I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Environmental Contracting Presented by Janelle Larrison Acting Director, Environmental Contracting [email protected]

Environmental Contracting

Embed Size (px)

DESCRIPTION

Environmental Contracting. Presented by Janelle Larrison Acting Director, Environmental Contracting [email protected]. Overview. Contracting Overview On the Horizon Summary. AFCEE Pace of Business. Obligations $M. Actions. Millions. ** YTD as of 31 July 04 - PowerPoint PPT Presentation

Citation preview

Page 1: Environmental Contracting

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Headquarters U.S. Air Force

Environmental Contracting

Presented by

Janelle LarrisonActing Director, Environmental Contracting

[email protected]

Page 2: Environmental Contracting

2I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

Overview

Contracting Overview On the Horizon Summary

Page 3: Environmental Contracting

3I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

AFCEE Pace of Business

2426

3156

3636

4119

3277

0

500

1000

1500

2000

2500

3000

3500

4000

4500

00 01 02 03 04**

511 506

676

938

1311

0

200

400

600

800

1000

1200

1400

00 01 02 03 04**** YTD as of 31 July 04Source: ConData

Obligations $MActions

Million

s

Page 4: Environmental Contracting

I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

Indefinite Delivery Indefinite Quantity (IDIQ) - Primary Contract Vehicle

214 Contracts

Over $8.5 Billion Contract Capacity

Major Programs Are on a 5 Year Acquisition Cycle

Contract Capacity

Page 5: Environmental Contracting

AFCEE’s Contracts toolbox:The right tool for every job, every time

Global Engineering, Integration, & Technical Assistance (GEITA)Wide-ranging technical assistance: from environmental cleanup to noise studies

Full range of construction and engineering activities to meet all base requirements.

Supporting the four pillars: restoration, pollution prevention, conservation and planning, and construction management

Worldwide Planning, Program, & Design (4PAE)

Environmental Remediation and Construction (WERC)

Environmental Minor Construction, Operations, and Services (ECOS)

Broad range of construction, repair, and demolition work, both traditional and environmental; plus force protection and homeland security.

Military Family Housing A-E(AE45PC)Providing quality housing for quality people

Privatization SupportUsing the best experts in the field to get the best value in privatized housing

Design-Build Plus03 (DBP03)Supports single and multifamily housing, commercial and institutional, as well as other facility types

AFCEEToolbox

Page 6: Environmental Contracting

6I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

GEITA05 Milestones Global Engineering, Integration & Technical Assistance FY05 Follow-on to GEITA 2001 Large-scale Advisory & Assistance Services (A&AS) 5 Year IDIQ Program Ceiling: $850M NAICS 541620: Environmental Consulting Services Best value, full tradeoff; Anticipate approximately 5 awards Anticipated Milestone Schedule

Event Date

Formal RFP Release 29 Jun 04

Proposals Due 9 Aug 04

Begin Contract Awards Oct 04

Begin Debriefings Nov 04

Page 7: Environmental Contracting

7I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

FDSS-POL Milestones

Fuels Design, Support Services for POL Systems - Worldwide 5 Year IDIQ Program Ceiling: $25M NAICS 541330: A-E Design Services Anticipate 6 awards Anticipated Milestone Schedule

Event Date

Formal RFP Release 29 Jul 04

Proposals Due 31 Aug 04

Begin Contract Awards Oct 04

Begin Debriefings Nov 04

Page 8: Environmental Contracting

8I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

On the Horizon

Industrial Design-Build Plus Performance Based IDIQ

Page 9: Environmental Contracting

9I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

Industry Insight Summary

AFCEE continues to grow by leaps and bounds!

New opportunities exist

Be flexible - change with us

Together we succeed!

Page 10: Environmental Contracting

10I n t e g r i t y - S e r v i c e - E x c e l l e n c eIndustry Day 8/03

Panel Discussion

Mr. Paul Parker, Director Ms. Janelle Larrison, AC Mr. Terry Edwards, OD LTC Leonard Broseker, JA LTC Mark Smith, TD LTC Daniel Welch, BC Mr. Boyce Bourland, IC Mr. Bruce Leighton, IS Mr. Tom Russell, IW Mr. Tom Hodges, HD Ms. Mary Urey, Small Business Office