, a

and flora & fauna of the local area in particular government institute at Mohal, Kullu, HP for

by a reputed institution like Wildlife Institute carrying out the study on the impact of this

of India (WO) or Bombay Natural History project on the GHNP in general and flora &

Society (BNHP) or Indian Institute of fauna of tbe local area in ·particular. The institute

Sciences (HS) etc. has agreed to carry out the study & submitted

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2 Page 22

9

TOR. The work has been awarded to the

institute. Interim reports tor the 2nd year of study

& utili.zation certificate have been submitted by

the institute during April , 2014.

The user agency will take aH measure to HPPCL will take all measure to contain the

contain the subsidence over 6.053 ha of forest subsidence over 6.053 ha of forest land required

land required for underground works. ln the for undergrow1d works. Provision of

event of subsidence beyond permissible limits, Compensatory Afforestati on against 6.053 ha of

the user agency will be responsible for the forest land required for underground works has

damage and provide equivalent non- forest already been kept in the EMP.

Jaod along with funds for Compensatory

Afforestation for the same to the State Forest

Department within 6 months of its occutTence.

10 The forest land thus diverted shall be non No action required at this stage.

fransferable. Whenever the forest land is not

required, it shall be surrendered to the State

Fore st Department under i ntima.tion to th is

Ministay.

1 J The User Agency sha ll take all measures to Suitable protection works as per requirement at

avoid frequent road blockade due to landslide site is being provided to avoid frequent landslide.

etc. and shall provide breasts walls and

retaining walls wherever necessary.

12 Any other conditions that the Conservator of So far (date 30.06.2015) no additional

Forest (Central), Regional Office, Chandigarl1 conditions am communicated.

may impose from time to time for tl1e

protection and improvement of flora and fauna

in the forest area, shall also be applicable.

13 All steps shall be taken to prevent landslides to Necessary steps will be taken to prevent

ensure slope stability and also to ensure that no landslides by constructing Retaining walls,

damage to the roads, human life and flora& Gabions & other retaining structures wherever

fauna is caused. necessary.

SAINJ HEP (I 00 MW)-Environmcnt Monitoring Report No. S-2015/2 Page 23

7 3. Environment Clearance

Environmental Clearance for Sa inj (100 MW) HEP was accorded vide Additional Director Gol MoEF

Jetter No. J-12011/3012008-1/\.f dated 4th May, 2009.

Compliance status of conditions of Environment Clearance is given in the following:

SN Safeguarding Compliance Status

m eas ure/Stipu 1 a ti on

Part A: Specific Conditions

i) Catchment Area The fonds in phased manner (in five years) are being released to HP

Treatment Plan as has Forest Deptt. (CAMPA account) for implementing CAT .Plan. The

been proposed should be total provision al locate(t for CAT Plan is Rs 1 11.54 million.

completed in 3 years. Following payment has been done in favour of Forest Deptt:-

s. Amount Daie Remarks N. Deposited

(in Us.) l 5,20,75,000 3/04/2010 Rs. 185.14 lakh for 0

year and Rs. 335.61 lakh for 151 year

2 2,75,86,000 30/03/2012 2no year implementation of CAT Plan

3 2,42,98,000 29/03/2013 3ro year implementation of CAT Plan.

No Utilization Certificate received during the period.

ii) The 'land holding of Stands submitted.

project affected persons R&R Policy of HPPCL is latest and its provisions are better than

whose land is being National policy. Wide publicity has been made through pamphlets,

acquired to be submitted letters, calcnclMs, and brochures, banners, training cum awareness

to this Ministry. The R&R camps & with the help of nodal community based organization.

package among NRRP -

2007 and HPPCL R&R

package, w hichever is

better should be followed

for project

persons.

publicity

affected

Adequate

of the

SAINJ HEP ( 100 MW)-Environmenl Monitoring Report No. S-2015/2 Page 24

! compensation package

should be circulated in the

affected villages.

iii) As per finding of the R&R. Policy of HPPCL is being followed for declaration ofla11dless and

survey during the EJA houseless persons. As per R&R Policy of HPPCL, the PAP losing whole

study, no person is being agriculture land or whose balance agricultw·e land left after acquisition

rendered landless or is less than 5 bighas is declared landless and as per National R&R

houseless due to the land Policy 2007, the PAF losing more than 75% of land holding shall be

acquisition by the project, declared landless. The prov'ision of National R&R Policy 2007 (a person

however, if any person losing 75% of land holding to be declared landless) is also fulfilled in

rendered landless as per case of Sainj HEP as all the persons losing more than 75% of land are

definition of National also declared landless as per HPPCL's R&R Policy.

R&R Policy 2007 (more

than 75% of land holding

acquired) shall be declared

landless and all

consequent benefits as per

the resettlement &

rehabilitation plan would

be released to him/her.

iv) The commitment rnude Is being fulfilled. A &,>-_parate section (section no. 4) is added

during the public hearing

should be fulfilled.

v) Duri.ng lean season 1 Shall be released as per stipulated condition and aspect shall a lso be

cumec water has to be added in operation manual.

released for maintaining

the aquatic life m the

downstream.

vi) All the equipments which The machinery being used for the project work is fully mollified.

are likely to generare

high noise levels are to

be fully mollified (noise

reduction measures).

Regular checks are being made to limit their noise level tis per the

permissible limits notified by the manufacturer. (Already attached as

Annexure EMR-1)

SATNJ HEP (I 00 MW)-Environment Monitoring Report No. S-20 l 5/2 Page 25

I should be adhered.

ix) Green belt development as Shall be implemented as per proposal of Green Belt Development in

proposed on the either side consultation with Forest Department after the completion of bam'lge.

of the reservoir covering Matter has already been taken with Forest Deptt. For development of

with 2-3 layers of riursery for plantation in project area.

plantation in an area of 40

ha. using about 18

diffe rent pliint species

should be implemented.

x) The fisheries management Fingerlings shall be stocked after the formation of Sainj reservoir. First

plan for stocking of fish in installment of Rs. 50.00 lacs has been released during the month of

Sainj reservoir @20000 April, 2010 to the State fisheries Deptt. for the implementation of

fingerlings/ annum should Fisheries Management Plan vide Letter No.

be strictly adhered. The HPPC.L/SHE.P/F&A/Cash/201O-l1 -34-37 dated 13/04/2010. Fisheries

construction of additional Management Plan of Sa iuj HEP has been modified by H.P. Fisheries

rearing space for fish Department for native fish vide Direct·or cum-warden of Fisheries office

hatchling at .Hamini Fann Jetter No. FSH-F (2)39/2008-ARC-VUJ-7119 dated 7/08/2009.

should have separate bays A tota l budget of Rs. J 00 lacs is allocated for this pw-pose & will not be

for rearing carnivorous diverted for other purpose.

and herbivorous varieties

of trout fishes separately.

The native fish as reported

in the table No. 5.54 on

page 5-67 of EIA report at

Sl. No. J &2 Schzothorax

plagiostomus and

Schzothorax progasthus

would also be reared in the

proposed hatchery as

committed in the letter

dated 19.3 .2009. A total

budget of Rs .100 lak.hs is

allocated for this purpose

should not be diverted.

SAINJ HEP (100 MW)-Environment M<mitor ing Report No. S-2015/2 Page 27

xi) a) M inimum downstream Minimum one cumec w~ter shall be released. This aspect shall also be

flow of water necessary added in operation manual later on.

for the survival of aquatic

life and water holes should

be released even during

the lean season.

b) for conservation of A provision of Rs. 25.4 million for conservation of flora & fauna of

flora and fauna of the Wild Life San.cniary has been made and a study is being carried out on

Wildlife sanctuary, habitat the impact of t11is project on the GHNP in general and flora & fauna of

improvement project, the local area in particular by GB Pant Institute of Himalayan

agency has to commit for Environment and Development, Mohal, Kullu, HP.

the cost of th e project/ o r

for the consultancy

charges involved, jf any.

c) No blasting

construction

for No blasting for construction of road/tunnels etc is being done during

of winter season in the periphery of sanctuary area j.e. 2.5 km of tile area.

road/tunnels etc should be

done during winter season

in the periphery of

sanctuary area i.e. 2.5 km

of tbe area

d) No labour camps shall This condition is being complied with and labour camp has been

be set up in to periphery of constructed outside the periphery of Wildlife Sanctuary areas i.e. in the

Wildlife Sanctuary areas 2.5 km of the area. Labow- camp is folly established near construct ion

i.e. in the 2.5 km of the site.

area. The user agency Labour camp till <late ofreporting as under:-

should make such camps SN Name of labour Distance from Remarks in the adjoining vil.lages or cnmp Wildlife somewhere e lse and make Sanctuary necessary arran gemcnts

1 Jangla, Adit-1 3km approx.. -for transport of the labour

Contractor has provided th e Bus Service (Company vehicle) for the to and fro from the project

purpose of transport for transport of the labour to and fro from the site.

project site.

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2 Page 28

e) During construct.ion period, Three no. check posts are being maintained to regulate movement

number of check posts shall be of forest produce in consultation with fon:st Departmt:nt.

maintained in consultation with

Forest Department, to regulate

movement of forest produce at

the <.:OSI of LHH.~l' agency.

t) Excavated material, if any, All the dumping materials are dumped only in the specified

:c-h<rnld be properly utilised for dumping areas, not in foi·est land or in lh(! periphery of wild life

c(mstruction/ or dumped m sanctuary areas.

specified sites only, it should not

be thrown on the slopes or inside

the forestland or around

periphery of wildlifo sanctuary

area.

g) No l.ree foiling in around 2.5 No tree felling will be done aro1md 2.5 kn.1 of the wildlife

km of the wildlife sanctuary arci'I sanctuary area.

should be done.

h) During t:xccul.ion if needed So far (30.06.20 l 5) No .such additional condition has been

Chief' Wildlife Warden/ imposed or communicat~d

Conservator of Forests, National

Park may stipulate any condition

which is necessary for the

prok~ction/ welfare of flora and

Fauna.

Part-D: Genernl Condit.ions

SAIN.I HEP (JOO MW)Environmcnt Monitoring Rq>o11 No. S-2015/2 Page 29

i) Adeguate free foel arrangement Fud arrnngeme111 (LPG) has been ma<le by contractor for its labour

should be made for the labour and staff free of cost. The detail of fuel provided to tht: labourer

force engaged in the from Janl1ary, 20 l 5 to till June, ),()15 is as below:-

constrncrion work at pr~ject Mar- Apr- l\fay-

cost so that indiscriminate Sr.No. Jan-JS l"eb-15 ,luu-15 Total 15 15 15

telling of trees is prevented. Nos. of

Labour 4]9 394 38'.\ 452 444 458 2570

engaged

I.PG 82 85 94 83 84 87 SIS

Cylinder

Tutnl

F.xpcndilurc 128740 115600 124420 10!!481 110628 113622 701491

(in Rs.)

ii) Fuel depot may be opened al LPG cylinders are being provided hy the co1~tractor lo the labounm;

the site to provide the fud at the site. Two no. first Aid centers have been co11strnc1<'.<I by the

(kerosene/wood/LPG). Medical contractor near construction sites and also provided two nos. wclJ

facilities as welJ as recreational equipped ambulance. Frequent he<ilt.h checkups are being done.

facilities should also be

provided to the labourers.

iii) All the labourers to be engaged l ,ahourers to he engaged by the contractor are thoroughly

for construction work~ should exarnimxl by health pcrSLltltlcl before issuing them work permits.

be thoroughly cxamin<:d by Proper First Aid centers have been constrncted by the contractor at

heallli personnel and construction sites. Pha1macists were appointed and frequent health

adequately treated before checkups are being done.

issuing lhe1n work permit

The detail of medical related expenses from .l:H1uHry to June, 20 l S

is as gi vcn below :-

Mur- Apr- Moy· Juu-Sr. No. J1111-JS lfcb-15 Total

IS IS 15 15 ,

No.Qf

11atie11t 1\00 749 723 465 378 528 672'.\

visit.,d

Dispt'llNlll'Y

SAJNJ HEI' (I 00 .MW)-Enviro11me11l Monitol'ing Kepo1t No. S-20 I 5i2 Page 30

Expcnditur< on medical staff and 12283 12283 7839 123800.33 121519.33 126641.33 404365.99 medicine (in Rs.)

iv) Restoration of Shall be implemented at appropriate stage.

construction area

including dumping site

of excavated materials

should be ensured by

leveling, filling up of

burrow pits, landscaping

etc. The area should be

properly tr~ate-d with

suitable plantation.

v) Financial provision A provision of Rs 428.427 million has been kept in EMP. The costs are

should be made in the inbuilt and additional costs have been taken in the revised cost estimate

total budget of the of the DPR. However, it is assw·ed by the management that adequate

prqject for funds for implementation of EM.P shall be available.

implementation of the

above suggested

safeguard measures.

vi) Six monthly monitoring Report being submitted regularly. Last report for the period ending

reports should be 30.11.2014 was filed vi de GM Sainj HEP letter No.HPPCL/GM/

submitted to the Ministry SHEP/DB-2/15-2225-28 Datedll/08/2015.

and its Regional Office,

Chandigarh for review.

5 Officials from Regional Shall be provided full corporation, facilities and data during their

Office MOEF, inspection.

Chandigarh who would

be monitoring the

SAINJ HEP ( I 00 MW)-Environment Monitoring Report No. S-2015/2 Page 31

implementation of

environmental

safeguards should be

given fll 11 cooperation,

facilities and documents

I data by the project

proponents during their

inspection.

6. The responsibility of Agreed and being complied with.

implementation of

environmental

safeguards rests fully

w ith the Himachal

Pradesh Power

Corporation Ltd &

Government ofHimachal

Pradesh.

7 The total amount of Rs. The exact amount of EMP is 428.427 million and it will not be diverted

41.87 Crores kept in the for any other purpose.

budgeta1y provisions for

implementation of

environmental

management phm should

be strictly adhered and

not to be diverted for any

other purpose.

8 In case of change in the Agreed

scope of the project,

project would require a

fresh appraisal.

9 The Ministry reserves Safeguard measures shall be implemented as suggested and additional

the right to add safeguard measures if any suggested subsequently will also be

additional safeguard implemented.

measures subsequently,

SAINJ HEP ( I 00 MW)-Environment Monitoring Report No. S-20 l5/2 Page 32

i jf found necessary and to

take action including

revoking of the clearance

under the provisions of

the Environment

(Protection) Act, 1986,

to ensure effective

implementation of the

suggested safeguard

measures in a timc­

bound and satisfactory

manner.

10 This clearance Jetter 1s In terms of date the letter is valid up to 04-05-20 I 9 for commencement of

valid for a period of 10 works. Construction work has already been started and shall be

years from the date of completed by year 20 15.

issue of 1·his letter for

commencement of

construction work.

11 A copy of the clearance C<:>py of the clearance letter has already b.een sent to concerned

letter will be marked to Panchayats/ Local NGO vide Jetter No.HPPCL/Sr.Mgr. (P&M)/Env.

concerned Panchayat I (Sainj)-1/09 dated 22/07/2009.

local NGO, if any, from

whom any suggestion/

representation has been

received while

processing the proposal.

12 State Pollution Control Con finned telephonically from SPCB that the letter has been displayed at

Board I Committee the Regional Office, District Industry Center and Collectors

should display a copy of Officeffehsildar's office.

the clearance letter at ihc

Regional Office, District

lndustries Center arnl

Collector's office/

SAJNJ HEP (I 00 MW)-Environment Monitoring Report No. S-2015/2 Page 33

',~, ~-.--T-e-h-si-ld_a_r-'s~o-ft-1c-e~fo-r~3-0--,-~~~~~~~~~~~~~~~~~~~~~~~~~~~-,

days.

13 The project proponent Insertion in the News papers was already made in two local newspapers.

should advertise at least

in two local newspapers

widely circulated 111 the

region around the

project, one of which

shall be \11 the vernacular

language of the locality

concerned informing that

the project has been

accorded environmental

cleanmce and copies of

c leanmce letters are

available with the State

Pollution Control Board I

Committee and may also

be seen at Website of the

Ministry of Environment

and Forests at hti'p://

www .envfor.11ic.in

SATNJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2 Page 34

,/'• 4. Fulfillment of commitments of Public bearing '

s. Statement of

N. issues

I Rate of

compensation for

the land, houses

a11d trees acquired

for the Project on

the pattern of

ADHPL and

NTPC (Kol

Dam).

2. Disturbance

allowance

Action tal<en Response of Project Proponent

That Project authority has made As decided by the competent authority (Land

an R&R package following the Acquisition Officer) the comptmsation of

National Relief and land trees and structures disbursed among the

Rehabilitation Policy 2007 and owners.

the relief proposed is better than

the package envisaged in the

central policy.

As regards <,<ompensation on the

pattern of ADHPL (Allain­

Dhuhangan Hydro Power Ltd) &

NTPC Koldam, it is clarified that

HPPCL will pay as per the rates

fixed by the LAO (Land

Acquisition Officer) and HPPCL

docs not go il1 appeal against the

rate applied by l ,AO in the

award.

3. ·Pennanent job to As per availability of post and As per availability of postJJ-IPPCL shall give

all displaced and suitability of the persons pref.erence to PAF as per their eligibility.

affected families. affected, preference will be given

in tbe appointment.

4 Free training to A scholarship scheme would be Under Skill Up-gradation of local youth

youth. introduced by the prqject Scheme (lTI Scheme) following no. of

proponent for the eligible candidates has been nominated for free

persons from Prqject Affocled training 111 ITI: Jn addition, Sponsored

Families (PAP). candidates are given Rs. I 000/- pm

scholarship also.

Academic Veur (Nos. of candidate~ nominated)

AV AV 2008- :!009-09 IO

OJ 09

AY AY 2010 2011-- 11 12

JO 08

AV AY AY 2012- 2013-13 14 2014-

IS

07 J2 22

SATNJ HEP (I 00 MW)-Environmcnt Monitoring Report No. S-2015/2 Page 35

. s Extension of It js not possible to make it as a

Suind-Krahila project road but it may be taken

project road up to up under LADF (Local Area

Neuli. Development Fund).

6. Land in lieu of Giving land in lieu of land is not.

7

land. possible. However, return of

Return of surplus surplus land after construction of

land after project can be considered. No

completion of the commitment can be given at this

Proj ect. stage in this regard.

8 Widening of Widening & metalling of Sainj - Widening of Sain}Neuli road has been

Sainj-Neuli road, Neuli road shall be got executed completed.

before the start of through HPPWD with the

construction

project.

of request to complete the work

before commencement of

constrnction of the pr~ject.

9. Construction of Not possible from project cost

road on right b:mk but can be taken up under the

ofriver Sainj. LADF.

l 0 Construction of The demand for community

community centre, modern village,

Centre at Neu Ji. dispensaries, school, playground

11 All v.illages and drinking water may be met

should be adopted from LADF. Some of the

and developed as dumping ground, if found

mod ern villages. suitable, can be leveled on

12 Providing completion of dumping and left

dispensaries, as play ground. Regarding

middle school, firewood and fodder, project

playgrow1d, safe proponent is paying cost of

drinking water, Cornpensatory Afforestation and

fi re wood, fodder Catchment Area Treatment to the

etc. Forest Department undt:r which

suitable plantations may be

raised.

SAlNJ HEP (I 00 MW)-Environment Monitoring Report No. S-20 I 5/2 Page 36

13 Families left with 1t was intimatt:d that the project Declaration of landless is being done as per

5 Bighas of land affected family in whose case commitment.

should be balance agriculture land left after

declared landless. acquisition is Jess than 5 bighas

will be declared as landless.

14 Free electricity to 100 units per month as free Action wiJl be taken when power is

the affected power will be given to each generated.

Villages. project affected family (PAF) as

per Government of India, Tariff

Resolution dated 31.03.08.

15 Opening of JTI in No commitment was made to Industrial Training lnstitute (ITf), Sainj has

the area. open ITI in Village Neuli. been adopted by HPPCL vide HP Govt.

However, Project Proponent will Notification No. El)N (TE). J\ {4) 14/2007- 11

give scholarship to eligible Dated 24/02/2011.

persons from PAF for training.

16 Hindi copy of It was clarified that as per rules, No action needed.

ElA to the general the copies have been provided to

public of project the local village Pradhans as it is

affected area. not possjble to provide the same

to each person.

17 Employment and Project authority clarified that Seniority list of PAF's has been prepared on

suitable jobs to one member of each pr~ject the basis of R&R policy and as & when any

the locals. affected family rendered landless fresh recruitment done by the main

will be provided employment in contractor of lWPCL in skilled/semi-skilled

the category of skilled/semi categories they are given preference and

skilled workman subject to about 54 people from PAF has been given

18 Land

fulfilling the requisite employment.

criteria/qualification as and when In addition to this many schemes i.e. PAF

fresh recruitment is done in these Contractors scheme, works up to Rs.5 .00

categories and it would be lacs reserved for PAF, Hiring of

ensured that the persons rendered vehicles/taxis, Self Employment Scheme is

landless by the project eligible being implemented.

for employment arc given chance

first.

Prqject affected families As decided by the competent authorities the

SAINJ HEP (I 00 MW)-Environment l\.fo11itoring ReporL No. S-2015/2 Page 37

. Compensation rendered landless shall be pa1d compensation of land has been disbursed

may be increased relief of Rs. 50,000/- per bigha among the land owners & as per R&R policy

from Rs. 50,000/- which is over and above the Rs. 50000 to Rs. 250000 will be paid to each

per bigha to Rs. compensation awarded by LAO.

10.00 lacs per

bigha.

P AF rendered landless depending upon the

quantum of land acquired and balance with

.PAF.

19 Issue of atr Water sprinkling shall be carried Water sprinkling is being done.

pollution as dust out and preference in awarding

generated due to such wurk shall be given to

vehicles and PAFs.

various

activities.

project

20 Loss to houses Shall be suitably compensated The videography/ photography of the

and other rural after technical study. In this existing houses and water sources/ Gharats

structures viz. regard, documentation including were cruTied out and documentation was

Gharats water videography/ photography of the done. ln addition to this, a study on the

springs by the ex.isting houses and water ground vibration & air over pressure due to

construction work somces shall be carried out blasting adjacent to powerhouse complex,

and blasting. before starting the con~truction HRT etc. has been conducted through N IRM,

work. Bangalore to suitably <iddress the local

complaints.

21 Pollution of water Shall be taken care of as per The sedimentation/settling tanks have been

from tunnel provisions made in EMP. prov·ided for tunnel discharge.

discharge

22 Maintenance of These works are to be done Same as Sr. No. 5

footpaths. through LADF.

23 Tender up to Rs. Project proponent clarified that D ata under compilation.

50 (fifty) lacs to amount of snch tenders is limited

be awarded to to Rs. 5.0 (five) lacs only.

affected public of

project area.

24 Monthly meetings Meetings in this regard are Meetings in this regard are be1ng conducted

with project conducted by District time to time by Distt Administration.

authorities. Administration as per practice.

25 Use of The matter is being noted and Development fund is being provided through

SArNJ HEP ( I 00 MW)-Environnmnt Monitoring Reporl No. S-2015/2 Page 38

' development fund

provided (By

Project

Authorities)

properly and

timely by

respective

depa1tments for

the development

of Project affected

areas.

26 Extension of date

of Public Hearing.

27 Same rate of land

compensation be

applied in the

entire Kullu Distt.

28 Issue of muck

disposal in to the

river.

29 Contents of RR

should not be

proposal only but

commitments.

shall be addressed suitably by the LADA as per requirement made by

concerned.

It was clarified that public

hearing meeting has been

conducted in line with the

relevant procedure and it is not

possible to postpone the same.

Chairman LADA time to time and LADA is

keeping a watch on all the works.

It was clarified that the land Same as Sr. No. I

compensation shall be made as

per award of LAO.

Shall be taken care of as per the Necessary Protection measures have been

provision made m the EMP, provided to prevent the rolling of muck into

which has a detailed muck the river.

management plan.

Project authorities clarified that R&R Plan has been notified by Govt. of

provision made in RR shall be Himachal Pradesh vide Notification No. Rev

forwarded to Government for (PC) A ( 10)-7 /2008 dated 19tl• Jan., 2009 and

final approval and the RR Plan is being implemented in toto.

approved finally shall be

implemented in toto.

30 Mentioning of un- Project authorities clarified that

irrigated Jand in the payment shaJJ be made as per

the proposal for class of land as revenue record.

land being

acquired whereas

SAlNJ HEP (JOO MW)-Environmcnt Monitoring Report No. S-2015/2 Page 39

most of the land is

irrigated.

31 Injustice has been Pr<l_ject autl1orities assured that

made to the these issues will be suitably

people of area by attended and development

Parbati HEP work/activities are to be met

authorities, hence from the provision under the

regular LADF.

employment to

the affected

people,, provision

of suitable roads,

water supply

schemes,

construction of

community hall,

construction of

Surya Narayan

temple be made in

affected area.

32 Opening of Project authorities assured that Tender are being invited as per prevailing

tenders at Neu Ii. the copies of tender enquiries practice of HPPC I ' · All out efforts are being

33 Environment

Problems.

will be sent to all Panchayat made to award small tender to local

Pmdhans of Project affected area registered contractors.

and w ill also be displayed in the

office of Naib Tehsildar, Sainj.

Opening the site office of

HPPCL and thereby opening

small tenders locally in due

course was also committed.

Project authority intimated that Is being implemented.

most of the components of the

project are underground and

there are lesser chances of

pollution; however, the

SAINJ HEP (100 MW)-Environ.rncnt Monitoring Report No. S-2015/2 Page 40

environmental concerns have

been taken care of in the EMP

which will be implemented

earnestly.

34 Award of tenders Project authority agreed to the Sa.me as Sr. No. 23

up to Rs. 5. 0 lacs proposal.

to the aff ectcd

pubUc of the

project area

through limited

tendering.

35 Compensation of

land based on the

Project authority clarified that As decided by the competent authorities

the rates of compensation shall (Land Acquisition Officer) the compensation

negotiated rates be as decided by the LAO of land trees and structures disbursed among

directly between appointed by the Government.

Government and

owner of the land.

36 Provision of Public facilities shall be

public facilities provided/created m a phased

like water supply, manner from LADF.

roads, health

before the

construction work

of the pr~ject.

the owners.

SAINJ HEP (I 00 MW)-Environmenl Monitoring Report No. S-20 I 5/2 Page 41

5. ADB Stipulations/ safeguarding measures (not covered above)

SN Product Parameter to he monitol'ed Compliance Status

Activity/Stage

1. Equipment layout Construction techniques and Scientific blasting is being done. The machinery

and machinery being used for the project work is fully mollified

installation

2. Temporary

blockage of

drainage

Temporary fi]J placement

(mJ)

and produces less noise pollution and vibrations.

Regular checks are being made to limit their

noise level is as per the permissible limits

notified by the manufacturer. (already attached

as annexure El\1R-I)

No blockage so far and a lternative measures has

been made.

3. Power

tunnel

House/ Seasonal start and finish Settling tanks has been provided at the adits.

major ea1thworks/ machine

construction

4. Storage

Chemicals and

materials .•

explosives

5. Encroachment

into

farmland

6. Nu isance

Installed (Pn, .BOD/COD.

Suspended solids, other) No

signiffoant water spillage

into nallahs /river is there,

from the construction

activities.

of Location of hazardous Hazardous waste materials are stored separately

material storage; spil l report to avoid pollution & Explosive materials handed

(type of material spilled, over to third party for proper storage and

amou nt (Kg of m3 ) and maintenance.

action taken to con tro l and

c lean up spill)

Usage of existing utilities, No such incident of encroachm.cnt happened till

Status of existing facilities, date.

Status of facilities (earth

work in m:i), Implementation

of Crop compensation

(amow1t paid, dates, etc.)

to Contract Clauses .. Des ign Being ensured through implementation of

SArNJ HEP {I 00 MW)-Environment Monitoring Report No. S-2015/2 Page 42

nearby

properties

basis and layout, contract provisions.

Reinstatement of land stalus

(area a fleeted,

Implementation of Tree/

Crop compensation (amount

paid)

7. Flooding lrnzards Contract Clauses (e.g., The excavated muck from excavations is being

8.

9.

due to

construction

impediments

of natural

drainage

Equipment

submerged

under flood

Inadequate

construction

stage monitoring

suspended solids and dumped in designated dumping sites duly

BOD/COD in receiving compacted and protected by providing stone wire

water)

Store room levcJ to be above

HFL (elevation difference in

matters)

Training schedules,

Respective contract

checklists and remedial

actions taken thereof.

compliance report related . to

environmental aspects for

the contract.

crate walls/retaining walls to prevent its slippage

in to natural drainage system. Periodical check­

ups for BOD/COD & suspended solids are being

done by HP SPCB and Startech Labs, Hyderabad.

(Already attached as annexure EMR-VIlI).

It is being ensured that the plant and equipments

are stored approx. 50 m above HFL.

Training to HPPCL personnel's related with

environmental monitoring is being

given/organized from time to time.

SAlNJ HEP (I 00 MW)-Environment Monitoring Report No. S-2015/2 Page 43

6. Complaints received from locals during the reporting period

Sr. N.

1.

2.

Date

03/01/2012

5/01/2012

Location where complaint was filed

GM office at Sarnbai.

GM office at Sarabai.

Name & village of Complaint Action taken complainant issue

Sh. Yan Singh S/o Damage Sh. Mani Ram, Vill. Ghasni,

of The compensation as

Chinahidi P.O. compensation Bzalrnra Sub-Tehsil Sah\j, Distt Kullu (HP)

Sh. Mohar Singh S/o Regarding

Sh. Mani Ram~ Vilt. damage to the Matla, P.O. Suchain, house due to Sub-Tehsil Sainj, blasting' Distt Kullu (HP)

decided by the Revenue authorities m joint inspection has been paid .

Inspections of house of Sh. Mohar Singh has been carried out by Consultant

Geologist for Sai1\i HEP and it bas been concluded that the most probable cause of theses cracks is faulty construction and

improper foundation along the seepage due to

inadequatt: drainage arrangement resulting in differential settlements.

3. 16/02/2012 GM office Sh. Bhag Chand S/o Regarding Deputy Commissioner,

at Sarabai. Sh. Chidu Ram Vill. damage to the Kuflu has constituted a Khanduri PO house due to committee for the

Bazahra, Sub-Tehsil blasting. compensation of Saiitj, Distt. Kullu damage/losses caused dne (HP) to the construction

activities of Saiqj HEP vidc

his Office Ord~r No. 2044-

48/DRA dated 17/07/2012 Joint inspection of damage

to 12 No. houses has been

carried out on dated 28-10-2013 & 16/12/2013 by the

above committee. The committee has decided to

' The videography/ photography of the existing houses and water sources/ Gharats (F/ourmills) had been carried out before the construction work of Sainj HEP and study on the ground vibration & air over pressure due to blasting adjacent to powerhouse complex, HRT etc. has been conducted through NIRM, Bangalore.

SAfNJ HEP (100 MW)-Environment MonitoTing Report No. S-20l5/2 Page 44

4. 21102/2012 GM office

at Sarabai.

Hitcshwcr

Member,

council

Parishad)

Singh, Regarding dust

district and damage to

(Zila the houses due

to construction

work

5. 04.04.2012 GM office Sh. Manglu Ram S/o Regarding

at Sarabai. Sh. Tutu Ram Viii. cracks

.Matta ·po Ropa, Sub- developed in the

Tehsil Sainj, Distt. Kutlu (HP)

house due

blasting.

to

6. I 2.04.2012 GM office Sh. Raj Kumar S/o Regarding

7.

8.

16.04.2012

20.04.2012

& 19/06/2012

at Sarabai. Sh. Amar Chand Viii. damage to the

Khain, PO Bazahra, house due to

GM office

at Sarabai.

GM office

at Sarabai.

Sub-Tehsil Sainj, blasting.

Distt. Kullu (HP).

Sh. Dhoop Singh S/o Regarding loss Sh. Sa~ja Chand Viii. due to closing of

Manahara .PO saw mill at

Bazahra, Sub-Tchsil Sambha.

Sainj, Distt. Kullu

{HP).

Headmaster,

Middle

Kartah.

Govt.

School

Regarding

cracks

developed in the

school building

due to blasting.

9. 28.04.20 I 2 GM office S~. Thakur Dutt S/o Regarding

at Sarabai. Sh. Hari Ram Viii. cracks

Jangla PO Bazahra, developed in the

Sub-Tehsil Sainj, bathroom/toilet. Distt. Kullu (HP).

provide the appropriate

compensation after

evaluation.

-do-

Regular water sprinkling is

being done in near the

complaint area and a study

on the ground vibration &

Same as Sr. No. 3

-do-

Compensation will be paid

after receiving the

documents regardfog the

existence of saw mill

required for the assessment

of the compensation from

the Cl)mplainant. Inspection of school

building has been carried

out by Consultant Geologist

for Sainj HEP and it has

been concluded that the

most probable cause of

theses cracks 1s faulty

construction and improper foundation along the

seepage due to inadequate

drainage airnngement

resulting in differential

settlements.

Same as given in Sr No. 3

10. 16.05.2012 GM office Sh. Dabe Ram S/o Regarding risk Wire Crates has been

SAINJ HEP (100 MW)-Environment Monitoring Report No. S·2015/2 Page 45

'• at Sarabai. Sh. Harfi Ram Vilt. to the house due provided for the protection

Nalon PO Majhan, to increase water of house/structure of Sh.

11. 23/06/2012

12. 30/08/2012

13. 3/10/2012

14. 11/12/2012

DC office

at Kullu

DC office

at Kullu

GM Office at

Sarabai

GM

Office at

Sarabai

15. 12/11/2012 GM

omcc at

Sarabai

16. 16/01/2013 GM

Sub-Tehsil Sainj, level of river Dabe Ram.

D.istt. Kullu (H.P) Sainj.

forwarded by SDM,

Banjar, Distt. Kutlu

Smt. Beena Devi w/o

Sh. Sushil Kumar,

Viii Kartah, PO

Ropa, Sub Tehsil

Saii\i, Distt. Kullu, (llP)

Sh. Lagan Chand, s/o

Sh. Naju Ram Vilt. Blmdludwar, PO PO

Regarding

damage to the

house due to

muck road

construction.

Regarding

damage to the

house due .to

Bazahra, Sub-Tehsil blasting

Sai11j. Distt. Kullu (HP).

Sh. Gumat Ram s/o Regarding

Sh. Bhajnu Ram, damage to the

Viii. Bhndludwar, PO house due to

PO Bazahra, Sub- blasting

Tchsil Sainj, Distt.

Kullu (HP).

Soom water source

drinking water supply

to GSSS Shcnsher,

GPS Shenshcr, Vill.

Chatteradala, Sanogi,

Bhrogi & Bazahara

Regarding

Drying up of water source

The contractor has been

directed to dump the muck

from the Surge Shaft road

construction in the

designated dwnping site only.

Same as given in Sr No. 3

---do-----

The water source has been

inspected by .internal

damage assessment committee of the project

and was found dried up

.The estimate of new water

supply scheme is being

prepared for the GSSS

Shensher, GPS Shensher,

Viii. Chatteradala, Sanogi, Bhrogi & Bazahara.

Sh. Scs Ram s/o Sh. Damage of plant An evaluation amounting to

Amar Chand Viii. due to road Rs. 71,792/- from Dy.

Dhcrmcdha, PO construction at Director, Ho11iculture

Ropa, Sub Tehsil Adit-H through SDM, Banjar has

Sainj, Distt. Kullu, been received and the

(HP) amount paid to the

applicant for the damage

and the requisite amount

paid to the applicant by the

project authority.

Sh. Ses Ram Regarding Same as given in Sr. No. 3

SATNJ HEP (I 00 MW)-Environment Monitoring Report No. S-2015/2 Page 46

. I Oflice at Viii. Kha in, P.O damage to the Sarnbai Bazahrn, Sub-Tebsil house due to

Saii1j, Distt. Ku Hu blasting

(H.P)

17. 30/01/2013 GM Sh. Tek Ram s/o Sh. Damage to The site of Gharnt was Office at Ku rm a alias Kurnm Gharat due to inspected and compensation

Sarabai Dutt Vill. Jaogla, blasting assessed by R&R Cell and

P.O. Bazahara Sub- compensation paid

Tehsil Sainj, Distt. accordingly.

Kullu (H.P)

18. 02/02/2013 GM Sh. Govind Ram S/o Regarding Same as given in Sr. No. 3

Office at Sh. Bhagat Ram Vil\. dmnage to the

Sarabai Jang la, PO Bazhara, flour mill due to

through Sub-Tehsil Sainj, blasting

MLA Distt. Kullu (1 LP) Ban jar

19. 02/02/2013 GM Sh. Mohan Lal S/o Regarding ---do--& Office at Sh. Kahan Chand damage to the 15/02/2013 Sarabai Vill. Chinahidi P.O. house due to

Bzahara Sub-Tehs'il blasting

Sairi Distt Kull u

(HP).

20. 02/02/2013 GM Villagers of Ruard Regarding ---do-----

Office at G.P Deoridhar, Sub- damage to the Sarabai Tehsil Sainj, Distt. land due to

through Kullu (H.P) blasting DC, Kutlu

21. 13/02/2013 GM Sh. Krishan Dev S/o Regarding ---do----Office at Late Sh. Sarav Dyal damage to the

Sarabai Sharma Vill. .f iwa PO house due to

Raila, Sub-Tehsil blasting

Sainj, Distt. Kuitu

(H.P).

22. 19/02/2013 GM Sh. Ramesh Kumar -----do------ ---do-----Office at Slo Sh. Yan Dutt, Sarabai Viii . Thuvari, PO

Bazhara, Sub-Tehsil

Sainj Distt. Ku llu (H.P).

24. 17.04.2013 GM Gram Panchayat, ----do----- ----do------Office at Shensher, Distt.

Sarabai Kullu (H.P).

through

DC, Kullu

25. 16.04.2013 GM Uttam Chand s/o Sh. Damage to crops -----do------Office at .Tho fa Ram Vill due to crusher

SAlNJ HEP (JOO MW)-Environmen1 Monitoring Report No. S-2015/2 Page 47

Sarabai Riyahda, P.O.

through Bazl1ara, Sub-Tehsil

DC, Kullu Sainj Distt. Kullu (H.P).

26. 3 1.1 0.201 3 GM Hira Singh s/o Ra tu Regarding ------do-------

Office at Ram Viii. damage to the Sarabai Dhamahidi, P.O. house due to

through Bazhara, Sub-Tehsil blasting

DC, Kullu Sainj Distt. Kull u (H.P).

27. 3 1.10.201 3 GM Sangat Ram Vill. Regarding ------do-------Office at Dhamahidi, P.O . damage to the

Sarabai Bazhara, Sub-Tehsil house due to

ttu·ough Sainj Distt. Kutlu blasting DC, Kullu (Ii.P).

28. 13.1 1.20 13 GM Vi1lagers of Bhati Regarding ----do---Office at Thauvi, Sub-T ehsil damage to the

Sarabai Sainj Distt. Kutlu temple due to

through (H.P). blasting

DC, Kullu

29 28.01.20 14 GM Villagers of Regarding

Office at Shenshar, Sub- Tehsil damage to the In process

Sarabai Sainj Distt. Kullu houses due to

through 0-l.P) dumping of DC, K ullu muck

30 20.1 1.2014 GM Leeladhar Bhardwaj R egardiug

Office at Vill. Bazhara P.O. damage to the - -- ---do-------

Sarabai Bazhara, Sub-Tehsil house due to

through Sainj Distt. Kullu construction of DC, Kullu (H.P). project

SAJNJ HEP (100 MW)·Environment Monitoring Report No. S-2015/2 Page 48

.- J 7. Others:-

No stipulations imposed so far.

49

8. Staffing Position

Following is the staff position for Environment Management in the project and Social and R&R management in Sainj HEP.

S.N. Reportine Aspect Staff posted 1 Environment Management staff One Ass istant Engineer (Environment) for environment

related works 2 Social and R&R Management Two .Junior Officer (R&R)

SArNJ HEP ( 100 MW)-Envirorunent Monitoring Report No. S-2015/2 Page 50

...... '

TEST REPORT

Hi11,lusta o Coms\ructrnn Company Ltd.,

(, ,. ii ,\nt;1 11LJ

•f1i •::w \ :i0::.1 s :1111> II

foh 81lr\FH."l 01st Kdl u H ,-. 11: rll

"; 11 /fl: ~;.r:: 200~1-008, J 'i

NOISE LEVEL MONITORING

S.No. Location Time l.ovela in

Leq (dBA)

f>1t:-1r C• '3 3f1t 1SQ01<vA1 l v1 tlo ;.. 50 'tl'.)

r11!il' ng P1 nt

t. r 1 1r e

d )

8

CPCB Limits 75 dBA

Sampling 1s carrl~d out as per Standard methods

r. quipment Details

Monitored by

Remarks

M;;;..-e : Q.J\'-' Ir>< h111. <JU1r;<> Mouel No <'.'l '/. 2'0

Mr n~w~s·~~r· 1r l i:• L"q·n• ~,,

Complies

!l

)ll• r; ){) 1"

1r " 11\!I 20 : ~)

19:., J11re 10 1 !)

Night

Time Levols 1n Leq fdBA)

70 d8A

Approved Laboratory by MoEF . OH SAS 18001 and ISO 9001 Yb=.:bs•te .~.,w ~'d!lPt.:hl~.; ~crn £ -rr.it<° t ·~ 1•1t,h ... Jl~"; st,. ·!· ... ·C"J·,~>S.c...i....,11· s~[··~(! .h!Ci~~ ~:""'J!'a, :..:_>;!;.

SAINJ HEP (100 MW)-Envi.rorunent Monitoring Report No. S-2015/2

EMR-1 'l. b.\-1

Page 51

,-t t•fi( lli~dtr

~INJ HE PROJlCT w:c L ro

-----.... , ..

····F~.r..-..d•tt;;; na inettlrhtt"

~ ... , lo \PfH t•ht r• flD t 1r:Jo,.11I •iAI .. .,

SAINJ HEP (I 00 MW)-Envirorunent Monitoring Report No. S-2015/2

lJ.!:" JJ

ltJt.al

lHl'r•

EMR-11 l~2.

Page 52

Month

Moo th

10S003~3 IAmtJulJnc' 1 O April 111 to June 2015 )-ISO Qty ltr En9in Ot l Sp:uc!> Co"t Coolant Out Stt.Q rc~ir Cost

-· Rs. 7 104

T05003il7 CAmbulanrc I 01 Apri 1!> to June 2015 ,HSO Qty ltr iEngin Oil S1;arc<. Co<ol Orn Sltll ll'f'•"' C:o,.,1

~

·.

Rs. H 159

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-201512 Page 53

Provision umler Catchment A rea Treatment Plan (or Sainj HEP

EMR-111. 1. 61-2

Abstract of cost for Catchment Area Treatment Plan for Sainj HEP (100 MW)

S.N. Activity Unit Rate (in

Phy Fina·ncial (Rs.

Rupees ) in Lakh) I WORKS

A Biological Measures

1 Afforestation ha 79000 101 79.79 2 Gao Plantation ha 59600 195 116.22

3 Pasture Develooment ha 11800 150 17.70

4 Fuelwood Plantation ha 59600 40 23.84 5 Fodder (Silvioaslure) ha 59600 40 23.84 6 Social Forestry ha 59600 90 53.64 7 Establishment of New Nurseries No. 200000 5 10.00

i Sub-Total (1) Biological Measures - - 621 325.03

B Enginerring Measures

1 Contour Bunding ha 25000 401 100.25

2 Steooed drain Rmt 25000 105 26.25

3 Check dams No. 200000 15 30.00 iii Su-total (2) Engineering Measures - - - 156.50 c Wildlife lmorovemcnt & Develooment - 194.00 D JFM, Traininq, Awareness LIS - - 20.00 E Silt Observatory - 40.00 iii Sub-Total (3) Works (A to E) 735.53

F Departmental Charaes ® 17.5 % - - - 128.71 iv Total Works (I) Comnonent (4) - - - 864.24

II SERVICES

G Eco-Tourism® 1 % of iv - - - 8.64 H Payment of Environmental Services" LIS - - 60.00

I Eco-task force (Physical 100 ha min.) Ha. - - 150.00 v Total cost of (II) Services - - - 218.64

vi Total of Works+ Services (1+11) 1082.88

J Monitoring & Evaluation l@ 3 % of vi - - - 32.48 Grand Total (A-J) - - - 1115.36

Rupees in Crores 11 .154

Rates are inclusive of Maintenance for.5 years

Payment of Environmental Services" = To be paid to communities for conservation behaviour related to silt load as monitored

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2 Page 54

L..__,.-

Year-wise Physical and Financial Target for Catchment Area Treatment Plan Saini Hydroelectric Project (100 MW) Financial Total Phy.

s. Activity Outlay for Unit Outlay for OYr 1 Yr 2Yr 3 Yr 4 Yr 5 Yr Total Remarl<s N. the CAT CAT Plan Plan Period Per1od

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

! ~ A Biological Measures , Afforestation 79.79 ha 101 11 8.69 30 23.7 30 23.7 30 23.7 0 0 0 D 101 79.79 Rate of work to be applied 2 Gap Plantation 116.22 ha 195 15 8.94 60 35.76 60 35.76 60 35.76 0 0 D 0 195 116.22 in field while executing J Pasture Development 17.70 ha 150 10 1.18 60 7.08 60 7.08 20 2.36 0 0 D 0 150 17.7 wor1ts shall be as per

4 Fuelwood Plantation 23.84 ha 40 10 5.96 10 5.96 10 5.96 10 5.96 0 0 D 0 40 23.84 notified norms excluding maintenance and

5 Fodder (Silvipasturel 23.84 ha 40 10 5.96 10 5.96 10 5.96 10 5.96 0 0 0 a 40 23.84 departmental charges. 6 Social Forestly 53.64 ha 90 15 8.94 25 14.9 25 14.9 2S 14.9 0 0 0 0 90 53.64 Maintenance as per

norms notified are to be Establishment of New segregated by Executing

7 Nurseries 10.00 No. s 5 10 0 0 0 0 0 0 0 0 0 0 6 10 Aaency Sub-Total (1) Biological

ii Measu1es 325.IJJ . 6 21 76 49.67 1115 93.35 195 155 88.G4 . . . 621 325.03 B Engineering Measures Rato of WO<k to be applied 1 Cont our Building 100.25 ha 401 101 25.3 100 25 100 25 100 25.00 0 0 " 0 401 100.25 in field sh<lll be as glvon 2 Stepped drain 26.25 Rmt 105 15 3.75 45 11.25 25 6.25 20 5.00 0 0 0 0 105 26.25 in abstract of costs

excluding departmental 3 Check dams 30 No. 15 2 4 B 16 3 6 2 4.00 0 0 0 0 15 30.00 charges

Su-total (2) Engineering ;;; Measures 156.SO . . 33.0 . 52.15 :37.25 . 34.00 . . 156.50

Wildlife Improvement & . 67.90 . 48.50 . 48.50 . 29.10 . c Development 194 . 194.00 Ref·Table No.B

a JFM. Trai ning, Awareness 20 us . 7.00 . 5.00 . 5.00 3.00 . 20.00

E Silt Observatorv 40.0 . 40.0 . . . 40.00 Iii Sub-Total (3) Worlts (A to El 735.53 . . . 157.57 . 239.11 . 184.11 154.74 . 735.53

Departmental Charges @ F 17.5% 128.71 . 27.57 41.31 32.22 . 27.08 . 128.71

Iv Total Works m Comoonent f41 864.24 . - 185.14 280.95 216.33 181.82 864.24

II SERVICES . G Eco· Tourism~ 1 "lo of Iv 8.64 2.16 . 2.16 . 2.16 2.16 8.64

Payment of Environmental 15.00 15.00 15.00 15.00

H Services• 60.00 us . - . 60.00 I Eco-task force 150.00 Ha. - . 37.50 37.50 37.50 37.50 . 150.00 Phy. 100 ha min. v Total cost of !Ill Sorvicos 218.64 . 64.66 54.66 54.66 54.66 . 218.64 vi Total of Work1' + Services (1+11) 1082.88 . . 185.14 335.61 . ZT0.99 236.48 54.66 . 1082.88

Monitoring & Evaluation @ 3 % 4.87 6.50 9.74 11.3

J of vi 32.48 . . . - 7 . 32.48 11.3

Grand Total IA·Jl 1115.35 . . 185 .14 - :)35.61 . 275.86 242.98 . ti4.40 - 7 1115.35

Phy= Physical ; Fin. =Financial

Financial Amount = Total is inclusive of Maintenance for 5 yea;s including on Soil & Moisture Conservation Works Rates to be applied eaeh Year= as. per notified norms for executing tho? wor1cs This Phasing Is mo.Inly for phvsical worial phasing and release of money by the User Acioncv. Slrn:e financial amount nch year includes maintcnancC!, the break up to be done by Exceuting Agency.

SAJNJ HEP ( I 00 MW)-Environrnent Monitoring Report No. S-2015/2 Page~

.. '

--

MONTHLY STATEMENT OF MUCK/DEBRIS DISPOSAL TO BE SUBMITIED TO HP SPCB by Samj HEP11QOMWJ N~me & Addrm of Project: • S~lnj Hydro ElWric Proj!e~ HPPCL, SJlilbai, Distt Ku/Ju tHPJ

EMR-IV 1Dti

MONTH FOR WHICH STA TE&!ENT IS SlJ&tITTED: • Jllll• 2016 I I ElhtidQ!y OIJallliti~ Of mit.Mebrii lor 'Cuwlalht Qui~llti.!111 the end ~of tht C1pa:i!y ot Ott

:a·.1 Prc'11t1Ctm~cunt 'Dtr,pti I dumping ,its IGtl!etlled .1Jtltzt4 Dumped !(tenm<,td IOtltztd

t DilMilrS~

I I

2 lrt.ake Sl'IOC:Jre I

lm':IJ ~200 •,\VJ j . 19499'3 134~91 ,

~ ('!!.:·~·~ I

C.~4.\~l I - I ~ jhe3d Race TiJ.'~ . I I

Fr...e-< U.S' A

' . 23U5 ,i[\ '

Fa~l!OSJ '1' CC0 3GC 5375561 ~ms.&1 1eua20 ~ , ,,

AO.t·I J

1n554 37°'1 I -

M'HJHRT v J 0 sc~• 9400 ,,. F¥.t~1: u au-rv J I I

5 ~ s.·~ t~ 5t,:" .... • 0 I \ I I,~ :,be i ~

r 4!1.1 '.~ HRT (J·2' ~ ii I I ' . • r.ll!B :M!. !ti VHS~ 14~ ,,

~ . I J.Zi

r1,1r~- 51rf. Xi F~5 lil~: 0 .. I c , .,. 1.{) .

IP 3:t.::e ~j I c I ~ c .

1ss Cmcr; ~::a I \SfO I ~I ~

I fa.~-5 .J

r~·i I ~ ~ I 0 I ~* I 0

I

~ r:'tSSV!Slla,~ '..1:-00

i .

I I

!~.» ~ 'C3n6 :1i:) ; Pci,e: Hti:~ C..."'llp;er. I Q v ~

B Ta:lRace lunr.~ 12400

Total 57lZ3D mo 27!-0 G 539118.91 340199.97

I

I

dlX'l,'lillg 11!1 In Remaitt CL•rn

&Jr-pi~ site no !alfiiM;r.i

!illCS 11~

I I S72S Duil>p1ng s:lt r.c

0 2 31 rJ<1S~: nJ2lS

&ISO

·12ss Ctirp. .. ~ s~e'lC SatCt.a,"l't~n

~~.:J~

517~

Xi' /{}Jil'ie;ng SMr j 1 - !5 m~i

~l1· r~ ~ "ll .. : r·.,, . "" . -~~r'.1Tff

1C2M i)J1Tlpi!l9 ste~•. hl~'t!h

199679

;!(96 &:Ml".M .)! dl~t?;::

C!r;.~CC·"'~'e'.i

n:m

-lt)M1ager -­

Sat~ Hrcre E~ Pt()jec!.

HPPCl Sa.rabar (Bhu~~)

SAINJ HEP ( I 00 MW)-Envirorunent Monitoring Report No. S-2015/2 Page 56

Tf'.ST REPOR r

hindust~n Construclioa Company Lio ,

.11!;1g1;- fl. fl:o".' '.:,'I'll

(

EMR-V 1~3

! ·~ti H '!II I •I \ (i ' . I'.; I J ., p .. 11f' ,., Rc;:cr1111q ·o. •Jui" 2C1'i

) ! i :..h ;). f ... " . - '

• ~~rrs · t·r

AMBIENT AIR QUALITY - NEAR KARTAH CRUSHING PLANT

S No Pa ram el1?1 ~

600

80

J 80

Sampl111g and Analysi$ c;:irried out as per IS: 5162

Equipments Details:

Moo1tored by

Remarks

I Chocked by

Mak(" ''<'•o V ro:1mE:r.f f.,,lo~~c ~....... R :')f ~·:")GO ti.1~kl 1:l 1t• ••

M<1 I"-': ·-.." :, , ') 12 • : \~'.)~lltlt t:llY t. t t.hHOer

·Mr ()Hf :ci . f- ·1v l·1olr! A<;·''

CompllCHi

1//ti ,,,. I' ~ J Authorised lly :

Rosu It$

14 !)

f

Nota. Radon G:is A1H1iy?J1s 15 cone only 111 Elaba Atom1r. ResP;ir.:h ~~11'ter ~tMurnbai

Appro\led Laborato1y by MoEF. OHSAS 18001 and fSO 9001 \o\it1(1' t1• .r..• ... v . ,d"'l~ j· .. -:_•jc; 01' r t> 1111 r! ,t 1'l .:tt..;..)t,_ •·1~ t,l·~~t·\ ,, r u:'· i:f:·h",} ;:

SAINJ HEP (100 MW)-Envi.ronment Monitoring Report No. S-2015/2 Page 57

~!;1 •l I:' •). tll <>

I 'd. 4'~'!!

,11tlr •

f, r r "lu

TEST R[PORT

Hiod.usian Const~uc t i o11 Comp any Ltd

'./ 1ll;igl~ ~ l) (l~. t i: .. 1,11;

1 di BtrnJ;,11,; ;;,,,:: i<11l111 H P I I 'I Rc.:p 1110

,, . 4. <•; ·"

O.J \I . 2; 'fl

17 ld1"1 ,1rl"' r

H)!'\ 1u1 ~ )~It I i

AMBIENT AlR QUALITY - NEAR KARTAH ROAD SIDE SCHOOL

$ .No. Parameters Lirnits

60

100

"i.lt;J "' '•oxides \SO 1 HI 1 80

80

Carbot1 Mo ~oxidf! fCOJ . ., 1 n 40

400

Sampling and Analysis carried out a~ p&r IS: 5182

Eq u lpmeots Details .

1 Equipments Details

I Monitored by

Romark5

Cht.tr.ked by

Muk!' f.!• :o V1ron :r.e1·t ;,~odbr N•• Ro:; 'i >Hi ,Md~e 1-.. o!t;cil Mo~ci ~J~' .llAS 1 1.1

Mt fi:JJ;,._,,, •h;;11 ['n,· El' lJi11• ~Jlr ..1u • :~ o1 I m ~ 11,l:l A~1;;

Complies

Approved Laboratory by MoEF, OHSA$ 1B001 and ISO 9001

Results

F ·~

1'i f-

'!.Ii

IJ:I

( 1

'/v't~b!)ii1: ...... ~"/;, ~,(::J;i1~·r:·i.!'.<.1_P ~.;,~!·!~·· I l"'ij.i; ! 1~}~ ,·•h: ~J~1.:·:·~>1~,tl . t\i')I~·.·. :··~1n ;t;r ;t dJ'th<~(t.i::71\rA'1 . cm

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-201512 Page 58

11, II f ltrn !rich 11 v

fEST RLPORT

H1nrl11st:111 '' nstroction Con1p:rny 1 I

V H~h.J(' !• po· ' ~.J •1J 111• f R •• ti I jh J.Jll<' iO 15

1 .-11 ·B•rn1.1•J r •,•~.ii· i-.. r rJ

l I f I. . '•

l r,~, 1il 111v•1:lo1•ri9: G9.i5 ,1111 1 .. ! 1'i .vn ' I, llU.Hi L'1fl!:>

W;r.ri r,p0;·rl ·J .:l K.ms • •11

~ I \, • •

AMBIENT AIR QUALITY - NEAR ADl1·1 CRUSHER PLANT

I

~ S.No Pu.Hn1>1ors

3uspendod Pai t1cu1,1tu Mo111t:r ( '3PM) p91m:•

I: S ilphur 01ox1des. ac; SI), ::::1,mlj

.l Nitroga1~ D1u~illes "" MO~ t J1g:mJ)

r Sampling and Analysis carried out as per IS: 5182

Eq11ipmnn1; Oct. 11& M11k') Ac·rc V1rnf'mc..,t Mo<le 1 •; .l kDS 90tllJ

Equl1Hncntr. 0f'Hltb 'l.R11f> ~ "O\cch Mi>th•l NII fl.As 1 !.7

r:onill)t"d by \Ir "'aj-.J!:ckl1ar Fnv Engmeer . Mr l~•\1r(p r~riv Fi1:'ct J'>llf.t

Remarks Complies

Limits

600

80

80

Checfcod hy A11thorlscd IJy· ...

Rl)sults

na

13 6

16 9

NP.t''I· R~d(lo G<is Anutysi~ is done only in £3alla Atomic Ruof!rch CllnlN .:it Mu1111JJ1

-- .

Approv~ laboratory by MoEF, OHSAS 18001 and ISO 9001 ~,.lnt~1!1., \\ 1.'#·~~ \",ft~'l'll~Jl~·~ ·n I "' .. 111 1 tmf'"·~;i-. :; ~, rt·'tr!:11'a.>': <Y.·:·1 .tart""'~l,1h~~·:J·'~,1i', _.·ri

SAJNJ HEP ('LOO MW)-Envirorunent Monitoring Report No. S-2015/2 Page 59

/

Mame oi the lnd\lstry

Adorr.sr.

REF No

Hi 11tlus1 11 Cono;t, l11.;f 11.111

Company I Id

', di.t~l~ & p .. <;1• , ,,·· 1. : •'h -l.lc.111JH" 1 .... ; '"\u:;J H.1

H

1( Ii hr I 'J' .,uric. 201'·

12" IJl'U. 2011.

DRINKING WATER QUALl~Y - KARTAH AREA· STOREIWORKSl10P (BOREWELL-3)

S.No. Parameter

Ph1:rulic Compounds ~~11~.0!: (' 1-1 1::

Mercury us Hg (r11£1iL)

LO C;idm•Jm ::is Cd img/LJ

21 .Seloniurn as !;c ( mg/l I

L2 Ar .. enic as As (rng '!..}

/3

)t\

2?

f~yw:rll'' as CN in·qil )

Lroa s P1 ··~· L 1

l nc ns Zn ("'• L)

Chrorr11uin .is C1 ·0 (lll[JiL1

Mrneral Oil ,mg•: l

8orun as B (mg!L)

'It·• 11·11111 ::i• (mgtl)

fol ~1 A!k,11 n1tv d!> t:aCOJ (mr, l

Pt"<!" "JP~ tr. 11 I

Methods

;s 3l 25 P~rl 48

AP1t:, 3500

Ar)H1\ 3fi00B

:" JIJ2 1 nart 'ii !J· liA ~!'iOOP.

,!.Pt'A 3:IOOB

AP~I/ ,Hi!lOB

IS 302ti t1 :~rt 39

APHA ~5008

J Pl;,

p /,

D<" •r<ible 1m ts As Per IS 10500

0.001

0.001

0.01

0.0 I

0 01

0.05

0 05

5 0 05

Q.01

1.0 0 03

200

AU!HJJll

Should I.le al>scrll

Should !Ju absr.int

Sample Collected by M: n,, ~{'~.11.11 i:r .. tnqr· r •·

Checked by

Results

N\1

IJ I

1:1 tJ

O':I 1)1, I IN!

N'I! 01' 1 r1cted

i .ot I• i;lcrcl

•:11

NI .,, ·Ill CJ

Abs~n1

thsertt

Apprnved Laboratory by MoEF, OHSAS 18001 and ISO 9001 \.~;t~b~~ K~ Wl;''rh' ''1 :t ~1-.,t1 fat~·; Ci;lt1 E ·· r~i: r;:;·rit·~b.;.! ·'l:!~~~·.~31!:0.r:~·.~t;!tt .. ctrn !Sl~rk.•o.:t~f9bs@_fl ~-.):: r_qr!::

SAlNJ HEP (100 MW)-Environcnent Monitoring Report No. S-2015/2 Page 60

JESLREPORT

Name of tho Industry Hindustan Construction CompBny Ltd ..

1r I 111 't" 'n r.1 ? '' i i

Add res$ Vill;igc & P'·"l ::; 111~! feti .e.:~llj:H,1 ;;•<,f /( •JilLI tl p

REF Ne>

DdlP tJ[ Pt c•J,p1

~Jale nr f(r~p(, J1ill!J

Jun 21 I

1111 l 201

DRINKING WATER QUALITY - KARTAH ARE'A - STORE/WORKSHOP (BOREWELL·31

S.No Parnmctcr

Co'or \Him.·n unrtsJ

2 Odar

.! "u~l;nlity \t'll rlJ' 'i pH

u fot,11 H;.irdnesi; a~ r:.1CQJ (rnqr i

Iron ;is Fe 1mg/l.)

8 C 1lurnles as Cl 1mg/l}

\'.! R!':> dual !r11<1 chlocne (1'1Q 1 .. i

10 [J;<:~olved i;~~ .ii~ (1r9n.;

11 Cv um u~, (;, 1 moilj

12 \jaqr~siom as i.19 1n ~~/1 )

1'3 Coppe1 il5 Cu : rr:µtL,

14 ' .. .~

1' ., IT

'vl<Jrl(JilfH~St 1s Mn (Tg 1l. J

Sulp11t11es ,1., so. •.'11y 1l)

N 11alr1 :ls t;O. (m9il.)

F•uri;itJt: ;;s F tmgil)

Chi:icked by A Sf I Jf r.!.)J'i

Methods

1•11; Zli!

I 1025 P,irt f'

tf 3025 P::irt 7

APrlA 21~~8

f1PllA 450tB

APHA 2J40::

1PI ,\ .; fiOOO APH A ).•uto

Al'HA J~OOB

I PHA 'iflO

, 'HA 11 JO

I F ~ i •'

r11," OA

1,rM.4 ~ '' >OD

Dos1rahlc! Limits As Per JS 10500

5

Agreeable

Agr&eable

5 6.5-B.5

300

0.3

250 0.2

500

75

30 1L05

0.1

200 45

1.0

Approve<! Laboratory by MoEF. OHSAS 18001 and ISO 9001

Results

Agree;iblB

Agre<:ulJ fl

03 1 1 !"l

44 i

I Jil

10 G

r. '

',:\';:!_c.Ur :VV/l\' ,ii~ h Ch~~_;.(;:. ·c :u r q1,t:1 l;.lli !I.<: • 'li }'i:1:~~?;.1.( 1 !;;t;·>~ '"· ~)trtilv~_,f :1}/~~I '-.:1_! ...... ~~]_\

SAINJ HEP (100 MW)-F.nvironment Monitoring Report No. S-2015/2 Page 61

I ..,

T~~I RJ;PORT

Na1T1c or fh(' Industry H1ndus1an Gon:;.rruction Compuny Ltd. Oat 01 ..imp n.1 r (j J•ll)P '5

'-t1l:<-lql,l ~ ~1.')<;~ :·~·''''•, lttr< '; • '> ·,, ., (:l,w:,,._. ;; •' •, IL 1:,

un 15

REF No l f- '"' . DRINKING WATER QUALITY·· W0'1KERS CAMPfOHICERS CAMPIADIT·i SITE

(BOREWELL-2)

S No. Parurnet.er Methods

PhPnn· · (em;'nll ··J~; C11"1 ( ;1;ro'1 1 ' 'd fl, •,. <i (1

1,1(: • J ) d- ·~o ,, q11. •,; :, '2'; r (• l i~

21.J C,H;m1om as Cd {r.iglt.) '"'11.:. 3~00

:.1. ;.~3 .. ~ ..

27 ) I

~.;l1-:na1111 ii~ Se ('Tl '111)

-,;,• il5 As , :~ .J 1 ! J

Cy<11:•dc ii~ vN ("'·qil i

~HI• .i l '11 \J l

Chrom11JOr a~ Ci"· ill tl/L)

".~ r.er •I ('i !mg , 1

1-: 0' ,.; '"' . r. fl l I

I' 1\IJJnll1111rn as Al /m9JLj

:rn '01a1 ,.,,k "" 1 UCO, 11 ~1':..l -:1 ~l StrP!'ll rn<: 1

_., · I r· c · 1 • ,-1'("1, r· o 1 ' "'"

Sample ColiP<:!ed by

Remarks: Analysed as per given sample

)., ..... , ""'"'"' ~ /;Pl'•\ ;r,ro·i

t. PI IA J ~iOGH

~ i ; ( l i 11\fl /.

l' ~I,)/, I;'•(

Oi.sir.1hlc I.units As Pt>r IS 10500

0 001

0.001

ll .O I

0 .01

0 .01

0.05 0 05

0 05

0.01

1.0

0.03

200

Absent

Should he ,,IJ.,011 1

Should be .,b~urnt

Checkert by Authorized by· ;:

Approved laboratory by MoEF. OHSAS 18001 and ISO 9001

SAJNJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2

Results

~· N1

Not Oi.!lec1et1

NI

tv I

h. ,' l)\'tf;· te<j

tJo! rJrd1>rted

NII

.)

\ """' A $('''?

.t\t. "'" lt

Page 62

,.. I

Name of the Industry

TEST REPORT

Hindus.tan Cons truction Corn1n1 y L t<l .

Address Vdi3ge Ft P•'" ; d:1 . Uah .. of <, ~· 111 12· · J .. iorn ?.O 1 ~ Tf;~: BanJ.-l <J 111•,t !• 11" 1 " f

REF No

DRINKING WATER QUALITY - wmmrns CAMPiOHICERS CAMP/ADIT-1 SITE

(BOREWELL·2)

S.No.

2

J

4

8

Parameter

Culoc 1t t..i;c;11 units1

Ort or dSl{I

1 urb,d1ty; ~J r.J)

l J'H Toi<• '1.i•dr1t). ~ <1:, C;: -;v, ,r•r,i·l

l'.W a~ ie 1r.·1 1 l

C/il1J•rdf"!> as Cl 1.rng/I.}

1 ~.es1d1"1 l lrn•' ~.r!l<Jn'1e (·n\}!I,

1:i ()1;:,l1lv1.;d ~.>Hds (r'19!L)

11 lv:n 1' a, C ~ \mg.'L.)

1? M:i~ nrs 111111 ,I'· Mg [m9!Li

1 ' '·DP fl•" ,, Cu (n 9n ,

, .i r1 ill I q 'l f (. -H· ']') Mr: ( Ill;;. ' )

Che-eked by

MQthods

,.. ' ~,\ ~ 1 tOC

A.PHI\ 1; :ms ,·, "l'A FCvB

Desirable Limits As Pei IS 10500

5 Agreeable

Agroeablc

Gs.as 300 0.3

250

0.2 500

75 30

0.05

0 i

200 45

1.0

Authorized by.· ,· , I

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001

.I

Results

kglfH~dllle

,',grH~~!lhic:

o~

5G 8(,

214

?2.8 I) ll

fo1 Del r.•. d

lo -• c

( '

i~Yt:b~1tt..: tJ\·~··.;~ :.) dn1:.•_:;~~.;.::;:· . .:~·:i1 E .,,,, 1 • f• ·t~l'l: .i __ 'i~t ·.~1.~~·.:~~L~.=i~t~;~ t •• ":t -~r P·c ·r··' .~9.~7.i.~~jl:'.·.<~.~'.:.

SAlNJ HEP (100 MW)-Envirorunent Mooitoring Report No. S-2015/2 Page 63

N.11110 of the lndu.,1 y

Address

REF No

fEST REPORT

H111d11st rn Constru ct ion Compar i .td.

'•. 7')' ~ j " I

: et· h,"·1jd' : .):~~, K ..1 111 H ;.,

S f - I t ~. I- "I ' P •

C· ;,i .h ,,.., Ii ! '>

/' I· /l!• , ( "

" '"

DRINKING WATER QUALITY - OHJCERS CAMP - SAINJ (BOREWCLL·1J

S.No

20

24

/111'1<; Hy ;i;, I• J (;'q'i l

C1H.Jrn1uri1 ,ls ,.,, (;ng/LJ

c;t•lc'liur' ,;,. SI"' • rr •l L:

At .Cl I } /.• '1 l

·;yai·1\le % '.,N \'Hq!Li

,,~ .)(J Cl'> Pt t ''•t;/l )

~t- ,:, le ;;t:; Zn ,mq,,}

i-1: r.t r 'r"l um w; L«" 1"1n:L1

~ ~ Born as B f11n l >

'i •• lu nl J • " f.1 'Tl'1

rntnl Al~Hil'l "/HS Ca,()

r~s11''•df'.s im11 i \

Sample Collecfod by

Remark~ : Analysed ,1s per 91vcn s :iniplc.

Methods Desirable Limits

Results As Per IS 10500

0.001 I ,

0.001 111

0.01 t~ot "''f-t..+ct--: t

0 01 Nol [•c•Jef."d

0.01 'Jot C•"'!vc td

0.05 1l I

0.05 • .. 1

5 l\luf 0P.'f'0P I

0.05 N:.I ;)clrll'l(:d

0.01 ll1I

1.0 l ,11

0.03 1-111

200 ~!I

Abs(•nt 1. use

Should h·• ;itJsont "h~

Sl1ould ho aui.cnl ,b nt

Autholl.zcd by: 1;" · · .J {

Approved laboratory by MoEF, OHSAS 18001 and ISO 9001 '1\t~r.~'>•k: it\',,\ .. , .. , LH!:.:t:h:~ L\• .::F ~:: rn;;ili t ;r11h~b:; J(/ ;t,i.· ;,. • :·,;~~~ .. ~.:· <::n .. :;·'..{.: hLJ; )·:J u·r.~:.!:·, ~·

SAINJ HEP (100 MW)-Environment ~onitoring Report No. S-2015/2 Page 64

N::ime of the Industry

Address

REF No:

TE~J.REf9RJ

Hindustan Cunt.ttuctlon Company Lid.,

V1ll<i·p• & p·.'··· :' 'l'oj ftil• l3,H1tdr,1 ltr"'k1! l,t •

S l. if h S1F12:.110'1 ~'

Dah: o' R~< <.1;. 1

D~te ot Rej10•1in~

l

l , .;"!~ ,,')• 5

u "

DRINKING WATER QUALITY - OFFICERS CAMP - SAINJ fBOREWELL-1J

S.No

1

I

re

7

8

ii)

Parameter

Color IH£12en 11n·ts \

Od•JI

• Taste

Tortlldly (fHJ'

ph

lot,11 H..=11d11~i.s i:lS CaC(): (Jl'•}j;_,

Iron ;;s Fe ( u•qf! )

Chlom1~~ as Cl (mg/t 1

Re1'1dual free c/1/odne t1nµiL \

Dlssolv1}d ~;o11cts {mg:L)

11 Ca c1um as Cn (.ng/L)

12 Maqnes1\.lm a~; Hg irng:I)

13 [C1ppor as Cu {mgil }

1.i ;Jar g<ln0s" .i., r-1 1' IT l/11 ')

15 S11iphatn~ a:> 8'. ·1 ~mq!L:

·u N.trotr l.!) T\I\ "(r• ~I)

f 11.or•riL (10 r 1\J>l l

Checked by l ....

Methods

J',1-'t•r. ;12ll J

,p "''i' DA AP•~A 450! 8

APH,\ 4500B

.~Pl .• 2540C

APH.fi J!100B

.:.f>HA 351 B

APMA :J<;(,f B

APHA 35008

,\PHA ~50Gf'

#.P'-JA 1 E"it1C~

••-'!A 4r(;:}[1

Desirable Limits Results

As Pet IS 10500

s Agreeable i"~r~H!dblu

Agree a bit> •\y roe;; lllo

5 0 1

6.5-8.5 7.2'2

300 54

0 3 NI

250 3€ •l

0.2 Nt!

500 100

75 ~6 c 30 II r>

0.05 ~.oi Dele"led

0.1 °Xv' Oohicted

200 , ll

45

1.0

Authorized by'- ( ,, . iJ · l ~

._.,,

Approved Laboratory by MoEF. OHSAS 18001 and ISO 9001 !'' ,t I

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2 Page 65

N aine of the I rttl\J st ry

Addrtl\iS

TEST RE.PORT

Hindust<in Con$Uuc1'on Company Lid ,

Vi!l;Jcu:· ~. (,n., -: :l:tq

It ,1 an pll i

:, h -1;1,.11 ~ llosl ~ ·,, 1 II I o J .nf. ,.I).

REF No II •

DRINKING WATER QUALITY - BARRAGE VILLAGE NIHARNI

S.No P111ameter Methods

"hnrnJi,· -:o 11~ )UfH1s C·,li ')I · 111) 1• l t~A '.Vi.~(,D

19 r.~1wury ;t$ /-1,1 '.•l -.11) I'.) J025 Pa•! ;8

'.{ 1 Selenium ii!.:;.~ ! mq '1 )

/2 2.)

74 I I

.L~ lrnc !ls Zn :1w;1:...)

1'

3?

Chromium Ci!:> C1 - (mgt li ~.ho r 11 C I n II

Borvr as 8 ( rrq 'l J

!\• 1.1,n1r11a'f ;1:-; /\I (mqj• ~

lulc.f r'\l~alil•,•y ;,i; CaCO. (l!o-;,l;I •

l'f::sticrdP.~ (m1H)

S·rep'OC'<'C.C

E.. Co!• i1 ecal l ol;inrm'

N'H.:. 3500

,;. ~r ) r.~ I :l~

:•_i>H,\ 4tl!Ol3

·~ 1'" lU

.p~, ? •,oin 1 • r P ,. l r;(J I

vH P!· 1G02

Sample Collected by V· ! ,,., , I•,.,, E • f: •!

Remarks· Ana1ysed as per given sample

Desirable Li mi ts As Per IS 10500

0.001

0.001

1L01

I) :111

0 .01

D.05

0 05

5

0.05

0 .01

1.0

0.63

200

Absent

Should bo absent

Should bo absent

Checked b\I I~ ,• J

J/ Jr Authorized by: • ._

Approved Laboratory by MoC:F, OHSAS 18001 and ISO 9001

Results

,...

Not DP.h!<:ti:d

Not C•1)tei:t~'::l

Not Of!fute i

~.

n1 Mot Do: •nc t~d Not r~~tr,.'.:tEH1

'l

JI

NI

:..in• f~·,fertecl

1"" \u~ll1I

Ab~•.nt

f•t )Cl.!

\,\!r~)~litc, !.~.,·,v-.· ~L1i1~~~s:~.j::~~]} • .. ,'}' f 01.;; r, ~.:~n,f,i.i.',a.1 ~jt~:;,· .. :i.H~~~!.~Ht(t1' · • .. ;r.Jn1 ·~,!~~f~J~cl1;: .. 'b~,(c·(; ,~,,:.1.~ ~ .. 11i

SAINJ HEP (I 00 MW)-Envirorunent Monitoring Report No. S-2015/2 Page 66

-·-...

Name of the Industry

l\ddtess

REF No

TEST RE PURT

Hindustan Co11 structiu n Company Ltd ..

\:' 1fhi1H~ c.~ r :-;.t ~l~ 1 f'\·,

• 1:r1 n:inj.'it.;, !)1q1 :<un,; !ID

S l l.il H :)/! 1 · 1Hl'l1 '')

r rhn

DRINKING WATER QUALI TY - BARRAGE VILLAG~ NIHARNI

S.No

' 4

5

' ' R

9

10

1 '

12

14

Parameter

I •:o v : 13?.e 1 11 • s

Odor

Tast'

I :~Lt<Jity (NTU)

,f<Jt':li Harr11H'"" <!'5 CaGC1 (rri\.J LI

ff. n '"' r.. 'm~J· J 11ir Jes ilfi ~r 1mg1L)

Residual fre e <:hlcrin r (mg/L

r' ""'d ~\) ds l1rn:.1/l)

Cd'c.um ::;,, ,:.1 ·~1g'•

M.int t.'S!JiT• ,w Mn l:'rg/t l

C<it 1u:r ;:ir. r .; (rng.t •

'v~<lfl\,)c.MCS\! .th "htt :• r!;/ J

:;u1r,.11;itfJ~; ,1" ~lo~ 1•ng1t)

11) "V.lrr1te d'> !\\', (111G·• 1

! I olJIJrldf' as I- iflll.)IL

\ ~I Checked by r 1} j l/ ir

Methods

~,r~ I~ L. 2 J,

IS "1Cl~ Pilft t, J~; ·.n...'f, Part

>\Ph' tLll•B

'~P 11/· .1 ii008

,'\PH t. 2'340G

;.p IA .• 50':!3

t\PriA 45001.l

1WI IA 45008

A ~t' A l'>-1 IJ(.

"' u 11,\ :l 500B M' I r .\ Vi{]( [4

,,Pt<A ~!)(jOB

.i>f'I u, -:iOOB

Ou1rable Limits As Po r IS 10500

Ag rne nblP.

Aurncab lt'

5

6. 5·8 ~)

JOO 0 3

2~0

0.2 500 7'.>

30 u 05

0 1

200

i,P•t/, A500P. 45

.<\Pd/'1 1~lD.1:J t.O

Authorized by : 1..

Approved Laboratory by MoEf, OH SAS 18001 and ISO 9001

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2

'" " t ..

Results

i." A rno. l 1~1

1,gr1h!c1b e Nil

7 1:: 24

12 (

r I

108 b 4

'lo: Dcl~r:1F.l !

Nol Oo1e1:1ed

Page 67

N l)W I.· • rrJuslry

H1ndds•·111 Co11s!r1Jtt,on Company Ltd ..

' F .,

1.: JtJ'". 2 t1:i -Villrtg•~ & po.,.t<;<)iB:

;\doro!;s I ui1 riaui;ira, U1:-.1 -;<'.uth1. HY

WASTE WATER~ VEHICLE WASHING RAMP - :SEDIMENTATION TANK - KARTAH WORKSHOP

S.No. Paramet&rs

-1 pl I

5

6

B'Olog1ca O~~sn Demu 1d 3 ·1<oys &27'C (rnq I

Total Residual C>;1onn~ (rn~J'l.)

Sample analysis done as per APHA

Method&

/1r •tA 52 lOu

'•.i-'HA 4~ l~

Remarki: Analysed as per given sample.

A p;. Checked b;o ljt-'

As per APPCB/CPCB limits

5.5-9.0

200

10

250

30

1.0

I

Au t11onz.~.cl by

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001 \fvt.it>.~i!(: ':'tJP•• :,' 1•tu.· 1\;<~.t2"' ~.0:1~ t . .. \!~~,: · r\11..i.·; Ji~1':~.t. ~,i...·:1.~~.:~5.~~~ ~k·•'' · ;·~:t!:-1.J'0~· · s 1 ·::lm

SAINJ HEP (100 MW)-Envirorunent Monitoring Report No. S-2015/2

Resul1s

~ ,, I <I

H'

J 2

112 3

8

·~11

Page 68

- ...,,____

t•.Jlll ... \

Ir r.11i;.ry

REF N >

TEST REPORT

H11t!lu:>tan Co11struc:1ion Company Ltt1 ..

VtlJ.iqo Ii pt·.>l S .r, I (:/I HanJ<l'a !}. • ""111!1. H !'

I •, nf ,.,ri,. 1•\J

: '•'',June 211•5

WASTE WATER-· FROM SEDIMENTATION TANK - BATCHING PLANT -- ADIT-1

S.No. Parameters M&thods As per APPCSICPCB Limits , .

p~ 5 5-9.0

2. To\o1t '.:!vspand1X! Sokds {mq1l i APH1\ /~,~GD 200

,l 0:1 & <3rew:1• •n~JI!...) M llA " ? [! IU

~ Chen.~r-rJ OJCygi?tl Dfm:and (lll'l ' 1 M.lftf :Jt/.llH 250

,. R1otogin-11 (~>.yqe" De1mn~ 1 do{~ •\PHA ~;1 10B 30 ,)

t:1!2'i'"C ( rfl ~J 'l. j

lot.JI R~tiduJI Chlorine (rn91Lj A.P.-iA 4~•rJDh 1.0

5ampte analysis dono as per APHA

Remarks; Analysed as per given snmpl~.

Chet;ked hy

• 1

)

rv'f i J i•,.:kl <I' [nv ( ng,, '}CC

I

~.

Authoriz~d Liv

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001

Results

6 8/

122

2 0

SB ' 28

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2 Page 69

Name )f lrii' r n1l1~,; r y

Hindust2m Con11ln1clion Company Ltd ..

l!tt..- 'i. f! >~!·Sni:•1 r c'1 -Oclr !'1'« :, • f<, '• , 1 1·

I 1

1, 11 m.11 11 ,,, l 1: 2' 1 !l

c:r- l 1 I ll f.\ , 4 I

WASTE WATER - FROM SEDIMENTATION TANK-- BATCHING PLANT- MAT

Parameter& Methods S.No As pet APPCBICPCB Results limits

pH 5.5·9.0 n 85

200 W' •j

3 0 & Grl}<iSt•{11101'.J 4P A !iUOB 10 I ~

250 ~~.J

a..; u v-g vu U"~Y~ ... n D~ ... ~ "' 11.• ..... I~ a•.!;·(. !1 'i 30 74

1.0 NI

Sample analysis don~ as per APHA

Romarks. Aoalysed as per given sample

I • I Checked by If Authoril'ucl hy ....

Approved Laboratory by MoEF. OHSAS 18001 and ISO 9001 •'~ h 1r JI I l

SAINJ HEP (I 00 MW)-Envirorunent Monitoring Report No. S-2015/2 Page 70

t ulT'(· , f fht

Ad lro.;;

TE~T REPO_RT

Mindustan Constructi on Cump.111y I 1d

Vrl , /}'J ~ P'> ' S • 1 >/\ i ,H .ir ) . .Ji") r I ' H r

!) Tl EI Slf 1201"- ...

I• f i t ( h ' • l{...,

lw1 I 1"'

.,, ' J ttn~. 2Cl 5

WASTE WATER - F'ROM SEDIMENT A Tl ONT ANK - BA TC HING PLANT - AOIT -2

S No

}

4

5

Paramelllrs

o,: & Gm"· e 1mg'1 l

U1r1:!XJ1r.JI 0:<-1 1 • 0<'11:,ind 3 d<iys 3! "Ii (I

Sample analysis clone as por APH A

Methods

APH/.. 4b008

AP tA ')!",?OB

/.Pf/A 450 [

Remarks: Analysed as per given somple.

·1rrrl • ,, r.ctc· 'l I /

Checked by

As per APPCB/CPCB Limits

5.5-9.0

200

10

250

30

1.0

Au lh<>rized by

Approved Laboratory by MoEF, OHSAS 18001 and ISO 9001 ,'vet-.<:•lr , "' •

SAINJ HEP (100 MW)-Eovironment Monitoring Report No. S-2015/2

R~tflts

I l

1 ce

1 (j

10/

211

Nil

Page 71

'~I ' . \

N!lm£~ uf the l1 t rtu~t 1 y

rEST REPOHT

Hrndu<;lnn C1>nst r 11c 1tu11 Compony Ltd .•

, II l o;

...i ! " 0. ~ .

.r• j

l I I R1 P 1 •

13 1 ''t

s

JUI ' ,

WASH~ WATER - FROM SCDIMENTATION TANK - TUNNEL WASTE WATER - AOIT·2

S.No. Parameters

Ctiemcal Chywm ~m.ind {fn.,H.)

!:l1ological O~v':l•" Go 11nrid 'l d. / • . ~ r, nlP'.I I l

I obi HHsrduaf Ch1orsr.e {mg'U

Sample analysis. done as per APHA

Methods

i\PH;. '>' '} .8

;\PIM ri:.>20G

Remarks: Analysed as per given sample.

S iimplP. Cn1IN:ted ti~·

.,,) Ch~ckccl by . { J'

As per APPCBICPCB Limits

5.!>·9.0

zoo

10

250

30

1.0

Appra11Rd Laboratory by MoEF, OHSAS 18001 and ISO 9001 'I · I I

SAINJ HEP (100 MW)-Envirorunent Monitoring Report No. S-2015/2

Results

- 11

02

1 2

71i

r~

Nrl

Page 72

RFF ~rn

TEST REPORT

Hrndustan Constructlo11 < .impany Ltd

'ill~91·: & l"'~.l fa111;. : ul1 Bapj·1r-1 [),,• ·1 ·J ,, f'

Dall: uf 0<l · p 1•1q

•;ii

rt IJ

WASTE WATE.R - FROM OFFICER MESS SAINJ

S.No Param&ters ~

pH

C!1er11cn· Ox19e11 Demar1d lmgiU

t11ologiral Qxy<1(•f' Dr•JT'Md ~ i;i...-•, :)I :'i g l

Totill Rcs!dU<if Chfonnr. (rng1i '

Sample c'tnalvsis done as pllt APflA

Methods

APHA f220fi

.4PHA ';2'"8

Remarks: Analysed as per given sumple-

Checked by

As piH APPCS/CPCB

llmlts

5.5+9.0

200

10

250

JO

1.0

} . (.''

Authorlvid by

Approved Laboratory by MoEr. OHSAS 18001 and ISO 9001

'fi' Ju w " '1

•;•. JUM' .r01':

Reau Its

·.~>8

!lC

'<l

4d 6

IL

1111

l't;t)$it, · 1 .... ,". • ~ ,~ t ... t.. .. ··:.:-~~J-'.:. :.' ~r ; E 11 J rt·:~.}t!.: ~;l; >. ·J~p~;f..11 / \ haf.?.~-~-~,~--·1 ;>~~:t ·~ 1

• 1lct":~>li;:JJ.l~J .. I .:'?.~[."~

SAlNJ HEP (100 MW)· Environment Monitoring Report No. S-201512 Page 73

.-(

EMR-VII

.. ---lLP.STATE POLLUTION ( 0'\ITHOL BOARD

Hl·:G /_.!{) llfeM.fl l"fJ/r.l.\'YSUNIWR '

U1 ,.,,. t ;'\ t, •

II II• ,,

I .

I;: I ,

I()

1..2.

I.>

14.

, ,

ht.uc'tf tu

t •. u,,h',I lh. lbr .. t•f It, n-•11•: ,.,.,,.,, 11.·t "'

~IU-'

I l\ni I S • I r'IOJ.;od

I !.:n l ' • I' • • . I

~It f)!S '.It\ l .;lh'

' II f)ff ·C~'

' ''MAl If) f1 \)l\..'-1

'He "" •.1;1 lht 11 I' nflX:I ~.,,.

II• ' ,,., "'

l'lfONt.' NO. 0 1'°0 _ • ",., 'vfA.\'Dl fll 1'1

\~'lo\u'

.....

I I 111•1•1 I ':ti •

U.1 t.._ ul ~;.1tn~•lio;~ Tinlc I '()lft·~1io11 ~''1'11r1 ftt'sulls 1u1:''t 'i

fl ....

t ··~1 •I 1 I'\~

I l l'"I I , I\ \1

1\,vl ra ·: t'~

I • I J • P\I '11 • •l'M '" 7.•0 \'1

tr \\th•• ltl'\I • l'~l tr> 1 A\I

1r\Mt119.\\i

'> ;\~11' ~ l'M

(I o I'' 1 "' I ·" \ \1

'•I \' I ' \'I

... •, I II I \I

;l;o. l{...,l'\I 'II \ J:S f)l..I )

A ~ : UDJ.. ·US ~II ~1111 r I ' <·•·. 11111

I\ ~I •"I 110 lllll 111 >I

\ I~'\ VII H •I RDl

;\ .. '\J ·~ llO 11111 lll>I

\ ~.: • rro Ill > Ill •I .. ., (llJ ltl I Ill •I •.00 Ill II .Ill II

t\ ~-, •' 1 ,HI 11111.JWI

\ ~'"'' c.,,lUO 11111 llf)f

J\ ,,, I'! : Ill llflJ .l<l>t

A''' ,,>4'\ ti BDl .llDl.

\ ' I .{,') llDl .Rr)L

. , ~ ll fll>I .IWI

,, ~l'~~a ) 11 J- .l<tl-\) \ YS'J

'<1. ~111>1 11111 llUI , .. J • Ul>f

I ..,)( ISi II

l:Dl Bill

)1111 .• llf)l

Ill •I .Ill >I JI JI Hiii

Ill >I flfll UDI .,llfll

lll>l .1.'

lllll 11111

lllJI Ill •l . 116um1

I l•J 11n1

SAINJ HEP (100 MW)· Environment Monitoring Rt1port No. S-2015/2 Page 74

EMR-VIII 1. 1- .s

\.' \! '- "''°' !<hf'\)K' l\)I :

\\;\. fi tf. \\'\~l l \-\-'\l[:R,-\,;1'it-

IUn\U'"'·"' ~l:,U .. • r11:<4l'"th•\i ( ... httf\l h •tb'~· .... , ..... h:.t ' •\:"4' J '"' D&'rt(i (.,.Jc..H'

~uoJ,:r '1.J1'U1. u;:..1f. :\lt'"'U I H fl,}

~1Ut<.)i.:r ~'4-.;1.r•t 1-t.(di.

Riv .. , ""'"°Y ProJ<tCt~ lh<:ludlnS,I Hyd<>I P<>W(O)r I LAS 1nw.t1td : S9GU

T£STRePOIH Oc::to : O.fJ107/2(11 5

To>I R .. po<\ tlu • 5919

'11u1~ .,,r th'-' cu.,toritrt

.\d<ht''"

..... 1iuj tl~ t.f •.,.' r:ll'<\,ll' l'<uj..-"• t1i-f-JlfJd) • IOWYfJ ~(Jq1h~n,t :\.la.1u•U,L·t· .. ~.,fnj U~dro t::l~·•rh.· l"roj4•.;t .JU'l'CI ~flt0l>:J1.H!-·· G<n<"n1l l\l~11}.1'..!°'

\\ (1r~~; ... lro\.atnj f'n.>jt·-:'C ( :cHnt . Cir~(ce. Ul•t~Cl..!'luruhlll

Nalnl'l' ut .~n•plc ~ . ~•llll'I~ (.'1Jl\1,.:trd lly <. C)tt•Wrlt~ "' ?) :.mttle ""·cC"h'-J. f1. (""'d~ N <J. ol thl' S't•UlJk 7. n&tt"" & [ 'nu.1 or('ul~+ti.~n & lu,,at't\ln~

tc. l>11U:-0(Sc:1r1 "~ (.'utttl.llctio-• vf .,\ctllJ~~h

~. ~tuu(Jlha.t:. Point iO, l"Un'I U<'t~u~ <k~"'"'Jrks)

IL ~\1o .. h· vf l11'J''-"':11I l l , ''\funuh.~ H -.:t.:'-'h iM.¥, llod~

I J .. T$i-t1t)IC"l' 1iHur~ "" Coltt":C\iou I .4. ( ·.,_rl•tr'"' '\o,: fvr

\Vah•s ( oni_umpttulf & \\-.\\ (~ (t{t . S•f.)\

$(

' ;·J·l~'.;'"O"AJ~, .!llrl•\;I.

.. .,_;.jl..,;i;('.1_11 ..

\\ -1.1 ·"~kc \~t(l.,'J(ul). (10•1• ·1 ~·1>'-': (l(IR·ll.t>.iot .. for•m~<')

ltn,Uhh-r t'uHhU ."\l I "

)'J6ll

2Ll>t•;2UI !'-. 11~?-" 1<1 1 .t.1111 &. ?.,;()1>/lOI ~

27 Vbi 2tJ t f\ ... ~ ()9!.,"!.'2UJ ~

tlauJ 1~u1t1') o• l'\;-t4tb• , Utrtl(.11• -

rh1t

0

... ~ pll H.att\~lti: f'JI \>I\ ">'-"" !

.,"' ( •''ill So. ,\tt(l~;J.t l\llU' (. l'-·~'r

lo.ti :~.•nu).''"'" :Z<!.IJl)1) & Ind I CIUU . l)tnn :16.!J\l\I

Anup ValdyOJ,SSO

• • ~llJl P..,ll••'ll If. W> .JI+•<. n;:fQ-11 1 • •'•~f 1~ o.C' "•I !'\I ""/,\,.;

:r~J ,..._, •• i '' ,,,,._, 011: t'.' ~.,..,. 1-1 .. ~v'J,. ,"·r>~~:c;. ;o ,..;. • 1_..~1 ... : .. 1~ ~· 1•:t"1""oc •. r ,.., •. ,. ,f:'l)l ,,~ :,r fo). ~ '"' ,..,,.,1, .. , >-!\'•;·t,,1.1 )I .. 1>

::>•t"ll. tO.•l W ~I Mt \Ju'.:-1' y~~J .;,,Jr.et l() ;,.ny~ f,, ru ,,,.., •.!?.lV '• ,,.,. ·~ •p,,.l I 1••.,.'fl •.,11llJ~S •>~ .. ,,.., 'vl4~.i .,o.f,.••• 1l·ff:~ Th''° • ..,.,pvrt t~ ;:nt to t:u '1J>"v<l•);.;~)o wh<.:•11) ..,, ir' p.,rt' \)J ~1~t.:·f ~~ ar~-.. d"1·11.111111n"1 "r;,yii;i ·.iv•th<nA \l•t:J ''~:111"11s~t{1~-. ;.;' ll\') o_. ... c~• ">''''''>9

r "'fh\o< b!",fl'..i o'J ''~' t'6~~pOn!c1bl(4 fur"'" ~1,•:tn""lt«.:.:Hy fur 1110 ~",'Vt.~~ 11,.,1 .::1,;,l•\"f !~<l t:•y 1i1(; BC•••h.1,. r;n,t:.• 1·11.

·-· l~,,._~ "uLW1~~/ ~I i.:..i,. L'l~Alory ,., k111•1' .. "'<J t.) •l',:-."t tn'-"""'"'J ..in '' 1 A.•\)' \h.t~\~ u~~frv.~ ":vl <.lf l!1~ u. •'""n 1" "iUl#l'K"l :r;

<-i<"'1..>c,:u • ~r .. t 1t•11~ .,:...,r;~·':IJ-\J(\vr. ""' ,,,.

m

SAINJ HEP (lOO MW)-Enviromnent Monitoring Report No. S-2015/2 Page 75

\°" \ l. Y':iJ<;. /U·.f '<IR 1 , O!(

\!. \ 1 LK Wr\:"'t I '). ·\ fF~ :-, \'.\lrl l· tlhn 1rh•l " 1ah l'ollu1!un 1..·ontro l lh>ara J.:iud.:1 '"~"

l-\1

11.BMll (ulo:t !> 1111olet '-a&>r. Oisll. M•udt ( Ii.I'.

River V.ill;iy PtoJcCt!> Including Hyd"I Pow-.r I LAG l11waf<I : 5{)68

Sundt• -.;,.k•¥· F.+4ll

TEST REPQRT 11 t lf.,1 • u1 1 1~0 G9~8 Oete: OG/0712015

: S11it1J lh1fro f;l1·r1r1< t•ru]r<'I (llltlkl) • IOJNI> ' • fl U- u f lh ,· l lhlhUh I

\J.h '" : -,(.,pn~rnl :'111&1u11.:r, !-.lliqj llydru El~~rk Prnjl~I ,Hl'l'C I !,,u11b~l,Dy. I ;~ n~r.i l \lam

\\ 111 l.\).\•lnj f'~oj cct C 1J 11>c. Ch.:1.-. HI' I'< C,, -.,.rwltoti•

.1. 'f~lorc or ~""'fl~ ~- Sltinpk Ce>ll~cl\-d a.v 5. Qv-uHt~ <1fS1>n1pk J«c~(.,11<1

().Cude Ne>. vfth~ S.i1111pk!

7. Ditfc & 'l'itnt ol'Coll,cllou .I:. 1111.-,.rtJirl~ Ii. Oo:lt of ~l:Jrl .~ C11111pklh111 <If .\11:.11~ ~ '.). s~mplini: l'oint

lU. fkm lli·i~Hnk~m~,k~l

11. ·""d" <if J)l•(IOtill

12. l'l1iuwce Ktltivi1111 llod~

1.1. 'h11111~r:.tqf< on ( ull~<'liuo

I -1. ( •tl"loO~> ' °" rrir \Viiot~r (\111~umpUu11 & 'W.\\ .(; IKLPl)J

;;· c,;~~ikmCJ ... t(j'

~ ()l~ ;.~nr. Gt~tl\:i~

\L\ t-\\ .ikr \ct(U~fl l ), (Imp T~·p•·: llOl~Jl.O.Rrfor,_.1tH)

Ra, in4cr h:111nar.·\E.I:.

J\1111.U

n;oc.1201s . ,,,. 1:; ,., 1-42u, & 2·M1i.;zu15

l11U(1!:01~ ·"' 09107-'201$

();~ !11IJu1u •ulu11.~. ,\tlfl-1il<.11ttul11~1!01\J •·

~

,'\: r111 lt•nM~ '"'pit Strip: I/.; ('o lur .S: ,\ 111'1 oritn.:•• : li\!ll.1 bru""o

Jn<l :i. tKlll , llu1u :22.tl!Jll .t tnrl :1.000. floni :JW.0111!

Un rt t .. tMotho<I

Anup \laldya .SSO

N<,•

~ · !··,tnc f't$f.j!tl6ft""\ ~'8 .;.u·.~1"',; ..;•1·!,t U•r- ~ ;>p-" <''"l"':;l

'•··· ~(>-;, 1\(:J '(•(~, 1..•nf-r ''' ·~ 1-t~:~v. ,;;i;oµi~b il,;-.,; ~q.,t;;;L._,,a•:"'' 1..,1 ,~,'~'""'' ~ +'' • •i.~::\fln pf ~r~•i;\.t'ts I'.; 11~>V1.:..• ·1(1~l.4:l1 '" '.tl~r10.U .:;_;:J;:>µ•n •Y·U ~ \.o\1btluy•.1t ,i''•· I\! dct)'";; ff om :t:\; tMt~ <,.I :os.i..,,'"' (•' :.r.,.t fld~\ •I Ull.L~.:-. <>l~ 'U\~~ .. $p1;1c1lie-tl

Tr~1~ r(•(.:".1'1 ·~ UJl tQ bt.' 1•Jp~•)1_j;.l('\llS V•f'O:I)" ::.•; it1 j.)·&4t\ •_li U~P.1 '1 ,._,, I ;.... . .., .. ,. t:t'Jt~ f'rl&U'J.1~ w1!f(t;J! lh'1C~'•'°'K11 u( 1h~ 80t1H,1 i;• •V.'i~1tt{; ~ r J1,,. tJ.,,.,11tJ 1~ ,.ut "~~·o"" lbm k<' iho ..,tf\t)8.''1~~c1t)· fc-r •t;" .i •n·" ~ •i:t.-1 . ,)II\ r (('u n,. ~he 6r..:iir.:f ~ <>fr:~·~h h l ~~b lhil'.>~hl; ¢:~\tr :.;~r,•t~J~ • h'.•'''l:t>L' I(.: lth; 1H't""•k,.C J rt(' j)j An'!" v-1t"t •Jft!tl~) <Ju~ <;:i "'-"" ft;J.Qil of.I t:..~t;•..i' ! >

>1111),;, J• Pr0\1 ,f\ .J t 3~ tac. , ., ... J,. ~ t"">Gtl":1>9>t1i1.•l Ci it.ic:'i,.\. .::.-1..,4 \/I EPA~ 1!~ .. $ l)~d~o-nr.- :'Jll'-_. ... y(·~....v1,dc.11 Tt rtlnt1,ncrt~1rl1 '/) c,fCf'.ot"'S

SAINJ HEP (100 MW)-Environment Monitoring Report No. S-2015/2

30107/2015

Page 76

\ \l) :-.1-.. RI •'<.ti( I 1,m '\. ·\ J H< •',\·A..;: l'l. \\.,\ 1 l·R '- \'-lh f·

R1v11r V•lloy Pl'OJCX:~ l11cludll\9 Hydal l'(,'W<Jr' LAI! Inward : 5967

J

lhmotth-•I '°'lhlta• p~,U111i1>11 (.,ufllfl)l lkl•n.t ~11.nth:r i\a2~r [ .IB

1111"-lft ('.,fou~ S11ndt1 l\~~.r. lfoll \1andl i II.I'./

:.M11d"' ·'•cor-1 ~~~01

lcSl REPOAT OQt• : 09/0112015

: S:oi 111 ll~ \Irv I .l<'ll k Pl'uj~ ... t tllpp~ll - UJ~(I l "~"''' or th" C11>ta "" 1

l . . \lldrcf\). : -,(;"11er:ll !ll~na11e1. ~aiu j U~ds o 1-:lt-ttrk l"r~Jttl , 11 rl'<.'I. ~~n•l>l•l.11~ . G•o~ral "1~11>1.it

\\.o1rl..•),..,oi!lj t'ruj<<'I (. uu>=t. (. i1-.·J11, lfl'l'Cl .,Sttrulu1i ,

·'·:-. .. cur<: ufS:u:npk

4. S\1uq•lc Culh:cli'u ll>

!-. ~u~11t11: of S•1aplc Rc•t·ch •'<l

6 l'udc '"· .. 111, .. ~•11tplo 7. IJat~ I\, Tim"uf(.'olll!~llun ..I\: lonJrtliu~ !I. l)111t ufStnl'1 & CompMio11 ul .~w.;lysls

\I Srnnplin1: l'uint

JO. I Ju" Ow1il; ilh·r11:1 rl..•I J l. \luar vi lJ i,p11111l

J l. \..\tuu:il·· \<,<chill;t lfody

1.1. t 1:n11•-'n•111r" "'' <:'ull"r1i.111 I~. ( arbb>' Nos l•ir

Y,·:.k• < u11wm11<iu11 ..\;. \\ .\\' .(; ll'Ll'J>l

Sr ~ ~~,ril(S1.'1•<i•!d :::;.. .• ~;:;~ .p r <''vlu~;,,.:.·:

... ~:,. :'I tJ ~; ~ft'7\1

\\.l\' r.\\a1" ,\('f(l.~'AUIJ. (ll•~P ·ryl"': llOT«tl.0.lh·frtt·M~) lb1·h1(1 .. 1 h'.uuo.11· •• HS

,\Y(1l.,.

~1 't1M201:'. 0_.4~ tu u~111 "'- 371t1f1'lU1~

?7/1161~111<', & l)\)fil,J.?111~

1 '' l.~11011:1 fOJI011~ • .'\llil·l lK.:111'<>1 :>.ull~h) •

f\\ , .,.

(I

&. l!ll f(;111g1 ull (Ill Strip:

& Cu!ou & Al•tt~Jr'llll~<' :Clt~r

lncf :2.0ll'J. 00111 :22 UOQ & Ind : l.000. Pom : 111 .tll!IJ

IJ1tlt

.:ir.· 1-1. ...

Anup Valdya,SSO

..... ,

m

! ;'.~t* Pf1(~r<'~:. tJi ,jfr· '(l'IH~·I: .._,01,).r lth.~ ..;.;; ·:t ~l r'A~~~ : h~ ~-:lt 1lt.1> rt.~rl.;r ir.·••1 t.> U•t' h::: ·~~...! :-..;,: 1~;.i <'';(:•"'I'· •.:.. i• '" ; 1~~•.t' ·••·• • F ~ .. t;.;'~" 1Qdl tJt ~r~'1Cb :'io ~··· ' •' ;f • • .... • ,_ .. j

... ':' l •";;.._,it !\ "I • l~ ti'~! II.) e-.... .-.>JI;"' n r (~ ... ~, ,., .r·) Kf, , • .., .. j';lQ .I~~" fl.,}\,..~ 'l,; '.. >1' .,f I""~-- f! . ..:i·1, :1o, '"·:J .,.11~· ck 1Hl ·• 1Lt ""'~":" n.1~1., f· ,. U'"' Jt1 'l)(t"1I u:Y t- ' 0 ,. Jt c~ t::. '· I • i.. "S:C~"1J t<t 'r'" 0"::& ·d 't cfl'1n•1lr;. 1,111 ;:..it:; t'.

1vr0-,1. ; .• r; .. ,:~•~;)ry 1· .. 1111111.,l'' ;n :••t, ,.y;;, .. "';;: ~r;.:.--..;1l ;\r'r •1•'.;p,;w .-<11 ''' ·~ tn..1l ll: tr.1~ ''-'jj.Xt ;'I .w;i.,;.,~ t~·

H· .;J,·,r,., ~.a·.,. .... h J•Ji·~·~'i'. u, .• , .. ' 1·,·"n;~s·f\• l.;"" • i(';.11~~4'~;t1.1 \.I~·\'~ t::·J'~t'\~.._,... I .. \;· <i.; \." 1~r"'(.;jt-1J5l't:-..llJ.,,,,,i1 ni:!l•'•f.11,"'Jf'•!.:'1! IS11.J'.\;,:1rt:•;, ••

----------

SAJNJ HEP (100 MW).Envi..romnent Monitoring Report No. S-2015/2

J01U7·201 ~

Page 77

·\'·'\I\ ~I' lll.t'•JR r J'<'R Uu.11.a~bJI ~1•h; f1 b-l-llifinn c~1ttttt>l llo-aJd. ~Urt(h•r '•~A.r I . .%.~

I\ \ r F.R '.\ !\$1 r· \\ \I 1: k "''VI!>( r

Rl'ier Vallcr Projects lncludlnsl HyJlll Pow~r I LA9 Inward : S964

resT REPORT

U.&Mn Cvl<•u>

Sutt<l~r l'<u\l"r· l>i•ll, \1iu11ll \ t4.P.1 Suntlrr ""J:dr•J ~.WO:!

Datu: 0910712015

'\HU\ ttrllh l U\IHfU\t

~ '"'''. \

: ~;unj ll~til•• l.l«1rir l'rujecl Olr>pcl) • l03'1<> : ··0...•'11•'1111 \l111111~cr, ~~inj ll)<lrn Eledrk l'rvJnl ,lll'PCl. '>l\ruh:tl,O~ (,.,11.,-.11 'l~flll~t W11rk>),Sainj J'roj\'rl Cull•I Cini .. , HPPCL.,!;:iral111l

J. N~1uN ol' ~M11pltt

-l.. Sm1111ll~ Colle~! ed U~ s. (ju~n1h~ uf Sompll lh·c .. h·•u t>. (·~,k 'o. uf ltw S1111111k

i. Uah· ~ rtme or ( ulk.ttl•11t ,;i: h1-.110 <.11111:

Ii. o~i.· ~fStnrt ,\ C1>t1t)>leli1111 ur An:il~st~

9. snmpliul! \'11iu1

10. Mo" 0~1:iib l~•m.rl.\)

I I, Ml>dc uf () l\lJQ•al

I:!.. l llli111a1t" i<«\'ivho~ 811dy IJ, 'f't"IH!)<l'Ol1Urt l!ll ( ollt•t·lloll

l4 ( :irl•·"' "'"\ fo1 \\ llh'I ' oJll~UlllprtUJI ,(, \\ .\\.(;("I J'lll

Sr ~ ~:'.J>i.\;1'!\(i-"~~ $~hi.ii.

2. \.. -..) il•h.;'~hV1b'

J ...;., r" · ' (i~x­~ ; • 1

W,\ T-W111~r A~t(l.cJ!,Oll}. (l11sp TH>I~ ~ lfOR-H.Q.Rcf~n:11~~)

Ra•llul<• Kurn:11 .. \EE

,,91il7

l!11H.lillll~. 0:;111 to l!-:?111 & Z'Ml1>!2UI ~ 27/U<o!2UI!- & 0~1U712Ql5 RiYrr lbinj ul 1lhn,iufl ~II 1t•·tu1't>'l!t. -

fJ

'"' rill H;llll!C tlll pit S1rip: '" ( <•lor ,\, \t•pl·;u·ativ~ :Cl~u• ln11 .! (11,u. l1u•ll :!l.OUCl & l nd :I Ot1u. 00111 :l!l.IJO(t

.• .,

Anup Vaidya,SSO

m

1 "~51.! p;Ufll'rlt! ~ .flrt• (\)/~•I•:\, Uf\dt ( tf;t,1 • ro)f t• f'1 '"4E?c fl ( :.U"tG •vft'r 'J t, ,, ''H:- (,a• .,,,,. #h"r-; ~}:, H'IJ .. 1.,• • ,.._: i .,~ ... ,,., ''S f ll i j, ,., 1UI\' • pt:)J,,,,d~ .~ .~!irw I ,,,~t·d1..• ... ) ,~JO<!

'.l-:1 ~\t1.\l)t1'J11~\}yil\J.-' .tl :1,~1·<. .. liU..,tJ' .. t ,, t fNr.1r .. tvl~n\:.rtOfl)IW'4;.,,,l-"~'J ~ lh s ·'l.·"'CX1 , 1 u l~ n:-;,n.l3L ~ 1 v.1l.:0~/-01 Pil t ,, J• .. ~ ell) :;tt\f( tstr s, :ni...~ tt ll~1J-l ~ "pu-r '"'"'r~, j o~ E: .J:\l"l <• .,.r·."1.;

H ,., ..... ,\,,, Pn:4.Jtl(tl1

~ r"'"1'$'S~

rl Jti<+-J t ;..Af{ f. .f Jr •J ~ ; •1 :M1 ..,, • <.1~0 tiy \h~ t; '3m S ol{u·,tfJ '!I.

1 ,,~, •• ;1;~ ,:v / '1•~:'•;f\, CH•~.;1r·1 1 •• d ut '"'~ t"1i-IO 1 ~ ·~~:~ll;:· ae

SAINJ HEP (100 MW)-Envi..ronment Monitoring Report No. S-2015/2

3010712015

Page 78

l r

."-:-.\!\SI'\ ltFPC1lt l IOI.; 111111.,. l1AI 51t,,,,. l'nllu11•H• ( tm lrol llu~rd. Su1tdrt :'.'~l:JI• L.\U

BUM 0 ('.,i.,n}

Suollor l'»i:or. 00.H. '>1.rt<il t ti.~.)

:i11t1<kr N~it~t>-11 ~~Ol

w A n R ... '-' i\STr' v . . \ l flt ~ \ \.1 rt 1:

River V'Uey Proj11c1s l11el1Jding Hyd~l f'uwcr I I.AB Inward ; 596l

TEST REPORT

: ~~it\j ll,1 •hv Ektlrk l'ruj'<'.l 1llp~1) • 10896

Cat•: 091071:t015

t. 'lllU lit lln ( U\ll)UtL f

.!. ,., ... , .... : .,(;out·r:il M11u:ogcr. Nuinj HydtC) 1-:1~1rlc l'rojc~I ,llJ>i.'(.:I. 'i•r;iln•IJ>y. G4.'ll<'"'' "'"""lo: \\or'->).S~iaJ l'r.,j,•ct ('cm'c. C-itcl,.., 111'1'~ · l .. ~r:>h.tl .

'· ~iltllrt' of S;.unplt 4. ~11n1pk Collecw.l By

\\ \T-\\ ~rtr -\~l!l.~1:~11, dntp I YI!~: llOlt·lf.O.rt"~"r'•nc~)

H1l\lt1<ll·r l1.ut11•H»··\li.I'

S. i)ll>llllll\ of~Alllpk Rec~h ~d

<1. t •1tk ""· ol lh• !.ampk i. 1la11• & 'fiUlc u{ Cullot1:li11n & '"" ~1 lJi11~

8. H~l• or !)IHI.\:. (;;,mph;liM of .-\.111'11,,.j,

9. Siuupl111~ Point

}\), l-'l11n U1:1iull~ (R~mll•'k•>

11. Mr"lc "' Dl~11osal II. l,l1i11ovh; lt~,-.,Mns: Jlt>J~

13. 'l'~mpcr~ll.I~ 011 Collt~tlun

1-4. t'>U bu~~ N<1s lur

,\.,.h-r ( .. n<111111rti1m •"- \\,\\,(, <"l.l'f)J

Sr

t Sv~~ ..... 1~:j ~ """

:t c~uJ;.i;;l;:lity '.I (;ii !l.''j nr~+!A

~ ;A1

,li() l(J

t Z'Vvi20 I 5 , ( J .ll:; lo I.!!() l & H f()CJ!ll) I :0 2i (11\.'i() I~ ,4' O!iiO ?ilO I~

R1•u Saini l t.m l>l'Tl~T u111h.-1 -

0

,'l( pll RtUIJ.:l' 01111H Slri11 : ,\. (ulor ,1;: \p11~>1h1t1Cl· : Cl~ur

ltul :V)lJ(). Ovm :2!.l}OIJ & l11J. I .I.IOU, l>um : 18.11110

Unn

" ···"""" ••Mftr>wit:'"· ~,,,...,,~ ..... ~4•f" .1r:~-:.;-:1 u • ~-,i...r: '">t .JArli

Anup Vaid~a.sso

J i 11w f"\f~h;i(-A '"''~' Ot"I:., '"' ,.,"~ Ct:1\.~• ~ \.tH•j)lv~, i• iJ 11ijjoh :nLI·~ •'·;' .1·n~:~r\ : 0.,1 ~w;1,')n' ct "l<O.O.hc 1·\ .~ ~(l~trv.,r • .'t1ea nor I~\~ -"',1

~ 1e.1~~"' t,CoJ~~\J 'i'0.,,,,1:· r n:tJ..,;:::r.f~" Hl.,(';.~(11.1' s,: .. "~'"'-"' ev .. u~\:s~c.. •tr,.,-.tt,'°'•• <t'f

Al •• , ..... 4.~'~;"" '*I )I .... tit. ••r. hJ-i.l: • I '1H>. y..... • ... "V.-! "'' u~f'f'd ~1 • ~ t, .. &j•,.;\-~r~ ... uv ll1•~1;!1 th :toV1Jl tJ e Pt'' 'l'Wi~IC' l'l ... ' u,": 6•\ll j ,,., .. tt'•,.n l

: ht: f;:,..')tn •,riot ri·£-r~!\•\1L~~ rvr U•<. m.t~61'l .._~,(). ft.H lta1 \:;;;~rr~: t<}J 'HJt' •~ilt.H.ailJ b-y t°'Q rv~ud'~ l'~:, •t.1l9'

'.Hn: k<~t" i&~., ~ (;Uf .J(.1,lfA'Jry ~C'. )\; ~1 :c- Vi liVJ•~~· ,,Jn('-t •• ~~ ,<t,. ), ' j)l1o_i .u., fi\! Jf at !:-t~. rt;; ' .~ ~;....:..,.,· ... t

~. """"' JI. '(H!l'f~ Jur. )I( l'J I ••

SAlNJ HEP (l 00 MW)-En.viromnent Monitoring Report No. S-201512 Page 79