76
I Environmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water Resources Management in the Baiyangdian Basin Prepared by Baoding ADB-Loan Project Management Office SOGREAH Consultants Baoding, China For Baoding Municipal Government Hebei Provincial Government

Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

  • Upload
    vuanh

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

I

Environmental Monitoring Report

Project Number: 36437 July 2010

Loan 2428-PRC: Integrated Ecosystem and Water

Resources Management in the Baiyangdian Basin

Prepared by Baoding ADB-Loan Project Management Office

SOGREAH Consultants

Baoding, China

For Baoding Municipal Government Hebei Provincial Government

Page 2: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

I

PEOPLE’S REPUBLIC OF CHINA

ASIAN DEVELOPMENT BANK

INTEGRATED ECOSYSTEM AND WATER RESOURCES

MANAGEMENT IN THE BAIYANGDIAN BASIN

EMP IMPLEMENTATION PROGRESS REPORT

(SECOND SEMIANNUAL PROGRESS REPORT, JANUARY TO JULY OF 2010)

PREPARED BY BAODING ADB-LOAN PROJECT MANAGEMENT OFFICE

JULY 2010

Page 3: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

II

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................................ 1

2. PROGRESS OF THE PROJECT ........................................................................................................ 5

2.1.1. LIUSHI WWTP................................................................................................................................ 5

2.1.2. BAIGOU WWTP ............................................................................................................................. 5

2.1.3. LI COUNTY WWTP......................................................................................................................... 5

2.1.4. XUSHUI WWTP .............................................................................................................................. 6

2.1.5. XINXING WWTP ............................................................................................................................. 6

2.1.6. ANXIN WWTP ................................................................................................................................ 6

2.1.7. YI COUNTY WWTP......................................................................................................................... 6

2.1.8. DINGXING WWTP........................................................................................................................... 7

2.1.9. DINGZHOU WWTP.......................................................................................................................... 7

2.1.10. MANCHENG WWTP........................................................................................................................ 7

2.1.11. XIONG COUNTY WWTP .................................................................................................................. 8

2.1.12. TANG COUNTY WWTP ................................................................................................................... 8

2.1.13. WENQUANCHENG WWTP............................................................................................................... 8

2.1.14. YI COUNTY WATER SUPPLY ............................................................................................................ 9

2.1.15. XIONG COUNTY WATER SUPPLY ..................................................................................................... 9

2.1.16. DINGZHOU WATER SUPPLY............................................................................................................. 9

2.1.17. ANGEZHUANG WATERSHED (RESERVOIR) REFORESTATION ........................................................... 10

2.1.18. BAIYANGDIAN LAKESIDE REFORESTATION .................................................................................... 10

2.1.19. ANXIN URBAN FLOOD MANAGEMENT ............................................................................................ 10

2.1.20. IWM(WANGKUAI-XIDAYANG RESERVOIR) ..................................................................................... 10

2.1.21. SOLID WASTE MANAGEMENT (HUANGHUAGOU WATERSHED) ........................................................ 11

2.1.22. XIONG COUNTY CLEAN (GEOTHERMAL) ENERGY........................................................................... 11

3. IMPLEMENTATION STATUS OF EMP ............................................................................................ 12

3.1. INSTITUTIONAL AND RESPONSIBILITIES .......................................................................................... 12

3.2. ENVIRONMENT MANAGEMENT AND MITIGATION MEASURES TAKEN..................................................... 12

3.2.1. LIUSHI WWTP.............................................................................................................................. 13

3.2.2. BAIGOU WWTP ........................................................................................................................... 14

3.2.3. LI COUNTY WWTP....................................................................................................................... 16

3.2.4. XUSHUI WWTP ............................................................................................................................ 17

3.2.5. XINXING TOWN WWTP ................................................................................................................. 17

3.2.6. ANXIN WWTP ................................................................................................................................ 18

3.2.7. YI COUNTY WWTP ......................................................................................................................... 18

3.2.8. DINGXING WWTP......................................................................................................................... 19

3.2.9. DINGZHOU WWTP........................................................................................................................ 20

3.2.10. MANCHENG WWTP ........................................................................................................................ 21

3.2.11. XIONG COUNTY WWTP................................................................................................................... 22

3.2.12. TANG COUNTY WWTP .................................................................................................................... 23

3.2.13. WENQUANCHENG WWTP ............................................................................................................... 24

Page 4: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

III

3.2.14. YI COUNTY WATER SUPPLY .......................................................................................................... 24

3.2.15. XIONG COUNTY WATER SUPPLY .................................................................................................... 24

3.2.16. DINGZHOU WATER SUPPLY .......................................................................................................... 24

3.2.17. ANGEZHUANG WATERSHED (RESERVOIR) REFORESTATION ........................................................... 25

3.2.18. BAIYANGDIAN LAKE REFORESTATION ........................................................................................... 25

3.2.19. ANXIN UFM.................................................................................................................................. 25

3.2.20. IWM (WANGKUAI-XIDAYANG RESERVOIR)..................................................................................... 26

3.2.21. SWM (HUANGHUAGOU WATERSHED) ........................................................................................... 27

3.2.22. XIONG COUNTY CLEAN (GEOTHERMAL) ENERGY........................................................................... 28

3.3. ENVIRONMENTAL MONITORING......................................................................................................... 28

3.3.1. ENVIRONMENT MONITORING IN CONSTRUCTION PHASE ................................................................... 28

3.3.2. ENVIRONMENT MONITORING OF ENVIRONMENT CHECK-AND-ACCEPTANCE OF PROJECT

COMPLETION (ECAPC)................................................................................................................. 29

3.3.3. ENVIRONMENT MONITORING IN OPERATION PHASE ......................................................................... 30

3.4. INSTITUTIONAL STRENGTHENING AND TRAINING .......................................................................... 39

3.5. ENVIRONMENTAL COMPLIANCE STATUS......................................................................................... 41

3.5.1. ENVIRONMENT IMPACT ASSESSMENT............................................................................................. 41

3.5.2. MITIGATION MEASURES TAKEN ...................................................................................................... 41

3.5.3. ENVIRONMENT CHECK-AND-ACCEPTANCE OF PROJECT COMPLETION (ECAPC).............................. 42

4. CONCLUSION AND RECOMMENDATIONS ................................................................................... 43

4.1. CONCLUSION ........................................................................................................................................ 43

4.2. RECOMMENDATIONS........................................................................................................................... 45

Page 5: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

IV

LIST OF TABLES

TABLE 1-1 LIST OF SUBPROJECTS ((((SOURCE ADB)))) .......................................................................................................2

TABLE 3-2 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (BAIGOU WWTP)............................................14

TABLE 3-3 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (LI COUNTY WWTP) .............................................16

TABLE 3-4 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (XUSHUI WWTP).............................................17

TABLE 3-5 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (ANXIN WWTP) ....................................................18

TABLE 3-6 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (YI COUNTY WWTP) ................................................19

TABLE 3-7 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (DINGXING WWTP)............................................19

TABLE 3-8 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (DINGZHOU WWTP) ..............................................20

TABLE 3-9 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (MANCHENG WWTP) ............................................21

TABLE 3-10 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (XIONG COUNTY WWTP) .......................................22

TABLE 3-11 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (TANG COUNTY WWTP)...................................23

TABLE 3-12 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (DINGZHOU WSS) ............................................24

TABLE 3-13 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (BAIYANGDIAN LAKE REFORESTATION) .............25

TABLE 3-14 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (ANXIN UFM)...................................................26

TABLE 3-15 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (IWM) .............................................................26

TABLE 3-16 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (SWM) ............................................................27

TABLE 3-17 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF YI COUNTY WWTP (2010.1-2010.6) .................30

TABLE 3-18 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (YI COUNTY WWTP 2010.1-2010.6)))) ...............31

TABLE 3-19 SLUDGE MONITORING RESULT DURING OPERATION PHASE OF YI COUNTY WWTP (HEBEI GEOLOGY AND

MINERAL RESOURCES LABORATORY CENTER: 2009.11)..................................................................................................31

TABLE 3-20 EXTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF YI COUNTY WWTP (YI COUNTY ENVIRONMENT

MONITORING STATION: 2010.3 – 2010.6) .........................................................................................................................32

TABLE 3-21 EXTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF YI COUNTY WWTP (HEIBEI ENVIRONMENT

MONITORING CENTER 2008.10 / 2009.11) ........................................................................................................................32

TABLE 3-22 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF MANCHENG WWTP (2010.1-2010.6) ................33

TABLE 3-23 SLUDGE MONITORING RESULT DURING OPERATION PHASE OF MANCHENG WWTP (HEBEI GEOLOGY AND

MINERAL RESOURCES LABORATORY CENTER: 2009.11)..................................................................................................33

TABLE 3-24 EXTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF MANCHENG WWTP (MANCHENG

ENVIRONMENT MONITORING STATION: 2010.1-2010.6).....................................................................................................34

TABLE 3-25 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF DINGZHOU WWTP (2010.1-2010.6) ..................34

Page 6: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

V

TABLE 3-26 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (DINGZHOU WWTP 2010.1-2010.6)))) ................35

TABLE 3-27 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF XIONG COUNTY WWTP (2010.1-2010.6)...........36

TABLE 3-28 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (XIONG COUNTY WWTP 2010.1-2010.6)))) .........36

TABLE 3-29 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF LIUSHI WWTP (2010.1-2010.6) ........................37

TABLE 3-30 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (LIUSHI WWTP 2010.1-2010.6)))) ......................37

TABLE 3-31 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF LI COUNTY WWTP((((2010.4-2010.6))))............38

TABLE 3-32 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (LI COUNTY WWTP 2010.1-2010.6))))................38

TABLE 3-33 SLUDGE MONITORING RESULT DURING OPERATION PHASE OF LI COUNTY WWTP (HEBEI GEOLOGY AND

MINERAL RESOURCES LABORATORY CENTER: 2010.6)..................................................................................................39

TABLE 3-34 ENVIRONMENT MANAGEMENT TRAININGS CONDUCTED AND MEETINGS DURING THIS REPORT TIME .......................40

Page 7: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

VI

ABBREVIATIONS

ADB Asian Development Bank

BEMU Environmental Management Unit of BPMO

BDRC Baoding Development and Reform Commission

BPMO Baoding project management office

BMG Baoding municipal government

B-EPB Baoding Environmental Protection Bureau

C-EPB County Environmental Protection Bureau

CED clean energy development

ECAPC Environmental Check-and-Acceptance of Project Completion

EMC Environmental monitoring center

EMU Environmental Management Unit

EIA environmental impact assessment

EMP environmental management plan

IA implementing agency

ICB international competitive bidding

IWM integrated water management

MDG Millennium Development Goal

PCSS Procurement Contract Summary Sheet

PIU project implementation unit

PPMS project performance management system

PPTA project preparatory technical assistance

PRC People’s Republic of China

SEIA summary environmental impact assessment

SO2 sulphur dioxide

SWM solid waste management

UFM urban flood management

WSS water supply system

WWTP wastewater treatment plant

Page 8: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

1

1. INTRODUCTION

Baoding City is located in the middle of Hebei Province, China, on the north China plain,

approximately 140 km south of Beijing. It is a famous city with a long history of more than 2300

years. Baoding City as presently administered includes 4 cities, 18 countries and 3 districts

covering 22,100 km2. The total population is 11 million and the urban population is about 1

million. The famous lake, Baiyangdian, “White Ocean Lake”, is located in Anxin Country about

80 kilometres east of Baoding City.

Water pollution and ecosystem degradation in the Baiyangdian Basin have accelerated in the last

two decades due to continued pressure from rapid economic growth, industrialization, and

urbanization. The degradation of the lake has diminished livelihood opportunities for communities

living in the lake’s surrounding areas and has put them at risk from various types of diseases.

Adding to the current problems is the weak capacity of county governments to implement and

enforce environmental policies and safeguards to conserve biodiversity of the Basin.

The “Integrated Ecosystem and Water Resources Management in the Baiyangdian Basin”

Project will support the Baoding Municipal Government (BMG) and participating county

governments in abating the continuing pollution and degradation in the Lake and its river network

as well as in rehabilitating its ecosystem in line with the priorities of the national, provincial, and

municipal governments. The proposed Project is part of the first phase under the Baiyangdian

Ecosystem Rehabilitation Master Plan which calls for an integrated effort to reduce pollution

loads in the Lake and rehabilitate the ecosystems in the Basin, with a planned investment of over

$1.0 billion. This Project is a pilot demonstration project for future undertakings.

In order to fund this Project, China together with the Hebei Provincial Government and Baoding

Municipal Government has applied for a loan equal to $100 million US dollars to cover part of the

total $273.4 m cost. The remaining counterpart funding will come from a variety of domestic

sources. The ADB loan has been approved.

The final list of subprojects entails 22, which are grouped into seven categories of interventions,

based on their basic characteristics. The seven categories of interventions include:

� Category 1: Wastewater treatment (13 subprojects);

� Category 2: Water supply (3 subprojects);

� Category 3: Reforestation (2 subprojects);

� Category 4: Water resource reallocation (1 subproject);

� Category 5: Watershed rehabilitation (1 subproject);

� Category 6: Clean energy (1 subproject); and,

� Category 7: Flood control (1 subproject).

Page 9: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

2

TABLE 1-1 LIST OF SUBPROJECTS ((((SOURCE ADB))))

Description

No. Wastewater

Treatment

Plants

Location Treatment

Process

Treatment

Capacity

(m3/day)

Sewer

Pipes

(km)

1 Liushi Town Li County CAST 20,000 4.6

2 Baigou Town Gaobeidian

City

UNITANK 30,000 20.4

3 Li County Li County CAST 30,000 15.0

4 Xushui County Xushui City Orbal oxidation

ditch process

30,000 10.0

5 Xinxing Town Li County Orbal oxidation

ditch

process

25,000 4.3

6 Anxin County Anxin County Biolak 20,000

7 Yi County Yi County CASS 20,000 31.3

8 Dingxing Dingxing

County

Biolak 40,000 28.4

9 Dingzhou City Dingzhou City CAST 40,000 22.6

10 Mancheng

County

Mancheng

County

UNITANK 40,000 11.1

11 Xiong County Xiong County UNITANK 20,000 16.5

12 Tang County Tang County CAST 20,000 2.9

13 Wenquancheng Baoding City Wetland

treatment

30,000

Total 365,000

No. Water Supply

Systems

Location No. of New

Wells

Capacity

(m3/day)

Water

Mains (km)

14 Yi County Yi County 14 30,000 129.8

15 Xiong County Xiong County 10 26,600 23.0

16 Dingzhou City Dingzhou City 10 50,000 35.4

Total 106,600

No. Miscellaneous

Subprojects

Location Description

17 Angezhuang

Watershed

Reforestation

Yi County (i) 9,800 ha of plantations including 2,000 ha of

fast-growing and high-yielding forests, 2,000 ha of

water conservation forests, 4,666 ha of soil

erosion control forests, and 933 ha of ecological

protection forest with non-timber products; and (ii)

8,666 ha of mountain closure for forest recovery.

18 Baiyangdian

Lakeside

Forestation

Anxin County Forest rehabilitation of 264 ha; reforestation of 268

ha; 1,200 ha of landscape forests; and 99 ha of

green belts.

Page 10: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

3

19 Urban Flood

Management

Anxin County Embankment of 6.7 km, and bank reinforcement.

20 Integrated

Water

Management

Baoding City (i) Construction of 14.45 kilometers canal to

connect two reservoirs to divert water from

Wangkuai to Xidayang, and (ii) diversion of water

from Xidayang to replenish Baiyangdian Lake and

recharge Yimuquan groundwater.

21 Solid Waste

Management

Baoding City (i) Relocation of 0.55 million tons of dumped waste

to Baoding Municipal Landfill, and (ii)

Rehabilitation of the coal fly ash storage of

Baoding Thermal Power Plant.

22 Clean Energy

Development

Xiong

Xiong County 4.5 million m3/day geothermal water supply for

space-heating, four central supply stations, and 18

km of supply pipelines.

According to the Environmental provisions in the Project Agreement:

BMG shall cause each IA to construct, maintain and operate the Project facilities in strict

conformity with (i) all applicable national and local environmental laws, regulations and

procedures; (ii) ADB’s Environment Policy (2002); and (iii) the environmental mitigation and

monitoring measures set out in approved EIA, the SEIA, the IEE and SIEE; and the EMP for the

Project.

BMG shall ensure that the IEE and EIA are (i) reviewed and updated following final detailed

designs, (ii) approved by ADB prior to undertaking any works, and (iii) updated with all

mitigation measures incorporated in the bidding documents and the civil works contracts.

BMG shall ensure that each IA (i) allocates sufficient resources to implement the EMP; and (ii)

provides monitoring reports to the PMO which shall coordinate the preparation of a semiannual

environmental report on implementation of the EMP in a format acceptable to ADB, for the

duration of the Project.

The EMP has been included in the SEIA, and was submitted by BPMO to ADB in May 2009.

EMP mainly includes (i) objectives, (ii) summary of potential impacts, (iii) mitigation measures,

(iv) environmental monitoring, (v) planned public consultation, (vi) responsibilities and

implementing authorities, (vii) institutional strengthening and training, (viii) reporting and

supervision, (ix) work plan, (x) procurement and cost estimation, and (xi) mechanisms for

feedback and adjustment. The EMP will be reviewed and updated at the end of the detailed design

to ensure consistency with the final detailed design.

With assistance from Environmental Monitoring Specialist from Consulting Company, the EMU

of BPMO have collected and summarized the information of EMP implementation of each

subproject by distributing questionnaires, site visit, interviews and document and report collection.

Based on the information of the EMP implementation of each subproject, evaluation is done on

the mitigation measures taken and the implementation of the environmental monitoring;

recommendation and requirements are given accordingly. Environmental mitigation measures and

monitoring plans of each subproject will be updated with assistance and supervision of BPMO if

Page 11: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

4

necessary.

This is the second EMP implementation progress report prepared by BPMO with assistance from

Environmental Monitoring Specialist of consulting company. The report covers the progress for

the period from January to July of 2010.

This report is to evaluate: 1. Overall progress of EMP implementation; 2. Mitigation measures

taken; 3. Implementation of environmental monitoring activities; 4. Institutional strengthening and

training; 5. Conclusion and recommendation.

Page 12: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

5

2. PROGRESS OF THE PROJECT

2.1.1. LIUSHI WWTP

This WWTP of 20,000 t/d will use “CAST” activated sludge process, filtration, chlorine

disinfection and discharge of effluent, and raw sludge dewatering and landfill.

The contract of works was awarded to Hebei Construction Group Co., Ltd. with contractual

amount of CNY18,094,928.05. BER and contract of works have been submitted to ADB and

PCSS 0003 was obtained.

The contract of goods was awarded to Hebei Xingyuan Environment Technology Company, Ltd.

with contractual amount of CNY31,818,530. BER and contract of goods have been submitted to

ADB and PCSS 0013 was obtained.

The first withdrawal application for goods has been made.

The construction has been started on March 28th 2009 and completed.

2.1.2. BAIGOU WWTP

This WWTP of 30,000 t/d will use “UNITANK” activated sludge process with coagulation and

sedimentation and chlorine disinfection, and sludge disposal by dewatering and landfilled.

Works bid was opened on April 17th 2009. The contract was awarded to Beijing No. 4

Municipal Construction Co. Ltd. with contractual amount of CNY38,494,385.53. Contract was

draft signed on May 4th 2009. BER and draft signed contract of works have been submitted to

ADB. PCSS was obtained.

Bidding documents of goods have been reviewed and approved by ADB. Bid was opened on

December 9th 2009. The BER and signed contract has been submitted to ADB and approved. The

PCSS has been obtained.

The civil works was commenced on May 4th 2009 and planned to be completed by August 2010.

2.1.3. LI COUNTY WWTP

This WWTP of 30,000 t/d will use a “CAST” activated sludge process and with possible discharge

or recycle and reuse of the treated wastewater, and raw sludge dewatering and landfill. More

details on the recycle and reuse proposal will be needed.

The contract of works was awarded to Hebei Construction Group Co., Ltd. with contractual

amount of CNY25,923,132.99. BER and contract of works have been submitted to ADB and

PCSS 0002 was obtained.

The contract of goods was awarded to Hebei Xingyuan Environment Technology Company, Ltd.

with contractual amount of CNY35,551,300. BER and contract of goods and works have been

submitted to ADB and PCSS obtained.

The first withdrawal application for goods has been made.

Page 13: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

6

The construction has been started on March 28th 2009 and completed.

2.1.4. XUSHUI WWTP

This WWTP of 30,000 t/d (60,000 t/d in long term) will use an oxidation ditch, filtration and

chlorination of liquid effluent, and raw sludge dewatering and landfill.

The served area is 11.5 km2 and the served population is 105,000 in 2010. In 2020, the number is

20.85 km2 and 200,000 respectively.

Civil works bid was opened on September 2nd 2009, the contract was awarded to Cmiic Huanjian

Engineering & Construction Co. with contract amount of CNY 47,782,396.9. Civil works contract

was signed on September 27th 2009. Goods bid was opened on January 19th 2010, and the

contract was awarded to China National Heavy Machinery Corporation with contract amount of

CNY 33,969,840.86. The contract was signed on April 2nd 2010. The BERs and contracts have

been submitted to ADB and PCSS have been obtained.

The subproject was planned to be commenced on October 7th 2009 and completed by the end of

October 2010.

2.1.5. XINXING WWTP

This WWTP of 25,000 t/d will use the “ORBAL” activated sludge process, filtration, chlorine

disinfection and discharge, with raw sludge dewatering and landfill.

In the draft MOU, ” The plant has been relocated to a new site. The new site will use non-basic

farmland as against the basic farmland at the original case. The amended resettlement plan (RP)

was prepared and sent to PRCM/ADB in August 2009. But ADB advised to prepare new RP. No

objection letter has been obtained on the new resettlement plan (RP). The subproject design

remains the same. The FSR has to be re-approved and it is currently going through the process.”

2.1.6. ANXIN WWTP

This WWTP of 20,000 t/d will use the “BIOLAK” activated sludge process, with anaerobic and

aerobic treatment, sedimentation and chlorine disinfection. Sludge will be dewatered and

landfilled.

Due to the urgent need to start and complete the construction, the construction has been finished

following national process.

In the draft MOU, ” The contracts were signed after the loan effectiveness but the requisite prior

review of ADB of contract document was not sought. The PIC will review the contract documents

to determine whether ADB guidelines were followed.”

The IA of this subproject plans to cancel the ADB loan on this subproject.

2.1.7. YI COUNTY WWTP

This WWTP of 20,000 t/d will use anaerobic treatment followed by “CASS” activated sludge

treatment, coagulation, sedimentation, filtration, and UV disinfection. Sludge will be dewatered

and landfilled.

Page 14: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

7

As the only retroactive subproject, the construction has been finished.

There are 3 works contracts and 1 goods contract in this subproject.

Withdrawal applications for 1 works have been submitted to the provincial financial department

and settled from the on-lending account.

2.1.8. DINGXING WWTP

This WWTP of 30,000 t/d will use a Biolak process and chlorine disinfection for liquids, and raw

sludge dewatering and landfill disposal. PDR has been finished.

BER and contract of works have been submitted to ADB and PCSS was obtained. The contract

was awarded to Hebei Construction Group Tiancheng Construction Engineer Co., Ltd. With the

contractual amount of CNY30,558,525.09.

2 Contracts of goods have been awarded already to German Baiwoke company with contractual

amount of 615,000 Euro and Beijing Hualijia Environmental Engineering Co., Ltd. With

contractual amount of CNY 9.2 million. ADB has reviewed the goods biding information and

given objection on the goods payment.

The construction has been completed.

2.1.9. DINGZHOU WWTP

This WWTP of 40,000 t/d uses “CAST” activated sludge process with filtration and chlorination.

Sludge will be dewatered and transported to landfill.

Due to the urgent need to start and complete the construction, the construction has been finished

following national process.

In the draft MOU, “The subproject is completed and operational. Procurement was done under

domestic rules and did not follow ADB procedures. Originally, $6.5 million was allocated from

the loan but had to be constructed ahead of schedule. About $1.0 million worth of procurement

followed ADB guidelines and can be disbursed as these contracts were signed after loan

effectiveness. The IA wants the remaining subloan allocation, $5.5 million, to be allocated to its

WSS subproject”

Dingzhou City Government has submitted written application on March 30th 2010 to cancel its

ADB loan for its wastewater subproject and suggest to allocate its $6.5 million loan to its WSS

subproject.

2.1.10. MANCHENG WWTP

This WWTP will have capacity of 40,000 t/d (80,000 t/d in long term), to serve about 120,000

people, and will use a multiple batch reactor “UNITANK” activated sludge process and UV

disinfection to achieve high quality effluent. Raw sludge will be dewatered and landfilled.

The civil works contract has been awarded to Mancheng County Municipal construction Company

with contractual amount of CNY34,499,799. BER and contract of works have been submitted to

ADB and PCSS was obtained.

Page 15: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

8

Bidding documents of goods have been submitted to ADB and reviewed. The bid was opened on

July 2nd 2009; the BER and the draft contract have gotten no-objection from the ADB. The

contract has been awarded to Beijing Haisidun on January 11th 2010. The contract will be

submitted to ADB for review before end of January 2010. The contractual amount is CNY23.98

million.

The subproject has been completed.

2.1.11. XIONG COUNTY WWTP

This WWTP of 20,000 t/d will use a highly complex process of anoxic treatment, oxidation ditch,

sedimentation, filtration, chlorine disinfection, coagulation, sedimentation, filtration and water

reuse. Sludge will be thickened, digested, dewatered and disposed to landfill.

Works bid was opened on May 5th 2009. Contract was draft signed on May 15th 2009. BER and

signed contract of works have been submitted to ADB. PCSS was obtained. The contract has

been awarded to Hebei Installation Engineering Company with contractual amount of

CNY19,644,666.44. As for the goods contract, no objection comments from ADB on the BER and

contract has been obtained. The contract has been awarded to Hebei Xingyuan Environment

Technology Co. Ltd. with contractual amount of CNY13,892,640. ADB issue PCSS 0016 to

Xiong County WWT goods contract on January 8th 2010.

The subproject is completed.

2.1.12. TANG COUNTY WWTP

This WWTP of 20,000 t/d will use the “CAST” activated sludge process followed by filtration and

chlorine disinfection. Sludge will be dewatered and landfilled.

The served area is 750 Ha. and the served population is 60,000 in 2010. In 2020, the number is

1286.53 Ha. and 100,000 respectively.

Works bid was opened on March 6th 2009. The contract was awarded to Forth Construction

Company of Hebei with contractual amount of CNY31,407,081. Contract was draft signed on

March 29th 2009. BER and draft signed contract of works have been submitted to ADB. PCSS

was obtained.

Bid of goods was opened on September 24th 2009. The contract was awarded to Beijing

Hi-standard water Treatment Equipment Co., Ltd. with contractual amount of CNY17,060,656.

The BER and the contract have been submitted to the ADB.

The subproject is completed.

2.1.13. WENQUANCHENG WWTP

This WWTP of 30,000 t/d will use primary sedimentation and a lagoon and wetland treatment.

Primary sludge will be tickened, dewatered and disposed of to landfill.

The subproject plans to cancel its ADB loan.

Page 16: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

9

2.1.14. YI COUNTY WATER SUPPLY

The Yi County Water Supply subproject is included in the ADB loan project. It was described as

constructing 14 new wells, increasing the safe public tap water supply by 7.58 million cubic

meters / year ( 21,000 m3/day, 240 L/s). The population of Yi County was expected to increase

from the existing 60,000 to a future 100,000. It was reported that the existing capacity to supply

was 1500 m3/day and the existing pipes 4.5 km, and that the proposed design supply capacity

would be 30,000 m3/day and the proposed pipes 129.8 km in length. A required investment of

CNY48,280,000 was estimated. Approximately one half would be ADB loan funded, the rest

from counterpart funding.

In the draft ADB MOU, “There will be change in scope without cost implication. The original

plan was to build a new system. But due to pressing need for continuing water supply, the part of

the old system was rehabilitated. It was then decided that the optimal solution was to rehabilitate

and expand the existing system as the water quality was good enough. The PIC will review the

new project scope in detail to assess its technical, financial, and economic viability before the

design is finalized. The PMO will report the outcome of the assessment to ADB before sending

FSR to BDRC for approval.”

The evaluation report has been submitted to ADB.

2.1.15. XIONG COUNTY WATER SUPPLY

The design capacity of Xiong County Water Supply system is 26,600 t/d. The subproject includes:

Water resource works, including 20 new wells with capacity of 60 t/h each.

Transmission net works, using pressure pipes made in cast iron. The diameter varies from 200 to

400 mm. The total length is 6.7 km. Distribution net works, using pressure pipes made in cast

iron and PE. The diameter varies from 200 to 600 mm. the total length is 13.8 km.

Water treatment plant, capacity 26,600 t/d. The main building includes 2 clean water tank with

volume of 2,500 m3, pump stations, disinfection room, office building and power

distribution/transform room.

The construction is planned to be commenced in September 2010 and completed in September

2012.

2.1.16. DINGZHOU WATER SUPPLY

The designed capacity of Dingzhou Water Treatment plant is 50,000 t/d with 10 new wells and

distribution pipelines of 39.77 km.

PDR is finished. 2 works contracts and 1 goods contract have been submitted to ADB. PCSS was

obtained.

The first works contract was awarded to Dingzhou Changcheng Construction Engineering Limited

Company with contractual amount of CNY25,908,525.

The second works contract was awarded to Dingzhou Municipal Park Engineering Limited

Company with contractual amount of CNY9,613,594.

Page 17: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

10

The goods contract was awarded to China Zhonghang International Technical & Economic Co.

Ltd. in association with China National precision Manchinery I/E Corp with contractual amount of

CNY41,642,552.

Withdrawal application for 1 goods and 1 works advance payment has been made and settled.

The construction was commenced on November 30th 2009 and planned to be completed

November 30th 2010.

2.1.17. ANGEZHUANG WATERSHED (RESERVOIR) REFORESTATION

The PDR is under preparation.

Experience from the “Baiyangdian Lakeside reforestation subproject” will be introduced and

training will be done before the planned commence date on September 1st 2010.

The subproject is planned to be completed by May 2013.

2.1.18. BAIYANGDIAN LAKESIDE REFORESTATION

Training on community participation was done on December 25th 2009. ADB’s requirements for

procurement, construction, disbursement and financial management were introduced.

The works has been commenced at the end of January 2010 and planned to be completed

September 30th 2011.

2.1.19. ANXIN URBAN FLOOD MANAGEMENT

The preliminary design was approved on November 17th 2009. The work scope in FSR is 6.7 km

river embankment. In the PDR, the river embankment length was increased to 7.286 km to one

more village.

The subproject plans to cancel its ADB loan.

2.1.20. IWM(WANGKUAI-XIDAYANG RESERVOIR)

The civil works are well underway for these aqueduct canals and tunnel, and the sites were visited.

This project is a key link in the transfer of additional water towards Baiyangdian, and the

reduction of water losses from existing canals and rivers. Procedures for release of the ADB loan

funds must be quickly introduced to sustain financing.

There are 4 works contracts in this subproject. BER and draft signed contracts for the first and

second have been submitted to ADB. PCSS is obtained. The BERs and draft signed contracts for

the third and forth works have been submitted to ADB for review.

The first works contract is for the Wanzi tunnel and Zhujiayugou works, which is the key project

since it involves tunnel. The first works contract has been awarded to Shandong Hengtai

Engineering Group Co. Ltd. with contractual amount of CNY36,582,510. Construction was

commenced on April 10th 2009 and planned to be completed on August 10th 2010.

The second works contract is for the civil works for Baiyangdian recharge canal, The second

works contract has been awarded to Hebei Water Conservancy Engineering Bureau with

contractual amount of CNY22,585,816. Construction was commenced on May 7th 2009 and

Page 18: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

11

completed on August 7th 2009.

The third works contract is for upstream channel project, the contract has been awarded to Hebei

Water Conservancy Engineering Bureau with contract amount of CNY 35,995,000. Construction

was commenced on March 1st 2010 and planned to be completed on September 27th 2010.

The forth works contract is for the Yimuquan Recharge. The bid was won by Hebei Water

Conservancy Engineering Bureau with contract amount of CNY 29,591,800. Construction was

commenced on January 15th 2010 and planned to be completed on September 27th 2010.

Goods procurement bid was opened on March 11th 2010. The contract was awarded to Tieling

Valve Group Special ValveCo.,Ltd with contract amount of CNY 2,650,000.

Withdrawal application for the first works contract has been made and reimbursed successfully.

2.1.21. SOLID WASTE MANAGEMENT (HUANGHUAGOU WATERSHED)

The subproject is located in Baoding Hi-TECH development zone. The main content of this

subproject is:

1. Rehabilitation of coal fly ash storage from Datang thermal power plant, 2 million m3;

2. Relocation of 0.55 million m3 of dumped waste to Baoding Municipal Landfill;

3. Rehabilitation of Huanghuagou canal;

4. Municipal road and landscaping relative with the 3 rehabilitation/relocation works;

The works of rehabilitation of coal fly ash storage has been commenced using “single source”

procurement method following national procedure.

The works of municipal road construction has been commenced also without following ADB

process.

Project owner of this subproject submitted application on May 11th 2010 to cancel its ADB loan.

2.1.22. XIONG COUNTY CLEAN (GEOTHERMAL) ENERGY

PIA has changed the implementing organization. This was reported to ADB. Xiong County has

submitted application to cancel its ADB loan on this subproject on March 18th 2010.

Page 19: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

12

3. IMPLEMENTATION STATUS OF EMP

3.1. INSTITUTIONAL AND RESPONSIBILITIES

BPMO has set up an EMU with 3 staffs. It will ensure the EMPs are carried out and will engage

DIs and professional consultants to help with environmental management during the preparation,

design, construction, and operation phases.

Environmental monitoring specialist from SOGREAH Consultant Company has been in place

since November 16 2009. Environmental monitoring specialist reviewed the EMPs, conducted the

site visits, environment management training and assisted BEMU with collecting the EMP

implementation information, updating the monitoring plan and preparing the semi-annual progress

report of EMP implementation.

IAs have set up their own EMUs that have 2 ~3 employees each. During the project, the EMUs

will be responsible for (i) implementing the EMPs and developing further implementation details;

(ii) supervising contractors’ implementation of mitigation measures during construction; (iii)

implementing training programs for contractors; (iv) incorporating environmental management,

monitoring, and mitigation measures into construction and operation management plans; (v)

developing and implementing internal routine environmental monitoring; and (vi) reporting

performance of the EMPs to PMO and relevant agencies.

B-EPB and C-EPBs will ensure compliance with PRC and local environmental regulations

through spot checks or regular environmental monitoring and inspection during construction and

operation. LEMSs will conduct the actual environmental monitoring on behalf of C-EPBs, and if

C-EPBs lack the capacity for environmental monitoring, BEMC may be requested to help in the

spot checks and regular environmental monitoring. B-EPB and C-EPBs will review the

effectiveness of regulations annually and modify them, if necessary, in accordance with applicable

legal procedures. Appropriate penalties for noncompliance may be levied on the IAs and

contractors.

3.2. ENVIRONMENT MANAGEMENT AND MITIGATION MEASURES TAKEN

Of 22 subprojects, 7 WWTP subprojects have completed the Environmental

Check-and-Acceptance of Project Completion (ECAPC) and are in the operation phase now. They

are Xiong County WWTP, Li County WWTP, Liushi WWTP, Mancheng WWTP, Yi County

WWTP, Dingzhou WWTP, Anxin WWTP. 4 WWTP subprojects such as Baigou WWTP, Tang

County WWTP, Xushui WWTP and Dingxing WWTP have been completed and are in the

commissioning phase and preparing for the ECAPC. 5 subprojects such as IWM (Integrated Water

Resources Management), Dingzhou WSS, Anxin Flood Control Management, Baiyangdian Lake

Reforestation and Solid Waste Management (SWM) have been on the construction phase. 6

subprojects such as Xinxing WWTP, Wenquancheng WWTP, Yi County WSS, Xiong County

WSS, Angezhuang Watershed (Reservoir) Reforestation, Xiong County Clean (Geothermal)

Energy are in the preparation phase. Mitigation measures taken of each subproject during this

period are as follows:

Page 20: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

13

3.2.1. LIUSHI WWTP

The project has been completed and finished the Environmental Check-and-Acceptance of Project

Completion (ECAPC). Currently it is in the operation phase. Li County Environment Protection

Bureau (EPB) is in charge of the regular environment inspection. According to the approval reply

of the ECAPC report, Liushi WWTP has implemented pollution prevention measures; total

amount of pollution emission or discharge are in accordance with the requirement of the approval

reply in the EIA report; treated wastewater meet the 1A standard of the Discharge Standard of

Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002); Online COD and flow

monitoring facilities have been installed for both the inflow and outflow; odor emission meets the

standard; sludge, bar screen waste and sand sediment are collected and disposed by Environmental

Sanitation Department.

The ECAPC monitoring shows that, boundary noise level of 2# monitoring point exceeds the

standard in both day time and night time. The approval reply of the ECAPC report requests that Li

County EPB is in charge to urge the WWTP to take effective noise control measures to ensure the

boundary noise level meets the standard within 1 month.

Specially-assigned personnel are in place in the switchgear room, wastewater treatment process,

sludge dewatering, chemical dosing and take the records.

During the commissioning, Li County EPB conducted regular site inspections to the WWTP and

was satisfied by the WWTP. Li County Environment Monitoring Station (EMS) monitored inflow

and outflow water quality which met the requirement of discharge standard.

Mitigation measures in the operation phase are summarized in the following table.

TABLE 3-1 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (LIUSHI WWTP)

Environmental Issues Mitigation measures taken

Wastewater discharge and water body

protection

� Treated wastewater meet the 1A standard

of Discharge Standard of Pollutants for

Municipal Wastewater Treatment Plant

(GB 18918-2002);

� COD online monitoring facilities have

passed the calibration test and linked with

Baoding EPB network;

Air pollution control � Electric heating is adopted for heating and

no boiler is constructed so that there is no

fume emission from coal burning;

� Odor emission meet the standard;

Noise control � Equipments of noise sources are installed

indoors, base vibration reduction measures

are taken to reduce the noise;

Solid waste � Sludge and bar green waste are collected

and treated by Environment Sanitation

Department

Page 21: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

14

3.2.2. BAIGOU WWTP

Civil works and equipment installation have been completed and the project is now in the

commissioning phase. During the commissioning phase, Baigou and Wenquancheng EPB

Divisions conducted site inspections to the WWTP and gave recommendations on the online

monitoring, filtration and disinfection. Baigou WWTP is now preparing for the ECAPC.

Mitigation measures in the construction phase during this period are summarized in the following

table.

TABLE 3-2 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (BAIGOU WWTP)

Environmental Issues Mitigation measures taken

Wastewater from construction site � Collected and treated in septic tank

Wastewater from maintenance and

cleaning of vehicles

� Wasting site for vehicle and equipment is

away from drainage and river

� Use concrete or asphalt paving and

construct drainage ditch

� Construct a wastewater tank to collect and

treat washing wastewater

Spill of hazardous and harmful

construction materials

� Set up regulation for building material

disposal to protect surface water and

groundwater from contamination

� Storage area is away from river; Set up

interception area to retain accidental

leakage

Dust

� Appoint specific personnel to supervise

earth work excavations; use enclosed

dump trucks to transport the excavated

earth

� Set up wheel washing facility and relevant

drainage and slurry sedimentation tank

� Cover with 10-15m long gunny sheet or

mat at the joint between construction site

and urban road

� Transporting vehicles follow guidance of

staff in disposal site and dump at

appointed site;

� Set up procedures for spraying and dust

control. Equipped with spraying

equipment. Appoint specific staff for dust

control. Spray once every morning and

evening in ordinary days. Spray 4 times on

dusty and windy days;

� Inventory management for cement; control

dust during loading and unloading;

Page 22: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

15

Environmental Issues Mitigation measures taken

� Construction waste is cleared in time.

Spray water to control dust;

� Mixing facilities is enclosed with

enclosure with spray facilities to control

dust;

� Boilers comply with environmental

requirements; Use oil burning boiler,

electrical drinking water boiler;

� Spray water while demolishing existing

buildings

Emissions from vehicles and equipment

� Enhance vehicle maintenance

� Eliminate expired or high-pollution

vehicles according to Vehicle Reject

Standard

Noise from construction vehicle and

equipment

� Take measures to reduce noise of

non-compliant equipment

� Project managing department organizes

environmental education for on-site

workers, especially mechanical operators

and constructors

� All mechanical equipment is maintained

following Mechanical Equipment

Technical Maintenance Rules

� New acquired and repaired equipment

should achieve noise standard

� Noise control during construction should

meet Noise limits for Construction Site

(GB12523—90)

� Control construction time. Construction is

prohibited from 22PM to 6AM. In

particular case of continuous construction,

contractor should apply for a nighttime

construction permit and take noise

reduction measures.

� Electric saw, planer, mixer, air compressor

are installed in noise insulation workshop

Domestic waste from workers’ camps

� Transported to solid waste treatment plant

for disposal

Construction waste � Treated by Baigou Town Environment and

Sanitation Department

Disposal of excavated earth and rock � Excavated earth from foundation pit

(trench) is transported and stored in the

spoil site.

Page 23: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

16

Environmental Issues Mitigation measures taken

� After large quantity of earth excavation,

every earth stockpile is hardened to reduce

dust

Vegetation Recovery � Vegetation has been restored

Environment and safety of construction

sites and health of workers

� On-site workers are equipped with safety

equipment such as helmet, rope, belt,

shoes, groves, mask, and etc.

3.2.3. LI COUNTY WWTP

Construction has been completed and passed the Environmental Check-and-Acceptance of Project

Completion (ECAPC). According to the reply of approval of ECAPC, the project is implemented

in line with the EIA regulation, pollution prevention and control measures have been taken, the

total amount of pollution emission or discharge meet the requirement of the reply of approval of

EIA. The outflow of the WWTP meets the 1A standard of the Discharge Standard of Pollutants

for Municipal Wastewater Treatment Plant (GB 18918-2002). COD and flow online monitoring

system have been installed for the inflow and outflow. The odor emission level meets the standard.

The sludge and bar green waste are collected and treated by Sanitation Department.

The boundary noise level monitoring indicates that, affected by the fan house, 3# monitoring point

at the south boundary exceeds the night time noise standard, and the 4# monitoring point at the

west boundary exceeds the noise standard of both day time and night time.

The boundary has met the 200m requirement of Width of Sanitary Protection Zone.

The reply of approval of the ECAPC has also requested that:

a) Greening must be implemented properly to meet the greening percentage required by the

EIA;

b) Properly keep records of operation, sludge dewatering, and chlorine injection;

c) Improve noise reduction measures under supervision of Li County EPB, to ensure the

noise level meet the standard within one month;

d) strengthen the management to ensure the treatment facilities are operating properly, the

discharge are stable and meet the standard;

e) Li County EPB is in charge of the regular environment supervision of the project;

Mitigation measures in the operation phase during this period are summarized in the following

table.

TABLE 3-3 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (LI COUNTY WWTP)

Environmental Issues Mitigation measures taken

Wastewater discharge and water body

protection

� Treated wastewater meet the 1A standard

of Discharge Standard of Pollutants for

Municipal Wastewater Treatment Plant

(GB 18918-2002);

Page 24: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

17

Environmental Issues Mitigation measures taken

� COD online monitoring equipments have

passed the calibration and been linked

with Baoding EPB network.

Air pollution control � Odor emission meet the emission standard

Noise control � Equipments of noise sources are installed

indoors, base vibration reduction measures

are taken to reduce the noise;

Solid waste � Sludge and bar green waste are collected

and treated by Sanitation Department

3.2.4. XUSHUI WWTP

Construction has been completed, the WWTP is now in the commissioning phase and preparing

for the ECAPC. During the construction and the commissioning phase, Xushui EPB conducted

site inspection and visits to the WWTP and gave comments and recommendations such as online

monitoring and discharge point location.

Mitigation measures in the construction phase during this period are summarized in the following

table.

TABLE 3-4 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (XUSHUI WWTP)

Environmental Issues Mitigation measures taken

Dust

� set up bounding wall in around the

construction site

� regular water spray to reduce dust,

properly arrange the construction schedule

� Cover the construction material

Emissions from vehicles and equipment

� Low noise level equipments and vehicles

are used

Noise from construction vehicle and

equipment

� Horning and night time construction are

prohibited

Domestic waste from workers’ camps � Collected and treated by Sanitation

Department;

3.2.5. XINXING TOWN WWTP

The previous EIA was approved in March 2007. Due to site location change, according to the

requirement of Law of the People's Republic of China on Environmental Impact Assessment, a

new EIA was prepared and approved in October 2009. The project is now in preparation phase.

Page 25: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

18

3.2.6. ANXIN WWTP

Project has been completed and passed the ECAPC. The total discharge amount of COD is 281 t/a,

less than the amount limit in the EIA reply of approval (1st phase: 432 t/a, 2nd phase: 300 t/a). The

boundary noise level meets the class 2 standard of the Emission Standard for the Industrial

Enterprises Noise at Boundary (GB12348-90). Solid waste production is 60t/a, collected and

treated by Anxin Environment Sanitation Department; the WWTP outflow and odor emission meet

the 1A standard in table 1 and class 2 standard in table 2 respectively in Discharge Standard of

Pollutants for Municipal Wastewater Treatment Plant((((GB18918-2002)))). The COD online

monitoring system has been calibrated and linked with Baoding EPB network.

Mitigation measures in the operation phase during this period are summarized in the following

table.

TABLE 3-5 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (ANXIN WWTP)

Environmental Issues Mitigation Measures taken

Wastewater discharge and water body

protection

� Treated wastewater meet the 1A standard

of Discharge Standard of Pollutants for

Municipal Wastewater Treatment Plant

(GB 18918-2002);

� Domestic and site washing wastewater of

the WWTP are collected by the network

and treated.

� COD online monitoring system has been

calibrated and linked with Baoding EPB

network.

Air pollution control � Odor emission meet the emission standard

Noise control � Equipments of noise sources are installed

indoors, base vibration reduction measures

are taken to reduce the noise;

� Boundary noise level meet the standard

Solid waste � Sludge and bar green waste are collected

and treated by Anxin Environment

Sanitation Department

3.2.7. YI COUNTY WWTP

Yi County WWTP is the only retroactive project in the loan contract. Construction has been

completed and WWTP is under operation. Treatment capacity of WWTP is 20,000m3/d. CASS

activated sludge is used as the treatment process (coagulation and flocculation, sedimentation,

filtration and UV disinfection). Sludge is landfilled after dewatering. During operation, a specific

environmental department is set up in charge of environment tasks of the WWTP. ECAPC

monitoring and audit has been completed. Management plan of operation period has related

content to address environmental protection issues. Monitoring is conducted on regular basis.

WWTP staffs have received environmental training. During operation, EPB conducts regular or

random on-site inspection and monitoring.

Page 26: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

19

Mitigation measures during operation are summarized in the following tables.

TABLE 3-6 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (YI COUNTY WWTP)

Environmental Issues Mitigation Measures taken

Wastewater discharge and water body

protection

� Domestic wastewater in the plant is

collected by HDPE pipe and treated in the

WWTP;

� Online wastewater monitoring facilities

have been installed;

Air pollution control � no boiler is constructed, water source heat

pump is used for heating, no air emission

from coal burning;

� greening belt is constructed to reduce

odor;

Noise control � Install high noise level machines in

specific workshops

� Set up noise insulation

Solid waste � Supervised by environmental protection

department;

� Collection and treatment by environment

and sanitation department;

Environment Management � An environmental risk emergency

response leading group has been set up,

with complete response measures

� Improve working conditions; Strengthen

safety training; safety insurance for

workers.

3.2.8. DINGXING WWTP

Construction has finished, the project is now in commissioning phase and preparing for the

ECAPC. COD and flow online monitoring systems are installed for the inflow and outflow.

During the construction phase, EPB conducted regular site inspections to the WWTP.

Mitigation measures during construction are summarized in the following tables.

TABLE 3-7 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (DINGXING WWTP)

Environmental issues Mitigation measures taken

Wastewater from construction site

� use wastewater pipeline to divert waste

water to specific drainage

Wastewater from maintenance and

cleaning of vehicle

� the washing wastewater is treated and

drained to drainage pipeline

Page 27: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

20

Environmental issues Mitigation measures taken

Spill of hazardous and harmful

construction materials

� hazardous and harmful construction

materials is stored separately and under

regular checking;

Dust

� spray water on site on daily basis

Emissions from vehicles and equipment

� control emission according to EPB

requirements

Noise from construction vehicle and

equipment

� Conduct regular vehicle maintenance

Domestic waste from workers’ camps � clean and transport the waste to waste

treatment plant on daily basis

Construction waste

� transport the construction waste to waste

treatment plant

Disposal of excavated earth and rock

� pile the earth and rock in specific location

3.2.9. DINGZHOU WWTP

Project has been completed and passed the ECAPC. The WWTP is now in the operation phase and

operated by KARDAN WATER. Cast process is adopted with design treatment capacity of 20,000

m3/d.

According to the reply of approval of ECAPC, the project has implemented EIA requirements,

pollution emission or discharge meets the standard.

Mitigation measures during operation are summarized in the following tables:

TABLE 3-8 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (DINGZHOU WWTP)

Environmental Issues Mitigation Measures Taken

Wastewater discharge and water body

protection

� Treated wastewater meets the 1 A

standard. The treated wastewater is reused

partly for greening and firefighting in the

WWTP and partly for the Guohua

Dingzhou Power Plant as cooling water;

� Domestic wastewater and washing

wastewater in the WWTP is collected by

the network and treated;

Air pollution control � Improve the greening, cancel the boiler

and eatery to reduce the air emission; odor

emission meets the standard;

Noise control � fan is installed indoors, noise insulation,

vibration reduction measures are taken;

boundary noise level meets the standard;

Page 28: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

21

Environmental Issues Mitigation Measures Taken

Solid waste � Sludge and bar green waste are collected

and landfilled by Environment Sanitation

Department

Environment Management � Develop Operation Management Manual

and corresponding regulations; conduct

regular meetings; strengthen the staff

training to meet the position requirement;

establish emergency plans to ensure the

stable WWTP operation.

3.2.10. MANCHENG WWTP

Project has been completed and passed the ECAPC. The project is now in operation phase.

According to the reply of approval of ECAPC:

The boundary has met the 200m requirement of Width of Sanitary Protection Zone. The maximum

concentration of odor monitored is 13, meets the standard. The outflow meets the 1A standard.

COD and flow online monitoring systems are installed for the inflow and outflow. The boundary

noise level meets the standard.

Bar screen waste, sand sediment and domestic waste are collected and treated by Mancheng

Environment Sanitation Department. The sludge is sold as brick production material.

Mitigation measures during operation are summarized in the following tables:

TABLE 3-9 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (MANCHENG WWTP)

Environmental Issues Mitigation Measures Taken

Wastewater discharge and water body

protection

� Reinforce the daily management,

equipment maintenance and staff on job

training to ensure the stable operation and

the treated wastewater meets the standard;

� Reinforce the inflow online monitoring

and manual monitoring;

Air pollution control � one active oxygen ion odor removal

facility (CSR-1600) is installed in the

coarse screen house; one active oxygen

ion odor removal facility(CSR-2000) is

installed in the fine screen house; one

active oxygen ion odor removal facility

(CSR-3000) is installed in the sludge

dewatering house to reduce the odor

emission;

� Water source heat pump is used for

heating, no boiler is constructed and no air

emission from coal burning;

Page 29: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

22

Environmental Issues Mitigation Measures Taken

Noise control � Equipments of noise source are installed

indoors, sound insulation and vibration

reduction measures are taken to reduce

noise level

� bounding wall is constructed to reduce the

impact of noise on the neighboring area;

Solid waste � sludge production is 7300t/a, which is sold

outside for brick production; bar screen

waste and sand sediment are collected and

treated by Mancheng Sanitation

Department;

Environment management � Environment emergency plan has been

established;

3.2.11. XIONG COUNTY WWTP

The project had passed the ECAPC and is now in operation phase.

The ECAPC monitoring result shows that, the outflow meets the 1A standard of the Discharge

Standard of Pollutants for Municipal Wastewater Treatment Plant((((GB18918-2002)))). COD and

flow online monitoring system has been installed for the inflow and outflow and linked with

baoding EPB network.

Odor monitoring result meets the class 2 standard of the Discharge Standard of Pollutants for

Municipal Wastewater Treatment Plant((((GB18918-2002)))).

Day time and night time noise level monitoring result meet the class 2 standard of the Emission

Standard for the Industrial Enterprises Noise at Boundary (GB12348).

Construction scale, process and equipment are in line with the EIA documents; operation is in

good condition, the pollution discharge and emission meet the standard; corresponding

management regulations are in place.

TABLE 3-10 MITIGATION MEASURES TAKEN DURING OPERATION PERIOD (XIONG COUNTY WWTP)

Environmental Issues Mitigation Measures Taken

Wastewater discharge and water body

protection

� sign agreement with enterprises whose

wastewater will be received by and treated

in the WWTP to ensure the outflows of the

enterprises meet the discharge standard;

� Ensure the outflow meets 1A standard;

Air pollution control � water source heat pump is used for heating

to reduce air emission;

� Odor emission meets the standard

Noise control � equipments of noise sources are installed

indoors, base vibration reduction measure

is used to reduce noise level

Page 30: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

23

Environmental Issues Mitigation Measures Taken

Solid waste � bar screen waste, sludge and domestic

waste are collected and treated by

Environment Sanitation Department;

3.2.12. TANG COUNTY WWTP

Civil works and equipment installation have been completed. The project is now in

commissioning phase and preparing for ECAPC. COD and flow online monitoring system have

been installed for the inflow and outflow. Mitigation measures are summarized in the following

table.

TABLE 3-11 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (TANG COUNTY WWTP)

Environmental Issues Mitigation Measures taken

Wastewater from construction site

� Collected to oxidation ditch and

discharge after treatment

Wastewater from maintenance and

cleaning of vehicle

� Discharged after oil removal

Spill of hazardous and harmful

construction materials

� No hazardous materials with leakage

risk is used in the site

Dust

� Spray water in the site regularly

� Harden main construction roads

Emissions from vehicles and equipment

� Choose vehicles and equipment that

comply with emission standard

Noise from construction vehicle and

equipment

� Choose low noise level vehicles and

equipment

� Set up noise insulation

Domestic waste from workers’ camps � Collected and transported to solid

waste treatment plant

Construction waste

� Used for construction refill

Disposal of excavated earth and rock

� Mechanical compact

� periodical water spray

� set up enclosure

Soil conservation and Vegetation recovery

of borrowed land

� Temporary occupied land is restored

Environment and safety of construction

sites and health of workers

� Workers’ camp is clean and tidy

� Good hygienic conditions in canteen

and toilet

� Workers are of good health and safety

condition

Page 31: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

24

3.2.13. WENQUANCHENG WWTP

Project is under preparation. EIA and preliminary design have finished.

3.2.14. YI COUNTY WATER SUPPLY

Project is under preparation. Project content has changed. PMO and environment monitoring

specialist reminded the IA of updating EIA documents accordingly.

3.2.15. XIONG COUNTY WATER SUPPLY

The project is under preparation. EIA has been completed and approved.

3.2.16. DINGZHOU WATER SUPPLY

EIA has been finished and approved. Construction has been started. Contractor had received

environmental mitigation measures training before project commencement. Mitigation measures

are summarized in the following table.

TABLE 3-12 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (DINGZHOU WSS)

Environmental Issues Mitigation Measures taken

Wastewater from construction site

� Discharged to municipal drainage

system after sedimentation

Wastewater from maintenance and

cleaning of vehicle

� Discharged to municipal drainage

system after sedimentation

Spill of hazardous and harmful

construction materials

� Set up Anti-leakage measures

Dust

� regular water spray

Noise from construction vehicle and

equipment

� properly arrange construction time

� Operation in enclosed mechanical

workshop as much as possible

Domestic waste from workers’ camps � Piled at appointed site; remove the

waste in time

Construction waste

� Piled at appointed site; remove the

waste in time

Environment and safety of construction

sites and health of workers

� Highlighting prohibition signs and

fireproof facilities should be set on

the site

� Workers are equipped with safety

helmet and belt

Page 32: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

25

3.2.17. ANGEZHUANG WATERSHED (RESERVOIR) REFORESTATION

Project is under preparation and EIA has been finished and approved.

3.2.18. BAIYANGDIAN LAKE REFORESTATION

Project is implemented by 2 phases respectively in 2010 and 2011. Project content of phase 1 are

mainly reforestation around Baiyangdian and channel embankment and within the Baiyangdian

scenery area. Phase 1 was implemented form March and April of 2010 and has been completed as

planned.

Training on environment management was conducted before project commencement, environment

mitigation measures such as soil conservation, noise reduction were introduced in the training.

Mitigation measures taken are summarized as follows:

TABLE 3-13 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (BAIYANGDIAN LAKE

REFORESTATION)

Environmental Issues Mitigation Measures taken

Soil erosion and recovery

� harden the surface soil, reduce

porosity and increase the soil

cohesive force to form a impermeable

layer;

� Regular inspection during curing

period, restore the broken areas

timely; do inspection before windy

and rainy days, take prevention

measures such as filling, hardening in

the potential soil erosion areas;

Dust � Regular water spray to reduce the

dust

Noise control

� Slow down vehicles when passing

villages and towns to reduce noise

from vehicles;

� Night time construction is prohibited

to reduce impact on the neighboring

communities

3.2.19. ANXIN UFM

The preliminary design was approved on November 17th 2009. The work scope in FSR is 6.7 km

river embankment. In the PDR, the river embankment length was increased to 7.286 km to one

more village.

According to Law of the People s Republic of China on Environmental Impact Assessment, for the

projects which will be changed in project content, if the project nature, scale, location, process or

mitigation measures to address pollution and ecological deterioration have undergone significant

change, New EIA report should be prepared and approved.

Page 33: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

26

In the meeting with Anxin Water Resources Bureau and EPB in May 2010, environment

monitoring specialist reminded Anxin Water Resources Bureau to consult with EPB who is in

charge of EIA approval for the updating of the EIA documents.

Construction has been commenced. Mitigation measures taken are summarized as follow:

TABLE 3-14 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (ANXIN UFM)

Environmental Issues Mitigation Measures taken

Dust � Regular water spray on construction site,

main roads to reduce dust;

Domestic waste

� Collected and landfilled far from water

body;

Soil conservation, greening

� Greening on the slopes of the

embankment to prevent soil erosion;

3.2.20. IWM (WANGKUAI-XIDAYANG RESERVOIR)

EIA has been finished and approved. Construction has been started. Contractor had received

environmental mitigation measures training before project commencement. Mitigation measures

are summarized in the following table.

TABLE 3-15 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (IWM)

Environmental Issues Mitigation Measures taken

Wastewater from construction site

� Collected and treated in accordance with

environmental requirements

Wastewater from maintenance and

cleaning of vehicle

� Cleaning site is far away from the rivers;

� Set up drainage ditch and wastewater tank

to collect and treat cleaning wastewater

Spill of hazardous and harmful

construction materials

� Lay canvas beneath the construction

materials and cover with canvas and

plastic sheet

Dust

� Water spray

� Air ventilation fan

� Air ventilation hole

Emissions from vehicles and equipment

� Emission of the vehicles and equipment is

controlled to ensure in compliance with

emission standard and conduct regular

inspection and certification system

Noise from construction vehicle and

equipment

� Noise of the vehicles and equipment is

controlled to ensure in compliance with

emission standard and conduct regular

inspection and certification system

Domestic waste from workers’ camps � Collected and transported to the disposal

site specified by EPB.

Page 34: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

27

Environmental Issues Mitigation Measures taken

Construction waste

� Collected and transported to the disposal

site specified by EPB.

Soil conservation, vegetation recovery and

slope protection works

� Restore the construction site after

completion

� When the slope protection work can not be

finished in time, plastic films are used to

cover the slope surface to reduce the soil

erosion by the runoff.

Disposal of excavated earth and rock

� Disposal in the dump site which is

enclosed with masonry wall.

Traffic

� Construct temporary road to avoid traffic

jam

Environment and safety of construction

sites and health of workers

� Full time personnel in charge of safety is

in place

� Dormitory of workers is properly set up;

construction site and dormitory areas are

divided

� conduct regular sanitation inspection and

properly arrange the meals for workers

3.2.21. SWM (HUANGHUAGOU WATERSHED)

EIA has been finished and approved. Fly ash site restoration and municipal roads construction

have been commenced. Mitigation measures taken during construction phase are summarized as

follow:

TABLE 3-16 MITIGATION MEASURES TAKEN DURING CONSTRUCTION PERIOD (SWM)

Environmental Issues Mitigation Measures taken

Wastewater from construction site

� wastewater is collected and treated by

septic tank and then to Lugang WWTP for

further treatment

Spill of hazardous and harmful

construction materials

� No hazardous and harmful construction

materials

Dust

� construction site is enclosed, water spray

for the roads, fine materials are transported

with coverage to reduce dust

Emissions from vehicles and equipment

� vehicles are permitted to enter the

construction site only when their emission

meet the standard

Noise from construction vehicle and

equipment

� Properly arrange the construction time,

make the reasonable construction plan;

� Equipments of high noise level are not

Page 35: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

28

Environmental Issues Mitigation Measures taken

allowed to be used in night time;

� Low noise level equipments are used.

Vehicles slow down when entering the

construction site and reduce the horning;

Domestic waste from workers’ camps � Domestic waste in the site is collected for

sanitation landfill

Construction waste

� Construction materials are collected and

recycled by recycling plant

Traffic

� waste transport time avoids the rush hour

Disposal of excavated earth and rock

� Transported timely and covered properly

Soil conservation, vegetation recovery and

slope protection works

� refill with earth after the excavation and

restore the vegetation timely;

Environment and safety of construction

sites and health of workers

� Take proper protection measures to ensure

the safety of workers;

3.2.22. XIONG COUNTY CLEAN (GEOTHERMAL) ENERGY

EIA has been finished and approved.

3.3. ENVIRONMENTAL MONITORING

3.3.1. ENVIRONMENT MONITORING IN CONSTRUCTION PHASE

As of June 2010, 11 WWTPs have been completed due to the urgent completion date requirement.

7 of them have completed the Environment Check-and-Acceptance of Project Completion

(ECAPC); 4 of them are in commissioning phase and preparing for the ECAPC.

Environment monitoring specialist of consulting company has been in place since November 2009,

requested the environment monitoring be commenced immediately and submitted detailed

monitoring implementation plans by categories of subprojects to BPMO.

In the EMP implementation training on April 2010, environment monitoring specialist emphasized

again the detailed requirement of the environment monitoring. Environment Management Unit

(EMU) of BPMO has also kept urging the IAs for the implementation of environment monitoring

and provided detailed requirements of environment monitoring. Since most of the WWTPs

commenced construction earlier and were under the urgent requirement of early completion,

environment monitoring during construction phase has not been implemented as required by the

Environment Monitoring Plan, which leads to the missing of environment monitoring data.

As of the site visits in May 2010, 11 WWTPs had been completed without environment

monitoring of construction phase. In order to compensate the missing of the monitoring data

Page 36: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

29

during construction phase, EMU of BPMO and the environment monitoring specialist requested

the IAs and EPBs to provide materials such as of environment supervision reports, EPB site

inspection reports and other environment related records, etc., which can record and explain the

environment impact and effectiveness of mitigation measures taken during construction to some

extent. EMU of BPMO and environment monitoring specialist also requested the IAs and the

EPBs to attached great importance to the following environment monitoring during operation and

confirmed the environment monitoring requirement during operation. The IAs promised to

implement the environment monitoring as requested by the environment monitoring plan and

submit monitoring reports to PMO on regular basis.

For the Integrated Water Resources Management (IWM) subproject, 4 parts of civil works

construction have been started, and it is estimated that the second part of the construction will be

finished by the end of August 2010 and other 3 parts will be finished by the end of September

2010. Construction has been more than half completed while the environment monitoring has not

yet implemented, far behind the environment monitoring plan. BPMO have kept pushing the

Baoding Water Resources Bureau (BWRB) for prompt implementation of environment monitoring.

Currently, BWRB has recruited a qualified monitoring institution, who will conduct environment

monitoring in early August.

Dingzhou WSS has commenced construction since November 30th 2009 and is estimated to be

completed by November 30th 2010. PMO has sent the monitoring requirement to the IA

Anxin UFM project is on construction phase now. PMO has sent the monitoring requirement to

the IA.

Baiyangdian Lakside Reforestation project has commenced construction. PMO has sent the

monitoring requirement to the IA.

As discussed with and Baoding EPB, County EPBs and IAs, and according to the review and

update of the environment monitoring plans in SEIA and EIAs of each project, it is suggested that,

IAs recruit the qualified monitoring institutions such as local Environment Monitoring Station,

Baoding Environment Monitoring Centre for monitoring in the construction phase, the major

monitoring parameters for the construction phase are mainly TSP, PM10 and noise level. The

monitoring report will be submitted to County EPBs, Baoding EPB and BPMO.

3.3.2. ENVIRONMENT MONITORING OF ENVIRONMENT

CHECK-AND-ACCEPTANCE OF PROJECT COMPLETION (ECAPC)

Xiong County WWTP, Li County WWTP, Liushi WWTP, Mancheng WWTP, Yi County WWTP,

Dingzhou WWTP and Anxin WWTP have finished the Environment Monitoring of Environment

Check-and-Acceptance of Project Completion (ECAPC). The monitoring results include the water

quality of inflow and outflow, boundary noise level and odor. General monitoring results are

summarized as follows:

Page 37: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

30

1. Water Quality: Water quality of outflow of Yi County WWTP has just met the 1B

standard of the Discharge Standard of Pollutants for Municipal Wastewater Treatment

Plant((((GB18918-2002)))), and passed the ECAPC of 1B standard. Currently, technical

improvement measures have been taken by Yi County WWTP to ensure the outflow can

meet the 1A standard. For other WWTPs, the water quality of treated wastewater have all

reached the 1A standard and passed the ECAPC of 1A standard.

2. Boundary Noise Level: For Li County WWTP, 3# monitoring point in the south

boundary exceeds the noise level limit of night time; 4# monitoring point in the west

boundary exceeds the noise level limit of both day time and night time. For Liushi WWTP,

2# monitoring point exceeds the noise level limit of both day time and night time. Other

WWTPs have met the standard of boundary noise level.

3. Odor: All WWTPs passing the ECAPC have met the odor emission standard.

Detailed monitoring results of ECAPC can be seen in Appendix 2.

3.3.3. ENVIRONMENT MONITORING IN OPERATION PHASE

COD online monitoring facilities have been installed in all of the WWTPs in operation phase to

conduct online monitoring for the inflow and outflow with monitoring results every 2 hours.

Besides, the WWTP laboratories conduct monitoring and analysis of COD, BOD5, NH3-N, TP, SS,

DO and etc. on daily basis. EPBs also conduct outflow water quality inspection monitoring on

monthly basis. According to the environment monitoring plan, WWTPs will also conduct

monitoring for boundary noise level and odor emission. Monitoring results will be submitted to

PMO and EPBs. Since the WWTPs have just been put into operation, the monitoring data

obtained during this report period are mainly outflow water quality data from some of the

constructed WWTPs.

3.3.3.1. ENVIRONMENT MONITORING DURING OPERATION PHASE OF YI COUNTY WWTP

Internal Monitoring: The range of monitoring results of outflow water quality from January to

June 2010 are: COD:17.6-30.67 mg/L、BOD5:11.33-13.69 mg/L、SS:7-11 mg/L、TP:0.6-0.96

mg/L、NH3-N:1.71-4.63 mg/L, which meet the 1B standard of GB18918-2002; compared with

the 1A standard, TP and SS and BOD5 exceed the standard in some months.

TABLE 3-17 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF YI COUNTY WWTP

(2010.1-2010.6)

Monitoring Time 2010.

1

2010.

2

2010.

3

2010.

4

2010.

5

2010.

6

1B

Standard

1A

Standard

COD

(mg /L) 24.82 30.67 26.41 25.22 19.97 17.6 60 50

BOD5

(mg /L) 13.69 11.49 11.33 11.88 13.31 12.84 20 10

Monitoring

Standard

SS

(mg /L) 9 7 9 11 10 9 20 10

Page 38: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

31

TP

(mg /L) 0.96 0.91 0.85 0.72 0.75 0.6 1 0.5

NH3-N

(mg /L) 2.87 2.68 3.19 4.63 1.71 2.19

8(>12℃)

15 (≤12℃)

5(>12℃)

8 (≤12℃)

Sludge output and water content monitoring from January to June 2010 show that monthly sludge

output is 291.2-316.2 t and the rate of water content is 80%.

Quality of Sludge from Municipal Wastewater Treatment Plant (GB24188-2009) requires that the

WWTP sludge should reach the rate of water content of below 80% after dewatering, if the sludge

is to be landfilled by domestic waste landfill, the rate of water content should meet the

requirement of Standard of Pollution Control on the Landfill Site of Municipal Solid Waste

(GB16889-2008), which means the rate of sludge water content should be less that 60%.

Compared with the standard, the sludge water content after dewatering in the Yi County WWTP

can meet the limit of 80%, but fail to meet the 60% limit for domestic landfill.

TABLE 3-18 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (YI COUNTY WWTP

2010.1-2010.6))))

Time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6

Output(t) 316.2 291.2 316.2 312 316.2 312

Rate of water content(%) 80% 80% 80% 80% 80% 80%

Hebei Geology and Mineral Resources Laboratory Center conducted the sludge monitoring for Yi

County WWTP in November 2009. Monitoring parameters includes Hg, Cd, As, Zn, pH, Cr, Ni,

Cu. Compared with the “Table 1: Basic control parameter and limit of sludge quality” and “Table

2: Alternative control parameter and limit of sludge quality in the Quality of Sludge from

Municipal Wastewater Treatment Plant (GB24188-2009), the monitoring result meets the standard.

TABLE 3-19 SLUDGE MONITORING RESULT DURING OPERATION PHASE OF YI COUNTY WWTP (HEBEI

GEOLOGY AND MINERAL RESOURCES LABORATORY CENTER: 2009.11)

Parameters pH

Hg

(10-6)

Cd

(10-6)

As

(10-6)

Zn

(10-6)

Cr

(10-6)

Ni

(10-6)

Cu

(10-6)

Monitoring

result

7.20 4.05 1.86 8.90 424 88.2 35.8 122

Standard

for

reference

5-10 <25 <20 <75 <4000 <1000 <200 <1500

External Monitoring: Data collected are mainly the outflow quality monitoring conducted by Yi

County Environment Monitoring Station on monthly basis. The monitored parameters are: flow

rate, pH, SS, COD, TP、NH3-N. In addition, Hebei Environment Monitoring Center conducted

Page 39: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

32

environment monitoring for the Pollution Discharge Permit Re-issue. The outflow water quality

monitoring parameters are: flow rate, COD, SS, NH3-N, pH, BOD5, TP;Noise level of boundary

was also monitored.

Water quality monitoring result from March to June 2010 from Yi County Environment

Monitoring Station shows that, the ranges of each monitored parameters of outflow water quality

are: pH: 7.2, SS: 8-9 mg/L, COD:23.5-25.6 mg/L, P: 0.45-0.72 mg/L, NH3-N: 2.42-5.63 mg/L,

which meet the 1B standard of GB18918-2002; compared with the 1A standard TP and NH3-N

exceed the standard in some months.

TABLE 3-20 EXTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF YI COUNTY WWTP (YI COUNTY

ENVIRONMENT MONITORING STATION: 2010.3 – 2010.6)

Monitoring

time

pH SS

(mg/L)

COD

(mg/L)

TP

(mg/L)

NH3-N

(mg/L)

2010.3 7.2 8 25.6 0.72 2.95 (≤12℃)

2010.4 7.2 8 23.8 0.45 4.12(≤12℃)

2010.5 7.2 8 23.5 0.66 2.42(>12℃)

2010.6 7.2 9 25.6 0.71 5.63(>12℃)

1A standard of

GB18918-2002

6-9 10 50 0.5 5(>12℃)

8 (≤12℃)

1B standard of

GB18918-2002

6-9 20 60 1.0 8(>12℃)

15 (≤12℃)

Outflow water quality monitoring conducted by Hebei Environment Monitoring Center in October

2008 shows that the daily average value of the parameters are: COD: 23 mg/L, BOD5:2.3 mg/L,

SS: 10 mg/L, NH3-N: 1.08 mg/L, TP: 0.679 mg/L, pH: 7.33-7.48, which meet the 1B standard of

GB18918-2002; and compared with 1A standard of GB18918-2002, TP exceeds the standard.

Outflow water quality monitoring conducted by Hebei Environment Monitoring Center in

November 2009 shows that the daily average value of the parameters are: COD: 18 mg/L, BOD5:

4.2 mg/L, SS:6 mg/L, NH3-N: 1.73 mg/L, TP: 0.452 mg/L, pH: 6.80-6.84, which meet the 1A

standard of GB18918-2002.

TABLE 3-21 EXTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF YI COUNTY WWTP (HEIBEI

ENVIRONMENT MONITORING CENTER 2008.10 / 2009.11)

Monitoring

time

pH COD

(mg/L)

BOD5

(mg/L)

SS

(mg/L)

NH3-N

(mg/L)

TP

(mg/L)

2008.10 7.33-7.48 23 2.3 10 1.08 (>12

℃)

0.679

2009.11 6.80-6.84 18 4.2 6 1.73 (>12

℃)

0.452

Page 40: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

33

1A standard of

GB18918-2002

6-9 50 10 10 5(>12℃)

8 (≤12℃)

0.5

1B standard of

GB18918-2002

6-9 60 20 20 8(>12℃)

15 (≤12℃)

1.0

Boundary noise level monitoring in October 2008 and November 2009 show that the boundary

noise level during day time and night time meet the standard.

3.3.3.2. ENVIRONMENT MONITORING DURING OPERATION PHASE OF MANCHENG WWTP

Internal monitoring: the range of monitoring results of outflow water quality from January to

June 2010 are: COD: 36.9-47.4mg/L, SS: 8-8.3 mg/L, which meet the 1A standard of

GB18918-2002.

TABLE 3-22 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF MANCHENG WWTP

(2010.1-2010.6)

Monitoring time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6 1A standard of

GB18918-2002

COD

(mg/L)

47.4 45.5 41.6 39.9 36.9 37.5 50 Monitoring

Parameters

SS

(mg/L)

8 8 8 8.3 8 8 10

Hebei Geology and Mineral Resources Laboratory Center conducted the sludge monitoring for

Mancheng WWTP in November 2009. Monitoring parameters includes pH, Hg, As, Cr, Cd, Ni, Cu,

Zn. Compared with the “Table 1: Basic control parameter and limit of sludge quality ” and “Table

2: Alternative control parameter and limit of sludge quality” in the Quality of Sludge from

Municipal Wastewater Treatment Plant GB24188-2009, the monitoring result meets the standard.

TABLE 3-23 SLUDGE MONITORING RESULT DURING OPERATION PHASE OF MANCHENG WWTP (HEBEI

GEOLOGY AND MINERAL RESOURCES LABORATORY CENTER: 2009.11)

Parameter pH

Hg

(10-6)

Cd

(10-6)

As

(10-6)

Zn

(10-6)

Cr

(10-6)

Ni

(10-6)

Cu

(10-6)

Monitoring

result

7.36 1.694 1.13 6.95 238 81.5 28.3 160

Standard

for

reference

5-10 <25 <20 <75 <4000 <1000 <200 <1500

External Monitoring: during operation, Mancheng Environment Monitoring Station conducted

Page 41: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

34

monthly inspection outflow water quality monitoring for Mancheng WWTP. Monitoring

parameters are NH3-N and COD. Range of monitoring results from January to June 2010 is:

NH3-N: 2.84-5.58 mg/L, COD: 28.0-43.3 mg/L, which meet the 1A standard of GB18918-2002.

TABLE 3-24 EXTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF MANCHENG WWTP (MANCHENG

ENVIRONMENT MONITORING STATION: 2010.1-2010.6)

Monitoring time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6 1A standard of

GB18918-2002

COD

(mg

/L)

28.3 28 36.2 35 39.6 43.3 50 Monitoring

Parameters

NH3-N

(mg

/L)

4.70 5.58 5.06 5.03 3.24 2.84 5(>12℃)

8 (≤12℃)

3.3.3.3. ENVIRONMENT MONITORING DURING OPERATION PHASE OF DINGZHOU WWTP

Internal Monitoring: regular internal monitoring parameters of Dingzhou WWTP are mainly:

COD, BOD5, SS, TP, NH3-N and TN. The range of monitoring results of outflow water quality

from January to June 2010 is: COD: 23.47-41.3 mg/L, BOD5: 4.9-7.99 mg/L, SS: 6.5-7 mg/L, TP:

0.31-0.43 mg/L, NH3-N: 2.4-4.37 mg/L, TN: 9-14 mg/L, which meet the 1A standard of

GB18918-2002.

TABLE 3-25 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF DINGZHOU WWTP

(2010.1-2010.6)

Monitoring time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6 1A standard of

GB18918-2002

COD

(mg

/L)

41.3 36.1 37.1 35 35.4 23.47 50

BOD5

(mg

/L)

7.99 7.1 6.66 6.45 7.91 5.66 10

SS

(mg

/L)

7 7 7 7 7 6.5 10

TP

(mg

/L)

0.43 0.41 0.4 0.42 0.31 0.37 0.5

Monitoring

Parameters

TN

(mg

14 13.0 12.0 9.0 14.0 9.0 15

Page 42: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

35

/L)

NH3-N

(mg

/L)

3.98 4.13 4.37 3.52 3.39 2.85 5(>12℃)

8 (≤12℃)

Sludge output and water content monitoring from January to June 2010 show that monthly sludge

output is 119-135 t and the rate of water content is 78%-79%.

Quality of Sludge from Municipal Wastewater Treatment Plant (GB24188-2009) requires that the

WWTP sludge should reach the rate of water content of below 80% after dewatering, if the sludge

is to be landfilled by domestic waste landfill, the rate of water content should meet the

requirement of Standard of Pollution Control on the Landfill Site of Municipal Solid Waste

(GB16889-2008), which means the rate of sludge water content should be less that 60%.

Compared with the standard, the sludge water content after dewatering in the Dingzhou WWTP

can meet the limit of 80%, but fail to meet the 60% limit for domestic landfill.

TABLE 3-26 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (DINGZHOU WWTP

2010.1-2010.6))))

Time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6

Output(t) 132 119 131 130 135 125

Rate of water content(%) 79% 78% 79% 79% 78% 78%

External Monitoring: external monitoring result conducted by EPB has not yet been obtained.

3.3.3.1. ENVIRONMENT MONITORING DURING OPERATION PHASE OF XIONG COUNTY

WWTP

Internal Monitoring: regular internal monitoring parameters of Xiong County WWTP are mainly:

pH, COD, BOD5, SS, TP, TN, NH3-N. Monitoring result of BOD5, SS, TP, TN and NH3-N from

January to April 2010, and COD from January to June 2010 have been obtained. The ranges of

monitoring results of outflow water quality from January to June 2010 are: COD: 28.64-44.39

mg/L, BOD5: 7.04-7.44 mg/L, SS: 7-8 mg/L, TP: 0.27-0.29 mg/L, NH3-N: 3.22-3.55 mg/L, TN:

7.38-8.77 mg/L, which meet the 1A standard of GB18918-2002.

Page 43: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

36

TABLE 3-27 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF XIONG COUNTY WWTP

(2010.1-2010.6)

Monitoring time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6 1A

standard of

GB18918-2

002

pH 7.22 7.45 7.17 7.17 _____ _____ 6-9

COD

(mg /L)

34.59 36.11 30.06 28.64 43.50 44.39 50

BOD5

(mg /L)

7.41 7.05 7.44 7.04 _____ _____ 10

SS

(mg /L)

7 8 7 7 _____ _____ 10

TP

(mg /L)

0.27 0.29 0.28 0.28 _____ _____ 0.5

TN

(mg /L)

8.34 8.77 7.86 7.38 _____ _____ 15

Monitoring

parameters

NH3-N

(mg /L)

3.39 3.35 3.22 3.24 _____ _____ 5(>12℃)

8 (≤12℃)

Sludge output and water content monitoring from January to June 2010 show that monthly sludge

output is 155-199 t and the rate of water content is 76.4%-78%.

Quality of Sludge from Municipal Wastewater Treatment Plant (GB24188-2009) requires that the

WWTP sludge should reach the rate of water content of below 80% after dewatering, if the sludge

is to be landfilled by domestic waste landfill, the rate of water content should meet the

requirement of Standard of Pollution Control on the Landfill Site of Municipal Solid Waste

(GB16889-2008), which means the rate of sludge water content should be less that 60%.

Compared with the standard, the sludge water content after dewatering in the Xiong County

WWTP can meet the limit of 80%, but fail to meet the 60% limit for domestic landfill.

TABLE 3-28 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (XIONG COUNTY WWTP

2010.1-2010.6))))

Time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6

Output(t) 199 170 181 189 196 155

Rate of water content(%) 77.9% 78.0% 77.4% 77.5% 77.1% 76.4%

Page 44: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

37

External Monitoring: external monitoring result conducted by EPB has not yet been obtained.

3.3.3.2. ENVIRONMENT MONITORING DURING OPERATION PHASE OF ANXIN WWTP

Internal or external monitoring result for Anxin WWTP has not been obtained yet.

3.3.3.3. ENVIRONMENT MONITORING DURING OPERATION PHASE OF LIUSHI WWTP

Internal Monitoring: The range of monitoring results of outflow water quality from January to

June 2010 is: COD: 34.9-40.2mg/L, SS: 7-8 mg/L, which meets the 1A standard of

GB18918-2002.

TABLE 3-29 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF LIUSHI WWTP (2010.1-2010.6)

Monitoring Time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6 1A

Standard

COD

(mg/L)

39.7 38.9 40.2 40.0 40.1 34.9 50 Monitoring

Standard

SS

(mg/L)

8 7 7 8 8 8 10

Sludge output and water content monitoring from January to June 2010 show that monthly sludge

output 33.6-61.3 t and the rate of water content is 80%-80.5%.

Quality of Sludge from Municipal Wastewater Treatment Plant (GB24188-2009) requires that the

WWTP sludge should reach the rate of water content of below 80% after dewatering, if the sludge

is to be landfilled by domestic waste landfill, the rate of water content should meet the

requirement of Standard of Pollution Control on the Landfill Site of Municipal Solid Waste

(GB16889-2008), which means the rate of sludge water content should be less that 60%.

Compared with the standard, the sludge water content after dewatering in the Liushi WWTP

slightly exceeds the limit of 80% and fails to meet the 60% limit for domestic landfill.

TABLE 3-30 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (LIUSHI WWTP 2010.1-2010.6))))

Time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6

Output(t) 58.8 55.7 56.8 61.3 58.8 33.6

Rate of water content(%) 80.1% 80.5% 80.1% 80% 80.1% 80%

External Monitoring: external monitoring result conducted by EPB has not yet been obtained.

3.3.3.4. ENVIRONMENT MONITORING DURING OPERATION PHASE OF LI COUNTY WWTP

Internal Monitoring: Monitoring results of COD and SS from April to June 2010 have been

obtained. The ranges of monitoring results of outflow water quality from April to June 2010 are:

COD:27-36 mg/L、SS:6-7 mg/L, which meet the 1A standard of GB18918-2002.

Page 45: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

38

TABLE 3-31 INTERNAL OUTFLOW WATER QUALITY MONITORING RESULT OF LI COUNTY WWTP

((((2010.4-2010.6))))

Monitoring time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6 1A standard of

GB18918-2002

COD

(mg

/L)

27.0 30.0 36.0 31 32 30 50 Monitoring

parameters

SS

(mg

/L)

7 6 7 7 7 7 10

Sludge output and water content monitoring from January to June 2010 show that monthly sludge

output is 94.5-109.8 t and the rate of water content is 79%-80%.

Quality of Sludge from Municipal Wastewater Treatment Plant (GB24188-2009) requires that the

WWTP sludge should reach the rate of water content of below 80% after dewatering, if the sludge

is to be landfilled by domestic waste landfill, the rate of water content should meet the

requirement of Standard of Pollution Control on the Landfill Site of Municipal Solid Waste

(GB16889-2008), which means the rate of sludge water content should be less that 60%.

Compared with the standard, the sludge water content after dewatering in the Li County WWTP

can meet the limit of 80%, but fail to meet the 60% limit for domestic landfill.

TABLE 3-32 SLUDGE OUTPUT AND WATER CONTENT MONITORING RESULT (LI COUNTY WWTP

2010.1-2010.6))))

Time 2010.1 2010.2 2010.3 2010.4 2010.5 2010.6

Output(t) 109.8 97.5 96.2 94.5 97.7 100.1

Rate of water content(%) 79.67% 79.3% 79.3% 79% 79.3% 80%

Hebei Geology and Mineral Resources Laboratory Center conducted the sludge monitoring for Li

County WWTP in June 2010. Monitoring parameters includes Hg, As, Cr, Cd, Ni, Cu, Zn, Pb.

Compared with the “Table 1: Basic control parameter and limit of sludge quality ” and “Table 2:

Alternative control parameter and limit of sludge quality” in the Quality of Sludge from

Municipal Wastewater Treatment Plant GB24188-2009, the monitoring result meets the standard.

Page 46: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

39

TABLE 3-33 SLUDGE MONITORING RESULT DURING OPERATION PHASE OF LI COUNTY WWTP (HEBEI

GEOLOGY AND MINERAL RESOURCES LABORATORY CENTER: 2010.6)

Parameter Cu

(10-6)

Hg

(10-6)

Ni

(10-6)

Cd

(10-6)

Cr

(10-6)

As

(10-6)

Zn

(10-6)

Pb

(10-6)

Monitoring

result

158 1.99 31.0 0.84 121 15.4 899 168

Standard

for

reference

<1500 <25 <200 <20 <1000 <75 <4000 <1000

External Monitoring: external monitoring result conducted by EPB has not yet been obtained.

3.4. INSTITUTIONAL STRENGTHENING AND TRAINING

Training conducted this time is mainly the environment management training for PMO, IAs and

EPBs.

Environment management training was conducted in Dongfang Hotel on April 16th 2010.

Environment monitoring specialist of SOGREAH Consultant and Baoding EPB made the

presentation to participants from Baoding PMO, County PMOs, IAs, Baoding EPB, County EPBs.

Presentations were made on ADB environment policy, contents and requirements of environment

management of this project. The training has clearly explained the ADB policy, requirements and

responsibilities of the environment management plan implementation.

From May 13 to 20, EMU of BPMO and environment monitoring specialist paid site visits to

some of the subprojects and met with County PMOs, IAs, EMUs and EPBs to collect information

and feedbacks of the EMP implementation and provide comments and recommendations.

Page 47: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

40

TABLE 3-34 ENVIRONMENT MANAGEMENT TRAININGS CONDUCTED AND MEETINGS DURING THIS REPORT TIME

Date Location Participants Content

2010.04.16 Baoding Dongfang

Hotel

Keynote speakers:

environment monitoring

specialist of

SOGREAH, Baoding

EPB

Participants:Baoding

PMO, IAs, Baoding

EPB, County EPBs

ADB environment

policy and requirement

Environment

management and

requirement

2010.05.13 Xiong County WWTP Baoding PMO,

SOGREAH, Xiong

County Environment

Monitoring Station

Site visit, progress of

EMP implementation,

plan of next step

2010.05.13 Baigou WWTP Baoding PMO,

SOGREAH, Baigou

WWTP, Baigou EPB

Site visit, progress of

EMP implementation,

plan of next step

2010.05.14 Li County WWTP Baoding PMO,

SOGREAH, Li County

WWTP, Li County PMO

Site visit, progress of

EMP implementation,

plan for next step

2010.05.14 Anxin DRC Baoding PMO,

SOGREAH, Anxin

DRC, Anxin EPB, Anxin

Water Resources

Bureau, Anxin Forest

Bureau

Site visit, progress of

EMP implementation of

Anxin WWTP, Anxin

Reforestation project,

Anxin Urban Flood

Management project,

plan of next step

2010.05.17 Tang County WWTP Baoding PMO,

SOGREAH, Tang

County WWTP, Tang

County EPB

Site visit, Progress of

EMP implementation,

plan of next step

2010.05.17 Dingzhou Water Supply

Company, Dingzhou

WWTP

Baoding PMO,

SOGREAH, Dingzhou

Water Supply

Company, Dingzhou

WWTP

site visit, progress of

EMP implementation,

plan of next step

2010.05.18

Yi County WWTP Baoding PMO,

SOGREAH, Yi County

WWTP

site visit, progress of

EMP implementation,

plan of next step

2010.05.18

Dingxing Construction

Bureau

Baoding PMO,

SOGREAH, Dingxing

Construction Bureau,

site visit, progress of

EMP implementation,

plan of next step

Page 48: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

41

Dingxing EPB

2010.05.19 Construction sites of

IWM project

Baoding PMO,

SOGREAH, Baoding

Water Resources

Bureau

site visit, progress of

EMP implementation

2010.05.20 Xushui WWTP Baoding PMO,

SOGREAH, Xushui

WWTP

site visit, progress of

EMP implementation,

plan of next step

2010.05.20 Mancheng WWTP Baoding PMO,

SOGREAH, Mancheng

WWTP

site visit, progress of

EMP implementation,

plan of next step

3.5. ENVIRONMENTAL COMPLIANCE STATUS

3.5.1. ENVIRONMENT IMPACT ASSESSMENT

All subprojects have completed the EIA reports and obtained EPB replies of approval. Xinxing

WWTP has updated the EIA report due to the site location change and got reply of approval from

EPB according to the requirement of Law of the People's Republic of China on Environmental

Impact Assessment. Anxin UFM subproject has change in the project scale after the reply of

approval of EIA report. Environment monitoring specialist reminded in the meeting with Anxin

PMO and IA of Anxin UFM that EIA report should be updated according to the requirement of

Law of the People's Republic of China on Environmental Impact Assessment.

3.5.2. MITIGATION MEASURES TAKEN

Subprojects in construction phase have taken proper environmental mitigation measures. The

construction and domestic wastewater generated from construction site is collected, treated and

discharged in accordance with discharge standard or reused as spray water on roads; Mitigation

measures such as regular water spray, material coverage, enclosed operation are taken to control

dust; Vehicles and equipments in compliance with emission standard are chosen in order to reduce

air emission; construction waste and domestic waste in construction site are collected and treated

properly; noise level is reduced by properly construction arrangement, usage of equipments of low

noise level and noise insulation; ecological restoration are taken at earth and rock excavation and

borrowed site to avoid soil erosion. In general, all subprojects in construction phase have taken

proper and effective mitigation measures according to the requirement of EMP to reduce the

adverse impact.

During construction, EPBs conducted inspection site visit to the construction site and provided

comments and recommendations on the mitigation measures taken for the wastewater pollution,

air pollutant emission, construction noise and construction solid waste. During commissioning of

WWTP and preparation of ECAPC, EPB conducted site visits and provided comments and

recommendations on the environmental issues such as facilities commissioning, chemical dosing,

online monitoring and greening, etc. Besides, EPB also took samples of wastewater during site

Page 49: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

42

visit and did analysis.

Effective measures are taken according to EMP requirement to ensure WWTP outflow to meet the

water quality standard. Noise insulation and silencer are adopted to ensure the boundary noise

level to meet the noise level standard. Trees are planted within the WWTP and around the

boundary to reduce the impact of odor on surrounding areas. Baoding EPB and County EPBs are

conducting regular site inspection and monitoring to ensure the mitigation measures are

effectively taken.

3.5.3. ENVIRONMENT CHECK-AND-ACCEPTANCE OF PROJECT COMPLETION

(ECAPC)

4 WWTP subprojects have completed and been in commissioning phase and preparing for the

ECAPC.

7 WWTP subprojects have been completed and finished the ECAPC. They are Xiong County

WWTP, Macheng WWTP, Li County WWTP, Liushi WWTP, Yi County WWTP, Dingzhou

WWTP, Anxin WWTP. Water quality of treated wastewater of Yi County WWTP has just met the

1B standard of the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant

((((GB18918-2002)))), and passed the ECAPC of 1B standard. Currently, technical improvement

measures have been taken by Yi County WWTP to ensure the outflow can meet the 1A standard.

Baoding PMO and environment monitoring specialist will follow the progress of its technical

improvement, provide guidance and assistance. For other WWTPs, the water quality of outflow

have all reached the 1A standard and passed the ECAPC of 1A standard.

For Li County WWTP, 3# monitoring point in the south boundary exceeds the noise level limit of

night time; 4# monitoring point in the west boundary exceeds the noise level limit of both day

time and night time. For Liushi WWTP, 2# monitoring point exceeds the noise level limit of both

day time and night time. In view of this, EPB has given requirement and recommendations on the

noise level exceeding issue. Baoding PMO and EPBs will urge and supervise Liushi WWTP and

Li County WWTP to take effective noise reduction measures to ensure the boundary noise level is

within the standard limit. Other WWTPs which have passed ECAPC have met the standard of

boundary noise level.

7 WWTPs WWTPs which have passed ECAPC have met the odor emission standard.

Page 50: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

43

4. CONCLUSION AND RECOMMENDATIONS

4.1. CONCLUSION

All subprojects have completed EIA reports and received reply of approval from EPB. Xinxing

has updated the EIA due to site location change and got reply of approval according to Law of the

People's Republic of China on Environmental Impact Assessment.

Of 22 subprojects, 7 WWTP subprojects have completed the Environmental

Check-and-Acceptance of Project Completion (ECAPC) and are in operation phase now. They are

Xiong County WWTP, Li County WWTP, Liushi WWTP, Mancheng WWTP, Yi County WWTP,

Dingzhou WWTP, Anxin WWTP. 4 WWTP subprojects such as Baigou WWTP, Tang County

WWTP, Xushui WWTP and Dingxing WWTP have been completed and are in the commissioning

phase and preparing for the ECAPC. 5 subprojects such as IWM (Integrated Water Resources

Management), Dingzhou WSS, Anxin Flood Control Management, Baiyangdian Lake

Reforestation and Solid Waste Management (SWM) have been on the construction phase. 6

subprojects such as Xinxing WWTP, Wenquancheng WWTP, Yi County WSS, Xiong County

WSS, Angezhuang Watershed (Reservoir) Reforestation, Xiong County Clean (Geothermal)

Energy are in the preparation phase.

Subprojects in construction phase have taken proper environmental mitigation measures. The

construction and domestic wastewater generated from construction site is collected, treated and

discharged in accordance with discharge standard or reused as spray water on roads; Mitigation

measures such as regular water spray, material coverage, enclosed operation are taken to control

dust; Vehicles and equipments in compliance with emission standard are chosen in order to reduce

air emission; construction waste and domestic waste in construction site are collected and treated

properly; noise level is reduced by proper construction arrangement, usage of equipments of low

noise level and noise insulation; ecological restoration are taken at earth and rock excavation and

borrowed site to avoid soil erosion. In general, all subprojects in construction phase have taken

proper and effective mitigation measures according to the requirement of EMP to reduce the

adverse impact.

7 WWTPs subprojects have passed ECAPC. For the boundary noise level, Li County WWTP and

Liushi WWTP have problem in the boundary noise level exceeding. In view of this, EPB has

given requirement and recommendations on the noise level exceeding. PMO and EPBs will urge

and supervise Liushi WWTP and Li County WWTP to take effective noise reduction measures to

ensure the boundary noise level is within the standard limit. Other WWTPs have met the standard

of boundary noise level.

For water quality of WWTP outflow, Yi County WWTP has just met the 1B standard of the

Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant((((GB18918-2002)))),

and passed the ECAPC of 1B standard. Currently, technical improvement measures have been

taken by Yi County WWTP to ensure the treated wastewater can meet the 1A standard. Baoding

PMO and environment monitoring specialist will follow the progress of its technical improvement,

provide guidance and assistance. For other WWTPs, the water quality of treated wastewater have

Page 51: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

44

all reached the 1A standard and passed the ECAPC of 1A standard.

7 WWTPs which have passed the ECAPC have met the odor emission standard.

Effective measures are taken according to EMP requirement to ensure treated wastewater to meet

the water quality standard. Noise insulation and silencer are adopted to ensure the boundary noise

level to meet the noise level standard. Trees are planted within the WWTPs and around the

boundary to reduce the impact of odor on surrounding areas.

In terms of institution and staff arrangement, BPMO has set up an EMU with 3 staffs in charge of

supervision of EMP implementation. Environmental monitoring specialist from SOGREAH

Consultant Company has been in place, reviewed the EMPs and assisted BEMU to prepare the

first progress report of EMP implementation. IAs have set up their own EMUs that have 2 ~3

employees each in charge of EMP implementation. Baoding EPB, County EPBs conduct site

inspection to ensure the environment mitigation measures are properly and effectively

implemented, provide comments and recommendations and organize the ECAPC.

For institution strengthening and training, environment management training and meeting has

been taken to provide an interactive way to introduce and explain the ADB environment policy,

contents and requirements of environment management of this project. The training has clearly

explained the ADB environment policy, requirements and responsibilities of the environment

management plan implementation.

Environment monitoring in construction phase are lagging behind schedule. Since most of the

WWTPs commenced construction earlier and were under the urgent requirement of early

completion, environment monitoring during construction phase has not been implemented as

required by the Environment Monitoring Plan, which leads to the missing of environment

monitoring data. PMO are urging the subproject in construction phase to commence monitoring as

soon as possible.

Monitoring data of outflow, boundary noise level and heavy metal in sludge obtained indicates

that the monitoring result meet relevant standards. Nevertheless, since the monitoring data

collected is not complete, data collected does not fully reflect the actual operation situation of the

WWTPs. Furthermore, the Baiyangdian Sewage Projects Assessment Report drafted by

Wastewater Treatment Process Specialist indicates that water quality monitoring data seems

suspicious; in some cases where a county-level WWTP is operated, usually fluctuate with

arbitrariness unskilled laboratory-clerks present. As we all know, a successful performance in

WWTP can never be expected without reliable measurements and availability of credible data; it

is recommended that a comprehensive review of the regular measurements is therefore imperative.

Sludge water content monitoring data from January to June 2010 of Yi County WWTP, Dingzhou

WWTP, Xiong County WWTP, Liushi WWTP and Li County WWTP show that their rate of water

content are: 80%、78%-79%、76.4%-78%、80%-80.5%、79%-80% respectively. Quality of Sludge

from Municipal Wastewater Treatment Plant (GB24188-2009) requires that the WWTP sludge

should reach the rate of water content of below 80% after dewatering, if the sludge is to be

landfilled by domestic waste landfill, the rate of water content should meet the requirement of

Standard of Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2008),

which means the rate of sludge water content should be less that 60%. Compared with the

standard, the sludge water content after dewatering in Yi County WWTP, Dingzhou WWTP,

Page 52: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

45

Xiong County WWTP, Li County WWTP can meet the limit of 80%, but sludge water content of

Liushi WWTP slightly exceeds the limit of 80%. However, they fail to meet the 60% limit for

domestic landfill.

4.2. RECOMMENDATIONS

Subprojects in construction phase should commence environment monitoring as soon as possible,

recruit qualified monitoring institutions to conduct environment monitoring according to the

Environment Monitoring Plan. B-PMO, B-EPB and C-EPB will supervise the monitoring

activities of IAs; for the subprojects which have commenced monitoring, monitoring results

should be submitted to BEMU on regular basis.

Strengthen the environment management during construction phase. Effective mitigation measures

should be taken to properly treat the wastewater, reduce dust and air pollutant emission, reduce

noise level of equipment and transportation, properly dispose the construction waste and domestic

waste.

Constructed WWTPs should draft corresponding operation management manuals and environment

management implementation procedure, establish well-formed contingency plans, clearly define

environment management responsibilities of each department. Environment management training

should be conducted on regular basis for the WWTP staff to improve awareness of environment

protection.

Comments and requirement for improvements in the EPB’s reply of approval in the ECAPC

should be followed. PMO and EPB should urge and supervise the implementation of improvement

measures. For the noise level exceeding issue of Liushi WWTP and Li County WWTP, PMO and

EPB should follow the implementation of improvement, provide assistance to find the cause of

noise level exceeding and take corresponding noise reduction measures such as planting trees,

noise insulation, and installation of silencer to ensure the boundary noise to meet the standard.

Roads and vegetation and trees should be recovered or planted timely when major civil works and

equipments installation are completed to reduce the impact of dust, noise and odor.

Yi County WWTP should speed up the improvement of wastewater treatment to ensure the treated

wastewater meet the 1A standard. Wastewater quality monitoring results should be submitted to

PMO on regular basis. PMO will provide supervision and assistance in the improvement.

Ensure reliable measurements and availability of credible data. It is recommended that a

comprehensive review of the regular measurements is therefore imperative.

More detailed information on the sludge dewatering process, dryness and disposal in the WWTPs

are needed to be collected from WWTPs to evaluate the current sludge treatment and provide

comments and recommendations for rectification and improvement.

For the subprojects which will be changed in project content, if the project nature, scale, location,

process or mitigation measures to address pollution and ecological deterioration have undergone

significant change, New EIA report should be prepared and approved according to requirements of

Law of the People s Republic of China on Environmental Impact Assessment. The updated EIA

report, design report should be submitted to BPMO.

Page 53: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

46

Regular communication and cooperation between BEMU, B-EPB, C-EPB, EMU of IAs,

contractors, Environmental Supervision Company (ECS), EIA institutes, Design institutes and

EMCs should be established and strengthened. IAs should regularly report to BEMU, B-EPB and

C-EPB the implementation status of mitigation measures and environmental monitoring results.

According to the implementation status of mitigation measures and monitoring report, BEMU will

give feedbacks and recommendations, in order to improve the effectiveness of environmental

management.

Page 54: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

47

APPENDIX 1::::DATA COLLECTED DURING THIS REPORT

PERIOD

Page 55: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

48

No. Documents Submitted by Time and Author

1 Application of Environmental

Check-and-Acceptance of Project

Completion (Yi County WWTP)

Yi County

WWTP

Approved by Hebei

Environment Protection

Bureau

2 Monitoring Report for Environmental

Check-and-Acceptance of Project

Completion

Yi County

WWTP

Hebei Provincial

Environment Monitoring

Center

2010.1 -6 3 Monthly Operation Report of Yi

County WWTP

Yi County

WWTP Yi County WWTP

2010.3-6 4 Outflow Quality Monitoring Report of

Yi County WWTP

Yi County

WWTP Yi County Environment

Monitoring Station

2009.12.12 5 Monitoring Report for Pollution

Discharge Permit of Hebei Province

(Yi County WWTP)(2009)

Yi County

WWTP Hebei Provincial

Environment Monitoring

Center

2008.12.23 6 Monitoring Report for Pollution

Discharge Permit of Hebei Province

(Yi County WWTP)(2008)

Yi County

WWTP Hebei Provincial

Environment Monitoring

Center

2009.12.2 7 Sludge Monitoring Report of Yi

County WWTP

Yi County

WWTP Hebei Geology and

Mineral Resources

Laboratory Center

2008.12.1 8 Monitoring Report for calibration

and acceptance of wastewater

online monitoring equipments (Yi

County WWTP)

Yi County

WWTP Baoding Environment

Monitoring Station

2009.12 9 Environment Supervision Report of

Mancheng WWTP

Mancheng

WWTP Baoding Third Project

Construction Supervision

Co.

April, June, and August of

2009

10 Site Environment Inspection Notice

of Mancheng EPB (Mancheng

WWTP)

Mancheng

WWTP

Mancheng EPB

2009.11.5 11 Application for acceptance of

Pollution Discharge Point

Standardization (Mancheng WWTP)

Mancheng

WWTP Mancheng EPB

2009.11 12 Monitoring Report for calibration

and acceptance of wastewater

Mancheng

WWTP Mancheng Environment

Page 56: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

49

No. Documents Submitted by Time and Author

online monitoring equipments

(Mancheng WWTP)

Monitoring Station

2010.7 13 Feedback Form of EMP

Implementation Progress

(Mancheng WWTP)

Mancheng

WWTP Mancheng WWTP

14 Application of Environmental

Check-and-Acceptance of Project

Completion

Mancheng

WWTP

Approved by Baoding

Environment Protection

Bureau

15 Monitoring Report for Environmental

Check-and-Acceptance of Project

Completion

Baoding Environment

Monitoring Station

2010.1-6 16 Monitoring Report by Mancheng

Environment Monitoring Station

(Mancheng WWTP)

Mancheng

WWTP Mancheng EPB

2010.1-6 17 Monthly Operation Report of

Mancheng WWTP

Mancheng

WWTP Mancheng WWTP

2009.11.13 18 Sludge Monitoring Report of

Mancheng WWTP

Mancheng

WWTP Hebei Geology and

Mineral Resources

Laboratory Center

19 Application of Environmental

Check-and-Acceptance of Project

Completion

Dingzhou

WWTP

Approved by Hebei

Environment Protection

Bureau

20 Monitoring Report for Environmental

Check-and-Acceptance of Project

Completion

Dingzhou

WWTP

Hebei Provincial

Environment Monitoring

Center

2010.1-6 21 Monthly Operation Report of

Dingzhou WWTP

Dingzhou

WWTP Dingzhou WWTP

22 Application of Environmental

Check-and-Acceptance of Project

Completion

Xiong County

WWTP

Approved by Baoding

Environment Protection

Bureau

23 Monitoring Report for Environmental

Check-and-Acceptance of Project

Completion

Xiong County

WWTP

Baoding Environment

Monitoring Station

2010.1-4 24 Monthly Operation Report of Xiong

County WWTP

Xiong County

WWTP Xiong County WWTP

Page 57: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

50

No. Documents Submitted by Time and Author

25 Application of Environmental

Check-and-Acceptance of Project

Completion (Liushi WWTP)

Liushi WWTP Approved by Baoding

Environment Protection

Bureau

26 Monitoring Report for Environmental

Check-and-Acceptance of Project

Completion (Liushi WWTP)

Liushi WWTP Baoding Environment

Monitoring Station

2010.1-6 27 Liushi WWTP Monthly Operation

Report of WWTP

Liushi WWTP

Liushi WWTP

28 Application of Environmental

Check-and-Acceptance of Project

Completion (Li County WWTP)

Li County

WWTP

Approved by Baoding

Environment Protection

Bureau

29 Monitoring Report for Environmental

Check-and-Acceptance of Project

Completion (Li County WWTP)

Li County

WWTP

Baoding Environment

Monitoring Station

2010.1-6 30 Monthly Operation Report of Li

County WWTP

Li County

WWTP Li County WWTP

2010.6 31 Sludge Monitoring Report of Li

County WWTP

Li County

WWTP Hebei Geology and

Mineral Resources

Laboratory Center

November 3rd, 13th,21st

of 2009

32 Site Environment Inspection Record

of Li County Environment

Supervision Unit (Li County WWTP)

Li County

WWTP

Li County EPB

2009.11 33 Monitoring Report for calibration

and acceptance of wastewater

online monitoring equipments (Li

County WWTP)

Li County

WWTP Li County Environment

Mnoitoring Station

34 Application of Environmental

Check-and-Acceptance of Project

Completion (Anxin WWTP)

Anxin WWTP Approved by Baoding

Environment Protection

Bureau

2010.7 35 Summary sheet of Environment

Mitigation Measures taken by Anxin

Urban Flood Management Project

Anxin WRB

Anxin WRB

2009.4-2009.9 36 Site Environment Inspection Notice

of Dingxing EPB ( Dingxing

WWTP)

Dingxing

WWTP Dingxing EPB

2010.7 37 Feedback Form of EMP

Implementation Progress

Dingzhou

WSS

Dingzhou WWS

38 Feedback Form of EMP Xushui WWTP 2010.7

Page 58: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

51

No. Documents Submitted by Time and Author

Implementation Progress Xushui WWTP

2010.8 39 Summary of Environment Protection

Measures taken by Baiyangdian

Lake Reforestation Project

Anxin Forest

Bureau

Anxin Forest Bureau

2009. 8-2010.4 40 Site Environment Inspection Notice

(Baigou WWTP)

Baigou WWTP

Wenquancheng Section of

Baigou EPB

2010.2-5 41 Site Environment Inspection Notice

(Baigou WWTP)

Baigou WWTP

Wenquancheng Section of

Baigou EPB

2009.4-2009.12 42 Site Environment Inspection Notice

of(Tang County WWTP)

Tang County

WWTP Tang County EPB

2010.7 43 Feedback Form of EMP

Implementation Progress(IMW)

Baoding WRB

Baoding WRB

2010.7 44 Feedback Form of EMP

Implementation Progress(SWM)

Management

office of

Baoding

High-tech

District

Management office of

Baoding High-tech District

Page 59: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

52

APPENDIX 2::::MONITORING RESULT OF

ENVIRONMENTAL CHECK-AND-ACCEPTANCE

OF PROJECT COMPLETION (ECAPC)

Page 60: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

53

1. ECAPC Monitoring results of Liushi WWTP

Table 1: Outflow water quality monitoring result

Monitoring

parameters

Concentration(mg/L), except

for pH

Acceptance Standard: 1A standard of

Table 1 in Discharge Standard of

Pollutants for Municipal Wastewater

Treatment Plant((((GB18918-2002))))

(mg/L , except for pH)

pH 7.29-7.35 6-9

COD 35.5 50

BOD5 3.35 10

SS 8.5 10

NH3-N 3.88 5: (>12℃)

8: (≤12℃)

TN 8.225 15

TP 0.3755 0.5

Petroleum oil 0.04 1

Anionics 0.128 0.5

Coliform 56.5 103

Chroma 8 30

Cr6+ 0.004L 0.05

Total Cr 0.004L 0.1

Table 2: Air monitoring result

Monitoring point Parameter Concentration Standard

1# odor 10.5 20(dimensionless)

2# odor 11 20(dimensionless)

3# odor 13 20(dimensionless)

Page 61: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

54

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

1# Day-time:51.2

Night-time: 47.2

Day-time: 70

Night-time: 55

2# Day-time: 63.8

Night-time: 60.9

Day-time: 60

Night-time: 50

3# Day-time: 47.5

Night-time: 45.2

Day-time: 60

Night-time: 50

4# Day-time: 48.6

Night-time: 47.3

Day-time: 60

Night-time: 50

Page 62: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

55

2. ECAPC Monitoring results of Li County WWTP

Table 1: Outflow water quality monitoring result

Monitoring

parameters

Concentration(mg/L), except

for pH

Acceptance Standard: 1A standard of

Table 1 in Discharge Standard of

Pollutants for Municipal Wastewater

Treatment Plant((((GB18918-2002))))

(mg/L , except for pH)

pH 8.01-8.27 6-9

COD 26 50

BOD5 2.5 10

SS 5.5 10

NH3-N 0.532 5: (>12℃)

8: (≤12℃)

TN 5.935 15

TP 0.408 0.5

Petroleum oil 0.04 1

Anionics 0.121 0.5

Coliform 647 103

Chroma 8 30

Cr6+ 0.004L 0.05

Total Cr 0.004L 0.1

Table 2: Air monitoring result

Monitoring point Parameter Concentration Standard

1# odor 10.75 20(dimensionless)

2# odor 13 20(dimensionless)

3# odor 12 20(dimensionless)

Page 63: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

56

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

1# Day-time: 50.6

Night-time: 48.2

Day-time: 60

Night-time: 50

2# Day-time: 55.4

Night-time: 49.6

Day-time: 60

Night-time: 50

3# Day-time: 59.0

Night-time: 56.8

Day-time: 60

Night-time: 50

4# Day-time: 66.3

Night-time: 63.4

Day-time: 60

Night-time: 50

Page 64: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

57

3. ECAPC Monitoring results of Anxin WWTP

Table 1: Outflow water quality monitoring result

Monitoring point Monitoring parameter Concentration(mg/L),

except for pH

Acceptance Standard:

1A standard of Table 1

in Discharge

Standard of

Pollutants for

Municipal

Wastewater

Treatment Plant

(((( GB18918-2002 ))))

(mg/L , except for

pH)

pH 7.04-7.20 6-9

COD 18 50

SS 6 10

BOD5 2.1 10

NH3-N 1.67 5: (>12℃)

8: (≤12℃)

TN 8.91 15

TP 0.162 0.5

Petroleum oil 0.01L 1

Anionics 0.281 0.5

Animal and vegetable

oil

0.021 1

Discharge outlet of 2nd

phase

Chroma 4 /yellowish 30

pH 7.06-7.23 6-9

COD 20 50

Coliform 578 1000

SS 6 10

BOD5 2 10

NH3-N 2.08 5: (>12℃)

8: (≤12℃)

General discharge

outlet

TN 11.0 15

Page 65: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

58

TP 0.197 0.5

Petroleum oil 0.011 1

Anionics 0.238 0.5

Animal and vegetable

oil

0.018 1

Chroma 4 /yellowish 30

Table 2: Air monitoring result

Monitoring point Parameter Concentration

(mg/m3)

Standard

1# NH3 0.003

2# NH3 0.004

3# NH3 0.004

4# NH3 0.004

Acceptance Standard:

class 2 of Table 4 in

Discharge Standard

of Pollutants for

Municipal

Wastewater

Treatment Plant

(((( GB18918-2002 )))) :

1.5(mg/m3)

1# H2S 0.001

2# H2S 0.022

3# H2S 0.032

4# H2S 0.027

Acceptance Standard:

class 2 of Table 4 in

Discharge Standard

of Pollutants for

Municipal

Wastewater

Treatment Plant

(((( GB18918-2002 )))) :

0.06(mg/m3)

Page 66: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

59

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

1# day time 52.3

1# night time 48.7

2# day time 52.3

2# night time 48.4

3# day time 48.7

3# night time 48.1

4# day time 51.6

4# night time 48.7

Class II of Emission Standard for

Industrial Enterprises Noise at

Boundary ( GB12348-90) day

time:60

night time:50

Page 67: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

60

4. ECAPC Monitoring results of Dingzhou WWTP

Table 1: Outflow water quality monitoring result

Monitoring

parameters

Concentration(mg/L), except

for pH

Acceptance Standard: 1A standard of

Table 1 in Discharge Standard of

Pollutants for Municipal Wastewater

Treatment Plant((((GB18918-2002))))

(mg/L , except for pH)

COD 21 50

BOD5 8.40 10

NH3-N 4.49 5: (>12℃)

8: (≤12℃)

Hg(ug/L) 0.077 0.001

SS 2 10

TN 13.9 15

TP 0.224 0.5

Cr 0.078 0.1

Ni 0.03 0.05

Animal and vegetable

oil

0.339 1

Petroleum oil 0.324 1

Coliform 750 103

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

1# east boundary Day-time:38.5-39.1

Night-time :37.9-38.1

Day-time: 60

Night-time: 50

2# west boundary Day-time:41.6-40.8

Night-time :38.5-38.2

Day-time: 60

Night-time: 50

3# south boundary Day-time:38.1-37.9

Night-time :37.3-37.0

Day-time: 60

Night-time: 50

4# north boundary Day-time:37.0-38.2

Night-time:35.8-37.6

Day-time: 60

Night-time: 50

Page 68: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

61

5. ECAPC Monitoring results of Xiong County WWTP

Table 1: Outflow water quality monitoring result

Monitoring

parameters

Concentration(mg/L), except

for pH

Acceptance Standard: 1A standard of

Table 1 in Discharge Standard of

Pollutants for Municipal Wastewater

Treatment Plant((((GB18918-2002))))

(mg/L , except for pH)

COD 30 50

BOD5 3.4 10

SS 7 10

NH3-N 0.421 5: (>12℃)

8: (≤12℃)

TN 7.04 15

TP 0.279 0.5

Petroleum oil 0.02 1

Animal and vegetable

oil

0.03 1

Anionics 0.185 0.5

Coliform 745 103

Table 2: Air monitoring result

Monitoring point Parameter Concentration standard

FQ_001 odor 10 20(dimensionless)

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

Zs_001 Day-time:52.8

Night-time:49.2

Day-time:60

Night-time:50

Zs_002 Day-time:45.7

Night-time:44.8

Day-time:60

Night-time:50

Zs_003 Day-time:48.6

Night-time:46.3

Day-time:60

Night-time:50

Zs_004 Day-time:44.4

Night-time:43.1

Day-time:60

Night-time:50

Page 69: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

62

6. ECAPC Monitoring results of Mancheng WWTP

Table 1: Outflow water quality monitoring result

Monitoring

parameters

Concentration(mg/L), except

for pH

Acceptance Standard: 1A standard of

Table 1 in Discharge Standard of

Pollutants for Municipal Wastewater

Treatment Plant((((GB18918-2002))))

(mg/L , except for pH)

COD 46 50

NH3-N 3.97 5: (>12℃)

8: (≤12℃)

SS 8 10

BOD5 4.6-5.1 10

TN 4.03-5.71 15

TP 0.427-0.475 0.5

Petroleum oil 0.01 1

Animal and vegetable

oil

0.02 1

Anionics 0.242-0.322 0.5

Coliform 745-775 /L 103 /L

Chroma 9-10 30

Table 2: Air monitoring result

Monitoring point Parameter Concentration Standard

1# odor 10 20(dimensionless)

2# odor 11 20(dimensionless)

3# odor 10 20(dimensionless)

Page 70: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

63

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

A Day-time:46.2

Night-time:42.8

Day-time:60

Night-time:50

B Day-time:48.6

Night-time:47.9

Day-time:60

Night-time:50

C Day-time:46.7

Night-time:43.1

Day-time:60

Night-time:50

D Day-time:63.2

Night-time:48.7

Day-time:70

Night-time:55

Page 71: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

64

7. ECAPC Monitoring results of Yi County WWTP

Table 1: Outflow water quality monitoring result

Monitoring

parameters

Concentration(mg/L), except

for pH

Acceptance Standard: 1B standard of

Table 1 in Discharge Standard of

Pollutants for Municipal Wastewater

Treatment Plant((((GB18918-2002))))

(mg/L , except for pH)

pH 6.90-7.21 6-9

COD 24 60

NH3-N 0.290 8: (>12℃)

15: (≤12℃)

SS 12 20

BOD5 3.7 20

TP 0.222 1

Table 2: Air monitoring result

Monitoring point NH3(mg/m3) H2S(mg/m3) Standard

1 0.021 0.009

2 0.025 0.010

3 0.023 0.009

4 0.034 0.011

NH3:1.5(mg/m3)

H2S:0.06(mg/m3)

Table 3: Monitoring result of boundary noise level

Monitoring point Noise level( dB(A)) Standard( dB(A))

1# Day-time:52.7

Night-time:43.6

Day-time:60

Night-time:50

2# Day-time:47.6

Night-time:45.7

Day-time:60

Night-time:50

3# Day-time:45.3

Night-time:44.1

Day-time:60

Night-time:50

4# Day-time:52.0

Night-time:49.2

Day-time:60

Night-time:50

Page 72: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

65

APPENDIX 2::::PHOTO OF SITE VISIT

Page 73: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

66

UNITANK REACTION TANK (XIONG COUNTY

WWTP)

FAN ROOM (XIONG COUNTY WWTP)

CONTROL CENTER ROOM (BAIGOU WWTP) SLUDGE STORAGE TANK (BAIGOU WWTP)

FILTRATION TANK (LI COUNTY WWTP) FLOCCULATION SEDIMENTATION TANK(LI

COUNTY WWTP)

Page 74: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

67

CAST REACTION TANK (TANG COUNTY WWTP) OUTFLOW DISCHARGED TO CHENGBEI RIVER

(TANG COUNTY WWTP)

CAST REACTION TANK (DINGZHOU WWTP) LABORATORY (DINGZHOU WWTP)

CONSTRUCTION SITE (DINGZHOU WSS) CONSTRUCTION SITE (DINGZHOU WSS)

Page 75: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

68

BIOLAK REACTION TANK (DINGXING WWTP) OUTFLOW (DINGXING WWTP)

CONSTRUCTION SITE IN WANZI TUNNEL(IWM) CONSTRUCTION SITE IN YIMU SPRING

RECHARGE AREA(IWM)

WANGKUAI RESERVOIR (IWM) AQUEDUCT (IWM)

Page 76: Environmental Monitoring Report - Asian Development · PDF fileEnvironmental Monitoring Report Project Number: 36437 July 2010 Loan 2428-PRC: Integrated Ecosystem and Water ... UNITANK

EMP PROGRESS REPORT NO.2

69

OXIDATION DITCH (XUSHUI WWTP) ROTATIONAL FLOW DESILTING TANK (XUSHUI

WWTP)

COARSE SCREEN (XUSHUI WWTP) FAN ROOM (MANCHENG WWTP)

UNITANK REACTION TANK (MANCHENG WWTP) COD AND FLOW ONLINE MONITORING

(MANCHENG WWTP)