page 1
July 2013 version
ENVIRONMENTAL ASSESSMENT WORKSHEET This Environmental Assessment Worksheet (EAW) form and EAW Guidelines are available at the
Environmental Quality Board’s website at: http://www.eqb.state.mn.us/EnvRevGuidanceDocuments.htm. The EAW form provides information
about a project that may have the potential for significant environmental effects. The EAW Guidelines
provide additional detail and resources for completing the EAW form.
Cumulative potential effects can either be addressed under each applicable EAW Item, or can be
addresses collectively under EAW Item 19.
Note to reviewers: Comments must be submitted to the RGU during the 30-day comment period
following notice of the EAW in the EQB Monitor. Comments should address the accuracy and
completeness of information, potential impacts that warrant further investigation and the need for an EIS.
1. Project title: Woodbury Lakes Theatre
2. Proposer: Ramco Gershenson Properties 3. RGU
Contact person: Jonathon Bauman Contact person: Sharon Doucette
Title: Vice President of Construction Title: Environmental Resource Coordinator
Address: 31500 Northwestern Highway, Suite 300 Address: 8301 Valley Creek Road
City, State, ZIP: Farmington Hills, MI 48334 City, State, ZIP: Woodbury, MN 55125
Phone: 248-592-6334 Phone: 651.714.3538
Fax: Fax: 651.714.3501
Email: [email protected] Email: [email protected]
4. Reason for EAW Preparation: (check one)
Required: Discretionary:
� EIS Scoping � Citizen petition
� Mandatory EAW x RGU discretion
� Proposer initiated
If EAW or EIS is mandatory give EQB rule category subpart number(s) and name(s):
5. Project Location: County: Washington
City/Township: Woodbury
PLS Location (¼, ¼, Section, Township, Range): NE ¼ of NE ¼ of T28, R21, Section 4
Watershed (81 major watershed scale): Mississippi River Watershed 20
GPS Coordinates: -92.926665, 44.947297
Tax Parcel Number: 0302821220066, 0402821110014, 0402821110010, 0402821110011 (there are
more than 10 PIDs for the Woodbury Lakes property, the 4 listed here are the parcels impacted by the
theatre construction and parking reconfiguration)
page 2
EAW Mapping:
• Figure 1 – Regional Location Map
• Figure 2 – 2004 EAW Full Woodbury Lakes Site Plan
• Figure 3 (sheets a and b) – Existing Conditions and Removals
• Figure 4 (sheets a and b) – Proposed Site Plan
• Figure 5 – Soils
• Figure 6 – Wetlands and Drainage
• Figure 7 – Traffic Analysis Information (Source: Spack Consulting)
page 3
6. Project Description:
a. Provide the brief project summary to be published in the EQB Monitor, (approximately 50
words).
A new movie theatre is proposed in a currently undeveloped portion of the Woodbury Lakes
commercial center. Two restaurants had previously been considered at this location. The theatre
will include approximately 1,000 seats and will include a bar/restaurant area primarily for theatre
patrons. The project also includes enhancements to existing parking areas.
b. Give a complete description of the proposed project and related new construction, including
infrastructure needs. If the project is an expansion include a description of the existing
facility. Emphasize: 1) construction, operation methods and features that will cause
physical manipulation of the environment or will produce wastes, 2) modifications to
existing equipment or industrial processes, 3) significant demolition, removal or remodeling
of existing structures, and 4) timing and duration of construction activities.
In 2004, the City of Woodbury completed an Environment Assessment Worksheet (EAW)
process for the full Woodbury Lakes retail and restaurant development (Woodbury Lakes). The
project covered in the 2004 EAW included an overall site of approximately 58 acres, with
combined retail and restaurant development of 400,000 square feet (ft2). The majority of the
project as proposed in 2004 has been built out. The regional location of Woodbury Lakes is
depicted on Figure 1. The site plan from the 2004 EAW is provided as Figure 2.
There are two areas from the 2004 plan which have not yet been developed. One is the area
originally dedicated to restaurant development (“Pad 3” and “Pad 4” from the 2004 site plan).
These contiguous pad sites have been graded but have remained unpaved and otherwise
unimproved. Their combined area is approximately 0.68 acre. The other remaining undeveloped
site is a pad between Ethan Allen and Thomasville on the east side of the overall Woodbury
Lakes development. That pad site has a maximum development potential of 12,000 ft2. The
existing conditions for the currently proposed project area, as well as proposed removals, are
depicted on Figure 3.
Current building development of the overall Woodbury Lakes center is 371,303 ft2. With the
addition of the proposed theatre, the total Woodbury Lakes building footprint will be increased to
414,138 ft2. Upon full development of the last remaining pad site, which will be consistent with
the original site plan approved by the City in 2004, the fully developed building footprint on the
site will be approximately 426,000 ft2. This compares with the 400,000 ft2 that was envisioned in
the 2004 EAW.
As a result of the proposed theatre size, the original EAW underestimated the total build-out
square footage of the center. As a result of this increased building footprint from the 2004 EAW
and concern for changes in the assumed traffic patterns moving from restaurant uses to the
theatre, the City determined that the changes in this project constituted the need for a new
(updated) EAW under Minnesota Rules 4410.1000 subpart 3A, 4410.4300 subpart 1 and
4410.4300 subpart 14.B.
page 4
The current owner of Woodbury Lakes (Ramco Gershenson Properties) is proposing to construct
a movie theatre in the area once envisioned for restaurant development. This EAW review covers
the following project elements (see Figure 4):
• Construction and operation of the theatre itself
• Reconfigure/add parking
These elements are described below. As the last remaining pad site on the east side of the site
would have been within the 2004 EAW fully developed square footages for the center and will be
a consistent use with the original EAW, the City does not believe any additional review for the
eastern pad site is required now or in the future.
Theatre Site
The proposed theatre building will be approximately 42,835 ft2, and will provide multiple
theater screens and approximately 1,000 seats. The building will include a bar/restaurant and
lounge area that will include a license for beer, wine and spirits. The project will be required
to meet the City’s architectural ordinance requirements. Existing parking directly north, west,
and south of the theatre will be lost because the building footprint is greater than the
undeveloped Pad 3 and 4 area.
The theatre building will tie into existing utility service for Woodbury Lakes, including water
supply and wastewater. These systems were designed with the intention of connection to the
EAW project site and will not need to be upgraded beyond the theatre connections. Further
information will be provided in Item 11 of this EAW. Stormwater run-off from the building
will be routed into the overall drainage system serving Woodbury Lakes. This drainage
system was designed to be able to treat stormwater from the developed theatre site consistent
with applicable regulatory requirements. Some surface infiltration features will be
reconfigured in the north parking lot but the total area will remain the same.
Enhanced Parking The existing theatre on the western side of Woodbury is currently parked at one parking
space per 3.5 theatre seats. The owner is requesting the same parking for the proposed theatre
in their PUD Amendment application. This translates to 270 parking spaces being required
for the proposed treater. The parking spaces mentioned above that will be lost with the
development of the theatre building will be more than replaced with enhanced parking in
“Lot 4" northeast of the theatre as well as on Main Street to support theatre operations (see
Figure 4). Parking in Lot 4 will be reconfigured in a more space-efficient manner such that
the parking rows will have an east-west orientation rather than a north-south orientation. All
Lot 4 pavement will be removed to regrade the area for drainage purposes. In addition,
parking islands will be reconfigured and restriping will be performed as depicted on Figure 4
relative to Figure 3. Main Street parking will be converted from parallel parking to diagonal
parking as depicted on Figure 4. This will involve relocating the curb/sidewalk location to
allow for the necessary depth, as well as restriping and landscaping removal.
page 5
The Main Street parking portion of the project is scheduled to begin construction in spring of
2017, and is anticipated to last approximately four months. The construction of the theatre itself
will begin summer of 2017 and will be complete during 2018. It is intended that Lot 4
reconfiguration will be completed in spring/summer of 2018, after the Main Street angled parking
reconstruction is completed in 2017. In general, there are no unique or remarkable aspects of the
project from a construction perspective; conventional construction methods and controls in
compliance with applicable regulatory requirements will be used. Further information is provided
in the applicable response items below.
c. Project magnitude:
Total Project Acreage 5.95 acres
Linear project length N/A
Number and type of residential units N/A
Commercial building area (in square feet) 42,835 ft2
Industrial building area (in square feet) N/A
Institutional building area (in square feet) N/A
Other uses – grassed/landscaped areas (in
square feet)
10,890 ft2
Other uses – parking, sidewalk (in square
feet)
205,457 ft2
Structure height(s) N/A
d. Explain the project purpose; if the project will be carried out by a governmental unit,
explain the need for the project and identify its beneficiaries.
This is a commercial development.
e. Are future stages of this development including development on any other property planned or likely to happen? � Yes X No
If yes, briefly describe future stages, relationship to present project, timeline and plans for
environmental review.
f. Is this project a subsequent stage of an earlier project? X Yes � No
The proposed project is part of the overall Woodbury Lakes commercial development. An EAW
was completed for the full 58-acre Woodbury Lakes development in 2004 and the majority of it
has been built out. The 2004 EAW envisioned two restaurants in the location of the currently
proposed theatre.
page 6
7. Cover types: Estimate the acreage of the site with each of the following cover types before and
after development:
Before After Before After
Wetlands 0 0 Lawn/landscaping 0.37 0.25
Deep
water/streams
0 0 Impervious
surface
4.9 5.7
Wooded/forest 0 0 Stormwater Pond
Brush/Grassland 0 0 Other
(undeveloped/un-
paved pad)
0.68 0
Cropland 0 0
TOTAL 5.95 5.95
8. Permits and approvals required: List all known local, state and federal permits, approvals,
certifications and financial assistance for the project. Include modifications of any existing
permits, governmental review of plans and all direct and indirect forms of public financial
assistance including bond guarantees, Tax Increment Financing and infrastructure. All of these
final decisions are prohibited until all appropriate environmental review has been completed. See
Minnesota Rules, Chapter 4410.3100.
Unit of Government Type of Approval or Permit Status
State of Minnesota
Minnesota Pollution Control
Agency
National Pollution Discharge
Elimination System (NPDES)
Construction Stormwater
Permit
Pre-construction
Department of Labor Plumbing – Interior and
Exterior
Pre-construction
Regional
South Washington
Watershed District
Review for compliance with
SWWD rules
Pre-construction
Local
City of Woodbury EAW In process
City of Woodbury Development Approvals
including stormwater
management, amended PUD,
CUP and final plat
In process
City of Woodbury Land Disturbance Permit Pre-construction
City of Woodbury Building Permits Pre-construction
City of Woodbury Fire Department Fuel Storage
Tank Approval (for fuel tank[s]
for emergency generator)
Pre-occupancy
page 7
Cumulative potential effects may be considered and addressed in response to individual EAW Item
Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item No. 19.
If addressing cumulative effect under individual items, make sure to include information requested
in EAW Item No. 19
9. Land use:
a. Describe:
i. Existing land use of the site as well as areas adjacent to and near the site, including
parks, trails, prime or unique farmlands.
The current land use of the site is undeveloped land plus commercial parking. The site is
part of the 58-acre Woodbury Lakes commercial development, most of which has been
built out. Adjacent land uses include residential development across Hudson Road to the
south, I-94 to the north, City Place (a mixed use development under construction) to the
west, and a City water tower and commercial uses to the east. There is a paved multi-use
off-street trail along the south side of Hudson Road. There are no parks or prime or unique
farmlands on or adjacent to the project area.
ii. Plans. Describe planned land use as identified in comprehensive plan (if available)
and any other applicable plan for land use, water, or resources management by a
local, regional, state, or federal agency.
In the current (2030) Woodbury Comprehensive Plan, the project area is guided as “Places
to Shop.” Although a movie theatre is not a retail land use, it is consistent with and
complements the shopping activities which take place in the full Woodbury Lakes
development.
The proposed project is consistent with guidance and policies as defined in the Surface
Water Management chapter of the Woodbury Comprehensive Plan and will comply with
applicable local, state, and federal regulatory requirements. This includes the rules of South
Washington Watershed District (SWWD).
iii. Zoning, including special districts or overlays such as shoreland, floodplain, wild and
scenic rivers, critical area, agricultural preserves, etc.
The project area is zoned B-3, “Planned Shopping Center District;” movie theatres are
allowed in this district as a conditional use. The original Planned Use Development (PUD)
and Conditional Use Permit (CUP) approvals for the full Woodbury Lakes development are
dated June 23, 2004. The proposed project will not require zoning changes. Zoning-related
approvals will be part of the PUD and CUP amendment procedures.
b. Discuss the project’s compatibility with nearby land uses, zoning, and plans listed in Item
9a above, concentrating on implications for environmental effects.
The project is fully compatible with nearby land uses and plans and complies with zoning
requirements. The proposed movie theatre is similar to the restaurant development as envisioned
for the project location in the 2004 EAW in that it complements the primary activity of
page 8
Woodbury Lakes, retail shopping. As will be further addressed in items below, the proposed
theatre is not anticipated to create adverse impacts relative to other land uses in the area.
c. Identify measures incorporated into the proposed project to mitigate any potential
incompatibility as discussed in Item 9b above.
The project will comply with all applicable regulatory requirements as summarized in Item 8 and
further discussed in other sections such as Item 11 (Water Resources). Beyond this, the need for
special mitigation measures is not anticipated.
10. Geology, soils and topography/land forms:
a. Geology - Describe the geology underlying the project area and identify and map any
susceptible geologic features such as sinkholes, shallow limestone formations,
unconfined/shallow aquifers, or karst conditions. Discuss any limitations of these features
for the project and any effects the project could have on these features. Identify any project designs or mitigation measures to address effects to geologic features.
As identified in the 2004 EAW, there are no known susceptible geologic features in the project
area such as karst conditions. The most recent Washington County Geologic Atlas shows that the
project area is split between the Shakopee formation and the St. Peter Sandstone as the first
encountered bedrock unit at a depth between 51 and 150 feet. Due to the nature of the proposed
project and the depth to bedrock, it poses little threat of groundwater contamination. The potential
for groundwater impacts would be no greater than the restaurant land use envisioned in the 2004
EAW.
b. Soils and topography - Describe the soils on the site, giving NRCS (SCS) classifications and
descriptions, including limitations of soils. Describe topography, any special site conditions
relating to erosion potential, soil stability or other soils limitations, such as steep slopes,
highly permeable soils. Provide estimated volume and acreage of soil excavation and/or
grading. Discuss impacts from project activities (distinguish between construction and
operational activities) related to soils and topography. Identify measures during and after
project construction to address soil limitations including stabilization, soil corrections or
other measures. Erosion/sedimentation control related to stormwater runoff should be
addressed in response to Item 11.b.ii.
Based on National Resources Conservation Service (NRCS) information, native soils in the
project location in include the following (see Figure 5):
Soil Unit Symbol Soils Unit Name Hydrologic Group
49B Antigo silt loam, 2-6% slopes B
153C Santiago silt loam, 6-15% slopes B
504C Duluth silt loam, 6-12% slopes C
504D Duluth silt loam, 12-25% slopes C
These soils have a moderate to slow infiltration rate and corresponding potential for erosion
losses.
page 9
Most of the project area has already been paved with surface parking and/or roadway curb and
sidewalk. The only unimproved area is the 0.68 acre Pad 3 and 4 location as identified in the 2004
EAW. The project area is flat. The types of disturbance associated with the project include
removal of existing pavements to accommodate the size of the theatre structure, construction of
the theatre structure and surrounding features such as sidewalks, removal and replacement of all
existing Lot 4 pavement to allow regrading for drainage, reconfiguration of Lot 4 grassed curb
islands to allow parking reconfiguration, and reconstructing the curb and sidewalk areas along
Main Street to allow diagonal parking.
Soil conditions will not represent a notable or unusual challenge regarding the construction and
operation of the proposed project. Please refer to Item 11.b.ii for measures that will be deployed
to limit the potential for erosion during construction.
11. Water resources:
a. Describe surface water and groundwater features on or near the site in a.i. and a.ii. below. i. Surface water - lakes, streams, wetlands, intermittent channels, and county/judicial
ditches. Include any special designations such as public waters, trout stream/lake,
wildlife lakes, migratory waterfowl feeding/resting lake, and outstanding resource value
water. Include water quality impairments or special designations listed on the current
MPCA 303d Impaired Waters List that are within 1 mile of the project. Include DNR
Public Waters Inventory number(s), if any.
There are no lakes, streams, wetlands, intermittent channels, or county/judicial ditches on the
project site. As part of the 2004 EAW and original project approvals, a wetland delineation
consistent with applicable regulatory requirements was performed. The wetlands identified as
part of that process are depicted on Figure 6. None of these wetland areas are within the
limits of the currently proposed theatre and parking project. The Wetland Conservation Act
approvals from 2004 (dated after the completion of the EAW) show that the LGU (the City of
Woodbury at the time) received and approved an exemption request for the area identified as
Wetland 3. The exemption request stated “wet ditch 3. . . is a small ditch . . . this area has a
road to the north and garden center driveway/parking to the south. The ditch is exempt under
the WCA since it was created via excavation for roadway drainage. Soil survey identifies
non-hydric Santiago Silt Loam soils in this area.”
As discussed previously, the only unpaved, unimproved portion of the theater project area is
the 0.68 acre Pad 3 and 4 area from the 2004 EAW. Based on review of wetland information
in the 2004 EAW, as well as historical imagery, and National Wetlands Inventory
information, the City believes that no wetland conditions exist in this undeveloped area.
Relevant information is provided in Attachment A.
As depicted on Figure 6, the channel of an intermittent creek (from Armstrong Lake to
Wilmes Lake) is subject to DNR jurisdiction as a Public Water Watercourse (“DNR
channel”) and runs west and south of the project area. This channel drains to the south,
ultimately to Wilmes Lake approximately ¾ mile south-southeast of the project area. Wilmes
Lake is also under the jurisdiction of the DNR (Public Water Inventory basin #82-90W). It
has been designated by the Minnesota Pollution Control Agency as an Impaired Water based
on nutrient/eutrophication biological indicators (EPA Category 5, aquatic recreation
affected). There are no other impaired waters within a mile of the project area.
page 10
ii. Groundwater – aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project
is within a MDH wellhead protection area; 3) identification of any onsite and/or nearby
wells, including unique numbers and well logs if available. If there are no wells known
on site or nearby, explain the methodology used to determine this.
Based on Minnesota Geological Survey information, the estimated depth to groundwater
ranges from 0 to 40 feet in the project area. The project is within the Woodbury Central
Wellhead Protection area. Most of the project area has been previously developed (parking,
roadway/curb, sidewalk). The project area (0.68 acres) does not have any wells. The
Minnesota Department of Health database identifies one water supply well (unique well
number 138936, “Seefert Nursery”) in a location that would be underneath Woodbury Lakes
Road, approximately 150 feet north of Main Street within the overall Woodbury Lakes
development. The 2004 EAW indicated that there was a private well at the northwest corner
of a nursery office building at 9050 Hudson Road and that this and other wells on the 58 acre
site would need to be sealed in accordance with Minnesota Rules Chapter 4725 and local
regulatory requirements. Presumably this was well 138936. It is assumed that well 138936
was sealed prior to construction of the overall Woodbury Lakes development. No evidence of
a well at this location exists today.
b. Describe effects from project activities on water resources and measures to minimize or
mitigate the effects in Item b.i. through Item b.iv. below.
i. Wastewater - For each of the following, describe the sources, quantities and
composition of all sanitary, municipal/domestic and industrial wastewater produced
or treated at the site.
1) If the wastewater discharge is to a publicly owned treatment facility, identify
any pretreatment measures and the ability of the facility to handle the added
water and waste loadings, including any effects on, or required expansion of,
municipal wastewater infrastructure.
2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS),
describe the system used, the design flow, and suitability of site conditions for
such a system.
3) If the wastewater discharge is to surface water, identify the wastewater
treatment methods and identify discharge points and proposed effluent
limitations to mitigate impacts. Discuss any effects to surface or groundwater
from wastewater discharges.
Wastewater from the overall Woodbury Lakes development is currently directed to a 12”
City trunk line along the west side of the DNR channel west of the project area. From
here, wastewater is routed south through a combination of City of Woodbury and
Metropolitan Council Environmental Services (MCES) sanitary sewer pipes to the Eagles
Point wastewater treatment plant located in Cottage Grove. This plant has capacity to
treat 10 million gallons of wastewater per day. The 2004 Woodbury Lakes EAW
estimated that the full development would generate between 70,000 and 96,000 gallons of
wastewater per day requiring treatment and identified that it would have a composition
typical of domestic wastewater.
page 11
Based on an assumed wastewater generation rate of 3 gallons per seat1, the proposed
theatre operations will generate approximately 2,800 gallons of wastewater per day, and
it is assumed that the bar/restaurant will approximately double this amount. The
wastewater will be typical of domestic wastewater. The project will be connected to the
existing sanitary conveyance system serving the Woodbury Lakes development. The City
has determined that this system has the capacity to handle the flows associated with the
proposed theatre project. The Eagles Point wastewater treatment facility also has
sufficient capacity to process this flow.
ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site
prior to and post construction. Include the routes and receiving water bodies for
runoff from the site (major downstream water bodies as well as the immediate
receiving waters). Discuss any environmental effects from stormwater discharges.
Describe stormwater pollution prevention plans including temporary and
permanent runoff controls and potential BMP site locations to manage or treat
stormwater runoff. Identify specific erosion control, sedimentation control or
stabilization measures to address soil limitations during and after project
construction.
The proposed project will increase impervious surfaces by 0.8 acre over existing
conditions. This is primarily due to the construction of the theater building on top of the
currently unimproved Pad 3 and 4 areas (as identified in the 2004 EAW). This is a small
percentage of the impervious surfaces that currently drain to the overall Woodbury Lakes
stormwater management system.
Drainage from the overall 58-acre Woodbury Lakes development currently flows to
several small surface infiltration features and multiple large underground infiltration
treatment systems that were constructed as part of the initial project. The drainage
originating in the project area goes through this infiltration and is then discharged to the
wetland/floodplain area to the west (see Figure 6). Drainage then flows through the
DNR channel culvert under Hudson Road. From this point, the DNR channel flows south
to Wilmes Lake through a large wetland complex and smaller, constructed stormwater
features.
Most of the additional impervious surface from the proposed project will be roof drainage
from the theatre building. The composition of the additional stormwater flow from the
proposed theatre project will be comparable to the existing composition of general
Woodbury Lakes stormwater. The City has determined that the existing overall
Woodbury Lakes stormwater management system has sufficient capacity to manage the
additional flows from the proposed project in terms of water quality, as well as volume
and rate control. The overall stormwater management system was designed and sized
with the assumption that the Pad 3 and 4 areas would ultimately be developed. The
project will need to comply with the South Washington Watershed District’s extended
detention requirements as defined in its 96 hour delay policy for projects that drain to
Wilmes Lake.
1 Wastewater Engineering Treatment and Reuse, Fourth Edition, Metcalf & Eddy, Inc.
page 12
Because the project will disturb more than one acre, a National Pollutant Discharge
Elimination System (NPDES) construction permit will be required for the project. As part
of this permit, a Stormwater Pollution Prevention Plan (SWPPP) will be generated. The
SWPPP will identify best management practices (BMPs) which will be used during
construction activities to limit the potential for stormwater impacts. The project will also
need to comply with City of Woodbury requirements associated with grading plan
approval. The construction-related BMPs for the proposed project will include, but not be
limited to, the following:
• Site perimeter silt fencing or similar sediment control
• Gravel entrances at field access points
• Inlet protection with fabric or other means
• Silt fencing or similar sediment control surrounding all temporary inactive
stockpiles
• Construction work phasing to minimize the duration that any disturbed soil is
exposed
• Temporary protection or permanent cover over exposed soil areas if not being
actively graded or at permanent grades within seven days of disturbance activity
temporarily or permanently ceasing
iii. Water appropriation - Describe if the project proposes to appropriate surface or
groundwater (including dewatering). Describe the source, quantity, duration, use
and purpose of the water use and if a DNR water appropriation permit is required.
Describe any well abandonment. If connecting to an existing municipal water
supply, identify the wells to be used as a water source and any effects on, or
required expansion of, municipal water infrastructure. Discuss environmental
effects from water appropriation, including an assessment of the water resources
available for appropriation. Identify any measures to avoid, minimize, or mitigate
environmental effects from the water appropriation.
The project will not require dewatering during construction activities. Once constructed,
the estimated water use for the proposed theatre would equal to or slightly greater than
the estimated wastewater volume of 5,600 gallons per day (see Item 11.b.i). The theatre
will be connected to the existing water supply system serving the overall Woodbury
Lakes center. This system uses City of Woodbury water. The source of the City’s water
supply system is the Jordan Sandstone Aquifer. This source is accessed through a
network of City wells. The water demand associated with the proposed theatre can
readily be accommodated by the Woodbury Lakes distribution system in place with
necessary connections. This demand will not have discernable impacts on the City’s
overall water supply system for the area.
Woodbury, being a city that is part of the North and East Metro Groundwater
Management Area (GWMA), accepts that current use patterns of groundwater may not be
sustainable under current and future use conditions and recognizes that modifications to
future groundwater appropriations is a possibility. Water supply is a regional issue and
the City recognizes it has a substantial stake in the proper management of groundwater
resources. The City has begun implementation of a suite of initiatives that will reduce its
demand.
page 13
Although the City has been and will continue to initiate steps to reduce its overall water
use while working collaboratively with all stakeholders in the GWMA, it is important to
note that sustainable groundwater conversations should not only focus on municipal
water supply systems. There are non-municipal systems in Washington County and the
GWMA that use substantial amounts of water from the same aquifer. It is suggested that
to address long-term supply issues there needs to be: 1) a broad approach to conservation
and implementation of design steps as communities adapt to the new reality of this
limited resource; 2) consider crop irrigation in and near the metro, and balance its water
use and aquifer impact with human benefit and the potential for growth; 3) consider the
impact private supply wells have on the aquifers and their growth in adjacent
communities without municipal systems and; 4) consider unique situations such as the
Woodbury 3M landfill that extracts 3 to 5 million gallons of groundwater a day to be
used as non-contact cooling water, treated and discharged to the Mississippi River.
iv. Surface Waters
a) Wetlands - Describe any anticipated physical effects or alterations to wetland
features such as draining, filling, permanent inundation, dredging and
vegetative removal. Discuss direct and indirect environmental effects from
physical modification of wetlands, including the anticipated effects that any
proposed wetland alterations may have to the host watershed. Identify
measures to avoid (e.g., available alternatives that were considered), minimize,
or mitigate environmental effects to wetlands. Discuss whether any required
compensatory wetland mitigation for unavoidable wetland impacts will occur in
the same minor or major watershed, and identify those probable locations.
The project will not result in wetland impacts. Please refer to information provided in
Item 11.a.1.
b) Other surface waters- Describe any anticipated physical effects or alterations to
surface water features (lakes, streams, ponds, intermittent channels,
county/judicial ditches) such as draining, filling, permanent inundation,
dredging, diking, stream diversion, impoundment, aquatic plant removal and
riparian alteration. Discuss direct and indirect environmental effects from
physical modification of water features. Identify measures to avoid, minimize, or
mitigate environmental effects to surface water features, including in-water Best
Management Practices that are proposed to avoid or minimize
turbidity/sedimentation while physically altering the water features. Discuss
how the project will change the number or type of watercraft on any water
body, including current and projected watercraft usage.
The proposed project will not result in physical effects or alterations to other surface
waters.
12. Contamination/Hazardous Materials/Wastes:
a. Pre-project site conditions - Describe existing contamination or potential environmental
hazards on or in close proximity to the project site such as soil or ground water
contamination, abandoned dumps, closed landfills, existing or abandoned storage tanks,
and hazardous liquid or gas pipelines. Discuss any potential environmental effects from pre-
page 14
project site conditions that would be caused or exacerbated by project construction and
operation. Identify measures to avoid, minimize or mitigate adverse effects from existing
contamination or potential environmental hazards. Include development of a Contingency
Plan or Response Action Plan.
When the overall 58-acre Woodbury Lakes project was developed in the early 2000s, Phase I and,
where necessary, Phase II Environmental Site Assessments were performed to evaluate the
potential for existing contamination or other environmental hazards. The issues identified through
these investigations were summarized in Table 2 (“Environmental Concerns Identified in ESAs”)
of the 2004 EAW. It is provided as Attachment B to this EAW. All of the issues identified were
addressed in compliance with applicable regulatory requirements to allow construction of the
development. There have been no known spills or other potential sources of notable
environmental contamination in the proposed project area since the overall Woodbury Lakes
project was built. A review of the Minnesota Pollution Control Agency’s “What’s In My
Neighborhood” database website shows no sites of concern on or near the proposed project area.
b. Project related generation/storage of solid wastes - Describe solid wastes generated/stored
during construction and/or operation of the project. Indicate method of disposal. Discuss
potential environmental effects from solid waste handling, storage and disposal. Identify
measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid
waste including source reduction and recycling.
The 2004 EAW estimated that the full Woodbury Lakes development would create approximately
4,000 pounds of mixed solid waste per day. This assumed the development of two restaurants
where the theatre is currently planned. The replacement of the restaurants with the theatre will not
substantially change the volume of the waste stream of the overall Woodbury Lakes development.
The composition would have a somewhat smaller percentage of organics relative to restaurant
waste. The theatre will comply with applicable state and local solid waste and recycling
requirements and all recycling and solid waste disposal will be removed from the site by a City of
Woodbury licensed hauler.
c. Project related use/storage of hazardous materials - Describe chemicals/hazardous
materials used/stored during construction and/or operation of the project including method
of storage. Indicate the number, location and size of any above or below ground tanks to
store petroleum or other materials. Discuss potential environmental effects from accidental
spill or release of hazardous materials. Identify measures to avoid, minimize or mitigate
adverse effects from the use/storage of chemicals/hazardous materials including source
reduction and recycling. Include development of a spill prevention plan.
Construction materials and chemicals will be typical for this type of project. They will be stored
in accordance with requirements established in the Stormwater Pollution Prevention Plan
(SWPPP) which will be prepared for the project in accordance with NPDES requirements. The
operation of the theatre will not require the storage of hazardous materials.
d. Project related generation/storage of hazardous wastes - Describe hazardous wastes
generated/stored during construction and/or operation of the project. Indicate method of
disposal. Discuss potential environmental effects from hazardous waste handling, storage,
page 15
and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the
generation/storage of hazardous waste including source reduction and recycling.
The proposed project will not generate hazardous wastes.
13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features):
a. Describe fish and wildlife resources as well as habitats and vegetation on or in near the site.
Most of the overall project area is paved and therefore does not provide natural habitat. The Pad 3 and
4 area as defined in the 2004 EAW is currently undeveloped. However, it is small (0.68 acre), and has
been graded as part of the overall Woodbury Lakes development. It is surrounded by paved areas. It
does not provide notable natural habitat.
b. Describe rare features such as state-listed (endangered, threatened or special concern) species,
native plant communities, Minnesota County Biological Survey Sites of Biodiversity
Significance, and other sensitive ecological resources on or within close proximity to the site.
Provide the license agreement number (LA-____) and/or correspondence number (ERDB
_____________) from which the data were obtained and attach the Natural Heritage letter from
the DNR. Indicate if any additional habitat or species survey work has been conducted within
the site and describe the results.
A letter was sent to the DNR to request a Natural Heritage Information System (NHIS) review for the
theatre project. In a response letter provided as Attachment C, DNR staff identified there are no
known occurrences of rare species or other significant natural features within the one-mile search area
for the theatre project.
c. Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may
be affected by the project. Include a discussion on introduction and spread of invasive species
from the project construction and operation. Separately discuss effects to known threatened
and endangered species.
Due to the nature of the proposed project in a previously developed area, it is unlikely to lead to a
problematic spread of invasive species.
The project has the potential to impact the northern long-eared bat due to tree removal. In the theatre
portion of the proposed project, 18 ornamental trees will be removed from the parking areas
surrounding the proposed theatre footprint. They will be replaced by 19 trees. In the Lot 4 portion of
the project, 18 ornamental trees will be removed and will be replaced with seven trees. In the Main
Street portion of the project, 17 ornamental trees will be removed without replacement to provide
extra parking depth for diagonal parking.
The US Fish and Wildlife Service (USFWS) issued a Final Rule and Programmatic Biological
Opinion (effective February 16, 2016) pursuant to their authority under Section 4(d) of the
Endangered Species Act. Per USFWS guidance supporting the Final Rule referenced above, the
project does not require further evaluation, regulatory coordination, or mitigation regarding northern
long-eared bats due to the following factors:
page 16
• Project will represent an “incidental take” of trees (i.e. removal is required for achieving a
separate objective – theatre and parking improvements)
• The project is greater than 150 feet from a known occupied maternity roost tree, and greater
than 0.25 mile from a hibernaculum (see DNR information, Attachment C)
d. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish,
wildlife, plant communities, and sensitive ecological resources.
The project as proposed is not anticipated to adversely impact fish, wildlife, plant communities,
or sensitive ecological resources. The project will comply with applicable regulatory
requirements for environmental control.
14. Historic properties:
Describe any historic structures, archeological sites, and/or traditional cultural properties on or
in close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3)
architectural features. Attach letter received from the State Historic Preservation Office
(SHPO). Discuss any anticipated effects to historic properties during project construction and
operation. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects
to historic properties.
The 2004 EAW identified that there were no archaeological, historical, or architectural resources on
or in proximity to the full 58-acre Woodbury Lakes development. The published EAW was reviewed
by the State Historic Preservation Office (SHPO) pursuant to responsibilities given to the Minnesota
Historical Society by the Minnesota Historic Sites Act and the Minnesota Field Archaeology Act, and
through the process outlined in Minnesota Rules 4410.1600. In a letter dated April 15, 2004 (provided
as Attachment D) responding to the published EAW, SHPO concurred with the historic properties
conclusions in the EAW as referenced above.
15. Visual:
Describe any scenic views or vistas on or near the project site. Describe any project related
visual effects such as vapor plumes or glare from intense lights. Discuss the potential visual
effects from the project. Identify any measures to avoid, minimize, or mitigate visual effects.
As identified in the 2004 EAW, there are no scenic views or vistas on or in proximity to the full
Woodbury Lakes development. This is true also of the proposed theatre site. The lighting associated
with the theatre project will be consistent with lighting for the full Woodbury Lakes development,
and will be typical of movie theaters throughout the metro area. The proposed project will not include
visual effects such as vapor plumes or glare from intense lights.
16. Air:
a. Stationary source emissions - Describe the type, sources, quantities and compositions of any
emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous
air pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality
including any sensitive receptors, human health or applicable regulatory criteria. Include a
discussion of any methods used assess the project’s effect on air quality and the results of
that assessment. Identify pollution control equipment and other measures that will be taken
to avoid, minimize, or mitigate adverse effects from stationary source emissions.
page 17
The theatre will use conventional natural gas space heating and hot water heating. Adverse air
quality impacts are not anticipated. No air quality permit will be required.
b. Vehicle emissions - Describe the effect of the project’s traffic generation on air emissions.
Discuss the project’s vehicle-related emissions effect on air quality. Identify measures (e.g.
traffic operational improvements, diesel idling minimization plan) that will be taken to
minimize or mitigate vehicle-related emissions.
As identified in the 2004 EAW, Carbon Monoxide (CO) is the traffic-related pollutant of most
concern in the Twin Cities. The 2004 EAW determined the following using procedures consistent
with MPCA guidance:
• The intersection affected by the full Woodbury Lakes development with the most post-
build delay was the East Hudson Road/Commons Drive/West State Farm Entrance
intersection.
• Modeled post-build CO levels at receptors in the vicinity of this intersection were far
below applicable state and federal standards (Table 10 from the 2004 EAW, provided as
Attachment E).
The 2004 EAW assumed the full Woodbury Lakes development including restaurant
development in the Pad 3 and 4 area. As discussed in Item 18 (Transportation) of this EAW, the
proposed theatre project will generate slightly more overall trips than the originally envisioned
restaurants would have. This increase, relative to all traffic in the study area, would not affect the
findings of the referenced 2004 EAW air quality analysis.
c. Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of
dust and odors generated during project construction and operation. (Fugitive dust may be
discussed under item 16a). Discuss the effect of dust and odors in the vicinity of the project
including nearby sensitive receptors and quality of life. Identify measures that will be taken
to minimize or mitigate the effects of dust and odors.
During construction, dust emissions will temporarily increase due to disturbance of paved and
unpaved surfaces. In addition, the exhaust from construction equipment will elevate odor levels in
the direct vicinity of construction activities. However, the work will be temporary in nature and
typical of this type of construction project; adverse impacts to receptors are not anticipated. Dust
generated during construction will be minimized through standard dust control measures such as
watering. The closest residential receptors to the construction activities will be approximately
1,200 feet to the south-southeast.
Once constructed, the theatre project will not generate dust and odors.
17. Noise
Describe sources, characteristics, duration, quantities, and intensity of noise generated during
project construction and operation. Discuss the effect of noise in the vicinity of the project
including 1) existing noise levels/sources in the area, 2) nearby sensitive receptors, 3)
conformance to state noise standards, and 4) quality of life. Identify measures that will be taken
to minimize or mitigate the effects of noise.
page 18
Typical construction noise will be generated during project construction. Noise levels in the project
area will vary depending on the type of equipment in use, the location of the equipment on the
construction site, and the operating mode. Working equipment may be congregated in a specific area
or spread out over a larger area. For these reasons, the construction equipment noise effects on a
single receiver point will vary both day-to-day and hour-to-hour. Project construction activities will
also lead to temporarily elevated truck traffic on Hudson Road, which is approximately 50 feet north
of adjacent residences to the south.
Once constructed, the project will not generate notably elevated noise levels relative to existing
conditions.
Existing noise levels in the project area are relatively low due to surrounding land uses (commercial,
residential, and freeway (audible only at low levels at Woodbury Lakes). The closest residential
receptors to site construction activities are approximately 1,200 feet to the east-southeast, on the south
side of Hudson Road. Construction-related noise will be temporary, typical to this type of project, and
is not anticipated to adversely impact quality of life. In accordance with City ordinances, construction
activities will not be allowed between 10:00 p.m. and 6:00 a.m. Generally, construction activities
involving earthmoving equipment only occur during daylight hours. Contractors will be required to
ensure that equipment has been properly maintained and fitted with mufflers and other noise controls
as specified by the manufacturer.
18. Transportation
a. Describe traffic-related aspects of project construction and operation. Include: 1) existing
and proposed additional parking spaces, 2) estimated total average daily traffic generated,
3) estimated maximum peak hour traffic generated and time of occurrence, 4) indicate
source of trip generation rates used in the estimates, and 5) availability of transit and/or
other alternative transportation modes.
Parking
The theatre project is part of a larger development and parking is shared between businesses.
Based on the anticipated amended PUD requirements, the proposed theatre project will be parked
at a rate of one parking space per 3.5 movie theatre seats. With 946 seats, this equates to 271
spaces. For the three project areas, the current vs. proposed number of parking spaces is
summarized below:
Area Current Spaces Proposed Change
Theatre (within
project limits)
171 86 -85
Lot 4 181 231 +50
Main Street 58 117 +59
Total 410 434 +24
Thus, the parking lost in the theatre area will be more than made up in the Lot 4 and Main Street
areas. When factoring in all parking serving this portion of the Woodbury Lakes development
relative to the theatre and other commercial parking needs, the parking enhancements to Lot 4
and Main Street will meet City requirements.
page 19
Traffic Generation
As part of the theatre development process, the City of Woodbury commissioned Traffic Impact
Study – Woodbury Lakes Theatre Addition (Spack Consulting, March, 2017). The full Traffic
Impact Study (TIS) is provided as Attachment F to this EAW. The primary purpose of the
Traffic Impact Study (TIS) was to analyze the effect of the proposed movie theatre project on the
existing roadway network and to identify improvements which would be required with the theatre
being developed (build alternative). Based on existing traffic levels on surrounding roadways, the
TIS evaluated two peak travel times: a Friday peak travel hour (4:15 to 5:15 p.m.) and a Saturday
peak travel hour (2:00 to 3:00 p.m.). Using Institute for Transportation Engineers (ITE) trip
generation rates along with traffic engineering assumptions to account for this specific project,2
the TIS provides the following trip generation estimates:
Average weekday: 1,974 trips
Friday peak hour: 154 trips
Saturday peak hour: 467 trips
Transit
There currently is no scheduled transit service to the project area. The closest transit stop is the
Metro Transit park and ride lot at the Guardian Angels Catholic Church parking lot which is
directly west of the northwest quadrant of the I-94/Radio Drive interchange. This lot is served by
Express Route 375 with service to downtown Minneapolis. Those wishing to access the proposed
theatre site could use the Metropolitan Council’s Transit Link (formerly Dial-A-Ride). This is a
curb-to-curb minibus or van service that operates on weekdays throughout the seven-county area.
b. Discuss the effect on traffic congestion on affected roads and describe any traffic
improvements necessary. The analysis must discuss the project’s impact on the regional
transportation system. If the peak hour traffic generated exceeds 250 vehicles or the total
daily trips exceeds 2,500, a traffic impact study must be prepared as part of the EAW. Use the
format and procedures described in the Minnesota Department of Transportation’s Access
Management Manual, Chapter 5 (available at:
http://www.dot.state.mn.us/accessmanagement/resources.html) or a similar local guidance.
Identified on Figure 7, the TIS analyzed the following intersections:
• Hudson Road & Woodbury Lakes Road/Pendryn Hill Curve
• Hudson Road & Troon Court
• Hudson Road & Turnberry Alcove
• Hudson Road & Woodbury Lakes East Access
• Woodbury Lakes Road & Site Access 1
• Woodbury Lakes Road & Site Access 2
The TIS accounted for surrounding traffic conditions and trends. Most notably, this includes the
anticipated full buildout of the City Place development to the west of the proposed theatre site by
2018. All of the luxury apartments within that development were assumed to be occupied in
2 Please refer to Section 3.a of the Spack Traffic Impact Study provided in Attachment F for further information.
page 20
2018, as well as approximately 59 percent occupancy of office and other land uses within City
Place.
The TIS identifies that the existing Woodbury Lakes development is experiencing roughly 50
percent of the original trip generation estimates from the analysis which supported the roadway
design. In addition, the proposed theatre development would only increase traffic generation by
approximately 15 percent relative to the originally planned two restaurants in the Pad 4 and 5
area.
Level of Service (LOS) is a traffic engineering measurement system of how a roadway segment
or intersection performs, or is expected to perform in the future, based on amounts of delay.
Results range from LOS A, which is free-flowing with no delay, to LOS F, where traffic volumes
exceed the roadway/intersection design capacity and excessive delay takes place. The LOS D/E
boundary of 55 seconds of delay per vehicle is considered the threshold of acceptable vs.
unacceptable congestion in the Twin Cities metro area.
There is only one traffic signal controlled intersection in the study area, Hudson Road at
Woodbury Lakes Road. The TIS found that this intersection will operate at LOS B during both
the Friday peak hour and Saturday peak hour under the 2018 build scenario. Levels of delay were
projected to be approximately 14 seconds during the Friday peak hour, and approximately 20
seconds during the Saturday peak hour. Both of these figures are well below 55 seconds threshold
referenced above.
The TIS also evaluated queue lengths at all of the study intersections. Queues are the lines of cars
backed up as they wait to proceed through an intersection. The 95th percentile queue lengths (the
length of vehicle stacking exceeded only 5% of the time) were used in the analysis to control for
outlier or extreme conditions. The TIS identifies that, under the 2018 build scenario, southbound
queues at the Hudson Road/Woodbury Lakes Road intersection reach 11 vehicles (just reaching
the Woodbury Lakes Drive/Site Access 2 intersection to the north) during the Saturday peak
hour. The TIS concluded that this queue length would not raise concerns because of infrequent
occurrence and relatively low impact on other intersections.
LOS analysis is generally not performed on two-way stop controlled intersections (where only the
side streets are controlled with stop signs) because the main street is generally free-flowing due to
no traffic control, and delay may not be a meaningful measurement for the overall intersection.
For the Woodbury Lakes TIS, study intersections without a traffic signal were analyzed to project
anticipated queueing on the side street. Queues longer than five vehicles were considered
problematic.
The two-way stop controlled intersection analysis in the TIS showed acceptable operations at all
non-signalized intersections in the study area except the Woodbury Lakes/Site Access 2
intersection. This is a three-legged intersection with the stop control on the eastbound and
southbound legs. This intersection is currently experiencing queueing close to or just above the
preferred five vehicle queue length for the southbound direction. Under the 2018 build scenario,
the southbound queue grows to over twenty vehicles during the Saturday peak hour, causing this
this movement to break down, and requiring mitigation.
page 21
c. Identify measures that will be taken to minimize or mitigate project related transportation
effects.
The excessive queueing on the southbound leg of the Woodbury Lakes Road/Site Access 2
intersection is due to the northbound traffic experiencing a free thru and left turn movement,
causing the stop-controlled southbound vehicles to wait for sufficient gaps in the traffic flow to
proceed through the intersection. The mitigation measure identified by the TIS to address this
condition is to re-stripe the stretch of Woodbury Lakes Road between Site Access 1 and Site
Access 2 to create a four-lane roadway. For southbound movements, this would include a thru-
right lane plus a new thru lane at the Woodbury Lakes Road/Site Access 2 intersection. This
would effectively reduce the southbound queueing by increasing southbound vehicle storage
capacity and by allowing two vehicles to pass through the intersection at one time. With this
change, the expected 95th percentile southbound queue at Woodbury Lakes Drive/Site Access 2
for the 2018 build Saturday peak hour condition would be reduced to five vehicles.
19. Cumulative potential effects: (Preparers can leave this item blank if cumulative potential effects
are addressed under the applicable EAW Items)
a. Describe the geographic scales and timeframes of the project related environmental effects
that could combine with other environmental effects resulting in cumulative potential effects. The relevant scale of environmental effects from the proposed theatre project would
include the construction limits for the theatre site and the supporting parking improvements, the
transportation network used by patrons to access the theatre, and the stormwater system
downstream of the theatre and parking improvements. Construction activities will begin in 2017
and conclude in 2018.
b. Describe any reasonably foreseeable future projects (for which a basis of expectation has
been laid) that may interact with environmental effects of the proposed project within the geographic scales and timeframes identified above. The known on-going/future development
actions which could conceivably result in cumulative impacts with the proposed project would
be: a) continued buildout and occupancy of the City Place mixed-use development, the closest
portion of which is approximately 300 feet west of the theatre location, and b) development of the
remaining undeveloped area of Woodbury Lakes between the Ethan Allen the and Thomasville
stores (maximum development potential of 12,000 ft2) approximately ¼ mile east of the Main
Street parking conversion portion of the proposed project.
c. Discuss the nature of the cumulative potential effects and summarize any other available
information relevant to determining whether there is potential for significant environmental effects due to these cumulative effects. The proposed project will meet all applicable
environmental regulatory requirements and will not limit the ability of other projects in the larger
vicinity as described above to meet applicable regulatory requirements. The City of Woodbury
does not foresee a potential for adverse cumulative environmental effects.
20. Other potential environmental effects: If the project may cause any additional environmental
effects not addressed by items 1 to 19, describe the effects here, discuss the how the
environment will be affected, and identify measures that will be taken to minimize and mitigate
these effects. No additional potential environmental effects have been identified.
FIGURES
Intentionally Left Blank
H u d s o n R d
ProposedTheatre Site
Google 2017
Woodbury Lakes Theatre Figure 1: Regional LocationMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
1 - R
egion
al Lo
catio
n_8x
11.m
xd | D
ate Sa
ved:
3/16/2
017 1
1:45:0
8 AM
ProjectEntire Woodbury LakesDevelopment Area
0 500Feet
Source: MnGEO
Environmental Assessment Worksheet
MapLocation
)s
?ÇA@
Washington CountyLocation
!"b%&h(
Legend!I
Intentionally Left Blank
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
2 - 20
04 Si
te Pla
n8x
11.m
xd | D
ate Sa
ved:
2/23/2
017 1
1:00:3
3 AM
Woodbury Lakes TheatreEnvironmental Assessment Worksheet
Figure 2: 2004 EAW FullWoodbury Lakes Site Plan
March 2017
Source: City of Woodbury, SRF Consulting Group
Intentionally Left Blank
!"b
M ATC
HLIN
E
Main Street
Lot 4
Woodbury Lakes Rd
Woodbury Lakes Theatre Figure 3a: RemovalsMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
3a - E
xistin
g Con
dition
s_Re
mova
l_8x1
1.mxd
| Date
Save
d: 2/2
3/201
7 1:49
33 PM
0 120Feet
Source: MnGEO, Westwood Professional Services
Environmental Assessment Worksheet
Legend IRemove StripingRemove LandscapingRemove Walkway/Curb
! !
!
!
Remove Existing Bituminous
Intentionally Left Blank
M ATC
HLIN
E
!"b
Main Street
Lot 4
Hudson Rd
Woodbury Lakes Rd
Woodbury Lakes Theatre Figure 3b: RemovalsMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
3b - E
xistin
g Con
dition
s_Re
mova
l_8x1
1.mxd
| Date
Save
d: 2/2
3/201
7 10:0
8:18 A
M
0 120Feet
Source: MnGEO, Westwood Professional Services
Environmental Assessment Worksheet
Legend IRemove StripingRemove Walkway/CurbRemove Landscaping
! !
!
!
Remove Existing Bituminous
Intentionally Left Blank
!"b
M ATC
HLIN
E
Theatre42,830sq. ft.946 seats Main Street
Lot 4
Woodbury Lakes Rd
Woodbury Lakes Theatre Figure 4a: Proposed Site PlanMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
4a - P
ropos
ed Pl
ans_
8x11
mxd |
Date
Save
d: 2/2
3/201
7 2:00
:38 PM
0 120Feet
Source: MnGEO, Westwood Professional Services
Environmental Assessment Worksheet
Legend IRestripingTheatre BuildingWalkway/CurbLandscaping
Intentionally Left Blank
M ATC
HLIN
E
!"b
Main Street
Lot 4
Hudson Rd
Woodbury Lakes Rd
Woodbury Lakes Theatre Figure 4b: Proposed Site PlanMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
4b - P
ropos
ed Pl
ans_
8x11
mxd |
Date
Save
d: 2/2
3/201
7 2:02
:15 PM
0 120Feet
Source: MnGEO, Westwood Professional Services
Environmental Assessment Worksheet
Legend IRestripingWalkway/CurbLandscaping
Intentionally Left Blank
!"b
504C,Duluth
153C,Santiago
153B,Santiago
49B,Antigo
120,Brill
504B,Duluth
504D,Duluth
454C,Mahtomedi
49B,Antigo 454C,
Mahtomedi 49,Antigo
454C,Mahtomedi
861C,Kingsley
367B,Campia
504C,Duluth
504D,Duluth
504C,Duluth
153B,Santiago
504C,Duluth 449,
CrystalLake504D,
Duluth
504C,Duluth 264,
Freeon302B,
Rosholt
342E,Kingsley
504B,Duluth
329,Chaska
449,Crystal
Lake
Google 2017
Woodbury Lakes Theatre Figure 5: SoilsMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
5 - So
ils_8x
11.m
xd | D
ate Sa
ved:
3/16/2
017 1
1:22:5
2 AM
Project AreaSoil Boundary
0 300Feet
Source: MnGEO, NRCS
Environmental Assessment Worksheet
Legend!I
Soil Unit Symbol Soils Unit Name Hydrologic Group 49B Antigo silt loam, 2-6% slopes B
153C Santiago silt loam, 6-15% slopes B
504C Duluth silt loam, 6-12% slopes C
504D Duluth silt loam, 12-25% slopes C
Intentionally Left Blank
!"b
H u d s o n R d
W o o d b u ry L a k e s R d
WilmesLake
Wetland 2Type 3
Wetland 1Type 2
Wetland 3Type 3
Google 2017
Woodbury Lakes Theatre Figure 6: Wetlands & DrainageMarch 2017
Map D
ocum
ent: \
\metr
osou
th1\gi
s\WBR
Y\N12
1127
60\ES
RI\M
aps\E
AW\Fi
gure
6 - W
etlan
ds an
d Drai
nage
_8x11
.mxd
| Date
Save
d: 3/2
0/201
7 2:48
:55 PM
Project Area2003 Wetland Boundary (2004 EAW)
0 600Feet
Source: MnGEO
Environmental Assessment Worksheet
Legend!I
Existing Drainage Direction
Intentionally Left Blank
ProposedTheatre Site
?¦
?§ ?̈?ª
?©?N2
Site Access 1
Site Access 2
Woodbury Lakes East Access
Troon Court
Spring Hill Bay
Spring Hill Cir
Spring Hill Dr
Turnberry Alc
Tamarack Rd
Pendryn Hill CurveWoodbury Lakes Rd
Hudson R
d
Woodbury Lakes Theatre Figure 7: Traffic Impact Study InformationMarch 2017
Map
Doc
umen
t: \\m
etro
sout
h1\g
is\W
BRY\
N12
1127
60\E
SR
I\Map
s\EA
W\F
igur
e 7
- Tra
ffic
Impa
ct_8
x11.
mxd
| D
ate
Sav
ed: 3
/17/
2017
10:
29:5
0 A
M
0 500Feet
Source: MnGEO
Environmental Assessment Worksheet
Study Intersections!I
?ª Woodbury Lakes Rd & Site Access 2?© Woodbury Lakes Rd & Site Access 1?̈ Hudson Rd & Woodbury Lakes East Access?§ Hudson Rd & Turnberry Alcove?N2 Hudson Rd & Troon Ct?¦ Hudson Rd & Woodbury Lakes Rd/Pendryn Hill Curve
The Traffic Impact Study identifies excessive peak hoursouthbound queueing at Site Access 2 with theatre development and no mitigation.
Proposed mitigation includes restriping Woodbury Lakes Rd between Site Access 1 and Site Access 2 to create four lanes total.
!"b$
Source: Traffic Impact Study, Spack Consulting, February 2017
Intentionally Left Blank
ATTACHMENT A
Wetland Memorandum
Intentionally Left Blank
H:\WBRY\N12112760\5_Permits\Wetland\112760_Doucette_Memo_161230.docx
MEMORANDUM
Date: December 30, 2016
To: Sharon Doucette, Environmental Resource Coordinator, City of Woodbury
From: Dan Donayre, Wetland Specialist
Subject: Woodbury Lakes Theatre
City of Woodbury Project No.: N12.112760
Sharon,
An Environmental Assessment Worksheet (EAW) for the Woodbury Lakes commercial development was
completed in 2004. This EAW included the Woodbury Lakes retail center and surrounding areas. The
EAW provides plans for seven retail buildings in a Main Street layout, with nine additional building pads
that were to be developed in the future and parking, utilities and access to the site.
Of the nine building pads, all but two on the west side of the property have been developed. These two
pads are now being considered for development as the 51,167 square foot Woodbury Lakes Theatre. The
pads are currently open spaces consisting of some manicured grass, gravel and sand.
As part of the 2004 EAW, three wetlands were identified, their approximate locations are found on Figure
1. None of these wetlands are found in the vicinity of the proposed Woodbury Lakes Theatre. Historical
imagery, Figure 2, does not show any wet signatures at the project location. The National Wetlands
Inventory, Figure 3, shows the area as upland.
Using the information gathered from the 2004 EAW, historical imagery and the National Wetlands
Inventory, it is our contention that no wetlands exist within the construction limits of the proposed
Woodbury Lakes Theatre.
Sincerely,
Dan Donayre, CWD #1191
Wetland Specialist
Intentionally Left Blank
Wetland 1Type 2
Wetland 2Type 3
Wetland 3Type 3
Google 2016
Woodbury Lakes Theatre Figure 1: 2003 Wetland DelineationDecember, 2016
Map D
ocum
ent: H
:\WBR
Y\N12
1127
60\G
IS\ES
RI\M
aps\1
1276
0_1_
Delin
eatio
n_8x
11.m
xd | D
ate Sa
ved:
12/30
/2016
12:59
:59 PM
Legend!I
Woodbury Lakes Theatre Location2003 Wetland Boundary
0 300Feet
Source: FSA Imagery - 2003
Intentionally Left Blank
Google 2016
Map D
ocum
ent: H
:\WBR
Y\N12
1127
60\G
IS\ES
RI\M
aps\1
1276
0_2_
Photo
_Arra
y_11
x17.m
xd |
Date
Save
d: 12
/30/20
16 12
:44:44
PM
Woodbury Lakes TheatreDecember, 2016
Figure 2: Historical Photo Array
Google 2016
Google 2016 Imagery ©2016
2003 2006
2013 2016
0 200Feet
Source: FSA Imagery (2003, 2006, 2013) Google Satellite Imagery (2016)
!I
Intentionally Left Blank
PEM1A
PFO1A
PEM1C
PEM1F
PEM1F
PUBG
PUBGx
PUBGx
PUBGx
PUBGx
PEM1A
PEM1C
PUBGx
PUBG
PEM1C
PUBGx
PUBGx
Woodbury Lakes Theatre Figure 3: National Wetlands InventoryDecember, 2016
Map D
ocum
ent: H
:\WBR
Y\N12
1127
60\G
IS\ES
RI\M
aps\1
1276
0_3_
NWI_8
x11.m
xd | D
ate Sa
ved:
12/30
/2016
11:40
:14 AM
Legend!I
Woodbury Lakes Theatre LocationNWI Wetland
0 300Feet
Source: Goggle Satellite Imagery (2016), MNDNR
Intentionally Left Blank
ATTACHMENT B
2004 EAW – Environmental Site Assessment
Summary
Intentionally Left Blank
ATTACHMENT C
Natural Heritage Information Service (NHIS)
Correspondence
Intentionally Left Blank
www.mndnr.gov
AN EQUAL OPPORTUNITY EMPLOYER
RRRR
February 13, 2017 Correspondence # ERDB 20170282 Mr. Peter Langworthy Bolton & Menk, Inc. 12224 Nicollet Avenue S Burnsville, MN 55337‐1649 RE: Natural Heritage Review of the proposed Woodbury Lakes Theatre; T28N R21W Sections 3 & 4; Washington County Dear Mr. Langworthy,
As requested, the Minnesota Natural Heritage Information System (NHIS) has been queried to determine if any rare species or other significant natural features are known to occur within an approximate one‐mile radius of the proposed project. Based on this query, there are no known occurrences of rare features in the area searched.
The Natural Heritage Information System (NHIS), a collection of databases that contains information about Minnesota’s rare natural features, is maintained by the Division of Ecological and Water Resources, Department of Natural Resources. The NHIS is continually updated as new information becomes available, and is the most complete source of data on Minnesota's rare or otherwise significant species, native plant communities, and other natural features. However, the NHIS is not an exhaustive inventory and thus does not represent all of the occurrences of rare features within the state. Therefore, ecologically significant features for which we have no records may exist within the project area. If additional information becomes available regarding rare features in the vicinity of the project, further review may be necessary.
For environmental review purposes, the results of this Natural Heritage Review are valid for one year; the results are only valid for the project location (noted above) and the project description provided on the NHIS Data Request Form. Please contact me if project details change or for an updated review if construction has not occurred within one year.
The Natural Heritage Review does not constitute review or approval by the Department of Natural Resources as a whole. Instead, it identifies issues regarding known occurrences of rare features and potential effects to these rare features. To determine whether there are other natural resource concerns associated with the proposed project, please contact your DNR Regional Environmental Assessment Ecologist (contact information available at http://www.dnr.state.mn.us/eco/ereview/erp_regioncontacts.html). Please be aware that additional site assessments or review may be required.
Thank you for consulting us on this matter, and for your interest in preserving Minnesota's rare natural resources. Please include a copy of this letter in any state or local license or permit application. An invoice will be mailed to you under separate cover. Sincerely,
Samantha Bump Natural Heritage Review Specialist
Minnesota Department of Natural Resources Division of Ecological and Water Resources, Box 25
500 Lafayette Road
St. Paul, Minnesota 55155-4025
Phone: (651) 259-5091 E-mail: [email protected]
1
Peter Langworthy
From: Bump, Samantha (DNR) <[email protected]>Sent: Wednesday, February 15, 2017 9:24 AMTo: Peter LangworthySubject: RE: NHIS Response: Woodbury Lakes Theatre-Northern Long-Eared Bat
Hi Peter,
Yes, that is correct. If we find NLEB within one mile of a project or closer, we will comment on it.
Have a great day,
Samantha
From: Peter Langworthy [mailto:[email protected]]
Sent: Wednesday, February 15, 2017 9:12 AM
To: Bump, Samantha (DNR) <[email protected]>
Subject: RE: NHIS Response: Woodbury Lakes Theatre-Northern Long-Eared Bat
Hi Samantha,
Thanks for this letter. I assume that there are not any known northern long-eared bat (NLEB) roosting trees within 150
feet of the project area, and no known NLEB hibernacula within 0.25 mile of the project area. Could you confirm?
As we described in our NHIS request form, the only trees that will be removed will be a limited number of ornamental
trees in parking and sidewalk areas, but I suppose we should cover NLEB considerations.
Thanks,
Peter
Peter R Langworthy, AICP
Sr. Transportation/Environmental Planner
Bolton & Menk, Inc.
12224 Nicollet Avenue
Burnsville, MN 55337-1649
Phone: 952-890-0509 ext. 2886
Mobile: 612-759-8369
email: [email protected]
Bolton-Menk.com
From: Bump, Samantha (DNR) [mailto:[email protected]]
Sent: Monday, February 13, 2017 6:17 PM
To: Peter Langworthy <[email protected]>
Cc: Horton, Becky (DNR) <[email protected]>; Parris, Leslie (DNR) <[email protected]>
Subject: NHIS Response: Woodbury Lakes Theatre
Hi Peter,
2
Attached is the NHIS response regarding the Woodbury Lakes Theatre EAW in Washington County. Please me know if
you have any questions.
Have a great day,
Samantha Bump
NHIS Review Specialist | Ecological & Water Resources
Minnesota Department of Natural Resources
500 Lafayette Road
St. Paul, MN 55155
Phone: 651-259-5091
Email: [email protected]
mndnr.gov
______________________________________________________________________
This email has been scanned by the Symantec Email Security.cloud service.
For more information please visit http://www.symanteccloud.com
______________________________________________________________________
______________________________________________________________________
This email has been scanned by the Symantec Email Security.cloud service.
For more information please visit http://www.symanteccloud.com
______________________________________________________________________
______________________________________________________________________
This email has been scanned by the Symantec Email Security.cloud service.
For more information please visit http://www.symanteccloud.com
______________________________________________________________________
Intentionally Left Blank
ATTACHMENT D
State Historic Preservation Office (SHPO)
Correspondence
Intentionally Left Blank
Intentionally Left Blank
ATTACHMENT E
Air Quality Analysis Information
Intentionally Left Blank
ATTACHMENT F
Woodbury Lakes Theatre Traffic Impact Study
Intentionally Left Blank
I hereby certify this report was prepared by me or under my direct supervision, and I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: _________________________ Bryant J. Ficek, P.E., P.T.O.E. License No. 42802 Date: _________________________
Traffic Impact Study Woodbury Lakes Theater Addition Woodbury, MN
February 24, 2017
Intentionally Left Blank
Traffic Impact Study i Woodbury Lakes Movie Theater
Executive Summary
Background: The existing Woodbury Lakes Shopping Center, located in the western corner of the Woodbury Lakes Development, south of Woodbury Lakes Road, north of Hudson Road, and east of Spring Hill Drive in Woodbury, Minnesota, is proposing the addition of new Movie Theatre Complex. The purpose of this study is to determine the traffic impacts associated with the build out of the proposed development on the study roads and intersections where significant impact is anticipated. Mitigation measures will be analyzed and recommended if traffic operations are expected to be below traffic engineering standards. It should be noted minor impacts are expected on corridors not analyzed in this study and improvements along those corridors may be needed in the future to accommodate incremental traffic growth from this and other area developments.
Results: The principal findings of this study are:
The proposed movie theater development is expected to generate 1,974 new trips during an average weekday, 154 new trips during the Friday peak hour and 467 new trips during the Saturday peak hour.
The study intersections are expected to operate with acceptable delay and queuing during the 2018 no-build and build scenarios with two exceptions, Hudson Road & Woodbury Lakes Road and Woodbury Lakes Road and Site Access 2.
During the 2018 Saturday peak hour the southbound 95th percentile queue at Hudson Road & Woodbury Lakes Road is expected to just reach the intersection of Woodbury Lakes Road and Site Access 2. Due to the tight intersection layout, low level of occurrence, and relatively low impact on other intersections this queue raises little concerns.
The southbound queue at Woodbury Lakes Road and Site Access 2 is expected to exceed its storage capacity and cause blockages at Woodbury Lakes Road and Site Access 1 causing excessive congestion to the intersection.
The maximum parking use counted was 892 on Saturday. The proposed Movie Theater is expected to need about 300 parking spaces on average. Combined, the parking needs of 1,200 vehicles is about 59 percent of the proposed parking stalls.
Recommendations: The following items are recommended based on the analyses contained in this study:
Restriping Woodbury Lakes Road between Site Access 2 and Site Access 1 to include an additional southbound through lane. This restriping will help increase vehicle storage and capacity of the Woodbury Lakes Road and Site Access 2 intersection, removing the excessive southbound queuing issue. Additional signage should be provided to help inform
Traffic Impact Study ii Woodbury Lakes Movie Theater
southbound drivers of the upcoming lane layout at Woodbury Lakes Road/Hudson Road allowing drivers more time to maneuver into their preferred lane before proceeding through the Woodbury Lakes Road and Site Access 2 intersection. Striping may also be necessary to guide drivers through the intersection.
New signage directing movie theater traffic to the northern two accesses along Woodbury Lakes Road should be added to help lower cut through traffic along Site Access 1 and 2 and help spread out traffic through the Woodbury Lakes site. Signage should also be considered informing drivers of the additional site accesses along Hudson Road to help spread out exiting traffic and remove some vehicles from the Hudson Road & Woodbury Lakes Road intersection.
Additional bus routes should be provided to and from the Woodbury Lakes development. Bus routes help lower the volume of vehicles on the road and are generally considered a benefit to a site by increasing transportation options.
Installation of bicycle parking and locking stations near the movie theater and storefront to help promote bicycle travel should be included.
This study is based upon a concept development plan titled “Woodbury Lakes“ and dated March 31, 2016. Assuming the general characteristics of the proposed development remain approximately the same as documented, minor changes in the final design are not expected to alter the results or recommendations of this study.
Traffic Impact Study iii Woodbury Lakes Movie Theater
TABLE OF CONTENTS
1. Introduction .......................................................................................... 1
2. Existing Conditions .............................................................................. 3
3. Forecasted Traffic ................................................................................ 4
4. Analyses ............................................................................................... 7
5. Conclusions and Recommendations ................................................ 16
6. Appendix ............................................................................................. 17
LIST OF TABLES & CHARTS
Table 1 – Study Corridor Characteristics ................................................. 3 Table 2 – New Trip Generation .................................................................. 4 Table 3 – Originally Calculated Vs. Observed Woodbury Lakes Daily
Trip Generation ...................................................................................... 5 Table 4 – Originally Calculated Vs. Proposed Woodbury Lakes Trip
Generation (Theater Site Only) ............................................................. 5 Chart 1 – Study Corridor Volume to Capacity .......................................... 8 Chart 2 – Friday Peak Hour Delays: Signal Controlled Intersections ..... 9 Chart 3 – Saturday Peak Hour Delays: Signal Controlled Intersections 9 Chart 4 – Friday Peak Hour Queues: Side Street Stop Sign Controlled
Intersections ........................................................................................ 11 Chart 5 – Saturday Peak Hour Queues: Side Street Stop Sign
Controlled Intersections ...................................................................... 11
Traffic Impact Study 1 Woodbury Lakes Movie Theater
1. Introduction
a. Proposed Development The existing Woodbury Lakes Shopping Center, located in the western corner of the Woodbury Lakes Development, south of Woodbury Lakes Road, north of Hudson Road, and east of Spring Hill Drive in Woodbury, Minnesota, is proposing the addition of new Movie Theatre Complex. The following are key attributes of the proposed development:
i. Access to the site will be provided via the existing Woodbury Lakes Road driveways per the concept development plan shown in the Appendix.
ii. The proposed development will include 52,275 square feet and seat approximately 1,060 people.
iii. The development is expected to be fully occupied by 2018. iv. Parking for the entire site will be revised, proposed to change to a new
total of 2,051 parking stalls for the site. This includes the parking privately owned on the site.
b. Purpose of Study The purpose of this study is to determine the traffic impacts associated with the build out of the proposed development. The traffic impacts are studied on the roads and intersections where significant impact is anticipated and improvements are recommended where mitigation is needed. For those not familiar with the general concepts and terms associated with traffic engineering, The Language of Traffic Engineering guide is included in the Appendix.
c. Study Objectives The objectives of this study are:
i. Document how the study intersections and roadways currently operate. ii. Forecast the amount of traffic expected to be generated by the proposed
development. iii. Determine how the study intersections and roadways will operate in the
future with and without the proposed development. iv. Recommend appropriate mitigation measures if poor operations are
identified.
The roadways corridors studied in this document include those surrounding the proposed site, which are:
i. Hudson Road ii. Woodbury Lakes Road
Traffic Impact Study 2 Woodbury Lakes Movie Theater
For the purposes of this traffic study, the study intersections closest to the proposed development and where the greatest impact is expected were chosen for review and include:
i. Hudson Road & Woodbury Lakes Road/Pendryn Hill Curve ii. Hudson Road & Troon Court iii. Hudson Road & Turnberry Alcove iv. Hudson Road & Woodbury Lakes East Access v. Woodbury Lakes Road & Site Access 1 vi. Woodbury Lakes Road & Site Access 2
However, it should be noted traffic expected from the proposed development will have minor impacts on other corridors and intersections beyond those studied here. It is standard agency policy to update roadways and intersections to their ultimate configuration when the need for upgrades is identified. Therefore, additional roadway improvements to the other corridors may be necessary in the future to accommodate incremental traffic impacts from this site and other expected development. Furthermore, this study does not account for the existing roadway conditions such as pavement quality or appropriate drainage.
Traffic Impact Study 3 Woodbury Lakes Movie Theater
2. Existing Conditions
a. Corridor Characteristics As mentioned, the proposed site is located on the western corner of the Woodbury Lakes Retail Development, south of Woodbury Lakes Road. Table 1 shows the characteristics of the key roadway corridors around this site and within the study area. Table 1 – Study Corridor Characteristics
Name1 Classification2 Speed Limit Lanes
Peds/ Bicycles
Woodbury Lakes Road
Local Street 30 mph 2 Undivided
with turn lanes
Sidewalks both sides, north thru two internal
intersections
Hudson Road (MSAS 117)
A Minor Reliever 45 mph 4 Undivided
with turn lanes
Trail on south side
1 I = Interstate, TH = Trunk Highway, CSAH = County State Aid Highway, CR = County Road, MSAS = Municipal State Aid Street.
2 City of Woodbury’s 2030 Comprehensive Plan.
b. Traffic Volumes Intersection video was collected at the existing study intersections under normal weekday and Saturday conditions in January 2017. Using these videos 24-hour turning movement counts were determined for the standard weekday and weekend. The highest weekday and weekend peak were determined to be from 4:15 to 5:15 p.m. on Friday and 2:00 to 3:00 p.m. on Saturday. The “typical day” counts from these two peak hours were used at the study intersections for analysis. The turning movement count data from the counts are contained in fifteen minute intervals in the Appendix. Based on the higher of the weekday or weekend turning movement volumes, the current highest daily traffic volumes on each study corridor are:
i. 14,200 vehicles per day on Hudson Road at Woodbury Lakes Road ii. 10,500 vehicles per day on Woodbury Lakes Road near Hudson Road at
the Woodbury Lakes Developments iii. 2,300 vehicles per day on Woodbury Lakes Road near Spring Hill Drive,
north of Woodbury Lakes Development iv. 300 vehicles per day on Spring Hill Drive at Woodbury Lakes Road
Traffic Impact Study 4 Woodbury Lakes Movie Theater
3. Forecasted Traffic
a. Site Traffic Forecasting A trip generation analysis was performed for the development site based on the methods published in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition. Trip generation rates are provided by the same ITE manual. The ITE manual compiles studies from across the country to provide a national average traffic for various land uses. For the proposed movie theater, the designation of Multiplex Movie Theater was used. Unfortunately, the ITE only has full weekday trip generation data based on number of movie screens, and not square footage or number of seats. Therefore, an estimate of the number of screens was determined based on the proposed number of seats in the theater compared to other similar movie theaters around the Twin Cities area. When comparing the proposed 1,068 seats to other theaters an estimated seven to nine screens can be expected. Per the development plans, and confirmed by the City, the total screen number expected is nine, which is used in this study. For each analysis, the raw trip generation was divided among two types of trips – new and internal. Pass-by trips were not used as they are not expected to contribute to a movie theater land use. Internal trips are those vehicles within the site visiting two or more stores. New trips represent traffic increasing the overall number of vehicles at the intersections. For the purposes of this study, the breakdown between these types of trip generation is:
25% Internal Trips. 75% New Trips.
The resultant new trips generated by the proposed development are shown in Table 2. A detailed trip generation table showing the exact breakdowns is provided in the Appendix. Table 2 – New Trip Generation
Land Use Code – Source1 Description & Size
Daily Friday Peak Hour
Saturday Peak Hour
In Out In Out In Out
445 - ITE Multiplex Movie Theater (9 Screens)
987 987 91 63 243 224
Traffic Impact Study 5 Woodbury Lakes Movie Theater
A trip distribution pattern was developed for the generated traffic going to and from the proposed development. This pattern is based on the existing traffic volumes, site access, competing land uses, and access to the regional transportation system. The general trip distribution pattern for this study is:
i. 54% of the generated traffic to/from the west on Hudson Road and Woodbury Lakes Road.
ii. 41% of the generated traffic to/from the east on Hudson Road iii. 5% percent of the generated traffic to/from the south on Pendryn Hill
Curve, Troon Court, and Turnberry Alcove.
Traffic generated by the site development was assigned to the area roadways per this distribution pattern.
b. Trip Generation Comparison Two trip generation comparisons were completed comparing the original Woodbury Lakes trip generation results to the existing Woodbury Lakes volumes, as well as the original designation of the movie theater lots as high turnover restaurants to the current proposed trip generation. Originally, Woodbury Lakes was studied to include 369,000 Square Feet of Shopping Center Retail and 56,000 Square Feet of High-Turnover (Sit-Down) Restaurants. The weekday daily trip generation for this layout was determined and compared to the collected turning movement counts along Woodbury Lakes Road. Table 3 below shows this comparison Table 3 – Originally Calculated Vs. Observed Woodbury Lakes Daily Trip Generation
Originally Calculated Daily Trip Generation
Observed Daily Trip Generation
Percent Observed to Originally Calculated
21,808 11,500 52% Table 4, below, shows the trip generation comparison between the proposed movie theater, and the original traffic studies analysis of two restaurant totaling 16,000 Square Feet. Table 4 – Originally Calculated Vs. Proposed Woodbury Lakes Trip Generation (Theater Site Only)
Originally Calculated Restaurant Daily Trip Generation
Proposed Movie Theater Daily Trip
Generation
Percent Proposed to Originally Calculated
1,730 1,974 114% As Table 3 shows, the existing Woodbury Lakes development is experiencing roughly 50 percent of the original expected traffic based on the original site layout and corresponding trip generation analysis. Table 4, then shows that the movie
Traffic Impact Study 6 Woodbury Lakes Movie Theater
theater is expected to generate roughly 15% more traffic then when compared to the original restaurant land usage. These results suggest that even with the higher volume of traffic generated from the movie theater usage, when compared to restaurant usage, there is still significant capacity available for additional trips within Woodbury Lakes due to the originally high calculated trip generation from the original study.
c. Non-site Traffic Forecasting Based on ITE’s Transportation Impact Analyses for Site Development, the impacts of the proposed development are studied in 2018. To forecast future traffic volumes in the study area outside of the proposed development’s traffic, specific other developments around the site and the general growth in traffic are considered. Based on prior reports within the area and discussions with the City of Woodbury, the City Place development to the west is expected to be constructed by the 2018 date. Assuming the complete addition of the luxury apartments, and roughly 59 percent occupancy of the office and other land uses, the corresponding additional trips were added to the 2018 No-build scenario. Due to the heavy commercial usage of the surrounding developments, relative density of developments, and short forecast year of 2018, little to no general increase in traffic volume is expected along the study corridors. In general, the proposed development along with City Place is expected to provide the magnitude of traffic increases on the study corridors.
d. Total Traffic Traffic forecasts were developed for the 2018 scenarios by adding the traffic generated by the proposed development to the existing volumes. The highest day traffic volume forecasts developed through this process are shown in Chart 1 in the following section. The resultant 2018 peak hour forecasts are shown in Figures 1 and 2 in the Appendix.
Traffic Impact Study 7 Woodbury Lakes Movie Theater
4. Analyses
a. Corridor Vehicular Analysis While many factors contribute to a road feeling congested, the two biggest factors are volume, how many vehicles are using the road, and capacity, how many vehicles the road can accommodate a day. Transportation professionals use these pieces of information to create a ratio of volume to capacity. For example, a road with a volume to capacity ratio of 1.0, where the traffic demand is nearly equal to the traffic supply, will feel congested to motorists. Below is a rough guide of the daily traffic volumes different types of roads can accommodate based on Exhibits 10-9 and 16-14 of the Highway Capacity Manual. If the Average Daily Traffic (ADT) volume on a roadway is below the threshold, then it is considered un-congested. If the daily volume falls inside the range, the road is almost congested, and if the daily volume is over the threshold the road is congested.
2-Lane (one in each direction with left turn lanes at busy intersections and coordinated signals), undivided street, are considered almost congested with a volume of 11,500 to 19,900 vehicles per day. The City of Woodbury has estimated the daily capacity of a two-lane roadway at 15,000 vehicles before a four-lane road is warranted for capacity reasons.
4-Lane, undivided street (two in each direction with left turn lanes at busy intersections and coordinated signals), – 23,500 to 37,900 vehicles per day.
6-Lane, divided street (three in each direction with left turn lanes at busy intersections and coordinated signals), – 34,800 to 54,300 vehicles per day.
To provide an initial planning level screening, Chart 1 provides volume to capacity ratios of the study corridors during each of the study years to determine if any of the roadway corridors are candidates for additional through lanes.
Traffic Impact Study 8 Woodbury Lakes Movie Theater
Chart 1 – Study Corridor Volume to Capacity
As Chart 1 shows, all intersections are currently operating well below capacity and are projected to remain below capacity after the addition of the movie theater to the Woodbury Lakes complex.
b. Intersection Vehicular Analysis Individual intersections can perform poorly during peak periods while the overall roadway corridor is operating with an uncongested daily volume to capacity ratio lower than 1.0. Therefore, capacity analyses are performed for the study intersections to determine if they need improvements such as turn lanes or an upgrade in traffic control.
The existing and forecasted turning movement volumes along with the existing intersection configurations and traffic control were used to develop the average delay per intersection in each study scenario. The delay calculations were done in accordance with the 2010 Highway Capacity Manual using the Vistro software package. The full calculations for each study scenario, including Level of Service (LOS) grades and queue lengths, are included in the Appendix. Also, included in the Appendix is a guide explaining the Level of Service grade concept.
Chart 2 (Friday peak hour) and Chart 3 (Saturday peak hour) show the average peak hour delay per traffic signal controlled intersection for each study scenario. The LOS D/E boundary of 55 seconds of delay per vehicle is considered the threshold between acceptable and unacceptable traffic signal operation in Minnesota.
Congested: volume/capacity of 1.0 or greater
Nearing Congestion: volume/capacity of 0.85 - 1.0
0
0.2
0.4
0.6
0.8
1
1.2
Woodbury Lakes Road Hudson Road Spring Hill Drive
Vo
lum
e to
Cap
acit
y R
atio
Existing 2018 No-Build 2018 Build Series7
Traffic Impact Study 9 Woodbury Lakes Movie Theater
Chart 2 – Friday Peak Hour Delays: Signal Controlled Intersections
Chart 3 – Saturday Peak Hour Delays: Signal Controlled Intersections
As shown in Chart 2 and Chart 3, the Hudson Road & Woodbury Lakes Road intersection currently operates at an acceptable level and is forecasted to operate with acceptable delays through the 2018 build scenario. However,
Congested at LOS D/E Boundary (55 seconds)
0
10
20
30
40
50
60
Hudson Road & Woodbury Lakes Road
Ave
rage
Dea
ly (
seco
nd
s)
Existing 2018 No-Build 2018 Build
Congested at LOS D/E Boundary (55 seconds)
0
10
20
30
40
50
60
Hudson Road & Woodbury Lakes Road
Ave
rage
Dea
ly (
seco
nd
s)
Existing 2018 No-Build 2018 Build
Traffic Impact Study 10 Woodbury Lakes Movie Theater
during the 2018 weekend build peak, the southbound 95th percentile queue leaving the Woodbury Lakes development increases to about 11 vehicles. This queue stretches to the Woodbury Lakes Road & Access 2 intersection and has the potential to disrupt operations at this internal site intersection. Due to this queue additional intersection mitigation will be analyzed in the following section. Chart 4 (Friday peak hour) and Chart 5 (Saturday peak hour) show the 95th percentile queue lengths on the busiest stop sign controlled approach at intersections with side street stop sign control. Average delays are not calculated for intersections with side street stop sign control because the vast majority of vehicles going through the intersection are on the main roadway and have zero delay, which leads to low overall average delays. At side street stop sign controlled approaches to busy roadways, the average delay for all the vehicles on the approach often exceeds 60 seconds. This can be the case for a few vehicles waiting at the stop sign where improvements would not be justified for the low traffic volume. Instead of reporting average approach delays like the previous charts, Charts 4 and 5 show the 95th percentile queue as the measure of effectiveness at intersections with side street stop sign control. Based on our experience, improvements are not warranted at these types of intersections until the 95th percentile queue at a stop sign is in the five to ten vehicle range.
Traffic Impact Study 11 Woodbury Lakes Movie Theater
Chart 4 – Friday Peak Hour Queues: Side Street Stop Sign Controlled Intersections
Chart 5 – Saturday Peak Hour Queues: Side Street Stop Sign Controlled Intersections
Unreasonable 95th Percentile Queue (5 Vehicles)
0
1
2
3
4
5
6
7
Hudson Road &Troon Court
Hudson Road &Turnberry Alcove
Hudson Road &East Access
Woodbury LakesRoad & Access 2
Woodbury LakesRoad & Access 1
Woodbury LakesRoad & Spring
Hill Drive
95
th P
erce
nti
le Q
ueu
es (
veh
icle
s)
Existing 2018 No-Build 2018 Build
Unreasonable 95th Percentile Queue (5 Vehicles)
0
5
10
15
20
25
Hudson Road &Troon Court
Hudson Road &Turnberry Alcove
Hudson Road &East Access
Woodbury LakesRoad & Access 2
Woodbury LakesRoad & Access 1
Woodbury LakesRoad & Spring
Hill Drive
95
th P
erce
nti
le Q
ueu
es (
veh
icle
s)
Existing 2018 No-Build 2018 Build
Traffic Impact Study 12 Woodbury Lakes Movie Theater
The two-way stop controlled intersection analysis shows acceptable operation at all intersections with the exception of Woodbury Lakes Road and Access 2. This intersection is currently experiencing queueing close to or just above the preferred five vehicle queue length for the southbound direction. This larger queue is due to the northbound traffic experiencing a free through and left turn movement causing the southbound vehicles to wait for sufficient gaps in traffic flow to proceed through the intersection. Due to the high northbound volume this queue is larger than preferred, however still fits within the provided storage space for the existing and no-build scenario. During the 2018 weekend build scenario, this movement breaks down with an excessive queue. Additional mitigation should be considered at this intersection to improve operation and shorten queueing.
c. Vehicular Mitigation Analysis Per the above analyses, most of the study intersections and corridors will operate acceptably throughout the study scenarios. However, the following intersections are identified as having sub-standard operation in the following scenarios:
i. Woodbury Lakes Road & Site Access 2 during the Friday build and Saturday existing, 2018 no-build, and 2018 build scenarios.
ii. Hudson Road & Woodbury Lakes Road during the Saturday build scenario.
Alternatives were explored to provide appropriate mitigation at these locations, improving the vehicle operations. Generally, the least expensive alternative providing acceptable operations is recommended (i.e. stop signs over a traffic signal if stop signs will be sufficient). Based on these analyses, the following improvements are recommended to provide acceptable Level of Service D or better operations with reasonable queuing:
i. Expansion of Woodbury Lakes Road between Access 1 and Access 2 to a four-lane roadway with a shared through right lane and additional through lane for southbound traffic.
With roughly 45 feet of road with along this roadway section expansion to a four lane road is possible. This additional through lane will help lower the southbound queue by increasing storage and allowing two vehicles to pass through the stop controlled intersection at one time. With this change, the expected 95th percentile queue for the worst peak scenario, the 2018 Saturday build scenario, drops to five vehicles. Additional signing should be installed to help inform southbound drivers of the upcoming lane layout at Woodbury Lakes Road/Hudson Road. This signage would help minimize weaving of vehicles as drivers pass through Access 2 and approach the intersection. Striping may also be necessary to guide drivers through the intersection. The relatively balanced lane volumes on Woodbury Lakes Road at its intersection with Hudson Road indicate that with proper
Traffic Impact Study 13 Woodbury Lakes Movie Theater
signage drivers will be able to maneuver into the proper lane with minimal impact due to weaving. The existing Woodbury Lakes Road & Site Access 2 stop signs have additional supplemental signage informing drivers that incoming traffic does not stop. If a compliance issue is noticed at the intersection the addition of flashing stop signs could help increase awareness, however, compliance issues were not noted in our review of the collected intersection videos. The Hudson Road & Woodbury Lakes Road intersection does operate with acceptable delays; however, the southbound through/left lane’s 95th percentile queue exceeds the storage length and spills into the Woodbury Lakes Road & Site Access 2 intersection during the Saturday 2018 build scenario. This queue is caused by the high number of vehicles turning left onto Hudson Road and the buildup of those vehicles during the phase’s red time. The following circumstances should be noted:
1. The queue fully clears during the phase’s green time. 2. The high magnitude of queueing is only expected in rare cases (5% or
less) during the highest weekend peak period (1-2 hours a week) with acceptable queueing and operation for the rest of the week.
3. The queueing occurs along an internal site development road with low speeds.
4. The additional southbound lane between Site Access 1 and Site Access 2 would allow vehicles wishing to turn right through the intersection to proceed unimpeded and help lower the impact of the queue on the Site Access 2 intersection.
These circumstances help lower the concern of this southbound queue due to its ability to clear out on each signal cycle, its regularity of occurrence, and the location it occurs in the roadway network. However, if mitigation is preferred to help remove this rare queue from occurring the following can be implemented:
1. Addition of a southbound left turn lane – This turn lane would increase storage and remove the potential of the queue from blocking Site Access 2. However, in order to implement this change the eastern sidewalk would have to be removed or roadway corridor widened, as well as operational changes to the signal.
2. Installation of a roundabout – a two-by-one roundabout would be able to handle the projected capacity along Hudson Road while minimizing queuing along Woodbury Lakes Road. The difficulty with this addition is the tight spacing of the residential housing along Pendryn Hill Curve, as well as the existing retaining wall along the western side of Woodbury Lakes Road.
These traffic control devices would be difficult to implement at the Hudson Road & Woodbury Lakes development, and are large and expensive fixes to a relatively small queueing issue. Therefore, some additional traffic mitigation techniques can be used to help spread out exiting traffic which would help lower the queue at the intersection. These techniques include:
Traffic Impact Study 14 Woodbury Lakes Movie Theater
1. The introduction of bus routes originating and ending in the Woodbury Lakes development. Having access to other modes of travel is often seen as an amenity and a general benefit to a site, while helping to reduce the overall number of vehicles accessing the site.
2. Additional of Bicycle storage throughout the development. Having ample bicycle storage near store fronts helps promote bicycle travel. With the high volume of surrounding residential developments, this has the potential to transition some vehicle trips to bicycle trips which will help decrease queueing at the intersection.
3. Additional signage within the Woodbury Lakes Development informing drivers of the additional site accesses at Turnberry Alcove and the Eastern Woodbury Lakes Access. By spreading out the exiting traffic through all of the existing accesses the volume of vehicles along the southbound leg of Woodbury Lakes Road will decrease.
d. Concept Site Plan & Multi-Modal Review The concept site plan contained in the Appendix was reviewed to determine what changes are recommended to the existing layout of Woodbury Lakes. Following are key transportation elements of the concept site plan that should be implemented:
i. Car Circulation and Signage: Additional signage should be placed within the Woodbury Lakes development informing drivers of the additional accesses past access 1 and access 2. For example, movie theater parking can be directed towards the northern two accesses along Woodbury Lakes Road. By directing traffic north there will be less traffic cutting through Access 1 and Access 2 increasing safety and comfortability of pedestrians and spreading traffic out throughout the development. Signage should also be added informing drivers of the various accesses to Hudson Road to help spread out exiting traffic.
ii. Bicycle infrastructure: Trails currently exist along the south side of Hudson Road with sidewalks present on both sides of Woodbury Lakes Road. Bicycle parking should be provided near storefronts and well-lit areas to help promote bicycle travel. This will in turn help lower the total number of vehicles accessing the site by transferring some vehicle trips to bicycle trips.
iii. Adjacent Transit: The addition of transit to and from the Woodbury Lakes development should be considered. Having access to other modes of travel is often seen as an amenity and a general benefit to a site, while helping to reduce the overall number of vehicles accessing the site.
e. Parking Review Using the collected 2017 turning movement counts an estimate of the total parked cars per fifteen minute period was determined for the Friday and Saturday peak hour. By calculating the total vehicles entering the site and subtracting the vehicles exiting the site, this number can be determined. It
Traffic Impact Study 15 Woodbury Lakes Movie Theater
should be noted that this parking count includes the privately-owned parking lots on the development site. Using this technique, the highest Friday peak parked vehicle count was calculated at 650 parked vehicles, representing about 32 percent of the available parking. The Saturday peak was 892 parked vehicles, representing about 44 percent of the available parking. To estimate parking use, the ITE Parking Generation Manual, 4th Edition was consulted. Based on studies for land use code 445, Multiplex Movie Theater, the proposed theater is expected to average less than 300 parked vehicles during the peak periods. Added to the maximum counted on Saturday, the average expected parking needs are about 1,200 stalls, about 59 percent of the proposed available parking. One change currently underway is the revision of the existing parallel parking spots along the western leg of Site Access 1 to angled parking stalls. This conversion will result with an additional 57 parking stalls. As a result of this change, additional traffic will be expected to and from the corridor parking areas as these spots will be more convenient to the main storefronts. Counterbalancing the potential increase is a potential decrease in traffic due to drivers avoiding the corridor. More parking spaces results in more parking operations and disruptions to the traffic flow. If not destined to one of the stores along this stretch, drivers may use other roads to avoid stopping for vehicles pulling into or out of a parking space. Therefore, the net impact on the overall traffic operations of the Woodbury Lakes development is expected to be minimal due to this parking change. .
Traffic Impact Study 16 Woodbury Lakes Movie Theater
5. Conclusions and Recommendations The traffic impacts of the proposed development were thoroughly studied and the principal findings are:
The proposed movie theater development is expected to generate 1,974 new trips during an average weekday, 154 new trips during the Friday peak hour and 467 new trips during the Saturday peak hour.
The study intersections are expected to operate with acceptable delay and queuing during the 2018 no-build and build scenarios with two exceptions, Hudson Road & Woodbury Lakes Road and Woodbury Lakes Road and Site Access 2.
During the 2018 Saturday peak hour the southbound 95th percentile queue at Hudson Road & Woodbury Lakes Road is expected to just reach the intersection of Woodbury Lakes Road and Site Access 2. Due to the tight intersection layout, low level of occurrence, and relatively low impact on other intersections this queue raises little concerns.
The southbound queue at Woodbury Lakes Road and Site Access 2 is expected to exceed its storage capacity and cause blockages at Woodbury Lakes Road and Site Access 1 causing excessive congestion to the intersection.
The maximum parking use counted was 892 on Saturday. The proposed Movie Theater is expected to need about 300 parking spaces on average. Combined, the parking needs of 1,200 vehicles is about 59 percent of the proposed parking stalls.
The following recommendations are made based on the above findings: Restriping Woodbury Lakes Road between Site Access 2 and Site Access 1 to
include an additional southbound through lane. This restriping will help increase vehicle storage and capacity of the Woodbury Lakes Road and Site Access 2 intersection, removing the excessive southbound queuing issue. Additional signage should be provided to help inform southbound drivers of the upcoming lane layout at Woodbury Lakes Road/Hudson Road allowing drivers more time to maneuver into their preferred lane before proceeding through the Woodbury Lakes Road and Site Access 2 intersection. Striping may also be necessary to guide drivers through the intersection.
New signage directing movie theater traffic to the northern two accesses along Woodbury Lakes Road should be added to help lower cut through traffic along Site Access 1 and 2 and help spread out traffic through the Woodbury Lakes site. Signage should also be considered informing drivers of the additional site accesses along Hudson Road to help spread out exiting traffic and remove some vehicles from the Hudson Road & Woodbury Lakes Road intersection.
Additional bus routes should be provided to and from the Woodbury Lakes development. Bus routes help lower the volume of vehicles on the road and are generally considered a benefit to a site by increasing transportation options.
Installation of bicycle parking and locking stations near the movie theater and storefront to help promote bicycle travel should be included.
Traffic Impact Study 17 Woodbury Lakes Movie Theater
6. Appendix
A. Site Plan
B. The Language of Traffic Engineering
C. Figures 1-2
D. Traffic Counts
E. Trip Generation Table
F. Level of Service (LOS)
G. Capacity Analysis Backup
Friday Existing Weekend Existing Friday 2018 No-Build Weekend 2018 No-Build Friday 2018 Build Weekend 2018 Build Friday 2018 Build Mitigation Weekend 2018 Build Mitigation
Appendix A: Site Plan
Traffic Impact StudyWoodbury Lakes Movie Theater
A1 Spack Consulting
Intentionally Left Blank
Appendix A: Site Plan
Traffic Impact StudyWoodbury Lakes Movie Theater
A2 Spack Consulting
Intentionally Left Blank
Research Brief — Volume No. 15
The Language of Traffic EngineeringTraffic Engineering, and Traffic Engineers, often use technical terms or jargon that may be confusing or tough to understand even within the context of a sentence. Key terms and acronyms that can generally be found in all types of traffic studies are defined in this document.
Types of StudiesAccess Management – The practice of government agencies limiting the amount of intersections (both public roadway crossings and private driveways) along a roadway corridor based on the function of the roadway to improve safety and mobility while streamlining access.
Corridor Study – A transportation review and analysis of the existing and future traffic operations of a roadway segment. Varies in length from a couple blocks to a few miles and typically covers all modes of travel.
Intersection Control Evaluation (ICE) Report – A document that examines and determines the most appropriate type of control (stop sign, signal, roundabout, or other) at one or more intersections.
Safety Study – An examination of crash records to identify potential trends, issues, and problem intersections/corridors. Usually includes potential mitigation options expected to decrease crash rates in the future.
Speed Study – A review of existing travel speeds and the corridor characteristics to determine if speeding is an issue, the appropriate speed to post as the limit, and/or areas to provide reduced speed warnings.
Traffic Impact Study (TIS) – A document that addresses the expected traffic impacts of a development and, if necessary, mitigation options that will reduce or eliminate negative impacts. Also referred to as a Traffic Impact Analysis.
Transportation Plan – A document developed by a government agency to take inventory of their transportation network, identify concerns or issues and lay out the path for improvement of the system.
Travel Demand Management Plan (TDMP) – A plan that documents the existing infrastructure around a site, including transit and non-motorized vehicle options, and develops measures to be implemented to encourage those alternative modes of travel.
Warrant Evaluation – Review of traffic volumes and other characteristics at an intersection against thresholds to determine if a traffic signal or other traffic control option is needed/warranted.
Key Organizations AASHTO – American Association of State Highway and Transportation Officials. A nonprofit, nonpartisan association representing transportation departments with a primary goal of fostering the development, operation, and maintenance of an integrated national transportation system.DOT – Department of Transportation. Government organizations within federal and state agencies dedicated to serving the transportation needs of the community and typically responsible for study, design, operation, and maintenance of all facets of transportation.FHWA – Federal Highway Administration. An agency within the US Department of Transportation that supports State and local governments in the design, construction, and maintenance of the highway system.ITE – Institute of Transportation Engineers. An international educational and scientific association of transportation professionals who are responsible for meeting mobility and safety needs.
Traffic Engineering is a branch of civil engineering that focuses on the safe and efficient movement of people and vehicles. It is part science and part art, requiring not only technical skills for analysis but an understanding of motivations in choosing travel routes.
Source: ETH Zurich
Appendix B: The Language of Traffic Engineering
Traffic Impact Study Woodbury Lakes Movie Theater B1 Spack Consulting
ResourcesMUTCD, 2009 Edition, published by FHWA
Highway Capacity Manual, HCM2010
Highway Safety Manual, HSM
About This BriefSpack Consulting prepared this brief as part of our company’s vision to significantly improve the practice of traffic engineering and transportation planning. Transportation professionals from around the world have assisted us in developing this document. We are providing this brief under the Creative Commons Attribution License. Feel free to use-modify-share this guide, but please give us some credit in your document. To request our whole series of Design Briefs and to be included on our distribution list for new materials, please email [email protected]. And please reach out if you have any comments or questions related to this Design Brief.
Research Brief — Volume No. 15
Important Manuals/Guides
HCM – Highway Capacity Manual (released by the Transportation Research Board, or TRB). The guide for engineers and planners to assess traffic and environmental effects of highway projects. This manual presents the foundation of traffic analysis procedures in the US.
MUTCD – Manual of Uniform Traffic Control Devices. A document that sets minimum standards and provides guidance to ensure uniformity of traffic control devices (such as messages, location, size, shapes, and colors) across the nation. All roads are subject to its jurisdiction.
HSM – Highway Safety Manual (released by AASHTO). A guide that presents a variety of methods for quantitatively estimating crash frequency or severity.
Results85th Percentile Speed – Speed at which 85 percent of drivers are traveling at or below. Speed limits are typically set at the 85th percentile speed. 95th Percentile Queue – The distance, generally measured in feet or number of vehicles, which will be exceeded in a lane, typically at an intersection, only five percent of the time. Usually used to help determine intersection turn lane lengths.Control Delay – The total amount of time a motorist takes to get through a road segment or intersection minus the time it would take without stopping due to traffic controls (like stop signs or traffic signals). Control delay includes decelerating and accelerating back to full driving speed.Functional Classification – the grouping of streets and highways into categories according to their characteristics and emphasis on mobility or access. Generally, categories include arterials (emphasizing mobility and fast travel), local roads (emphasizing access to adjoining properties), and collector roads (emphasizing a balance between the two and usually connecting arterials to local roads).Intersection Delay – The average amount of time, usually expressed in seconds, experienced by any vehicle traveling through an intersection.Level of Service (LOS) – Qualitative measure of traffic operations related to the amount of average delay experienced. Expressed in letter grades with LOS A representing the best operations with little to no delay and LOS F representing the worst operations with excessive delays and congestion.Measures of Effectiveness – Performance measures that define how well traffic is moving along a corridor or thru an intersection. The common MOEs are travel time, corridor speed, delay, and queues.Mitigation – Measures intended to reduce the impact of a development or improve an identified traffic issue by either improving capacity (like adding lanes) or reducing demand (like encouraging carpooling).
Queue – Length of line of cars waiting at an intersection or at a bottleneck in a corridor, typically measured for each individual lane of traffic in feet or number of vehicles.Volume to Capacity (v/c) ratio – the number of vehicles through an intersection or roadway segment in a specific amount of time divided by the expected capacity of the road. Less than 1.0 indicates available capacity and above 1.0 indicates more vehicles than can be accommodated. Typically, a v/c ratio above 0.85 suggests operational issues.Trip Generation – The amount of vehicle traffic generated by a land use. One trip is equal to one vehicle traveling from an origin to a destination (traveling to and from work equals two trips).Warrants – Criteria based on volumes and other Measures of Effectiveness for determining when all way stop signs, roundabouts, traffic signals, or other type of control should be installed.
Appendix B: The Language of Traffic Engineering
Traffic Impact Study Woodbury Lakes Movie Theater B2 Spack Consulting
Figure 1: 2018 No-Build Friday and Saturday Peak Volumes
- Friday Peak Hour on top, Saturday Peak Hour on bottom
Figure 2: 2018 Build Friday and Saturday Peak Volumes
- Friday Peak Hour on top, Saturday Peak Hour on bottom
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-6-17Site Code : 1Start Date : 1/6/2017Page No : 1
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 2 1 0 3 512:15 AM 0 0 1 0 0 1 0 1 1 0 0 2 0 0 0 0 0 0 1 0 3 0 0 4 712:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 1 0 1 212:45 AM 0 0 1 0 0 1 0 0 2 0 0 2 0 0 0 0 0 0 0 0 4 0 0 4 7
Total 0 0 2 0 0 2 0 1 6 0 0 7 0 0 0 0 0 0 1 0 9 2 0 12 21
01:00 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 701:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 101:30 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 101:45 AM 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0 1 0 0 1 0 0 1 3
Total 0 1 1 0 0 2 0 0 4 0 0 4 0 0 0 1 0 1 0 0 5 0 0 5 12
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 202:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 202:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 0 0 0 0 2
Total 0 0 0 0 0 0 0 0 3 0 0 3 0 1 0 0 0 1 0 0 2 0 0 2 6
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 103:30 AM 0 1 0 0 0 1 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 303:45 AM 0 0 1 0 0 1 0 0 1 0 0 1 0 2 0 0 0 2 0 0 0 1 0 1 5
Total 0 1 1 0 0 2 0 0 3 0 0 3 0 2 0 0 0 2 0 0 1 1 0 2 9
04:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 2 0 0 2 404:15 AM 0 0 0 0 0 0 0 1 4 0 0 5 0 2 0 0 0 2 0 0 3 0 0 3 1004:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 3 0 1 0 4 0 0 2 0 0 2 704:45 AM 0 0 0 1 0 1 0 0 5 0 0 5 0 2 0 0 0 2 0 0 5 0 0 5 13
Total 0 0 0 1 0 1 0 1 11 0 0 12 0 8 0 1 0 9 0 0 12 0 0 12 34
05:00 AM 0 0 0 0 0 0 0 0 4 4 0 8 0 3 0 0 0 3 0 4 5 0 0 9 2005:15 AM 0 0 1 0 0 1 0 0 7 2 0 9 0 3 0 1 0 4 0 1 6 1 0 8 2205:30 AM 0 1 0 1 0 2 0 1 6 0 0 7 0 5 0 1 0 6 0 0 11 0 0 11 2605:45 AM 0 1 0 1 0 2 0 0 15 4 0 19 0 7 0 0 0 7 0 1 13 1 0 15 43
Total 0 2 1 2 0 5 0 1 32 10 0 43 0 18 0 2 0 20 0 6 35 2 0 43 111
06:00 AM 0 1 0 3 0 4 0 0 6 1 0 7 0 6 0 2 0 8 0 0 8 0 0 8 2706:15 AM 0 6 1 4 0 11 0 0 13 0 0 13 0 5 0 1 0 6 0 0 9 1 0 10 4006:30 AM 0 1 0 3 0 4 0 0 19 1 0 20 0 10 0 1 1 12 0 1 8 0 0 9 4506:45 AM 0 4 0 2 0 6 0 0 25 2 0 27 0 10 0 1 0 11 0 1 17 1 0 19 63
Total 0 12 1 12 0 25 0 0 63 4 0 67 0 31 0 5 1 37 0 2 42 2 0 46 175
07:00 AM 0 1 1 0 0 2 0 1 21 0 0 22 0 12 0 3 0 15 0 0 9 2 0 11 5007:15 AM 0 1 0 0 0 1 0 0 24 0 0 24 0 16 0 7 1 24 0 1 14 2 0 17 6607:30 AM 0 2 0 2 0 4 0 1 32 2 0 35 0 15 0 1 1 17 0 2 11 2 0 15 71
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D1 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-6-17Site Code : 1Start Date : 1/6/2017Page No : 2
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 3 1 4 0 8 0 2 46 3 0 51 0 11 0 2 0 13 0 2 13 1 0 16 88
Total 0 7 2 6 0 15 0 4 123 5 0 132 0 54 0 13 2 69 0 5 47 7 0 59 275
08:00 AM 0 4 1 5 0 10 0 0 30 5 0 35 0 6 0 2 0 8 0 2 28 6 0 36 8908:15 AM 0 6 0 3 0 9 0 0 32 2 0 34 0 4 0 1 0 5 0 6 23 1 0 30 7808:30 AM 0 5 0 2 0 7 0 1 29 6 0 36 0 3 0 2 0 5 0 7 14 1 0 22 7008:45 AM 0 4 1 7 0 12 0 1 28 11 0 40 0 5 2 2 0 9 0 6 26 1 0 33 94
Total 0 19 2 17 0 38 0 2 119 24 0 145 0 18 2 7 0 27 0 21 91 9 0 121 331
09:00 AM 0 9 1 5 0 15 0 0 35 13 0 48 0 4 1 5 0 10 0 9 24 1 0 34 10709:15 AM 0 19 0 13 0 32 0 0 33 18 0 51 0 3 0 1 0 4 0 16 26 4 0 46 13309:30 AM 0 15 1 13 0 29 0 3 41 20 0 64 0 3 0 2 0 5 0 11 41 1 0 53 15109:45 AM 0 16 0 10 0 26 0 0 42 27 0 69 0 5 0 0 0 5 0 20 38 2 0 60 160
Total 0 59 2 41 0 102 0 3 151 78 0 232 0 15 1 8 0 24 0 56 129 8 0 193 551
10:00 AM 0 16 1 26 0 43 0 0 41 12 0 53 0 3 0 2 0 5 0 34 43 1 0 78 17910:15 AM 0 20 1 30 0 51 0 0 34 30 0 64 0 3 0 0 0 3 1 24 56 4 0 85 20310:30 AM 0 25 0 38 0 63 0 0 42 27 0 69 0 2 1 2 0 5 0 30 47 2 0 79 21610:45 AM 0 30 2 38 0 70 0 1 64 20 0 85 0 6 0 2 0 8 0 33 41 0 0 74 237
Total 0 91 4 132 0 227 0 1 181 89 0 271 0 14 1 6 0 21 1 121 187 7 0 316 835
11:00 AM 0 35 1 38 0 74 0 1 46 23 0 70 0 3 0 2 0 5 0 30 45 2 0 77 22611:15 AM 0 39 1 40 0 80 0 2 54 26 0 82 0 0 0 2 0 2 0 37 56 1 0 94 25811:30 AM 0 29 2 46 0 77 0 0 52 29 0 81 0 5 4 2 0 11 0 36 75 1 0 112 28111:45 AM 0 30 1 42 0 73 1 0 57 20 0 78 0 2 0 1 0 3 0 45 81 3 0 129 283
Total 0 133 5 166 0 304 1 3 209 98 0 311 0 10 4 7 0 21 0 148 257 7 0 412 1048
12:00 PM 0 55 3 58 0 116 0 0 53 23 0 76 0 5 0 1 1 7 0 46 57 5 0 108 30712:15 PM 0 33 1 50 0 84 0 0 80 26 0 106 0 4 1 1 0 6 0 48 74 0 0 122 31812:30 PM 1 47 0 55 0 103 0 1 81 33 0 115 0 2 0 1 1 4 0 42 90 4 1 137 35912:45 PM 0 46 3 79 0 128 0 0 68 24 0 92 0 4 1 2 0 7 0 51 83 5 0 139 366
Total 1 181 7 242 0 431 0 1 282 106 0 389 0 15 2 5 2 24 0 187 304 14 1 506 1350
01:00 PM 0 59 1 59 0 119 0 0 73 19 0 92 0 1 0 0 0 1 0 31 67 2 0 100 31201:15 PM 0 62 0 59 0 121 1 0 78 37 0 116 0 1 1 1 3 6 0 47 78 5 1 131 37401:30 PM 0 50 0 75 0 125 2 1 64 26 0 93 0 5 1 2 0 8 0 50 55 3 0 108 33401:45 PM 0 53 3 63 0 119 0 1 74 28 0 103 0 2 1 1 0 4 0 44 68 2 0 114 340
Total 0 224 4 256 0 484 3 2 289 110 0 404 0 9 3 4 3 19 0 172 268 12 1 453 1360
02:00 PM 0 53 1 54 0 108 0 2 75 30 0 107 0 5 2 1 0 8 1 34 73 3 0 111 33402:15 PM 0 42 3 63 0 108 1 1 62 30 0 94 0 2 1 2 0 5 0 53 78 6 0 137 34402:30 PM 0 56 3 67 0 126 0 1 58 23 0 82 0 6 0 4 0 10 0 41 70 5 0 116 33402:45 PM 0 39 2 72 0 113 0 2 71 35 0 108 0 1 2 1 0 4 0 39 76 5 0 120 345
Total 0 190 9 256 0 455 1 6 266 118 0 391 0 14 5 8 0 27 1 167 297 19 0 484 1357
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D2 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-6-17Site Code : 1Start Date : 1/6/2017Page No : 3
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 52 5 67 0 124 0 3 64 25 0 92 0 3 0 1 0 4 0 42 66 9 0 117 33703:15 PM 0 37 4 58 0 99 0 1 51 26 0 78 0 4 0 1 0 5 0 57 86 2 0 145 32703:30 PM 0 57 2 46 0 105 0 1 61 34 0 96 0 1 0 0 1 2 0 60 88 4 0 152 35503:45 PM 0 58 3 79 0 140 0 1 73 33 0 107 0 4 2 2 0 8 0 45 101 0 0 146 401
Total 0 204 14 250 0 468 0 6 249 118 0 373 0 12 2 4 1 19 0 204 341 15 0 560 1420
04:00 PM 0 60 7 61 0 128 0 1 71 30 0 102 0 5 0 5 0 10 0 51 81 5 0 137 37704:15 PM 0 58 11 73 0 142 0 2 71 36 0 109 0 4 0 4 0 8 0 47 97 5 0 149 40804:30 PM 0 49 5 63 0 117 1 3 107 28 0 139 0 5 0 1 0 6 0 51 97 8 0 156 41804:45 PM 0 61 7 78 0 146 0 1 62 37 0 100 0 6 1 5 1 13 0 65 92 6 0 163 422
Total 0 228 30 275 0 533 1 7 311 131 0 450 0 20 1 15 1 37 0 214 367 24 0 605 1625
05:00 PM 0 74 6 72 0 152 0 5 58 41 0 104 0 6 0 6 1 13 0 49 96 13 0 158 42705:15 PM 0 56 3 63 0 122 0 3 70 35 0 108 0 7 0 2 0 9 3 37 82 5 0 127 36605:30 PM 0 58 4 50 0 112 1 5 73 26 0 105 0 5 0 3 1 9 0 42 96 5 0 143 36905:45 PM 0 56 8 63 0 127 0 4 68 34 0 106 0 4 2 1 0 7 0 39 67 5 0 111 351
Total 0 244 21 248 0 513 1 17 269 136 0 423 0 22 2 12 2 38 3 167 341 28 0 539 1513
06:00 PM 0 40 9 56 0 105 0 1 82 34 0 117 0 5 0 3 0 8 3 37 71 8 0 119 34906:15 PM 0 43 5 54 0 102 0 2 74 22 0 98 0 3 1 3 0 7 0 34 76 7 0 117 32406:30 PM 0 47 3 62 0 112 0 7 53 34 0 94 0 5 0 5 0 10 0 36 65 6 0 107 32306:45 PM 0 46 2 53 0 101 0 1 59 21 0 81 0 4 1 2 0 7 0 33 63 5 0 101 290
Total 0 176 19 225 0 420 0 11 268 111 0 390 0 17 2 13 0 32 3 140 275 26 0 444 1286
07:00 PM 0 40 2 52 0 94 0 2 52 22 0 76 0 4 1 1 0 6 0 21 59 4 0 84 26007:15 PM 0 31 1 44 0 76 0 2 53 19 0 74 0 2 0 2 0 4 0 24 51 3 0 78 23207:30 PM 0 35 4 32 0 71 0 0 50 14 0 64 0 1 0 3 0 4 0 13 46 2 0 61 20007:45 PM 0 46 6 40 0 92 0 2 42 7 0 51 0 1 0 2 0 3 0 14 50 3 0 67 213
Total 0 152 13 168 0 333 0 6 197 62 0 265 0 8 1 8 0 17 0 72 206 12 0 290 905
08:00 PM 0 44 2 57 0 103 0 0 43 11 0 54 0 2 0 0 0 2 0 14 46 2 0 62 22108:15 PM 0 31 4 43 0 78 0 0 35 7 0 42 0 3 0 1 0 4 0 15 28 3 0 46 17008:30 PM 0 30 3 44 0 77 0 1 29 5 0 35 0 0 0 1 0 1 0 9 23 3 0 35 14808:45 PM 0 16 3 32 0 51 0 2 21 2 0 25 0 0 0 1 0 1 0 3 31 4 0 38 115
Total 0 121 12 176 0 309 0 3 128 25 0 156 0 5 0 3 0 8 0 41 128 12 0 181 654
09:00 PM 0 22 1 16 0 39 0 1 16 1 0 18 0 1 0 0 0 1 0 2 19 4 0 25 8309:15 PM 0 9 3 17 0 29 0 0 9 0 0 9 0 4 0 1 0 5 0 3 24 6 0 33 7609:30 PM 0 5 0 9 0 14 0 1 16 2 0 19 0 6 1 1 0 8 0 0 22 7 0 29 7009:45 PM 0 3 4 6 0 13 0 0 20 0 0 20 0 2 0 1 0 3 0 3 24 1 0 28 64
Total 0 39 8 48 0 95 0 2 61 3 0 66 0 13 1 3 0 17 0 8 89 18 0 115 293
10:00 PM 0 3 2 13 0 18 0 0 21 0 0 21 0 2 0 0 0 2 0 1 16 1 0 18 5910:15 PM 0 8 2 11 0 21 0 1 16 0 0 17 0 2 0 1 0 3 1 0 12 3 0 16 5710:30 PM 0 6 2 17 1 26 0 0 16 0 0 16 0 1 0 1 0 2 0 0 6 3 0 9 53
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D3 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-6-17Site Code : 1Start Date : 1/6/2017Page No : 4
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 2 4 6 0 12 0 0 12 1 0 13 0 2 0 0 0 2 0 1 10 2 0 13 40
Total 0 19 10 47 1 77 0 1 65 1 0 67 0 7 0 2 0 9 1 2 44 9 0 56 209
11:00 PM 0 3 3 5 0 11 0 3 7 0 0 10 0 3 0 0 0 3 0 0 9 3 0 12 3611:15 PM 0 2 1 5 0 8 0 1 7 0 0 8 0 3 0 0 0 3 0 0 7 3 0 10 2911:30 PM 0 1 0 5 0 6 0 1 9 2 0 12 0 0 0 0 0 0 0 0 2 1 0 3 2111:45 PM 0 0 2 1 0 3 0 0 7 0 0 7 0 0 0 1 0 1 0 0 2 0 0 2 13
Total 0 6 6 16 0 28 0 5 30 2 0 37 0 6 0 1 0 7 0 0 20 7 0 27 99
Grand Total 1 2109 174 2584 1 4869 7 83 3320 1231 0 4641 0 319 27 128 12 486 10 1733 3497 241 2 5483 15479Apprch % 0 43.3 3.6 53.1 0 0.2 1.8 71.5 26.5 0 0 65.6 5.6 26.3 2.5 0.2 31.6 63.8 4.4 0
Total % 0 13.6 1.1 16.7 0 31.5 0 0.5 21.4 8 0 30 0 2.1 0.2 0.8 0.1 3.1 0.1 11.2 22.6 1.6 0 35.4Cars + 1 2089 173 2564 1 4828 7 82 3281 1222 0 4592 0 317 27 122 12 478 10 1725 3470 233 2 5440 15338
% Cars + 100 99.1 99.4 99.2 100 99.2 100 98.8 98.8 99.3 0 98.9 0 99.4 100 95.3 100 98.4 100 99.5 99.2 96.7 100 99.2 99.1Trucks 0 20 1 20 0 41 0 1 39 9 0 49 0 2 0 6 0 8 0 8 27 8 0 43 141
% Trucks 0 0.9 0.6 0.8 0 0.8 0 1.2 1.2 0.7 0 1.1 0 0.6 0 4.7 0 1.6 0 0.5 0.8 3.3 0 0.8 0.9
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D4 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-6-17Site Code : 1Start Date : 1/6/2017Page No : 5
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Woodbury Lakes Rd
Hud
son
Rd
Hudson R
d
Pendryn Hill Curve
Right
2564 20
2584 Thru
173 1
174 Left
2089 20
2109 UTrn
1 0 1
Peds
1 0 1
InOut Total2974 4828 7802
17 41 58 2991 7860 4869
Out1 0 1 In0 0 0 Total1 0 1
Right
1222 9 1231
Thru
3281 39
3320 Left 82 1
83 U
Trn 7 0 7 Peds 0 0 0
Out
TotalIn
5681 4592
10273 53
49 102
5734 10375
4641
Out
7 0
7 In
0 0
0 Tota
l
7 0
7 UTrn0 0 0
Left317
2 319
Thru27 0
27
Right122
6 128
Peds12 0
12
Out TotalIn
488 478 966 10 8 18
498 984 486
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n10 0 10
Left
1725
8 17
33
Thru
3470
27
34
97
Rig
ht233 8
241
Peds
2 0 2
Tota
lO
utIn
6162
54
40
1160
2 61
43
10
4 62
23
1170
6 54
83
Out10
0 10
In 0 0
0
Total
10 0 10
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D5 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-6-17Site Code : 1Start Date : 1/6/2017Page No : 6
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Woodbury Lakes RdSouthbound
Hudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 9 1 5 0 15 0 0 35 13 0 48 0 4 1 5 0 10 0 9 24 1 0 34 10709:15 AM 0 19 0 13 0 32 0 0 33 18 0 51 0 3 0 1 0 4 0 16 26 4 0 46 13309:30 AM 0 15 1 13 0 29 0 3 41 20 0 64 0 3 0 2 0 5 0 11 41 1 0 53 15109:45 AM 0 16 0 10 0 26 0 0 42 27 0 69 0 5 0 0 0 5 0 20 38 2 0 60 160
Total Volume 0 59 2 41 0 102 0 3 151 78 0 232 0 15 1 8 0 24 0 56 129 8 0 193 551% App. Total 0 57.8 2 40.2 0 0 1.3 65.1 33.6 0 0 62.5 4.2 33.3 0 0 29 66.8 4.1 0
PHF .000 .776 .500 .788 .000 .797 .000 .250 .899 .722 .000 .841 .000 .750 .250 .400 .000 .600 .000 .700 .787 .500 .000 .804 .861
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 12:30 PM
12:30 PM 1 47 0 55 0 103 0 1 81 33 0 115 0 2 0 1 1 4 0 42 90 4 1 137 35912:45 PM 0 46 3 79 0 128 0 0 68 24 0 92 0 4 1 2 0 7 0 51 83 5 0 139 36601:00 PM 0 59 1 59 0 119 0 0 73 19 0 92 0 1 0 0 0 1 0 31 67 2 0 100 31201:15 PM 0 62 0 59 0 121 1 0 78 37 0 116 0 1 1 1 3 6 0 47 78 5 1 131 374
Total Volume 1 214 4 252 0 471 1 1 300 113 0 415 0 8 2 4 4 18 0 171 318 16 2 507 1411% App. Total 0.2 45.4 0.8 53.5 0 0.2 0.2 72.3 27.2 0 0 44.4 11.1 22.2 22.2 0 33.7 62.7 3.2 0.4
PHF .250 .863 .333 .797 .000 .920 .250 .250 .926 .764 .000 .894 .000 .500 .500 .500 .333 .643 .000 .838 .883 .800 .500 .912 .943
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 58 11 73 0 142 0 2 71 36 0 109 0 4 0 4 0 8 0 47 97 5 0 149 40804:30 PM 0 49 5 63 0 117 1 3 107 28 0 139 0 5 0 1 0 6 0 51 97 8 0 156 41804:45 PM 0 61 7 78 0 146 0 1 62 37 0 100 0 6 1 5 1 13 0 65 92 6 0 163 42205:00 PM 0 74 6 72 0 152 0 5 58 41 0 104 0 6 0 6 1 13 0 49 96 13 0 158 427
Total Volume 0 242 29 286 0 557 1 11 298 142 0 452 0 21 1 16 2 40 0 212 382 32 0 626 1675% App. Total 0 43.4 5.2 51.3 0 0.2 2.4 65.9 31.4 0 0 52.5 2.5 40 5 0 33.9 61 5.1 0
PHF .000 .818 .659 .917 .000 .916 .250 .550 .696 .866 .000 .813 .000 .875 .250 .667 .500 .769 .000 .815 .985 .615 .000 .960 .981
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D6 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-7-17Site Code : 1Start Date : 1/7/2017Page No : 1
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 1 0 1 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 1 0 4 712:15 AM 0 0 0 1 0 1 0 1 4 0 0 5 0 1 0 0 0 1 0 0 3 0 0 3 1012:30 AM 0 2 0 2 0 4 0 0 2 1 0 3 0 3 1 0 0 4 0 0 2 0 0 2 1312:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 1 0 3 4
Total 0 2 0 4 0 6 0 2 8 1 0 11 0 4 1 0 0 5 0 0 10 2 0 12 34
01:00 AM 0 1 0 0 0 1 0 0 3 1 0 4 0 0 0 0 0 0 0 0 3 0 0 3 801:15 AM 0 1 0 0 0 1 0 2 2 2 0 6 0 2 0 0 0 2 0 0 3 0 0 3 1201:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 2 1 0 3 501:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 2
Total 0 2 0 0 0 2 0 2 6 3 0 11 0 3 0 0 0 3 0 1 9 1 0 11 27
02:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 5 0 0 5 702:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 2 0 0 0 2 0 0 2 0 0 2 602:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 1 0 0 1 402:45 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 0 1 0 1 4
Total 0 0 0 0 0 0 0 0 9 0 0 9 0 3 0 0 0 3 0 0 8 1 0 9 21
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 203:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 4 0 0 4 503:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 3 0 0 1 1 0 2 503:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1 0 0 7 0 0 5 1 0 6 13
04:00 AM 0 0 0 1 0 1 0 0 0 1 0 1 0 1 0 0 0 1 0 0 2 0 0 2 504:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 6 0 0 6 804:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 1 0 0 0 1 0 0 3 0 0 3 604:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 1 0 3 4
Total 0 0 0 1 0 1 0 0 5 1 0 6 0 2 0 0 0 2 0 0 13 1 0 14 23
05:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 205:15 AM 0 0 1 0 0 1 0 0 3 1 0 4 0 3 0 0 0 3 0 1 9 0 0 10 1805:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 1 0 0 0 1 0 2 6 0 0 8 1105:45 AM 0 3 0 0 0 3 0 0 7 6 0 13 0 0 0 0 0 0 0 2 19 1 0 22 38
Total 0 3 1 0 0 4 0 0 14 7 0 21 0 4 0 0 0 4 0 5 34 1 0 40 69
06:00 AM 0 1 0 2 0 3 0 0 4 1 0 5 0 0 0 0 0 0 0 0 6 0 0 6 1406:15 AM 0 1 0 0 0 1 0 0 4 0 0 4 0 2 0 0 0 2 0 0 5 0 0 5 1206:30 AM 0 1 0 1 0 2 0 0 6 0 0 6 0 2 0 0 0 2 0 0 10 0 0 10 2006:45 AM 0 3 0 0 0 3 0 0 9 2 0 11 0 2 0 0 0 2 0 1 10 0 0 11 27
Total 0 6 0 3 0 9 0 0 23 3 0 26 0 6 0 0 0 6 0 1 31 0 0 32 73
07:00 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 5 0 1 1 7 0 1 8 2 0 11 2207:15 AM 0 1 0 0 0 1 1 0 8 0 0 9 0 3 0 0 0 3 0 2 4 1 0 7 2007:30 AM 0 1 0 0 0 1 0 0 8 1 0 9 0 6 0 2 0 8 0 1 13 1 0 15 33
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D7 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-7-17Site Code : 1Start Date : 1/7/2017Page No : 2
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 3 1 0 0 4 0 1 10 2 1 14 0 1 1 2 0 4 0 7 15 1 0 23 45
Total 0 5 1 0 0 6 1 1 30 3 1 36 0 15 1 5 1 22 0 11 40 5 0 56 120
08:00 AM 0 2 1 2 0 5 0 1 11 6 0 18 0 1 1 0 0 2 0 5 14 1 0 20 4508:15 AM 0 6 1 8 0 15 0 0 28 6 0 34 0 4 0 1 1 6 0 8 18 1 0 27 8208:30 AM 0 7 2 10 0 19 0 1 20 10 0 31 0 4 0 6 0 10 0 5 20 2 0 27 8708:45 AM 0 4 1 4 0 9 0 0 41 16 0 57 0 6 0 4 0 10 0 16 28 1 0 45 121
Total 0 19 5 24 0 48 0 2 100 38 0 140 0 15 1 11 1 28 0 34 80 5 0 119 335
09:00 AM 0 10 1 16 0 27 0 2 27 11 0 40 0 11 0 0 0 11 0 20 37 4 0 61 13909:15 AM 0 9 1 13 0 23 0 1 44 17 0 62 0 3 1 1 1 6 0 19 37 4 1 61 15209:30 AM 0 16 2 21 0 39 0 1 55 19 0 75 0 9 1 2 0 12 0 17 45 0 0 62 18809:45 AM 0 22 1 24 0 47 1 4 52 25 0 82 0 4 2 2 0 8 0 32 33 3 0 68 205
Total 0 57 5 74 0 136 1 8 178 72 0 259 0 27 4 5 1 37 0 88 152 11 1 252 684
10:00 AM 0 16 0 28 0 44 0 1 50 29 0 80 0 1 0 4 0 5 0 33 54 2 0 89 21810:15 AM 0 32 2 32 0 66 0 2 69 28 0 99 0 3 2 4 0 9 1 45 60 1 0 107 28110:30 AM 1 40 1 52 0 94 0 1 56 24 0 81 0 3 0 0 0 3 0 43 64 2 0 109 28710:45 AM 0 41 1 44 0 86 0 1 88 45 0 134 0 5 2 2 0 9 0 55 92 1 0 148 377
Total 1 129 4 156 0 290 0 5 263 126 0 394 0 12 4 10 0 26 1 176 270 6 0 453 1163
11:00 AM 0 39 1 75 0 115 0 1 86 40 0 127 0 6 1 2 1 10 1 65 91 3 0 160 41211:15 AM 0 42 5 79 0 126 0 1 84 52 0 137 0 6 0 2 0 8 0 59 81 2 0 142 41311:30 AM 0 57 3 76 0 136 0 3 85 45 0 133 0 5 2 3 0 10 0 61 79 4 0 144 42311:45 AM 0 50 2 89 0 141 1 2 113 51 0 167 0 4 1 4 0 9 0 63 100 4 0 167 484
Total 0 188 11 319 0 518 1 7 368 188 0 564 0 21 4 11 1 37 1 248 351 13 0 613 1732
12:00 PM 0 63 3 95 0 161 0 2 101 39 0 142 0 7 1 0 0 8 0 76 104 5 0 185 49612:15 PM 1 61 1 92 0 155 0 1 104 44 0 149 0 5 2 1 0 8 0 65 93 3 0 161 47312:30 PM 0 59 0 78 0 137 0 1 135 60 0 196 0 4 3 2 0 9 0 70 103 6 0 179 52112:45 PM 0 68 2 86 0 156 1 2 101 49 1 154 0 3 2 5 0 10 0 58 112 3 0 173 493
Total 1 251 6 351 0 609 1 6 441 192 1 641 0 19 8 8 0 35 0 269 412 17 0 698 1983
01:00 PM 0 84 3 98 0 185 0 3 112 65 0 180 0 1 2 2 0 5 0 79 106 1 0 186 55601:15 PM 1 78 5 81 0 165 0 2 109 56 0 167 0 6 1 5 0 12 0 85 98 3 0 186 53001:30 PM 0 69 2 82 0 153 1 5 85 36 0 127 0 4 0 5 0 9 0 80 115 3 0 198 48701:45 PM 0 83 4 115 0 202 0 3 97 72 0 172 0 5 1 3 0 9 0 78 122 3 0 203 586
Total 1 314 14 376 0 705 1 13 403 229 0 646 0 16 4 15 0 35 0 322 441 10 0 773 2159
02:00 PM 0 77 3 114 0 194 0 2 100 54 0 156 0 10 2 4 0 16 1 78 117 4 0 200 56602:15 PM 0 74 4 100 0 178 0 4 100 50 0 154 0 2 1 2 0 5 1 67 110 4 0 182 51902:30 PM 1 100 3 117 0 221 0 6 95 48 0 149 0 9 1 2 0 12 0 79 88 7 0 174 55602:45 PM 0 82 3 119 0 204 0 1 116 41 0 158 0 3 1 1 0 5 0 69 120 8 0 197 564
Total 1 333 13 450 0 797 0 13 411 193 0 617 0 24 5 9 0 38 2 293 435 23 0 753 2205
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D8 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-7-17Site Code : 1Start Date : 1/7/2017Page No : 3
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 88 3 97 0 188 1 2 98 46 0 147 0 3 3 3 0 9 0 64 108 4 0 176 52003:15 PM 0 79 4 116 0 199 0 2 106 44 0 152 0 4 3 1 2 10 0 58 90 4 2 154 51503:30 PM 0 93 2 71 0 166 0 1 90 39 0 130 0 0 1 2 0 3 0 63 98 1 0 162 46103:45 PM 0 72 3 84 0 159 0 3 91 54 0 148 0 3 1 2 0 6 0 61 117 5 0 183 496
Total 0 332 12 368 0 712 1 8 385 183 0 577 0 10 8 8 2 28 0 246 413 14 2 675 1992
04:00 PM 0 70 0 94 0 164 0 3 92 47 0 142 0 5 1 0 1 7 1 60 78 1 0 140 45304:15 PM 0 64 8 97 0 169 0 1 68 39 0 108 0 7 2 2 0 11 0 60 98 2 0 160 44804:30 PM 0 78 7 99 0 184 0 1 90 44 0 135 0 5 3 0 0 8 0 74 76 2 0 152 47904:45 PM 0 70 2 74 0 146 0 0 86 31 0 117 0 4 0 0 0 4 0 57 87 7 0 151 418
Total 0 282 17 364 0 663 0 5 336 161 0 502 0 21 6 2 1 30 1 251 339 12 0 603 1798
05:00 PM 0 71 3 78 0 152 1 3 54 37 0 95 0 3 0 1 0 4 0 54 74 8 0 136 38705:15 PM 0 61 0 79 0 140 0 1 100 37 0 138 0 5 1 3 0 9 0 55 75 4 0 134 42105:30 PM 0 40 1 64 0 105 0 2 79 37 0 118 0 4 1 2 0 7 0 51 75 7 0 133 36305:45 PM 0 56 4 85 0 145 1 1 55 32 0 89 0 6 1 3 0 10 1 49 63 4 0 117 361
Total 0 228 8 306 0 542 2 7 288 143 0 440 0 18 3 9 0 30 1 209 287 23 0 520 1532
06:00 PM 0 49 3 60 0 112 0 5 68 22 0 95 0 4 2 0 0 6 0 40 59 5 0 104 31706:15 PM 0 51 3 63 0 117 0 2 59 31 0 92 0 5 0 2 0 7 0 27 52 2 0 81 29706:30 PM 0 30 2 56 0 88 0 1 53 21 0 75 0 7 3 3 0 13 2 26 47 8 0 83 25906:45 PM 0 46 4 43 0 93 1 0 52 20 0 73 0 7 2 0 0 9 0 34 39 9 0 82 257
Total 0 176 12 222 0 410 1 8 232 94 0 335 0 23 7 5 0 35 2 127 197 24 0 350 1130
07:00 PM 0 32 0 52 0 84 0 1 42 17 0 60 0 5 1 0 0 6 0 20 50 4 0 74 22407:15 PM 0 32 2 43 0 77 0 1 56 22 0 79 0 2 0 3 0 5 0 25 35 2 0 62 22307:30 PM 0 31 3 44 0 78 0 1 53 10 0 64 0 1 0 1 0 2 0 13 38 4 0 55 19907:45 PM 0 24 2 46 0 72 0 3 36 12 0 51 0 1 1 0 0 2 2 7 29 1 0 39 164
Total 0 119 7 185 0 311 0 6 187 61 0 254 0 9 2 4 0 15 2 65 152 11 0 230 810
08:00 PM 0 33 5 34 0 72 0 1 31 9 0 41 0 3 1 1 0 5 0 13 24 4 0 41 15908:15 PM 0 43 3 48 0 94 0 0 27 6 0 33 0 4 0 1 0 5 0 8 25 4 0 37 16908:30 PM 0 27 2 43 0 72 0 3 24 2 0 29 0 2 0 0 0 2 0 9 22 10 0 41 14408:45 PM 0 21 3 24 0 48 0 0 19 2 0 21 0 1 0 0 0 1 0 5 23 0 0 28 98
Total 0 124 13 149 0 286 0 4 101 19 0 124 0 10 1 2 0 13 0 35 94 18 0 147 570
09:00 PM 0 8 2 20 0 30 0 1 13 2 0 16 0 2 0 2 0 4 0 4 25 6 0 35 8509:15 PM 0 11 2 12 0 25 0 0 16 0 0 16 0 1 0 1 0 2 0 2 29 3 0 34 7709:30 PM 0 10 4 11 0 25 0 1 12 1 0 14 0 2 0 0 0 2 0 1 25 3 0 29 7009:45 PM 0 4 4 14 0 22 0 1 15 1 0 17 0 1 0 0 0 1 0 1 16 3 0 20 60
Total 0 33 12 57 0 102 0 3 56 4 0 63 0 6 0 3 0 9 0 8 95 15 0 118 292
10:00 PM 0 10 0 13 0 23 0 1 7 0 0 8 0 3 0 3 0 6 0 0 17 3 0 20 5710:15 PM 0 7 1 14 0 22 0 2 8 0 0 10 0 2 0 2 0 4 0 0 10 3 0 13 4910:30 PM 0 5 3 7 1 16 0 0 7 0 0 7 0 3 0 0 0 3 0 1 12 0 0 13 39
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D9 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-7-17Site Code : 1Start Date : 1/7/2017Page No : 4
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundHudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 2 2 6 0 10 0 1 11 0 0 12 0 1 0 0 0 1 0 0 10 2 0 12 35
Total 0 24 6 40 1 71 0 4 33 0 0 37 0 9 0 5 0 14 0 1 49 8 0 58 180
11:00 PM 0 3 1 8 0 12 0 1 13 1 0 15 0 0 0 0 0 0 0 0 12 1 0 13 4011:15 PM 0 0 0 6 0 6 0 0 4 0 0 4 0 2 0 1 0 3 0 0 4 1 0 5 1811:30 PM 0 2 0 3 0 5 0 0 5 0 0 5 0 0 0 0 0 0 0 0 3 1 0 4 1411:45 PM 0 0 1 0 0 1 0 0 3 0 0 3 0 2 0 0 0 2 0 1 6 1 0 8 14
Total 0 5 2 17 0 24 0 1 25 1 0 27 0 4 0 1 0 5 0 1 25 4 0 30 86
Grand Total 4 2632 149 3466 1 6252 9 105 3902 1722 2 5740 0 287 60 113 7 467 10 2391 3942 226 3 6572 19031Apprch % 0.1 42.1 2.4 55.4 0 0.2 1.8 68 30 0 0 61.5 12.8 24.2 1.5 0.2 36.4 60 3.4 0
Total % 0 13.8 0.8 18.2 0 32.9 0 0.6 20.5 9 0 30.2 0 1.5 0.3 0.6 0 2.5 0.1 12.6 20.7 1.2 0 34.5Cars + 4 2624 149 3462 1 6240 9 105 3890 1718 2 5724 0 287 60 110 7 464 10 2385 3920 226 3 6544 18972
% Cars + 100 99.7 100 99.9 100 99.8 100 100 99.7 99.8 100 99.7 0 100 100 97.3 100 99.4 100 99.7 99.4 100 100 99.6 99.7Trucks 0 8 0 4 0 12 0 0 12 4 0 16 0 0 0 3 0 3 0 6 22 0 0 28 59
% Trucks 0 0.3 0 0.1 0 0.2 0 0 0.3 0.2 0 0.3 0 0 0 2.7 0 0.6 0 0.3 0.6 0 0 0.4 0.3
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D10 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-7-17Site Code : 1Start Date : 1/7/2017Page No : 5
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Woodbury Lakes Rd
Hud
son
Rd
Hudson R
d
Pendryn Hill Curve
Right
3462 4
3466 Thru
149 0
149 Left
2624 8
2632 UTrn
4 0 4
Peds
1 0 1
InOut Total4163 6240 10403
10 12 22 4173 10425 6252
Out4 0 4 In0 0 0 Total4 0 4
Right
1718 4 1722
Thru
3890 12
3902 Left
105 0 105
UTrn 9 0 9
Peds 2 0 2
Out
TotalIn
6654 5724
12378 33
16 49
6687 12427
5740
Out
9 0
9 In
0 0
0 Tota
l
9 0
9 UTrn0 0 0
Left287
0 287
Thru60 0
60
Right110
3 113
Peds7 0 7
Out TotalIn
480 464 944 0 3 3
480 947 467
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n10 0 10
Left
2385
6 23
91
Thru
3920
22
39
42
Rig
ht226 0
226
Peds
3 0 3
Tota
lO
utIn
7639
65
44
1418
3 16
28
44
76
55
1422
7 65
72
Out10
0 10
In 0 0
0
Total
10 0 10
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D11 Spack Consulting
File Name : 1 - Hudson Rd & Woodbury Lakes Rd, 1-7-17Site Code : 1Start Date : 1/7/2017Page No : 6
Hudson Rd & Woodbury Lakes RdWoodbury, MN
Woodbury Lakes RdSouthbound
Hudson RdWestbound
Pendryn Hill CurveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 10 1 16 0 27 0 2 27 11 0 40 0 11 0 0 0 11 0 20 37 4 0 61 13909:15 AM 0 9 1 13 0 23 0 1 44 17 0 62 0 3 1 1 1 6 0 19 37 4 1 61 15209:30 AM 0 16 2 21 0 39 0 1 55 19 0 75 0 9 1 2 0 12 0 17 45 0 0 62 18809:45 AM 0 22 1 24 0 47 1 4 52 25 0 82 0 4 2 2 0 8 0 32 33 3 0 68 205
Total Volume 0 57 5 74 0 136 1 8 178 72 0 259 0 27 4 5 1 37 0 88 152 11 1 252 684% App. Total 0 41.9 3.7 54.4 0 0.4 3.1 68.7 27.8 0 0 73 10.8 13.5 2.7 0 34.9 60.3 4.4 0.4
PHF .000 .648 .625 .771 .000 .723 .250 .500 .809 .720 .000 .790 .000 .614 .500 .625 .250 .771 .000 .688 .844 .688 .250 .926 .834
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 01:00 PM
01:00 PM 0 84 3 98 0 185 0 3 112 65 0 180 0 1 2 2 0 5 0 79 106 1 0 186 55601:15 PM 1 78 5 81 0 165 0 2 109 56 0 167 0 6 1 5 0 12 0 85 98 3 0 186 53001:30 PM 0 69 2 82 0 153 1 5 85 36 0 127 0 4 0 5 0 9 0 80 115 3 0 198 48701:45 PM 0 83 4 115 0 202 0 3 97 72 0 172 0 5 1 3 0 9 0 78 122 3 0 203 586
Total Volume 1 314 14 376 0 705 1 13 403 229 0 646 0 16 4 15 0 35 0 322 441 10 0 773 2159% App. Total 0.1 44.5 2 53.3 0 0.2 2 62.4 35.4 0 0 45.7 11.4 42.9 0 0 41.7 57.1 1.3 0
PHF .250 .935 .700 .817 .000 .873 .250 .650 .900 .795 .000 .897 .000 .667 .500 .750 .000 .729 .000 .947 .904 .833 .000 .952 .921
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:00 PM
02:00 PM 0 77 3 114 0 194 0 2 100 54 0 156 0 10 2 4 0 16 1 78 117 4 0 200 56602:15 PM 0 74 4 100 0 178 0 4 100 50 0 154 0 2 1 2 0 5 1 67 110 4 0 182 51902:30 PM 1 100 3 117 0 221 0 6 95 48 0 149 0 9 1 2 0 12 0 79 88 7 0 174 55602:45 PM 0 82 3 119 0 204 0 1 116 41 0 158 0 3 1 1 0 5 0 69 120 8 0 197 564
Total Volume 1 333 13 450 0 797 0 13 411 193 0 617 0 24 5 9 0 38 2 293 435 23 0 753 2205% App. Total 0.1 41.8 1.6 56.5 0 0 2.1 66.6 31.3 0 0 63.2 13.2 23.7 0 0.3 38.9 57.8 3.1 0
PHF .250 .833 .813 .945 .000 .902 .000 .542 .886 .894 .000 .976 .000 .600 .625 .563 .000 .594 .500 .927 .906 .719 .000 .941 .974
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D12 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-6-17Site Code : 2Start Date : 1/6/2017Page No : 1
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 2 0 0 2 412:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 0 0 3 512:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 112:45 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 4 0 0 4 6
Total 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 0 0 9 0 0 9 16
01:00 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 701:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 101:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 101:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2
Total 0 0 0 0 0 0 0 0 3 0 0 3 0 1 0 0 0 1 0 0 7 0 0 7 11
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 202:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 202:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 4 0 0 4 5
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 103:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 303:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 1 0 0 1 3
Total 0 0 0 0 0 0 0 1 2 0 0 3 0 0 0 1 0 1 0 0 3 0 0 3 7
04:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 304:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 1 0 0 0 1 0 0 3 0 0 3 804:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 3 0 0 3 404:45 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 1 0 0 0 1 0 0 6 0 0 6 11
Total 0 0 0 0 0 0 0 0 10 0 0 10 0 2 0 0 0 2 0 0 14 0 0 14 26
05:00 AM 0 0 0 0 0 0 0 0 6 0 0 6 0 2 0 0 0 2 0 0 5 0 0 5 1305:15 AM 0 0 0 0 0 0 0 0 7 0 0 7 0 2 0 0 0 2 0 0 7 0 0 7 1605:30 AM 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 13 0 0 13 2105:45 AM 0 0 0 0 0 0 0 1 17 0 0 18 0 1 0 0 0 1 0 0 14 0 0 14 33
Total 0 0 0 0 0 0 0 1 38 0 0 39 0 5 0 0 0 5 0 0 39 0 0 39 83
06:00 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 3 0 0 0 3 0 0 11 0 0 11 1806:15 AM 0 0 0 0 0 0 0 0 14 0 0 14 0 0 0 0 0 0 0 0 16 0 0 16 3006:30 AM 0 0 0 0 0 0 0 0 17 0 0 17 0 3 0 0 0 3 0 0 9 0 0 9 2906:45 AM 0 0 0 0 0 0 0 0 25 0 0 25 0 1 0 0 0 1 0 0 23 0 0 23 49
Total 0 0 0 0 0 0 0 0 60 0 0 60 0 7 0 0 0 7 0 0 59 0 0 59 126
07:00 AM 0 0 0 0 0 0 0 0 21 0 0 21 0 0 0 0 0 0 0 0 13 0 0 13 3407:15 AM 0 0 0 0 0 0 0 0 17 0 0 17 0 9 0 0 0 9 0 0 21 1 0 22 4807:30 AM 0 0 0 0 0 0 0 1 33 0 0 34 0 6 0 2 1 9 0 0 15 0 0 15 58
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D13 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-6-17Site Code : 2Start Date : 1/6/2017Page No : 2
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 2 41 0 0 43 0 6 0 1 0 7 0 0 18 0 0 18 68
Total 0 0 0 0 0 0 0 3 112 0 0 115 0 21 0 3 1 25 0 0 67 1 0 68 208
08:00 AM 0 0 0 0 0 0 0 0 34 0 0 34 0 4 0 1 0 5 0 0 33 0 0 33 7208:15 AM 0 0 0 0 0 0 0 0 33 0 0 33 0 2 0 0 0 2 0 0 31 0 0 31 6608:30 AM 0 0 0 0 0 0 0 0 36 0 0 36 0 0 0 0 0 0 0 0 21 0 0 21 5708:45 AM 0 0 0 0 0 0 0 0 40 0 0 40 0 1 0 3 1 5 0 0 30 0 0 30 75
Total 0 0 0 0 0 0 0 0 143 0 0 143 0 7 0 4 1 12 0 0 115 0 0 115 270
09:00 AM 0 0 0 0 0 0 0 1 46 0 0 47 0 1 0 1 0 2 0 0 37 0 0 37 8609:15 AM 0 0 0 0 0 0 0 1 49 0 0 50 0 1 0 1 0 2 1 0 43 1 0 45 9709:30 AM 0 0 0 0 0 0 0 1 63 0 0 64 0 2 0 0 0 2 0 0 59 1 0 60 12609:45 AM 0 0 0 0 0 0 0 1 67 0 0 68 0 3 0 2 0 5 0 0 54 0 0 54 127
Total 0 0 0 0 0 0 0 4 225 0 0 229 0 7 0 4 0 11 1 0 193 2 0 196 436
10:00 AM 0 0 0 0 0 0 0 0 52 0 0 52 0 0 0 3 0 3 0 0 59 0 0 59 11410:15 AM 0 0 0 0 0 0 0 1 66 0 0 67 0 0 0 0 0 0 0 0 74 0 0 74 14110:30 AM 0 0 0 0 0 0 0 0 63 0 0 63 0 4 0 0 0 4 0 0 78 0 0 78 14510:45 AM 0 0 0 0 0 0 0 0 85 0 0 85 0 0 0 1 0 1 0 0 71 2 0 73 159
Total 0 0 0 0 0 0 0 1 266 0 0 267 0 4 0 4 0 8 0 0 282 2 0 284 559
11:00 AM 0 0 0 0 0 0 1 0 76 0 0 77 0 1 0 0 0 1 0 0 81 0 0 81 15911:15 AM 0 0 0 0 0 0 0 0 77 0 0 77 0 2 0 0 0 2 0 0 96 1 0 97 17611:30 AM 0 0 0 0 0 0 1 0 79 0 0 80 0 0 0 1 0 1 0 0 102 0 0 102 18311:45 AM 0 0 0 0 0 0 0 1 81 0 0 82 0 0 0 0 0 0 0 0 112 1 0 113 195
Total 0 0 0 0 0 0 2 1 313 0 0 316 0 3 0 1 0 4 0 0 391 2 0 393 713
12:00 PM 0 0 0 0 0 0 0 0 73 0 0 73 0 1 0 1 0 2 0 0 110 1 0 111 18612:15 PM 0 0 0 0 0 0 0 2 109 0 0 111 0 0 0 0 0 0 1 0 105 2 0 108 21912:30 PM 0 0 0 0 0 0 0 1 113 0 0 114 0 1 0 1 0 2 0 0 137 2 0 139 25512:45 PM 0 0 0 0 0 0 0 1 94 0 0 95 0 2 0 1 0 3 0 0 130 3 0 133 231
Total 0 0 0 0 0 0 0 4 389 0 0 393 0 4 0 3 0 7 1 0 482 8 0 491 891
01:00 PM 0 0 0 0 0 0 0 0 91 0 0 91 0 2 0 0 1 3 0 0 122 0 0 122 21601:15 PM 0 0 0 0 0 0 0 2 119 0 0 121 0 1 0 0 1 2 0 0 137 7 0 144 26701:30 PM 0 0 0 0 0 0 0 1 88 0 0 89 0 2 0 0 0 2 0 0 115 0 0 115 20601:45 PM 0 0 0 0 0 0 0 1 103 0 0 104 0 0 0 0 0 0 0 0 120 1 0 121 225
Total 0 0 0 0 0 0 0 4 401 0 0 405 0 5 0 0 2 7 0 0 494 8 0 502 914
02:00 PM 0 0 0 0 0 0 1 0 111 0 0 112 0 0 0 0 0 0 0 0 129 1 0 130 24202:15 PM 0 0 0 0 0 0 0 0 91 0 0 91 0 0 0 1 0 1 1 0 122 1 0 124 21602:30 PM 0 0 0 0 0 0 0 1 86 0 0 87 0 2 0 0 1 3 0 0 128 0 0 128 21802:45 PM 0 0 0 0 0 0 0 0 107 0 0 107 0 2 0 0 0 2 0 0 117 3 0 120 229
Total 0 0 0 0 0 0 1 1 395 0 0 397 0 4 0 1 1 6 1 0 496 5 0 502 905
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D14 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-6-17Site Code : 2Start Date : 1/6/2017Page No : 3
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 0 0 0 0 0 0 0 90 0 0 90 0 1 0 0 0 1 0 0 114 1 0 115 20603:15 PM 0 0 0 0 0 0 0 2 86 0 0 88 0 1 0 2 0 3 0 0 125 0 0 125 21603:30 PM 0 0 0 0 0 0 0 0 87 0 0 87 0 0 0 0 0 0 0 0 143 2 0 145 23203:45 PM 0 0 0 0 0 0 2 0 107 0 0 109 0 2 0 0 0 2 0 0 160 3 0 163 274
Total 0 0 0 0 0 0 2 2 370 0 0 374 0 4 0 2 0 6 0 0 542 6 0 548 928
04:00 PM 0 0 0 0 0 0 0 0 97 0 0 97 0 2 0 0 0 2 1 0 141 5 0 147 24604:15 PM 0 0 0 0 0 0 0 1 116 0 0 117 0 1 0 1 0 2 0 0 159 1 0 160 27904:30 PM 0 0 0 0 0 0 0 1 136 0 0 137 0 1 0 0 0 1 0 0 147 2 0 149 28704:45 PM 0 0 0 0 0 0 0 0 98 0 0 98 0 2 0 1 0 3 0 0 151 3 0 154 255
Total 0 0 0 0 0 0 0 2 447 0 0 449 0 6 0 2 0 8 1 0 598 11 0 610 1067
05:00 PM 0 0 0 0 0 0 1 2 105 0 0 108 0 3 0 1 0 4 0 0 168 5 0 173 28505:15 PM 0 0 0 0 0 0 0 0 108 0 0 108 0 1 0 2 0 3 0 0 136 4 0 140 25105:30 PM 0 0 0 0 0 0 0 0 109 0 0 109 0 3 0 0 0 3 0 0 158 7 0 165 27705:45 PM 0 0 0 0 0 0 0 2 104 0 0 106 0 0 0 0 0 0 0 0 118 2 0 120 226
Total 0 0 0 0 0 0 1 4 426 0 0 431 0 7 0 3 0 10 0 0 580 18 0 598 1039
06:00 PM 0 0 0 0 0 0 0 1 121 0 0 122 0 0 0 2 0 2 0 0 117 5 0 122 24606:15 PM 0 0 0 0 0 0 0 2 106 0 0 108 0 0 0 0 0 0 0 0 125 2 0 127 23506:30 PM 0 0 0 0 0 0 0 1 86 0 0 87 0 3 0 3 0 6 0 0 110 7 0 117 21006:45 PM 0 0 0 0 0 0 0 1 77 0 0 78 0 2 0 1 0 3 0 0 118 1 0 119 200
Total 0 0 0 0 0 0 0 5 390 0 0 395 0 5 0 6 0 11 0 0 470 15 0 485 891
07:00 PM 0 0 0 0 0 0 0 0 73 0 0 73 0 1 0 3 0 4 0 0 99 4 0 103 18007:15 PM 0 0 0 0 0 0 0 0 73 0 0 73 0 2 0 0 0 2 0 0 80 1 0 81 15607:30 PM 0 0 0 0 0 0 0 4 65 0 0 69 0 0 0 1 0 1 0 0 85 1 0 86 15607:45 PM 0 0 0 0 0 0 0 1 45 0 0 46 0 0 0 2 0 2 0 0 99 2 0 101 149
Total 0 0 0 0 0 0 0 5 256 0 0 261 0 3 0 6 0 9 0 0 363 8 0 371 641
08:00 PM 0 0 0 0 0 0 0 1 49 0 0 50 0 3 0 2 0 5 1 0 87 1 0 89 14408:15 PM 0 0 0 0 0 0 1 1 42 0 0 44 0 0 0 0 0 0 0 0 60 2 0 62 10608:30 PM 0 0 0 0 0 0 0 2 33 0 0 35 0 2 0 1 0 3 0 0 55 1 0 56 9408:45 PM 0 0 0 0 0 0 0 2 24 0 0 26 0 0 0 0 0 0 0 0 47 1 0 48 74
Total 0 0 0 0 0 0 1 6 148 0 0 155 0 5 0 3 0 8 1 0 249 5 0 255 418
09:00 PM 0 0 0 0 0 0 0 0 18 0 0 18 0 0 0 0 0 0 0 0 39 0 0 39 5709:15 PM 0 0 0 0 0 0 0 1 8 0 0 9 0 1 0 0 0 1 0 0 33 1 0 34 4409:30 PM 0 0 0 0 0 0 0 0 21 0 0 21 0 0 0 0 0 0 0 0 27 0 0 27 4809:45 PM 0 0 0 0 0 0 0 3 19 0 0 22 0 0 0 0 0 0 0 0 28 2 0 30 52
Total 0 0 0 0 0 0 0 4 66 0 0 70 0 1 0 0 0 1 0 0 127 3 0 130 201
10:00 PM 0 0 0 0 0 0 0 0 21 0 0 21 0 0 0 1 0 1 0 0 20 0 0 20 4210:15 PM 0 0 0 0 0 0 0 1 17 0 0 18 0 0 0 2 0 2 0 0 21 1 0 22 4210:30 PM 0 0 0 0 0 0 0 1 16 0 0 17 0 0 0 1 0 1 0 0 13 0 0 13 31
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D15 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-6-17Site Code : 2Start Date : 1/6/2017Page No : 4
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 0 0 0 0 0 0 0 12 0 0 12 0 1 0 0 0 1 0 0 11 0 0 11 24
Total 0 0 0 0 0 0 0 2 66 0 0 68 0 1 0 4 0 5 0 0 65 1 0 66 139
11:00 PM 0 0 0 0 0 0 0 2 10 0 0 12 0 0 0 0 0 0 0 0 12 1 0 13 2511:15 PM 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 1 0 1 0 0 8 1 0 9 1711:30 PM 0 0 0 0 0 0 0 0 14 0 0 14 0 0 0 0 0 0 0 0 3 0 0 3 1711:45 PM 0 0 0 0 0 0 0 0 4 0 0 4 0 1 0 0 0 1 0 0 3 0 0 3 8
Total 0 0 0 0 0 0 0 2 35 0 0 37 0 1 0 1 0 2 0 0 26 2 0 28 67
Grand Total 0 0 0 0 0 0 7 52 4569 0 0 4628 0 103 0 48 5 156 5 0 5675 97 0 5777 10561Apprch % 0 0 0 0 0 0.2 1.1 98.7 0 0 0 66 0 30.8 3.2 0.1 0 98.2 1.7 0
Total % 0 0 0 0 0 0 0.1 0.5 43.3 0 0 43.8 0 1 0 0.5 0 1.5 0 0 53.7 0.9 0 54.7Cars + 0 0 0 0 0 0 7 52 4535 0 0 4594 0 103 0 48 5 156 5 0 5633 97 0 5735 10485
% Cars + 0 0 0 0 0 0 100 100 99.3 0 0 99.3 0 100 0 100 100 100 100 0 99.3 100 0 99.3 99.3Trucks 0 0 0 0 0 0 0 0 34 0 0 34 0 0 0 0 0 0 0 0 42 0 0 42 76
% Trucks 0 0 0 0 0 0 0 0 0.7 0 0 0.7 0 0 0 0 0 0 0 0 0.7 0 0 0.7 0.7
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D16 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-6-17Site Code : 2Start Date : 1/6/2017Page No : 5
Hudson Rd & Troon CtWoodbury, MN
Hud
son
Rd
Hudson R
d
Troon Ct
Right
0 0 0
Thru
0 0 0
Left
0 0 0
UTrn
0 0 0
Peds
0 0 0
InOut Total0 0 0 0 0 0 0 0 0
Out0 0 0 In0 0 0 Total0 0 0
Right 0 0 0
Thru
4535 34
4569 Left 52 0
52 U
Trn 7 0 7 Peds 0 0 0
Out
TotalIn
5681 4594
10275 42
34 76
5723 10351
4628
Out
7 0
7 In
0 0
0 Tota
l
7 0
7 UTrn0 0 0
Left103
0 103
Thru0 0 0
Right48 0
48
Peds5 0 5
Out TotalIn
149 156 305 0 0 0
149 305 156
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n5 0 5 Le
ft0 0 0 Th
ru
5633
42
56
75
Rig
ht97 0 97
Peds
0 0 0
Tota
lO
utIn
4638
57
35
1037
3 34
42
76
46
72
1044
9 57
77
Out5
0 5
In 0 0
0
Total5
0 5
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D17 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-6-17Site Code : 2Start Date : 1/6/2017Page No : 6
Hudson Rd & Troon CtWoodbury, MN
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 1 46 0 0 47 0 1 0 1 0 2 0 0 37 0 0 37 8609:15 AM 0 0 0 0 0 0 0 1 49 0 0 50 0 1 0 1 0 2 1 0 43 1 0 45 9709:30 AM 0 0 0 0 0 0 0 1 63 0 0 64 0 2 0 0 0 2 0 0 59 1 0 60 12609:45 AM 0 0 0 0 0 0 0 1 67 0 0 68 0 3 0 2 0 5 0 0 54 0 0 54 127
Total Volume 0 0 0 0 0 0 0 4 225 0 0 229 0 7 0 4 0 11 1 0 193 2 0 196 436% App. Total 0 0 0 0 0 0 1.7 98.3 0 0 0 63.6 0 36.4 0 0.5 0 98.5 1 0
PHF .000 .000 .000 .000 .000 .000 .000 1.00 .840 .000 .000 .842 .000 .583 .000 .500 .000 .550 .250 .000 .818 .500 .000 .817 .858
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 12:30 PM
12:30 PM 0 0 0 0 0 0 0 1 113 0 0 114 0 1 0 1 0 2 0 0 137 2 0 139 25512:45 PM 0 0 0 0 0 0 0 1 94 0 0 95 0 2 0 1 0 3 0 0 130 3 0 133 23101:00 PM 0 0 0 0 0 0 0 0 91 0 0 91 0 2 0 0 1 3 0 0 122 0 0 122 21601:15 PM 0 0 0 0 0 0 0 2 119 0 0 121 0 1 0 0 1 2 0 0 137 7 0 144 267
Total Volume 0 0 0 0 0 0 0 4 417 0 0 421 0 6 0 2 2 10 0 0 526 12 0 538 969% App. Total 0 0 0 0 0 0 1 99 0 0 0 60 0 20 20 0 0 97.8 2.2 0
PHF .000 .000 .000 .000 .000 .000 .000 .500 .876 .000 .000 .870 .000 .750 .000 .500 .500 .833 .000 .000 .960 .429 .000 .934 .907
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 0 0 0 0 0 0 1 116 0 0 117 0 1 0 1 0 2 0 0 159 1 0 160 27904:30 PM 0 0 0 0 0 0 0 1 136 0 0 137 0 1 0 0 0 1 0 0 147 2 0 149 28704:45 PM 0 0 0 0 0 0 0 0 98 0 0 98 0 2 0 1 0 3 0 0 151 3 0 154 25505:00 PM 0 0 0 0 0 0 1 2 105 0 0 108 0 3 0 1 0 4 0 0 168 5 0 173 285
Total Volume 0 0 0 0 0 0 1 4 455 0 0 460 0 7 0 3 0 10 0 0 625 11 0 636 1106% App. Total 0 0 0 0 0 0.2 0.9 98.9 0 0 0 70 0 30 0 0 0 98.3 1.7 0
PHF .000 .000 .000 .000 .000 .000 .250 .500 .836 .000 .000 .839 .000 .583 .000 .750 .000 .625 .000 .000 .930 .550 .000 .919 .963
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D18 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-7-17Site Code : 2Start Date : 1/7/2017Page No : 1
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 0 0 3 512:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 0 0 3 512:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 712:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 3
Total 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 12 0 0 12 20
01:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 2 0 1 1 0 4 601:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 5 0 0 5 901:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 301:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 2 0 9 1 0 12 19
02:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 202:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 2 0 0 2 402:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 1 0 0 1 402:45 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
Total 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 4 0 0 4 12
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 4 0 0 4 603:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 103:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 5 0 0 5 7
04:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 304:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 7 0 0 7 904:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 1 0 0 0 1 0 0 3 0 0 3 604:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 3
Total 0 0 0 0 0 0 0 0 5 0 0 5 0 2 0 0 0 2 0 0 14 0 0 14 21
05:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 205:15 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 1 0 0 0 1 0 0 9 0 0 9 1305:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 7 0 0 7 905:45 AM 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 0 0 22 0 0 22 35
Total 0 0 0 0 0 0 0 0 20 0 0 20 0 1 0 0 0 1 0 0 38 0 0 38 59
06:00 AM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 7 0 0 7 1206:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 6 0 0 6 1006:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 3 0 0 0 3 0 0 11 0 0 11 1706:45 AM 0 0 0 0 0 0 0 0 9 0 0 9 0 6 0 1 0 7 0 0 13 0 0 13 29
Total 0 0 0 0 0 0 0 0 21 0 0 21 0 9 0 1 0 10 0 0 37 0 0 37 68
07:00 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 1 0 1 0 0 8 0 0 8 1207:15 AM 0 0 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 0 0 7 0 0 7 1607:30 AM 0 0 0 0 0 0 0 0 8 0 0 8 0 1 0 1 0 2 0 0 14 2 0 16 26
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D19 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-7-17Site Code : 2Start Date : 1/7/2017Page No : 2
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 1 13 0 0 14 0 1 0 2 0 3 0 0 19 0 0 19 36
Total 0 0 0 0 0 0 0 1 33 0 0 34 0 2 0 4 0 6 0 0 48 2 0 50 90
08:00 AM 0 0 0 0 0 0 0 1 17 0 0 18 0 1 0 1 1 3 0 0 16 0 0 16 3708:15 AM 0 0 0 0 0 0 0 0 33 0 0 33 0 2 0 0 0 2 0 0 25 0 0 25 6008:30 AM 0 0 0 0 0 0 0 0 33 0 0 33 0 0 0 0 0 0 0 0 33 0 0 33 6608:45 AM 0 0 0 0 0 0 0 0 52 0 0 52 0 2 0 0 0 2 0 0 33 2 0 35 89
Total 0 0 0 0 0 0 0 1 135 0 0 136 0 5 0 1 1 7 0 0 107 2 0 109 252
09:00 AM 0 0 0 0 0 0 0 0 41 0 0 41 0 1 0 2 0 3 0 0 45 1 0 46 9009:15 AM 0 0 0 0 0 0 0 1 59 0 0 60 0 1 0 0 1 2 0 0 48 0 0 48 11009:30 AM 0 0 0 0 0 0 0 0 74 0 0 74 0 1 0 0 0 1 0 0 60 0 0 60 13509:45 AM 0 0 0 0 0 0 0 1 77 0 0 78 0 3 0 1 0 4 1 0 58 0 0 59 141
Total 0 0 0 0 0 0 0 2 251 0 0 253 0 6 0 3 1 10 1 0 211 1 0 213 476
10:00 AM 0 0 0 0 0 0 0 0 80 0 0 80 0 2 0 1 0 3 0 0 72 0 0 72 15510:15 AM 0 0 0 0 0 0 0 1 96 0 0 97 0 2 0 0 0 2 0 0 98 0 0 98 19710:30 AM 0 0 0 0 0 0 0 1 81 0 0 82 0 0 0 0 0 0 0 0 101 1 0 102 18410:45 AM 0 0 0 0 0 0 0 0 135 0 0 135 0 2 0 2 0 4 0 0 138 1 0 139 278
Total 0 0 0 0 0 0 0 2 392 0 0 394 0 6 0 3 0 9 0 0 409 2 0 411 814
11:00 AM 0 0 0 0 0 0 0 1 120 0 0 121 0 2 0 2 0 4 0 0 123 5 0 128 25311:15 AM 0 0 0 0 0 0 0 1 140 0 0 141 0 2 0 0 0 2 0 0 127 1 0 128 27111:30 AM 0 0 0 0 0 0 0 1 127 0 0 128 0 2 0 1 0 3 0 0 137 3 0 140 27111:45 AM 0 0 0 0 0 0 0 0 163 0 0 163 0 1 0 3 0 4 1 0 147 2 0 150 317
Total 0 0 0 0 0 0 0 3 550 0 0 553 0 7 0 6 0 13 1 0 534 11 0 546 1112
12:00 PM 0 0 0 0 0 0 1 2 151 0 0 154 0 2 0 4 0 6 0 0 161 2 0 163 32312:15 PM 0 0 0 0 0 0 0 0 139 0 0 139 0 2 0 2 0 4 0 0 157 1 0 158 30112:30 PM 0 0 0 0 0 0 0 0 194 0 0 194 0 3 0 2 0 5 0 0 161 2 0 163 36212:45 PM 0 0 0 0 0 0 0 3 146 0 0 149 0 0 0 1 0 1 1 0 183 2 0 186 336
Total 0 0 0 0 0 0 1 5 630 0 0 636 0 7 0 9 0 16 1 0 662 7 0 670 1322
01:00 PM 0 0 0 0 0 0 0 2 182 0 0 184 0 1 0 4 0 5 0 0 186 4 0 190 37901:15 PM 0 0 0 0 0 0 0 5 166 0 0 171 0 2 0 1 0 3 0 0 180 3 0 183 35701:30 PM 0 0 0 0 0 0 0 0 126 0 0 126 0 1 0 1 0 2 0 0 188 2 0 190 31801:45 PM 0 0 0 0 0 0 0 1 168 0 0 169 0 1 0 1 0 2 0 0 208 0 0 208 379
Total 0 0 0 0 0 0 0 8 642 0 0 650 0 5 0 7 0 12 0 0 762 9 0 771 1433
02:00 PM 0 0 0 0 0 0 0 1 163 0 0 164 0 3 0 3 0 6 0 0 192 0 0 192 36202:15 PM 0 0 0 0 0 0 0 0 143 0 0 143 0 0 0 0 0 0 0 0 185 2 0 187 33002:30 PM 0 0 0 0 0 0 0 0 157 0 0 157 0 2 0 1 0 3 0 0 194 1 0 195 35502:45 PM 0 0 0 0 0 0 0 2 144 0 0 146 0 1 0 3 0 4 0 0 201 1 0 202 352
Total 0 0 0 0 0 0 0 3 607 0 0 610 0 6 0 7 0 13 0 0 772 4 0 776 1399
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D20 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-7-17Site Code : 2Start Date : 1/7/2017Page No : 3
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 0 0 0 0 0 0 1 147 0 0 148 0 0 0 1 0 1 0 0 190 5 0 195 34403:15 PM 0 0 0 0 0 0 0 1 149 0 0 150 0 0 0 0 0 0 0 0 171 1 0 172 32203:30 PM 0 0 0 0 0 0 0 0 136 0 0 136 0 0 0 2 0 2 0 0 192 0 0 192 33003:45 PM 0 0 0 0 0 0 0 1 143 0 0 144 0 2 0 3 0 5 0 0 184 3 0 187 336
Total 0 0 0 0 0 0 0 3 575 0 0 578 0 2 0 6 0 8 0 0 737 9 0 746 1332
04:00 PM 0 0 0 0 0 0 1 2 141 0 0 144 0 1 0 1 0 2 0 0 116 1 0 117 26304:15 PM 0 0 0 0 0 0 0 0 108 0 0 108 0 1 0 2 0 3 0 0 162 0 0 162 27304:30 PM 0 0 0 0 0 0 0 0 139 0 0 139 0 3 0 3 0 6 0 0 149 2 0 151 29604:45 PM 0 0 0 0 0 0 0 2 112 0 0 114 0 2 0 0 0 2 0 0 157 2 0 159 275
Total 0 0 0 0 0 0 1 4 500 0 0 505 0 7 0 6 0 13 0 0 584 5 0 589 1107
05:00 PM 0 0 0 0 0 0 0 1 98 0 0 99 0 1 0 0 0 1 0 0 148 3 0 151 25105:15 PM 0 0 0 0 0 0 0 2 129 0 0 131 0 1 0 1 0 2 0 0 138 1 0 139 27205:30 PM 0 0 0 0 0 0 0 1 114 0 0 115 0 4 0 0 0 4 0 0 117 1 0 118 23705:45 PM 0 0 0 0 0 0 0 1 91 0 0 92 0 1 0 1 0 2 0 0 115 2 0 117 211
Total 0 0 0 0 0 0 0 5 432 0 0 437 0 7 0 2 0 9 0 0 518 7 0 525 971
06:00 PM 0 0 0 0 0 0 0 2 88 0 0 90 0 1 0 1 0 2 0 0 114 0 0 114 20606:15 PM 0 0 0 0 0 0 0 1 89 0 0 90 0 1 0 0 0 1 0 0 104 1 0 105 19606:30 PM 0 0 0 0 0 0 0 4 75 0 0 79 0 2 0 0 0 2 0 0 79 0 0 79 16006:45 PM 0 0 0 0 0 0 0 0 75 0 0 75 0 2 0 0 0 2 0 0 87 0 0 87 164
Total 0 0 0 0 0 0 0 7 327 0 0 334 0 6 0 1 0 7 0 0 384 1 0 385 726
07:00 PM 0 0 0 0 0 0 0 0 55 0 0 55 0 1 0 1 0 2 1 0 75 2 0 78 13507:15 PM 0 0 0 0 0 0 0 0 79 0 0 79 0 0 0 0 0 0 0 0 69 1 0 70 14907:30 PM 0 0 0 0 0 0 0 0 62 0 0 62 0 2 0 0 0 2 0 0 69 2 0 71 13507:45 PM 0 0 0 0 0 0 0 1 50 0 0 51 0 0 0 2 0 2 0 0 50 2 0 52 105
Total 0 0 0 0 0 0 0 1 246 0 0 247 0 3 0 3 0 6 1 0 263 7 0 271 524
08:00 PM 0 0 0 0 0 0 0 2 40 0 0 42 0 1 0 0 0 1 0 0 57 0 0 57 10008:15 PM 0 0 0 0 0 0 0 0 35 0 0 35 0 0 0 0 0 0 0 0 68 1 0 69 10408:30 PM 0 0 0 0 0 0 0 0 25 0 0 25 0 0 0 2 0 2 0 0 46 3 0 49 7608:45 PM 0 0 0 0 0 0 0 1 21 0 0 22 0 0 0 0 0 0 0 0 42 2 0 44 66
Total 0 0 0 0 0 0 0 3 121 0 0 124 0 1 0 2 0 3 0 0 213 6 0 219 346
09:00 PM 0 0 0 0 0 0 0 0 15 0 0 15 0 1 0 0 0 1 0 0 33 1 0 34 5009:15 PM 0 0 0 0 0 0 0 2 14 0 0 16 0 0 0 0 0 0 0 0 35 5 0 40 5609:30 PM 0 0 0 0 0 0 0 0 15 0 0 15 0 1 0 0 0 1 0 0 35 0 0 35 5109:45 PM 0 0 0 0 0 0 0 1 16 0 0 17 0 1 0 0 0 1 0 0 20 0 0 20 38
Total 0 0 0 0 0 0 0 3 60 0 0 63 0 3 0 0 0 3 0 0 123 6 0 129 195
10:00 PM 0 0 0 0 0 0 0 1 8 0 0 9 0 0 0 0 0 0 0 0 29 1 0 30 3910:15 PM 0 0 0 0 0 0 0 1 11 0 0 12 0 0 0 0 0 0 0 0 16 3 0 19 3110:30 PM 0 0 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 0 0 14 2 0 16 22
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D21 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-7-17Site Code : 2Start Date : 1/7/2017Page No : 4
Hudson Rd & Troon CtWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 0 0 0 0 0 0 1 12 0 0 13 0 0 0 0 0 0 0 0 12 0 0 12 25
Total 0 0 0 0 0 0 0 3 37 0 0 40 0 0 0 0 0 0 0 0 71 6 0 77 117
11:00 PM 0 0 0 0 0 0 0 0 16 0 0 16 0 1 0 0 0 1 0 0 13 1 0 14 3111:15 PM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 5 0 0 5 811:30 PM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 1 0 1 0 0 4 1 0 5 1111:45 PM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 1 0 1 0 0 5 0 0 5 9
Total 0 0 0 0 0 0 0 0 27 0 0 27 0 1 0 2 0 3 0 0 27 2 0 29 59
Grand Total 0 0 0 0 0 0 2 55 5634 0 0 5691 0 86 0 64 2 152 6 0 6544 88 0 6638 12481Apprch % 0 0 0 0 0 0 1 99 0 0 0 56.6 0 42.1 1.3 0.1 0 98.6 1.3 0
Total % 0 0 0 0 0 0 0 0.4 45.1 0 0 45.6 0 0.7 0 0.5 0 1.2 0 0 52.4 0.7 0 53.2Cars + 0 0 0 0 0 0 2 55 5621 0 0 5678 0 86 0 64 2 152 6 0 6516 88 0 6610 12440
% Cars + 0 0 0 0 0 0 100 100 99.8 0 0 99.8 0 100 0 100 100 100 100 0 99.6 100 0 99.6 99.7Trucks 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 0 0 28 0 0 28 41
% Trucks 0 0 0 0 0 0 0 0 0.2 0 0 0.2 0 0 0 0 0 0 0 0 0.4 0 0 0.4 0.3
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D22 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-7-17Site Code : 2Start Date : 1/7/2017Page No : 5
Hudson Rd & Troon CtWoodbury, MN
Hud
son
Rd
Hudson R
d
Troon Ct
Right
0 0 0
Thru
0 0 0
Left
0 0 0
UTrn
0 0 0
Peds
0 0 0
InOut Total0 0 0 0 0 0 0 0 0
Out0 0 0 In0 0 0 Total0 0 0
Right 0 0 0
Thru
5621 13
5634 Left 55 0
55 U
Trn 2 0 2 Peds 0 0 0
Out
TotalIn
6580 5678
12258 28
13 41
6608 12299
5691
Out
2 0
2 In
0 0
0 Tota
l
2 0
2 UTrn0 0 0
Left86 0
86
Thru0 0 0
Right64 0
64
Peds2 0 2
Out TotalIn
143 152 295 0 0 0
143 295 152
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n6 0 6 Le
ft0 0 0 Th
ru
6516
28
65
44
Rig
ht88 0 88
Peds
0 0 0
Tota
lO
utIn
5707
66
10
1231
7 13
28
41
57
20
1235
8 66
38
Out6
0 6
In 0 0
0
Total6
0 6
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D23 Spack Consulting
File Name : 2 - Hudson Rd & Troon Ct, 1-7-17Site Code : 2Start Date : 1/7/2017Page No : 6
Hudson Rd & Troon CtWoodbury, MN
SouthboundHudson RdWestbound
Troon CtNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 0 41 0 0 41 0 1 0 2 0 3 0 0 45 1 0 46 9009:15 AM 0 0 0 0 0 0 0 1 59 0 0 60 0 1 0 0 1 2 0 0 48 0 0 48 11009:30 AM 0 0 0 0 0 0 0 0 74 0 0 74 0 1 0 0 0 1 0 0 60 0 0 60 13509:45 AM 0 0 0 0 0 0 0 1 77 0 0 78 0 3 0 1 0 4 1 0 58 0 0 59 141
Total Volume 0 0 0 0 0 0 0 2 251 0 0 253 0 6 0 3 1 10 1 0 211 1 0 213 476% App. Total 0 0 0 0 0 0 0.8 99.2 0 0 0 60 0 30 10 0.5 0 99.1 0.5 0
PHF .000 .000 .000 .000 .000 .000 .000 .500 .815 .000 .000 .811 .000 .500 .000 .375 .250 .625 .250 .000 .879 .250 .000 .888 .844
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 12:30 PM
12:30 PM 0 0 0 0 0 0 0 0 194 0 0 194 0 3 0 2 0 5 0 0 161 2 0 163 36212:45 PM 0 0 0 0 0 0 0 3 146 0 0 149 0 0 0 1 0 1 1 0 183 2 0 186 33601:00 PM 0 0 0 0 0 0 0 2 182 0 0 184 0 1 0 4 0 5 0 0 186 4 0 190 37901:15 PM 0 0 0 0 0 0 0 5 166 0 0 171 0 2 0 1 0 3 0 0 180 3 0 183 357
Total Volume 0 0 0 0 0 0 0 10 688 0 0 698 0 6 0 8 0 14 1 0 710 11 0 722 1434% App. Total 0 0 0 0 0 0 1.4 98.6 0 0 0 42.9 0 57.1 0 0.1 0 98.3 1.5 0
PHF .000 .000 .000 .000 .000 .000 .000 .500 .887 .000 .000 .899 .000 .500 .000 .500 .000 .700 .250 .000 .954 .688 .000 .950 .946
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:00 PM
02:00 PM 0 0 0 0 0 0 0 1 163 0 0 164 0 3 0 3 0 6 0 0 192 0 0 192 36202:15 PM 0 0 0 0 0 0 0 0 143 0 0 143 0 0 0 0 0 0 0 0 185 2 0 187 33002:30 PM 0 0 0 0 0 0 0 0 157 0 0 157 0 2 0 1 0 3 0 0 194 1 0 195 35502:45 PM 0 0 0 0 0 0 0 2 144 0 0 146 0 1 0 3 0 4 0 0 201 1 0 202 352
Total Volume 0 0 0 0 0 0 0 3 607 0 0 610 0 6 0 7 0 13 0 0 772 4 0 776 1399% App. Total 0 0 0 0 0 0 0.5 99.5 0 0 0 46.2 0 53.8 0 0 0 99.5 0.5 0
PHF .000 .000 .000 .000 .000 .000 .000 .375 .931 .000 .000 .930 .000 .500 .000 .583 .000 .542 .000 .000 .960 .500 .000 .960 .966
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D24 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-6-17Site Code : 3Start Date : 1/6/2017Page No : 1
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 1 1 0 2 0 1 0 0 0 1 0 0 3 0 0 3 612:15 AM 0 1 0 0 0 1 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 0 0 3 612:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 112:45 AM 0 1 0 0 0 1 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 1 0 4 7
Total 0 2 0 0 0 2 0 0 6 1 0 7 0 1 0 0 0 1 0 0 9 1 0 10 20
01:00 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 701:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 7
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 3 302:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 0 0 0 0 202:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 2 0 0 2 1 0 3 6
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 103:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 303:45 AM 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 0 1 0 0 0 1 3
Total 0 0 0 0 0 0 0 1 3 0 0 4 0 0 0 0 0 0 0 1 2 0 0 3 7
04:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 304:15 AM 0 0 0 0 0 0 0 0 4 2 0 6 0 0 0 0 0 0 0 0 3 0 0 3 904:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 3 0 0 3 404:45 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 6 0 0 6 10
Total 0 0 0 0 0 0 0 0 10 2 0 12 0 0 0 0 0 0 0 0 14 0 0 14 26
05:00 AM 0 0 0 0 0 0 0 0 5 1 0 6 0 1 0 0 0 1 0 0 5 0 0 5 1205:15 AM 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 0 0 7 0 0 7 1405:30 AM 0 0 0 0 0 0 0 0 5 0 0 5 0 2 0 1 0 3 0 0 20 0 0 20 2805:45 AM 0 0 0 0 0 0 0 0 16 0 0 16 0 3 0 0 0 3 0 0 15 0 0 15 34
Total 0 0 0 0 0 0 0 0 33 1 0 34 0 6 0 1 0 7 0 0 47 0 0 47 88
06:00 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 1 0 1 0 0 10 0 0 10 1506:15 AM 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 1 0 15 1 0 17 3006:30 AM 0 0 0 0 0 0 0 0 14 0 0 14 0 2 0 0 0 2 0 0 10 0 0 10 2606:45 AM 0 0 0 0 0 0 0 0 23 1 0 24 0 2 0 1 0 3 0 0 23 1 0 24 51
Total 0 0 0 0 0 0 0 0 54 1 0 55 0 4 0 2 0 6 1 0 58 2 0 61 122
07:00 AM 0 0 0 0 0 0 0 0 17 1 0 18 0 3 0 1 0 4 0 0 14 0 0 14 3607:15 AM 0 0 0 1 0 1 0 0 12 2 0 14 0 4 0 2 0 6 0 1 19 0 0 20 4107:30 AM 0 0 0 0 0 0 0 1 27 1 0 29 0 3 0 1 1 5 0 0 17 1 0 18 52
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D25 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-6-17Site Code : 3Start Date : 1/6/2017Page No : 2
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 2 0 1 0 3 0 0 38 3 0 41 0 6 0 1 0 7 0 0 17 1 0 18 69
Total 0 2 0 2 0 4 0 1 94 7 0 102 0 16 0 5 1 22 0 1 67 2 0 70 198
08:00 AM 0 1 0 0 0 1 0 1 31 1 0 33 0 2 0 0 0 2 0 1 31 0 0 32 6808:15 AM 0 0 0 0 0 0 0 0 31 2 0 33 0 2 0 0 0 2 0 0 30 1 0 31 6608:30 AM 0 0 0 0 0 0 0 1 32 1 0 34 0 4 0 0 0 4 0 0 25 0 0 25 6308:45 AM 0 0 0 1 0 1 0 0 38 5 0 43 0 1 0 0 0 1 0 2 29 3 0 34 79
Total 0 1 0 1 0 2 0 2 132 9 0 143 0 9 0 0 0 9 0 3 115 4 0 122 276
09:00 AM 0 0 0 0 0 0 0 0 43 2 0 45 0 1 0 1 0 2 0 1 35 0 0 36 8309:15 AM 0 2 0 1 0 3 0 1 49 3 0 53 0 1 0 0 0 1 0 0 42 0 0 42 9909:30 AM 0 1 0 1 0 2 0 0 60 9 0 69 0 0 0 1 0 1 0 3 52 2 0 57 12909:45 AM 0 1 0 2 0 3 0 1 66 15 0 82 0 1 0 1 0 2 0 0 58 1 0 59 146
Total 0 4 0 4 0 8 0 2 218 29 0 249 0 3 0 3 0 6 0 4 187 3 0 194 457
10:00 AM 0 5 0 4 0 9 0 0 48 7 0 55 0 0 0 0 0 0 0 2 57 1 0 60 12410:15 AM 0 3 0 1 0 4 0 0 58 11 0 69 0 1 0 1 1 3 0 2 72 1 0 75 15110:30 AM 0 6 0 3 0 9 0 0 60 13 0 73 0 1 0 0 1 2 0 0 75 0 0 75 15910:45 AM 0 6 0 5 0 11 0 0 77 14 0 91 0 0 1 0 0 1 0 2 74 1 0 77 180
Total 0 20 0 13 0 33 0 0 243 45 0 288 0 2 1 1 2 6 0 6 278 3 0 287 614
11:00 AM 0 8 0 4 0 12 0 2 69 9 0 80 0 1 0 0 0 1 0 0 75 0 0 75 16811:15 AM 0 5 0 2 0 7 1 0 74 12 0 87 0 1 0 0 0 1 0 2 101 0 0 103 19811:30 AM 0 7 0 1 0 8 0 1 76 8 0 85 0 1 0 0 0 1 0 2 103 1 0 106 20011:45 AM 0 8 0 2 0 10 0 0 78 24 0 102 0 0 0 0 0 0 0 1 106 2 0 109 221
Total 0 28 0 9 0 37 1 3 297 53 0 354 0 3 0 0 0 3 0 5 385 3 0 393 787
12:00 PM 0 4 0 0 0 4 0 0 72 25 0 97 0 0 0 0 1 1 0 4 109 0 0 113 21512:15 PM 0 10 0 6 0 16 0 1 102 17 0 120 0 1 0 0 0 1 0 2 95 1 0 98 23512:30 PM 0 9 0 3 0 12 0 0 108 18 0 126 0 1 0 0 0 1 0 5 134 1 0 140 27912:45 PM 0 15 0 6 0 21 0 2 84 14 0 100 0 0 0 1 0 1 0 4 131 0 0 135 257
Total 0 38 0 15 0 53 0 3 366 74 0 443 0 2 0 1 1 4 0 15 469 2 0 486 986
01:00 PM 0 7 1 4 0 12 0 0 86 17 0 103 0 1 0 1 0 2 0 3 129 3 0 135 25201:15 PM 0 14 0 6 0 20 0 1 114 22 0 137 0 1 0 0 1 2 0 1 136 0 0 137 29601:30 PM 0 19 0 2 0 21 0 0 89 9 0 98 0 1 0 0 0 1 0 1 117 0 0 118 23801:45 PM 0 9 0 7 0 16 0 1 93 17 0 111 0 0 1 0 0 1 0 2 120 0 0 122 250
Total 0 49 1 19 0 69 0 2 382 65 0 449 0 3 1 1 1 6 0 7 502 3 0 512 1036
02:00 PM 0 20 1 6 0 27 0 1 102 15 0 118 0 1 0 0 0 1 0 3 128 0 0 131 27702:15 PM 0 9 0 2 0 11 0 0 90 11 0 101 0 1 0 0 0 1 0 1 113 2 0 116 22902:30 PM 0 14 0 3 0 17 0 0 81 14 0 95 0 1 0 1 0 2 0 1 129 1 0 131 24502:45 PM 0 9 0 1 0 10 0 0 105 15 0 120 0 0 0 0 0 0 0 3 119 0 0 122 252
Total 0 52 1 12 0 65 0 1 378 55 0 434 0 3 0 1 0 4 0 8 489 3 0 500 1003
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D26 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-6-17Site Code : 3Start Date : 1/6/2017Page No : 3
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 15 0 9 0 24 0 1 80 14 0 95 0 1 0 0 0 1 0 3 114 1 0 118 23803:15 PM 0 15 1 3 0 19 0 1 78 11 0 90 0 2 0 0 1 3 0 1 118 1 0 120 23203:30 PM 0 12 1 2 0 15 0 1 87 11 0 99 0 1 0 1 0 2 0 2 150 1 0 153 26903:45 PM 0 9 0 3 0 12 0 0 100 16 0 116 0 1 0 0 0 1 1 1 154 1 0 157 286
Total 0 51 2 17 0 70 0 3 345 52 0 400 0 5 0 1 1 7 1 7 536 4 0 548 1025
04:00 PM 0 8 1 6 0 15 0 1 91 18 0 110 0 1 0 1 0 2 0 2 136 2 0 140 26704:15 PM 0 9 2 7 0 18 0 1 104 20 0 125 0 2 0 0 1 3 0 4 161 1 0 166 31204:30 PM 0 13 0 5 0 18 0 0 127 16 0 143 0 2 0 1 0 3 0 2 144 1 0 147 31104:45 PM 0 11 0 2 0 13 0 2 92 23 0 117 0 0 0 0 0 0 0 1 143 1 0 145 275
Total 0 41 3 20 0 64 0 4 414 77 0 495 0 5 0 2 1 8 0 9 584 5 0 598 1165
05:00 PM 0 18 0 9 0 27 0 1 94 18 0 113 0 1 0 1 0 2 0 1 166 4 0 171 31305:15 PM 0 14 0 2 0 16 0 1 98 14 0 113 0 3 0 1 0 4 1 1 132 2 0 136 26905:30 PM 0 11 1 4 0 16 0 3 93 18 0 114 0 4 0 1 0 5 0 6 146 5 0 157 29205:45 PM 0 16 0 6 0 22 0 1 98 13 0 112 0 0 0 1 3 4 0 1 126 1 0 128 266
Total 0 59 1 21 0 81 0 6 383 63 0 452 0 8 0 4 3 15 1 9 570 12 0 592 1140
06:00 PM 0 9 2 3 0 14 0 2 109 14 0 125 0 4 0 1 0 5 0 2 107 4 0 113 25706:15 PM 0 11 0 4 0 15 0 1 96 11 0 108 0 3 0 0 0 3 0 0 114 4 0 118 24406:30 PM 0 16 0 4 0 20 0 1 79 6 0 86 0 1 0 1 0 2 1 0 112 1 0 114 22206:45 PM 0 14 0 4 0 18 0 1 74 14 0 89 0 0 0 1 0 1 0 2 115 1 0 118 226
Total 0 50 2 15 0 67 0 5 358 45 0 408 0 8 0 3 0 11 1 4 448 10 0 463 949
07:00 PM 0 7 0 3 0 10 0 1 66 1 0 68 0 1 0 0 0 1 1 1 102 2 0 106 18507:15 PM 0 11 1 8 0 20 0 0 64 6 0 70 0 1 0 2 0 3 0 1 76 3 0 80 17307:30 PM 0 15 1 5 0 21 0 0 64 6 0 70 0 2 0 0 0 2 0 2 78 4 0 84 17707:45 PM 0 8 0 3 0 11 0 0 42 5 0 47 0 0 0 0 0 0 0 0 94 2 0 96 154
Total 0 41 2 19 0 62 0 1 236 18 0 255 0 4 0 2 0 6 1 4 350 11 0 366 689
08:00 PM 0 8 0 1 0 9 0 0 46 4 0 50 0 1 0 0 0 1 0 0 85 1 0 86 14608:15 PM 0 10 0 3 0 13 0 0 43 5 0 48 0 0 0 0 0 0 0 0 62 0 0 62 12308:30 PM 0 7 0 0 0 7 0 0 36 3 0 39 0 0 0 0 0 0 0 0 54 2 0 56 10208:45 PM 0 7 0 1 0 8 0 2 26 2 0 30 0 0 0 1 0 1 0 0 46 0 0 46 85
Total 0 32 0 5 0 37 0 2 151 14 0 167 0 1 0 1 0 2 0 0 247 3 0 250 456
09:00 PM 0 3 0 1 0 4 0 1 17 1 0 19 0 0 0 0 0 0 0 0 39 1 0 40 6309:15 PM 0 5 0 1 0 6 0 0 8 0 0 8 0 0 0 0 0 0 0 0 29 1 0 30 4409:30 PM 0 0 0 1 0 1 0 0 18 5 0 23 0 1 0 0 0 1 0 0 26 1 0 27 5209:45 PM 0 1 0 1 0 2 0 1 22 2 0 25 0 0 0 0 0 0 0 0 23 4 0 27 54
Total 0 9 0 4 0 13 0 2 65 8 0 75 0 1 0 0 0 1 0 0 117 7 0 124 213
10:00 PM 0 8 0 1 0 9 0 1 20 1 0 22 0 0 0 0 0 0 0 2 17 0 0 19 5010:15 PM 0 1 0 1 0 2 0 0 16 0 0 16 0 1 0 1 0 2 0 0 19 3 0 22 4210:30 PM 0 2 0 2 1 5 0 1 15 0 0 16 0 0 0 0 0 0 0 0 16 0 0 16 37
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D27 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-6-17Site Code : 3Start Date : 1/6/2017Page No : 4
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 1 0 1 0 2 0 1 11 0 0 12 0 0 0 1 0 1 0 0 10 1 0 11 26
Total 0 12 0 5 1 18 0 3 62 1 0 66 0 1 0 2 0 3 0 2 62 4 0 68 155
11:00 PM 0 1 0 1 0 2 0 0 10 0 0 10 0 1 0 0 0 1 0 0 12 0 0 12 2511:15 PM 0 0 0 0 0 0 0 1 7 0 0 8 0 0 0 0 0 0 0 1 7 0 0 8 1611:30 PM 0 2 0 4 0 6 0 0 6 0 0 6 0 4 0 0 0 4 0 0 4 0 0 4 2011:45 PM 0 1 1 0 0 2 0 0 5 0 0 5 0 0 0 0 0 0 0 0 3 0 0 3 10
Total 0 4 1 5 0 10 0 1 28 0 0 29 0 5 0 0 0 5 0 1 26 0 0 27 71
Grand Total 0 495 13 186 1 695 1 42 4262 620 0 4925 0 92 2 30 10 134 5 86 5568 83 0 5742 11496Apprch % 0 71.2 1.9 26.8 0.1 0 0.9 86.5 12.6 0 0 68.7 1.5 22.4 7.5 0.1 1.5 97 1.4 0
Total % 0 4.3 0.1 1.6 0 6 0 0.4 37.1 5.4 0 42.8 0 0.8 0 0.3 0.1 1.2 0 0.7 48.4 0.7 0 49.9Cars + 0 490 13 182 1 686 1 42 4220 613 0 4876 0 91 2 29 10 132 5 85 5510 80 0 5680 11374
% Cars + 0 99 100 97.8 100 98.7 100 100 99 98.9 0 99 0 98.9 100 96.7 100 98.5 100 98.8 99 96.4 0 98.9 98.9Trucks 0 5 0 4 0 9 0 0 42 7 0 49 0 1 0 1 0 2 0 1 58 3 0 62 122
% Trucks 0 1 0 2.2 0 1.3 0 0 1 1.1 0 1 0 1.1 0 3.3 0 1.5 0 1.2 1 3.6 0 1.1 1.1
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D28 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-6-17Site Code : 3Start Date : 1/6/2017Page No : 5
Hudson Rd & Turnberry AlcoveWoodbury, MN
Turnberry Alcove
Hud
son
Rd
Hudson R
d
Turnberry Alcove
Right
182 4
186 Thru
13 0
13 Left
490 5
495 UTrn
0 0 0
Peds
1 0 1
InOut Total700 686 1386
8 9 17 708 1403 695
Out0 0 0 In0 0 0 Total0 0 0
Right
613 7 620
Thru
4220 42
4262 Left 42 0
42 U
Trn 1 0 1 Peds 0 0 0
Out
TotalIn
6029 4876
10905 64
49 113
6093 11018
4925
Out
1 0
1 In
0 0
0 Tota
l
1 0
1 UTrn0 0 0
Left91 1
92
Thru2 0 2
Right29 1
30
Peds10 0
10
Out TotalIn
135 132 267 3 2 5
138 272 134
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n5 0 5 Le
ft85 1 86
Thru
5510
58
55
68
Rig
ht80 3 83
Peds
0 0 0
Tota
lO
utIn
4493
56
80
1017
3 47
62
10
9 45
40
1028
2 57
42
Out5
0 5
In 0 0
0
Total5
0 5
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D29 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-6-17Site Code : 3Start Date : 1/6/2017Page No : 6
Hudson Rd & Turnberry AlcoveWoodbury, MN
Turnberry AlcoveSouthbound
Hudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 0 43 2 0 45 0 1 0 1 0 2 0 1 35 0 0 36 8309:15 AM 0 2 0 1 0 3 0 1 49 3 0 53 0 1 0 0 0 1 0 0 42 0 0 42 9909:30 AM 0 1 0 1 0 2 0 0 60 9 0 69 0 0 0 1 0 1 0 3 52 2 0 57 12909:45 AM 0 1 0 2 0 3 0 1 66 15 0 82 0 1 0 1 0 2 0 0 58 1 0 59 146
Total Volume 0 4 0 4 0 8 0 2 218 29 0 249 0 3 0 3 0 6 0 4 187 3 0 194 457% App. Total 0 50 0 50 0 0 0.8 87.6 11.6 0 0 50 0 50 0 0 2.1 96.4 1.5 0
PHF .000 .500 .000 .500 .000 .667 .000 .500 .826 .483 .000 .759 .000 .750 .000 .750 .000 .750 .000 .333 .806 .375 .000 .822 .783
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 12:30 PM
12:30 PM 0 9 0 3 0 12 0 0 108 18 0 126 0 1 0 0 0 1 0 5 134 1 0 140 27912:45 PM 0 15 0 6 0 21 0 2 84 14 0 100 0 0 0 1 0 1 0 4 131 0 0 135 25701:00 PM 0 7 1 4 0 12 0 0 86 17 0 103 0 1 0 1 0 2 0 3 129 3 0 135 25201:15 PM 0 14 0 6 0 20 0 1 114 22 0 137 0 1 0 0 1 2 0 1 136 0 0 137 296
Total Volume 0 45 1 19 0 65 0 3 392 71 0 466 0 3 0 2 1 6 0 13 530 4 0 547 1084% App. Total 0 69.2 1.5 29.2 0 0 0.6 84.1 15.2 0 0 50 0 33.3 16.7 0 2.4 96.9 0.7 0
PHF .000 .750 .250 .792 .000 .774 .000 .375 .860 .807 .000 .850 .000 .750 .000 .500 .250 .750 .000 .650 .974 .333 .000 .977 .916
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 9 2 7 0 18 0 1 104 20 0 125 0 2 0 0 1 3 0 4 161 1 0 166 31204:30 PM 0 13 0 5 0 18 0 0 127 16 0 143 0 2 0 1 0 3 0 2 144 1 0 147 31104:45 PM 0 11 0 2 0 13 0 2 92 23 0 117 0 0 0 0 0 0 0 1 143 1 0 145 27505:00 PM 0 18 0 9 0 27 0 1 94 18 0 113 0 1 0 1 0 2 0 1 166 4 0 171 313
Total Volume 0 51 2 23 0 76 0 4 417 77 0 498 0 5 0 2 1 8 0 8 614 7 0 629 1211% App. Total 0 67.1 2.6 30.3 0 0 0.8 83.7 15.5 0 0 62.5 0 25 12.5 0 1.3 97.6 1.1 0
PHF .000 .708 .250 .639 .000 .704 .000 .500 .821 .837 .000 .871 .000 .625 .000 .500 .250 .667 .000 .500 .925 .438 .000 .920 .967
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D30 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-7-17Site Code : 3Start Date : 1/7/2017Page No : 1
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 2 0 0 0 2 0 0 2 1 0 3 0 0 0 0 0 0 0 0 2 0 0 2 712:15 AM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 2 1 0 3 812:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 712:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 3
Total 0 2 0 0 0 2 0 0 11 1 0 12 0 0 0 0 0 0 0 0 10 1 0 11 25
01:00 AM 0 1 1 0 0 2 0 1 2 0 0 3 0 0 0 0 0 0 0 0 1 0 0 1 601:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 5 0 0 5 901:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 301:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 1 1 0 0 2 0 1 7 0 0 8 0 0 0 0 0 0 0 0 9 0 0 9 19
02:00 AM 0 2 0 0 0 2 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 402:15 AM 0 0 0 0 0 0 0 1 2 0 0 3 0 0 0 0 0 0 0 0 1 0 0 1 402:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 1 0 0 1 402:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 0 0 1 0 0 0 0 0 0 2
Total 0 2 0 0 0 2 0 1 7 0 0 8 0 1 0 0 0 1 0 0 3 0 0 3 14
03:00 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 503:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 103:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 7
04:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 304:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 7 0 0 7 804:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 2 0 0 2 404:45 AM 0 1 0 0 0 1 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 4
Total 0 1 0 0 0 1 0 0 5 0 0 5 0 0 0 0 0 0 0 0 13 0 0 13 19
05:00 AM 0 0 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 205:15 AM 0 0 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 0 0 0 7 0 0 7 1105:30 AM 0 4 0 0 0 4 0 0 2 0 0 2 0 0 0 1 0 1 0 0 7 0 0 7 1405:45 AM 0 5 0 0 0 5 0 0 10 1 0 11 0 2 0 0 0 2 0 0 21 0 0 21 39
Total 0 9 0 0 0 9 0 0 16 3 0 19 0 2 0 1 0 3 0 0 35 0 0 35 66
06:00 AM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 6 0 0 6 1106:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 6 0 0 6 1006:30 AM 0 0 0 0 0 0 0 0 2 1 0 3 0 1 0 0 0 1 0 0 9 0 0 9 1306:45 AM 0 0 0 0 0 0 0 0 8 0 0 8 0 1 0 0 0 1 0 0 15 0 0 15 24
Total 0 0 0 0 0 0 0 0 19 1 0 20 0 2 0 0 0 2 0 0 36 0 0 36 58
07:00 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 9 0 0 9 1207:15 AM 0 0 0 0 0 0 0 0 8 0 0 8 0 1 0 0 0 1 0 0 3 0 0 3 1207:30 AM 0 1 0 0 0 1 0 0 7 0 0 7 0 0 0 1 0 1 0 0 14 0 0 14 23
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D31 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-7-17Site Code : 3Start Date : 1/7/2017Page No : 2
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 0 12 2 0 14 0 0 0 0 0 0 0 0 22 0 0 22 36
Total 0 1 0 0 0 1 0 0 30 2 0 32 0 1 0 1 0 2 0 0 48 0 0 48 83
08:00 AM 0 2 0 0 0 2 0 0 18 1 0 19 0 0 0 0 0 0 0 0 15 0 0 15 3608:15 AM 0 0 0 0 0 0 0 0 28 2 0 30 0 3 0 1 0 4 0 0 23 0 0 23 5708:30 AM 0 0 0 1 0 1 0 0 30 2 0 32 0 0 0 0 0 0 0 2 29 0 0 31 6408:45 AM 0 0 0 0 0 0 0 0 51 4 0 55 0 2 0 2 0 4 0 1 35 1 0 37 96
Total 0 2 0 1 0 3 0 0 127 9 0 136 0 5 0 3 0 8 0 3 102 1 0 106 253
09:00 AM 0 0 0 0 0 0 0 1 37 5 0 43 0 1 0 0 0 1 0 0 44 1 0 45 8909:15 AM 0 3 0 0 0 3 0 0 59 3 0 62 0 2 0 0 0 2 0 1 46 2 0 49 11609:30 AM 0 1 0 1 0 2 0 2 68 14 0 84 0 3 0 0 0 3 0 1 63 0 0 64 15309:45 AM 0 7 0 3 0 10 0 2 71 10 0 83 0 1 0 1 0 2 0 4 58 0 0 62 157
Total 0 11 0 4 0 15 0 5 235 32 0 272 0 7 0 1 0 8 0 6 211 3 0 220 515
10:00 AM 0 5 0 1 0 6 0 2 76 12 0 90 0 0 0 0 0 0 0 0 42 0 0 42 13810:15 AM 0 4 0 1 0 5 0 0 94 13 0 107 0 3 0 0 0 3 0 1 120 0 0 121 23610:30 AM 0 6 0 2 0 8 0 0 79 26 0 105 0 1 0 1 0 2 0 0 94 2 0 96 21110:45 AM 0 10 0 2 0 12 0 0 126 18 0 144 0 0 0 1 0 1 0 1 87 1 0 89 246
Total 0 25 0 6 0 31 0 2 375 69 0 446 0 4 0 2 0 6 0 2 343 3 0 348 831
11:00 AM 0 10 0 2 0 12 0 1 111 20 0 132 0 2 0 2 0 4 0 2 155 3 0 160 30811:15 AM 0 14 0 0 0 14 0 0 134 31 0 165 0 2 0 0 0 2 0 0 125 1 0 126 30711:30 AM 0 9 0 3 0 12 0 0 122 29 0 151 0 1 0 1 0 2 1 0 136 2 0 139 30411:45 AM 0 10 0 3 0 13 0 0 157 22 0 179 0 1 1 1 0 3 0 3 144 1 0 148 343
Total 0 43 0 8 0 51 0 1 524 102 0 627 0 6 1 4 0 11 1 5 560 7 0 573 1262
12:00 PM 0 15 0 5 0 20 0 2 140 32 0 174 0 2 0 2 0 4 0 3 157 3 0 163 36112:15 PM 0 21 0 9 0 30 0 2 125 18 0 145 0 2 0 2 0 4 1 2 156 0 0 159 33812:30 PM 0 12 1 6 0 19 0 1 176 25 0 202 0 1 0 0 0 1 0 2 155 0 0 157 37912:45 PM 0 19 0 4 0 23 1 1 141 21 0 164 0 3 0 0 0 3 0 2 172 2 0 176 366
Total 0 67 1 24 0 92 1 6 582 96 0 685 0 8 0 4 0 12 1 9 640 5 0 655 1444
01:00 PM 0 13 0 4 0 17 0 1 170 37 0 208 0 4 0 1 0 5 0 1 174 4 0 179 40901:15 PM 0 16 0 6 0 22 0 1 159 26 0 186 0 1 0 1 0 2 0 1 172 2 0 175 38501:30 PM 0 24 0 5 0 29 0 0 115 36 0 151 0 5 0 1 0 6 0 6 177 1 0 184 37001:45 PM 0 14 0 4 0 18 0 0 154 21 0 175 0 1 0 0 0 1 0 0 200 2 0 202 396
Total 0 67 0 19 0 86 0 2 598 120 0 720 0 11 0 3 0 14 0 8 723 9 0 740 1560
02:00 PM 0 16 0 2 0 18 0 1 149 28 0 178 0 0 0 1 0 1 0 2 192 3 0 197 39402:15 PM 0 13 0 9 0 22 0 1 129 34 0 164 0 0 0 1 0 1 0 5 170 0 0 175 36202:30 PM 0 22 0 8 0 30 0 1 137 29 0 167 0 1 0 2 0 3 0 1 180 3 0 184 38402:45 PM 0 20 1 7 0 28 0 1 140 24 0 165 0 0 0 2 0 2 0 2 198 0 0 200 395
Total 0 71 1 26 0 98 0 4 555 115 0 674 0 1 0 6 0 7 0 10 740 6 0 756 1535
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D32 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-7-17Site Code : 3Start Date : 1/7/2017Page No : 3
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 19 1 9 0 29 0 0 136 28 0 164 0 0 0 1 0 1 0 0 182 0 0 182 37603:15 PM 0 18 0 13 0 31 0 0 128 21 0 149 0 1 0 0 0 1 0 2 167 0 0 169 35003:30 PM 0 11 0 8 0 19 0 1 122 26 0 149 0 1 0 0 0 1 1 0 188 0 0 189 35803:45 PM 0 17 0 4 0 21 0 2 129 30 0 161 0 4 0 1 0 5 0 0 172 0 0 172 359
Total 0 65 1 34 0 100 0 3 515 105 0 623 0 6 0 2 0 8 1 2 709 0 0 712 1443
04:00 PM 0 19 0 4 0 23 0 0 131 27 0 158 0 0 0 0 0 0 0 2 151 2 0 155 33604:15 PM 0 18 1 5 0 24 0 0 96 27 0 123 0 2 0 0 0 2 1 0 152 2 0 155 30404:30 PM 0 20 1 5 0 26 0 1 122 25 0 148 0 1 1 3 0 5 0 0 154 1 0 155 33404:45 PM 0 18 0 2 0 20 0 2 112 19 0 133 0 0 0 1 0 1 0 3 149 2 0 154 308
Total 0 75 2 16 0 93 0 3 461 98 0 562 0 3 1 4 0 8 1 5 606 7 0 619 1282
05:00 PM 0 20 0 3 0 23 0 1 85 16 0 102 0 2 0 1 0 3 0 2 130 1 0 133 26105:15 PM 0 14 0 6 0 20 0 2 117 12 0 131 0 0 0 1 0 1 0 4 128 1 0 133 28505:30 PM 0 16 0 3 0 19 0 0 103 20 0 123 0 0 0 1 0 1 0 2 102 1 0 105 24805:45 PM 0 8 0 2 0 10 0 2 86 7 0 95 0 1 0 1 0 2 1 0 107 2 0 110 217
Total 0 58 0 14 0 72 0 5 391 55 0 451 0 3 0 4 0 7 1 8 467 5 0 481 1011
06:00 PM 0 13 0 7 0 20 0 0 82 11 0 93 0 0 0 2 0 2 0 2 112 2 0 116 23106:15 PM 0 11 0 7 0 18 0 1 84 9 0 94 0 1 0 1 0 2 0 2 90 3 0 95 20906:30 PM 0 10 0 6 0 16 0 1 72 14 0 87 0 1 0 0 0 1 0 5 72 0 0 77 18106:45 PM 0 12 0 4 0 16 0 1 67 10 0 78 0 1 0 1 0 2 0 2 78 0 0 80 176
Total 0 46 0 24 0 70 0 3 305 44 0 352 0 3 0 4 0 7 0 11 352 5 0 368 797
07:00 PM 0 8 0 8 0 16 0 0 48 6 0 54 0 1 0 0 0 1 0 2 73 1 0 76 14707:15 PM 0 2 0 1 0 3 0 1 73 12 0 86 0 0 0 1 0 1 0 1 67 0 0 68 15807:30 PM 0 10 0 5 0 15 0 2 54 3 0 59 0 1 0 0 0 1 1 0 62 3 0 66 14107:45 PM 0 3 0 1 0 4 0 0 47 1 0 48 0 0 0 0 0 0 0 1 52 0 0 53 105
Total 0 23 0 15 0 38 0 3 222 22 0 247 0 2 0 1 0 3 1 4 254 4 0 263 551
08:00 PM 0 11 0 3 0 14 0 0 39 3 0 42 0 0 0 0 0 0 1 0 58 0 0 59 11508:15 PM 0 6 0 5 0 11 0 0 27 2 0 29 0 1 0 0 0 1 0 0 63 0 0 63 10408:30 PM 0 4 2 4 0 10 0 0 23 3 0 26 0 0 0 0 0 0 0 0 50 0 0 50 8608:45 PM 0 10 0 2 0 12 0 0 20 0 0 20 0 0 0 0 0 0 0 1 42 0 0 43 75
Total 0 31 2 14 0 47 0 0 109 8 0 117 0 1 0 0 0 1 1 1 213 0 0 215 380
09:00 PM 0 5 0 1 0 6 0 0 14 3 0 17 0 0 0 0 0 0 0 0 33 0 0 33 5609:15 PM 0 1 0 0 0 1 0 1 11 0 0 12 0 0 0 0 0 0 0 0 31 2 0 33 4609:30 PM 0 2 0 4 0 6 0 0 15 2 0 17 0 1 0 0 0 1 0 0 31 2 0 33 5709:45 PM 0 1 0 1 0 2 0 0 16 1 0 17 0 0 0 0 0 0 0 0 21 0 0 21 40
Total 0 9 0 6 0 15 0 1 56 6 0 63 0 1 0 0 0 1 0 0 116 4 0 120 199
10:00 PM 0 2 0 1 0 3 0 0 8 1 0 9 0 0 0 0 0 0 0 0 26 3 0 29 4110:15 PM 0 3 0 0 0 3 0 0 11 0 0 11 0 0 0 0 0 0 0 0 15 1 0 16 3010:30 PM 0 1 0 0 1 2 0 0 6 0 0 6 0 1 0 0 0 1 0 0 15 0 0 15 24
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D33 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-7-17Site Code : 3Start Date : 1/7/2017Page No : 4
Hudson Rd & Turnberry AlcoveWoodbury, MN
Groups Printed- Cars + - TrucksTurnberry Alcove
SouthboundHudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 1 0 0 0 1 0 0 11 0 0 11 0 2 0 0 0 2 0 0 10 0 0 10 24
Total 0 7 0 1 1 9 0 0 36 1 0 37 0 3 0 0 0 3 0 0 66 4 0 70 119
11:00 PM 0 0 0 2 0 2 0 0 13 0 0 13 0 0 0 0 0 0 0 0 15 0 0 15 3011:15 PM 0 0 0 0 0 0 0 1 3 1 0 5 0 0 0 0 0 0 0 0 5 0 0 5 1011:30 PM 0 0 0 1 0 1 0 0 4 0 0 4 0 0 0 0 0 0 0 0 5 0 0 5 1011:45 PM 0 0 1 1 0 2 0 1 2 0 0 3 0 0 0 0 0 0 0 0 6 0 0 6 11
Total 0 0 1 4 0 5 0 2 22 1 0 25 0 0 0 0 0 0 0 0 31 0 0 31 61
Grand Total 0 616 10 216 1 843 1 42 5208 890 0 6141 0 70 2 40 0 112 7 74 6293 64 0 6438 13534Apprch % 0 73.1 1.2 25.6 0.1 0 0.7 84.8 14.5 0 0 62.5 1.8 35.7 0 0.1 1.1 97.7 1 0
Total % 0 4.6 0.1 1.6 0 6.2 0 0.3 38.5 6.6 0 45.4 0 0.5 0 0.3 0 0.8 0.1 0.5 46.5 0.5 0 47.6Cars + 0 613 10 215 1 839 1 42 5198 887 0 6128 0 70 2 40 0 112 7 74 6270 63 0 6414 13493
% Cars + 0 99.5 100 99.5 100 99.5 100 100 99.8 99.7 0 99.8 0 100 100 100 0 100 100 100 99.6 98.4 0 99.6 99.7Trucks 0 3 0 1 0 4 0 0 10 3 0 13 0 0 0 0 0 0 0 0 23 1 0 24 41
% Trucks 0 0.5 0 0.5 0 0.5 0 0 0.2 0.3 0 0.2 0 0 0 0 0 0 0 0 0.4 1.6 0 0.4 0.3
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D34 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-7-17Site Code : 3Start Date : 1/7/2017Page No : 5
Hudson Rd & Turnberry AlcoveWoodbury, MN
Turnberry Alcove
Hud
son
Rd
Hudson R
d
Turnberry Alcove
Right
215 1
216 Thru
10 0
10 Left
613 3
616 UTrn
0 0 0
Peds
1 0 1
InOut Total963 839 1802
3 4 7 966 1809 843
Out0 0 0 In0 0 0 Total0 0 0
Right
887 3 890
Thru
5198 10
5208 Left 42 0
42 U
Trn 1 0 1 Peds 0 0 0
Out
TotalIn
6923 6128
13051 26
13 39
6949 13090
6141
Out
1 0
1 In
0 0
0 Tota
l
1 0
1 UTrn0 0 0
Left70 0
70
Thru2 0 2
Right40 0
40
Peds0 0 0
Out TotalIn
115 112 227 1 0 1
116 228 112
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n7 0 7 Le
ft74 0 74
Thru
6270
23
62
93
Rig
ht63 1 64
Peds
0 0 0
Tota
lO
utIn
5483
64
14
1189
7 11
24
35
54
94
1193
2 64
38
Out7
0 7
In 0 0
0
Total7
0 7
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D35 Spack Consulting
File Name : 3 - Hudson Rd & Turnberry Alcove, 1-7-17Site Code : 3Start Date : 1/7/2017Page No : 6
Hudson Rd & Turnberry AlcoveWoodbury, MN
Turnberry AlcoveSouthbound
Hudson RdWestbound
Turnberry AlcoveNorthbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 1 37 5 0 43 0 1 0 0 0 1 0 0 44 1 0 45 8909:15 AM 0 3 0 0 0 3 0 0 59 3 0 62 0 2 0 0 0 2 0 1 46 2 0 49 11609:30 AM 0 1 0 1 0 2 0 2 68 14 0 84 0 3 0 0 0 3 0 1 63 0 0 64 15309:45 AM 0 7 0 3 0 10 0 2 71 10 0 83 0 1 0 1 0 2 0 4 58 0 0 62 157
Total Volume 0 11 0 4 0 15 0 5 235 32 0 272 0 7 0 1 0 8 0 6 211 3 0 220 515% App. Total 0 73.3 0 26.7 0 0 1.8 86.4 11.8 0 0 87.5 0 12.5 0 0 2.7 95.9 1.4 0
PHF .000 .393 .000 .333 .000 .375 .000 .625 .827 .571 .000 .810 .000 .583 .000 .250 .000 .667 .000 .375 .837 .375 .000 .859 .820
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 01:00 PM
01:00 PM 0 13 0 4 0 17 0 1 170 37 0 208 0 4 0 1 0 5 0 1 174 4 0 179 40901:15 PM 0 16 0 6 0 22 0 1 159 26 0 186 0 1 0 1 0 2 0 1 172 2 0 175 38501:30 PM 0 24 0 5 0 29 0 0 115 36 0 151 0 5 0 1 0 6 0 6 177 1 0 184 37001:45 PM 0 14 0 4 0 18 0 0 154 21 0 175 0 1 0 0 0 1 0 0 200 2 0 202 396
Total Volume 0 67 0 19 0 86 0 2 598 120 0 720 0 11 0 3 0 14 0 8 723 9 0 740 1560% App. Total 0 77.9 0 22.1 0 0 0.3 83.1 16.7 0 0 78.6 0 21.4 0 0 1.1 97.7 1.2 0
PHF .000 .698 .000 .792 .000 .741 .000 .500 .879 .811 .000 .865 .000 .550 .000 .750 .000 .583 .000 .333 .904 .563 .000 .916 .954
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:00 PM
02:00 PM 0 16 0 2 0 18 0 1 149 28 0 178 0 0 0 1 0 1 0 2 192 3 0 197 39402:15 PM 0 13 0 9 0 22 0 1 129 34 0 164 0 0 0 1 0 1 0 5 170 0 0 175 36202:30 PM 0 22 0 8 0 30 0 1 137 29 0 167 0 1 0 2 0 3 0 1 180 3 0 184 38402:45 PM 0 20 1 7 0 28 0 1 140 24 0 165 0 0 0 2 0 2 0 2 198 0 0 200 395
Total Volume 0 71 1 26 0 98 0 4 555 115 0 674 0 1 0 6 0 7 0 10 740 6 0 756 1535% App. Total 0 72.4 1 26.5 0 0 0.6 82.3 17.1 0 0 14.3 0 85.7 0 0 1.3 97.9 0.8 0
PHF .000 .807 .250 .722 .000 .817 .000 1.00 .931 .846 .000 .947 .000 .250 .000 .750 .000 .583 .000 .500 .934 .500 .000 .945 .972
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D36 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-6-17Site Code : 4Start Date : 1/6/2017Page No : 1
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 2 0 0 2 412:15 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 5 0 0 5 712:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 212:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 4 0 0 4 5
Total 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 0 0 11 0 0 11 18
01:00 AM 0 0 0 1 0 1 0 0 2 1 0 3 0 0 0 0 0 0 0 0 4 0 0 4 801:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 101:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 101:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 0 0 1 0 1 0 0 2 1 0 3 0 0 0 0 0 0 0 0 7 0 0 7 11
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 102:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 102:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 102:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 1 0 0 1 4
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 303:45 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
Total 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 2 0 0 2 5
04:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 304:15 AM 0 0 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 0 0 3 0 0 3 904:30 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 5 0 0 5 604:45 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 6 0 0 6 10
Total 0 0 0 0 0 0 0 0 12 0 0 12 0 0 0 0 0 0 0 0 16 0 0 16 28
05:00 AM 0 0 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 0 0 5 0 0 5 1105:15 AM 0 0 0 0 0 0 0 0 6 0 0 6 0 0 0 0 0 0 0 0 7 0 0 7 1305:30 AM 0 0 0 0 0 0 0 0 5 1 0 6 0 0 0 0 0 0 0 0 16 0 0 16 2205:45 AM 0 0 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 0 0 0 19 0 0 19 35
Total 0 0 0 0 0 0 0 0 33 1 0 34 0 0 0 0 0 0 0 0 47 0 0 47 81
06:00 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 11 0 0 11 1506:15 AM 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 0 0 13 0 0 13 2606:30 AM 0 0 0 0 0 0 0 0 15 0 0 15 0 0 0 0 0 0 0 0 11 0 0 11 2606:45 AM 0 0 0 0 0 0 0 0 23 0 0 23 0 0 0 0 0 0 0 0 25 0 0 25 48
Total 0 0 0 0 0 0 0 0 55 0 0 55 0 0 0 0 0 0 0 0 60 0 0 60 115
07:00 AM 0 0 0 0 0 0 0 0 21 0 0 21 0 0 0 0 0 0 0 0 14 0 0 14 3507:15 AM 0 0 0 0 0 0 0 0 17 0 0 17 0 0 0 0 0 0 0 0 22 0 0 22 3907:30 AM 0 0 0 0 0 0 0 0 27 0 0 27 0 0 0 0 0 0 0 0 17 0 0 17 44
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D37 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-6-17Site Code : 4Start Date : 1/6/2017Page No : 2
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 0 44 0 0 44 0 0 0 0 0 0 0 0 20 0 0 20 64
Total 0 0 0 0 0 0 0 0 109 0 0 109 0 0 0 0 0 0 0 0 73 0 0 73 182
08:00 AM 0 1 0 0 0 1 0 0 30 1 0 31 0 0 0 0 0 0 0 0 34 0 0 34 6608:15 AM 0 0 0 0 0 0 0 0 36 1 0 37 0 0 0 0 0 0 0 0 31 0 0 31 6808:30 AM 0 0 0 0 0 0 0 0 32 1 0 33 0 0 0 0 0 0 0 0 23 0 0 23 5608:45 AM 0 0 0 0 0 0 0 0 45 1 0 46 0 0 0 0 0 0 0 0 30 0 0 30 76
Total 0 1 0 0 0 1 0 0 143 4 0 147 0 0 0 0 0 0 0 0 118 0 0 118 266
09:00 AM 0 0 0 0 0 0 0 0 44 2 0 46 0 0 0 0 0 0 0 0 37 0 0 37 8309:15 AM 0 0 0 0 0 0 0 0 59 1 0 60 0 0 0 0 0 0 0 1 46 0 0 47 10709:30 AM 0 0 0 0 0 0 0 0 63 1 0 64 0 0 0 0 0 0 0 0 54 0 0 54 11809:45 AM 0 0 0 0 0 0 0 0 86 1 0 87 0 0 0 0 0 0 0 1 56 0 0 57 144
Total 0 0 0 0 0 0 0 0 252 5 0 257 0 0 0 0 0 0 0 2 193 0 0 195 452
10:00 AM 0 1 0 1 0 2 0 0 55 3 0 58 0 0 0 0 0 0 0 1 67 0 0 68 12810:15 AM 0 0 0 0 0 0 0 0 77 0 0 77 0 0 0 0 0 0 0 0 76 0 0 76 15310:30 AM 0 1 0 0 0 1 1 0 67 0 0 68 0 0 0 0 0 0 0 0 79 0 0 79 14810:45 AM 0 0 0 1 0 1 0 0 93 1 0 94 0 0 0 0 0 0 0 1 74 0 0 75 170
Total 0 2 0 2 0 4 1 0 292 4 0 297 0 0 0 0 0 0 0 2 296 0 0 298 599
11:00 AM 0 1 0 1 0 2 0 0 84 0 0 84 0 0 0 0 0 0 0 2 91 0 0 93 17911:15 AM 0 0 0 1 0 1 0 0 86 1 0 87 0 0 0 0 0 0 0 0 101 0 0 101 18911:30 AM 0 2 0 2 0 4 0 0 84 2 0 86 0 0 0 0 0 0 1 2 108 0 0 111 20111:45 AM 0 0 0 1 0 1 0 0 97 2 0 99 0 0 0 0 0 0 1 0 119 0 0 120 220
Total 0 3 0 5 0 8 0 0 351 5 0 356 0 0 0 0 0 0 2 4 419 0 0 425 789
12:00 PM 0 4 0 2 0 6 0 0 93 2 0 95 0 0 0 0 0 0 0 0 117 0 0 117 21812:15 PM 0 1 0 1 0 2 0 0 128 1 0 129 0 0 0 0 0 0 0 1 110 0 0 111 24212:30 PM 0 1 0 1 0 2 0 0 121 2 0 123 0 0 0 0 0 0 0 0 141 0 0 141 26612:45 PM 0 1 0 2 0 3 0 0 103 1 0 104 0 0 0 0 0 0 0 0 141 0 0 141 248
Total 0 7 0 6 0 13 0 0 445 6 0 451 0 0 0 0 0 0 0 1 509 0 0 510 974
01:00 PM 0 0 0 2 0 2 0 0 98 2 0 100 0 0 0 0 0 0 0 1 131 0 0 132 23401:15 PM 0 0 0 2 0 2 0 0 129 1 0 130 0 0 0 0 0 0 0 0 153 0 0 153 28501:30 PM 0 0 0 1 0 1 0 0 101 1 0 102 0 0 0 0 0 0 0 0 128 0 0 128 23101:45 PM 0 1 0 1 0 2 0 0 113 2 0 115 0 0 0 0 0 0 0 0 127 0 0 127 244
Total 0 1 0 6 0 7 0 0 441 6 0 447 0 0 0 0 0 0 0 1 539 0 0 540 994
02:00 PM 0 0 0 1 0 1 0 0 118 0 0 118 0 0 0 0 0 0 1 3 140 0 0 144 26302:15 PM 0 1 0 0 0 1 0 0 89 0 0 89 0 0 0 0 0 0 0 0 129 0 0 129 21902:30 PM 0 0 0 0 0 0 0 0 96 1 0 97 0 0 0 0 0 0 0 0 144 0 0 144 24102:45 PM 0 0 0 1 0 1 0 0 118 1 0 119 0 0 0 0 0 0 0 1 123 0 0 124 244
Total 0 1 0 2 0 3 0 0 421 2 0 423 0 0 0 0 0 0 1 4 536 0 0 541 967
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D38 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-6-17Site Code : 4Start Date : 1/6/2017Page No : 3
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 2 0 2 0 4 0 0 95 0 0 95 0 0 0 0 0 0 0 0 130 0 0 130 22903:15 PM 0 1 0 3 0 4 0 0 94 2 0 96 0 0 0 0 0 0 0 0 142 0 0 142 24203:30 PM 0 1 0 0 0 1 0 0 97 2 0 99 0 0 0 0 0 0 0 0 154 0 0 154 25403:45 PM 0 1 0 2 0 3 0 0 120 0 0 120 0 0 0 0 0 0 0 0 163 0 0 163 286
Total 0 5 0 7 0 12 0 0 406 4 0 410 0 0 0 0 0 0 0 0 589 0 0 589 1011
04:00 PM 0 0 0 0 0 0 0 0 108 1 0 109 0 0 0 0 0 0 0 0 142 0 0 142 25104:15 PM 0 0 0 0 0 0 0 0 123 0 0 123 0 0 0 0 0 0 0 0 164 0 0 164 28704:30 PM 0 0 0 0 0 0 0 0 145 0 0 145 0 0 0 0 0 0 0 0 159 0 0 159 30404:45 PM 0 0 0 1 0 1 0 0 118 0 0 118 0 0 0 0 0 0 0 0 162 0 0 162 281
Total 0 0 0 1 0 1 0 0 494 1 0 495 0 0 0 0 0 0 0 0 627 0 0 627 1123
05:00 PM 0 0 0 1 0 1 0 0 119 0 0 119 0 0 0 0 0 0 0 1 186 0 0 187 30705:15 PM 0 1 0 1 0 2 0 0 112 1 0 113 0 0 0 0 0 0 0 0 150 0 0 150 26505:30 PM 0 0 0 1 0 1 0 0 114 2 0 116 0 0 0 0 0 0 0 0 157 0 0 157 27405:45 PM 0 0 0 1 0 1 0 0 108 0 0 108 0 0 0 0 0 0 0 0 138 0 0 138 247
Total 0 1 0 4 0 5 0 0 453 3 0 456 0 0 0 0 0 0 0 1 631 0 0 632 1093
06:00 PM 0 2 0 1 0 3 0 0 122 1 0 123 0 0 0 0 0 0 0 0 117 0 0 117 24306:15 PM 0 3 0 2 0 5 0 0 113 0 0 113 0 0 0 0 0 0 0 0 127 0 0 127 24506:30 PM 0 2 0 0 0 2 0 0 90 0 0 90 0 0 0 0 0 0 0 0 131 0 0 131 22306:45 PM 0 0 0 0 0 0 0 0 85 0 0 85 0 0 0 0 0 0 0 0 132 0 0 132 217
Total 0 7 0 3 0 10 0 0 410 1 0 411 0 0 0 0 0 0 0 0 507 0 0 507 928
07:00 PM 0 0 0 1 0 1 1 0 76 0 0 77 0 0 0 0 0 0 0 0 105 0 0 105 18307:15 PM 0 0 0 0 0 0 0 0 68 0 0 68 0 0 0 0 0 0 0 0 93 0 0 93 16107:30 PM 0 0 0 0 0 0 0 0 69 0 0 69 0 0 0 0 0 0 0 0 96 0 0 96 16507:45 PM 0 3 0 0 0 3 0 0 50 1 0 51 0 0 0 0 0 0 0 1 100 0 0 101 155
Total 0 3 0 1 0 4 1 0 263 1 0 265 0 0 0 0 0 0 0 1 394 0 0 395 664
08:00 PM 0 0 0 0 0 0 0 0 52 1 0 53 0 0 0 0 0 0 0 0 98 0 0 98 15108:15 PM 0 0 0 0 0 0 0 0 52 0 0 52 0 0 0 0 0 0 0 0 70 0 0 70 12208:30 PM 0 0 0 0 0 0 0 0 35 0 0 35 0 0 0 0 0 0 0 0 59 0 0 59 9408:45 PM 0 0 0 0 0 0 1 0 28 1 0 30 0 0 0 0 0 0 0 0 56 0 0 56 86
Total 0 0 0 0 0 0 1 0 167 2 0 170 0 0 0 0 0 0 0 0 283 0 0 283 453
09:00 PM 0 0 0 1 0 1 0 0 18 0 0 18 0 0 0 0 0 0 0 0 44 0 0 44 6309:15 PM 0 0 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 0 0 36 0 0 36 4509:30 PM 0 0 0 0 0 0 0 0 23 0 0 23 0 0 0 0 0 0 0 0 29 0 0 29 5209:45 PM 0 0 0 0 0 0 0 0 28 0 0 28 0 0 0 0 0 0 0 0 22 0 0 22 50
Total 0 0 0 1 0 1 0 0 78 0 0 78 0 0 0 0 0 0 0 0 131 0 0 131 210
10:00 PM 0 0 0 0 0 0 0 0 19 0 0 19 0 0 0 0 0 0 0 0 23 0 0 23 4210:15 PM 0 0 0 0 0 0 0 0 17 0 0 17 0 0 0 0 0 0 0 0 23 0 0 23 4010:30 PM 0 0 0 0 0 0 0 0 17 0 0 17 0 0 0 0 0 0 0 0 16 0 0 16 33
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D39 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-6-17Site Code : 4Start Date : 1/6/2017Page No : 4
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 0 0 0 0 0 0 0 12 0 0 12 0 0 0 0 0 0 0 0 12 0 0 12 24
Total 0 0 0 0 0 0 0 0 65 0 0 65 0 0 0 0 0 0 0 0 74 0 0 74 139
11:00 PM 0 0 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 0 0 13 0 0 13 2311:15 PM 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 8 0 0 8 1611:30 PM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 5 0 0 5 1011:45 PM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 4 0 0 4 9
Total 0 0 0 0 0 0 0 0 28 0 0 28 0 0 0 0 0 0 0 0 30 0 0 30 58
Grand Total 0 31 0 39 0 70 3 0 4933 46 0 4982 0 0 0 0 0 0 3 16 6093 0 0 6112 11164Apprch % 0 44.3 0 55.7 0 0.1 0 99 0.9 0 0 0 0 0 0 0 0.3 99.7 0 0
Total % 0 0.3 0 0.3 0 0.6 0 0 44.2 0.4 0 44.6 0 0 0 0 0 0 0 0.1 54.6 0 0 54.7Cars + 0 31 0 38 0 69 3 0 4892 45 0 4940 0 0 0 0 0 0 3 16 6037 0 0 6056 11065
% Cars + 0 100 0 97.4 0 98.6 100 0 99.2 97.8 0 99.2 0 0 0 0 0 0 100 100 99.1 0 0 99.1 99.1Trucks 0 0 0 1 0 1 0 0 41 1 0 42 0 0 0 0 0 0 0 0 56 0 0 56 99
% Trucks 0 0 0 2.6 0 1.4 0 0 0.8 2.2 0 0.8 0 0 0 0 0 0 0 0 0.9 0 0 0.9 0.9
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D40 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-6-17Site Code : 4Start Date : 1/6/2017Page No : 5
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Woodbury Lakes East Access
Hud
son
Rd
Hudson R
d
Right
38 1
39 Thru
0 0 0
Left
31 0
31 UTrn
0 0 0
Peds
0 0 0
InOut Total61 69 130 1 1 2
62 132 70
Out0 0 0 In0 0 0 Total0 0 0
Right 45 1
46 Thru
4892 41
4933 Left 0 0 0
UTrn 3 0 3
Peds 0 0 0
Out
TotalIn
6068 4940
11008 56
42 98
6124 11106
4982
Out
3 0
3 In
0 0
0 Tota
l
3 0
3 UTrn0 0 0
Left0 0 0
Thru0 0 0
Right0 0 0
Peds0 0 0
Out TotalIn
0 0 0 0 0 0 0 0 0
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n3 0 3 Le
ft16 0 16
Thru
6037
56
60
93
Rig
ht0 0 0 Pe
ds
0 0 0
Tota
lO
utIn
4930
60
56
1098
6 42
56
98
49
72
1108
4 61
12
Out3
0 3
In 0 0
0
Total3
0 3
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D41 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-6-17Site Code : 4Start Date : 1/6/2017Page No : 6
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Woodbury Lakes East AccessSouthbound
Hudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 0 44 2 0 46 0 0 0 0 0 0 0 0 37 0 0 37 8309:15 AM 0 0 0 0 0 0 0 0 59 1 0 60 0 0 0 0 0 0 0 1 46 0 0 47 10709:30 AM 0 0 0 0 0 0 0 0 63 1 0 64 0 0 0 0 0 0 0 0 54 0 0 54 11809:45 AM 0 0 0 0 0 0 0 0 86 1 0 87 0 0 0 0 0 0 0 1 56 0 0 57 144
Total Volume 0 0 0 0 0 0 0 0 252 5 0 257 0 0 0 0 0 0 0 2 193 0 0 195 452% App. Total 0 0 0 0 0 0 0 98.1 1.9 0 0 0 0 0 0 0 1 99 0 0
PHF .000 .000 .000 .000 .000 .000 .000 .000 .733 .625 .000 .739 .000 .000 .000 .000 .000 .000 .000 .500 .862 .000 .000 .855 .785
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 12:30 PM
12:30 PM 0 1 0 1 0 2 0 0 121 2 0 123 0 0 0 0 0 0 0 0 141 0 0 141 26612:45 PM 0 1 0 2 0 3 0 0 103 1 0 104 0 0 0 0 0 0 0 0 141 0 0 141 24801:00 PM 0 0 0 2 0 2 0 0 98 2 0 100 0 0 0 0 0 0 0 1 131 0 0 132 23401:15 PM 0 0 0 2 0 2 0 0 129 1 0 130 0 0 0 0 0 0 0 0 153 0 0 153 285
Total Volume 0 2 0 7 0 9 0 0 451 6 0 457 0 0 0 0 0 0 0 1 566 0 0 567 1033% App. Total 0 22.2 0 77.8 0 0 0 98.7 1.3 0 0 0 0 0 0 0 0.2 99.8 0 0
PHF .000 .500 .000 .875 .000 .750 .000 .000 .874 .750 .000 .879 .000 .000 .000 .000 .000 .000 .000 .250 .925 .000 .000 .926 .906
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 0 0 0 0 0 0 0 123 0 0 123 0 0 0 0 0 0 0 0 164 0 0 164 28704:30 PM 0 0 0 0 0 0 0 0 145 0 0 145 0 0 0 0 0 0 0 0 159 0 0 159 30404:45 PM 0 0 0 1 0 1 0 0 118 0 0 118 0 0 0 0 0 0 0 0 162 0 0 162 28105:00 PM 0 0 0 1 0 1 0 0 119 0 0 119 0 0 0 0 0 0 0 1 186 0 0 187 307
Total Volume 0 0 0 2 0 2 0 0 505 0 0 505 0 0 0 0 0 0 0 1 671 0 0 672 1179% App. Total 0 0 0 100 0 0 0 100 0 0 0 0 0 0 0 0 0.1 99.9 0 0
PHF .000 .000 .000 .500 .000 .500 .000 .000 .871 .000 .000 .871 .000 .000 .000 .000 .000 .000 .000 .250 .902 .000 .000 .898 .960
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D42 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-7-17Site Code : 4Start Date : 1/7/2017Page No : 1
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 312:15 AM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 2 0 0 2 712:30 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 4 0 0 4 712:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 3
Total 0 0 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 0 0 10 0 0 10 20
01:00 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 2 0 0 2 501:15 AM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 5 0 0 5 1001:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 201:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 10 0 0 10 18
02:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 3 0 0 3 402:15 AM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 2 0 0 2 502:30 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 1 0 0 1 502:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 6 0 0 6 14
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 503:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 103:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 6 0 0 6 7
04:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 204:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 7 0 0 7 804:30 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 3 0 0 3 504:45 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 3 0 0 3 4
Total 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 15 0 0 15 19
05:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 205:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 9 0 0 9 1305:30 AM 0 1 0 0 0 1 0 0 2 1 0 3 0 0 0 0 0 0 0 0 12 0 0 12 1605:45 AM 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 0 0 27 0 0 27 40
Total 0 1 0 0 0 1 0 0 21 1 0 22 0 0 0 0 0 0 0 0 48 0 0 48 71
06:00 AM 0 0 0 0 0 0 0 0 3 1 0 4 0 0 0 0 0 0 0 0 7 0 0 7 1106:15 AM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 6 0 0 6 1006:30 AM 0 0 0 0 0 0 0 0 6 1 0 7 0 0 0 0 0 0 0 0 16 0 0 16 2306:45 AM 0 0 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 0 0 14 0 0 14 23
Total 0 0 0 0 0 0 0 0 22 2 0 24 0 0 0 0 0 0 0 0 43 0 0 43 67
07:00 AM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 9 0 0 9 1107:15 AM 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 6 0 0 6 1407:30 AM 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 0 0 16 0 0 16 24
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D43 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-7-17Site Code : 4Start Date : 1/7/2017Page No : 2
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 0 17 0 0 17 0 0 0 0 0 0 0 0 22 0 0 22 39
Total 0 0 0 0 0 0 0 0 35 0 0 35 0 0 0 0 0 0 0 0 53 0 0 53 88
08:00 AM 0 0 0 0 0 0 0 0 20 0 0 20 0 0 0 0 0 0 0 0 20 0 0 20 4008:15 AM 0 0 0 0 0 0 0 0 49 0 0 49 0 0 0 0 0 0 0 0 45 0 0 45 9408:30 AM 0 1 0 0 0 1 0 0 34 1 0 35 0 0 0 0 0 0 0 0 31 0 0 31 6708:45 AM 0 1 0 0 0 1 0 0 57 3 0 60 0 0 0 0 0 0 0 2 33 0 0 35 96
Total 0 2 0 0 0 2 0 0 160 4 0 164 0 0 0 0 0 0 0 2 129 0 0 131 297
09:00 AM 0 0 0 0 0 0 0 0 48 1 0 49 0 0 0 0 0 0 0 0 47 0 0 47 9609:15 AM 0 0 0 0 0 0 0 0 60 1 0 61 0 0 0 0 0 0 0 0 47 0 0 47 10809:30 AM 0 0 0 0 0 0 0 0 85 1 0 86 0 0 0 0 0 0 0 0 62 0 0 62 14809:45 AM 0 0 0 0 0 0 0 0 87 1 0 88 0 0 0 0 0 0 0 0 62 0 0 62 150
Total 0 0 0 0 0 0 0 0 280 4 0 284 0 0 0 0 0 0 0 0 218 0 0 218 502
10:00 AM 0 0 0 0 0 0 0 0 90 0 0 90 0 0 0 0 0 0 0 0 78 0 0 78 16810:15 AM 0 0 0 0 0 0 0 0 111 1 0 112 0 0 0 0 0 0 0 0 98 0 0 98 21010:30 AM 0 0 0 0 0 0 0 0 102 0 0 102 0 0 0 0 0 0 0 2 107 0 0 109 21110:45 AM 0 0 0 1 0 1 0 0 158 1 0 159 0 0 0 0 0 0 0 0 145 0 0 145 305
Total 0 0 0 1 0 1 0 0 461 2 0 463 0 0 0 0 0 0 0 2 428 0 0 430 894
11:00 AM 0 1 0 1 0 2 0 0 140 2 0 142 0 0 0 0 0 0 1 1 133 0 0 135 27911:15 AM 0 3 0 1 0 4 0 0 167 2 0 169 0 0 0 0 0 0 0 2 135 0 0 137 31011:30 AM 0 1 0 1 0 2 0 0 152 2 0 154 0 0 0 0 0 0 1 1 143 0 0 145 30111:45 AM 0 1 0 2 0 3 0 0 185 2 0 187 0 0 0 0 0 0 0 0 163 0 0 163 353
Total 0 6 0 5 0 11 0 0 644 8 0 652 0 0 0 0 0 0 2 4 574 0 0 580 1243
12:00 PM 0 2 0 2 0 4 0 0 169 1 0 170 0 0 0 0 0 0 0 1 181 0 0 182 35612:15 PM 0 1 0 4 0 5 0 0 153 3 0 156 0 0 0 0 0 0 0 2 171 0 0 173 33412:30 PM 0 1 0 2 0 3 1 0 211 2 0 214 0 0 0 0 0 0 0 0 174 0 0 174 39112:45 PM 0 0 0 0 0 0 0 0 164 1 0 165 0 0 0 0 0 0 0 0 193 0 0 193 358
Total 0 4 0 8 0 12 1 0 697 7 0 705 0 0 0 0 0 0 0 3 719 0 0 722 1439
01:00 PM 0 0 0 0 0 0 0 0 212 2 0 214 0 0 0 0 0 0 0 0 204 0 0 204 41801:15 PM 0 2 0 1 0 3 0 0 188 2 0 190 0 0 0 0 0 0 2 0 195 0 0 197 39001:30 PM 0 0 0 1 0 1 0 0 147 1 0 148 0 0 0 0 0 0 1 0 201 0 0 202 35101:45 PM 0 0 0 3 0 3 0 0 188 3 0 191 0 0 0 0 0 0 0 0 225 0 0 225 419
Total 0 2 0 5 0 7 0 0 735 8 0 743 0 0 0 0 0 0 3 0 825 0 0 828 1578
02:00 PM 0 2 0 6 0 8 0 0 187 5 0 192 0 0 0 0 0 0 0 0 210 0 0 210 41002:15 PM 0 2 0 4 0 6 0 0 166 1 0 167 0 0 0 0 0 0 0 1 188 0 0 189 36202:30 PM 0 2 0 1 0 3 0 0 174 3 0 177 0 0 0 0 0 0 1 0 213 0 0 214 39402:45 PM 0 2 0 2 0 4 0 0 163 3 0 166 0 0 0 0 0 0 1 0 228 0 0 229 399
Total 0 8 0 13 0 21 0 0 690 12 0 702 0 0 0 0 0 0 2 1 839 0 0 842 1565
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D44 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-7-17Site Code : 4Start Date : 1/7/2017Page No : 3
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 1 0 4 0 5 0 0 166 6 0 172 0 0 0 0 0 0 0 0 213 0 0 213 39003:15 PM 0 1 0 1 0 2 0 0 162 1 0 163 0 0 0 0 0 0 0 2 185 0 0 187 35203:30 PM 0 1 0 3 0 4 0 0 152 4 0 156 0 0 0 0 0 0 0 0 213 0 0 213 37303:45 PM 0 0 0 3 0 3 0 0 163 1 0 164 0 0 0 0 0 0 0 2 200 0 0 202 369
Total 0 3 0 11 0 14 0 0 643 12 0 655 0 0 0 0 0 0 0 4 811 0 0 815 1484
04:00 PM 0 2 0 0 0 2 0 0 164 2 0 166 0 0 0 0 0 0 0 0 164 0 0 164 33204:15 PM 0 0 0 0 0 0 0 0 132 1 0 133 0 0 0 0 0 0 0 0 180 0 0 180 31304:30 PM 0 1 0 1 0 2 0 0 155 1 0 156 0 0 0 0 0 0 0 0 176 0 0 176 33404:45 PM 0 1 0 1 0 2 0 0 130 1 0 131 0 0 0 0 0 0 0 1 171 0 0 172 305
Total 0 4 0 2 0 6 0 0 581 5 0 586 0 0 0 0 0 0 0 1 691 0 0 692 1284
05:00 PM 0 2 0 1 0 3 0 0 106 1 0 107 0 0 0 0 0 0 1 1 155 0 0 157 26705:15 PM 0 0 0 2 0 2 0 0 139 1 0 140 0 0 0 0 0 0 0 0 153 0 0 153 29505:30 PM 0 2 0 1 0 3 0 0 138 1 0 139 0 0 0 0 0 0 0 0 130 0 0 130 27205:45 PM 0 1 0 0 0 1 0 0 93 0 0 93 0 0 0 0 0 0 0 0 129 0 0 129 223
Total 0 5 0 4 0 9 0 0 476 3 0 479 0 0 0 0 0 0 1 1 567 0 0 569 1057
06:00 PM 0 5 0 4 0 9 0 0 98 0 0 98 0 0 0 0 0 0 0 0 122 0 0 122 22906:15 PM 0 0 0 0 0 0 0 0 88 0 0 88 0 0 0 0 0 0 2 0 114 0 0 116 20406:30 PM 0 0 0 1 0 1 0 0 85 0 0 85 0 0 0 0 0 0 1 0 83 0 0 84 17006:45 PM 0 0 0 0 0 0 0 0 79 1 0 80 0 0 0 0 0 0 0 1 97 0 0 98 178
Total 0 5 0 5 0 10 0 0 350 1 0 351 0 0 0 0 0 0 3 1 416 0 0 420 781
07:00 PM 0 0 0 0 0 0 0 0 53 0 0 53 0 0 0 0 0 0 0 0 85 0 0 85 13807:15 PM 0 0 0 1 0 1 0 0 91 0 0 91 0 0 0 0 0 0 0 0 71 0 0 71 16307:30 PM 0 0 0 2 0 2 0 0 55 1 0 56 0 0 0 0 0 0 0 0 75 0 0 75 13307:45 PM 0 0 0 2 0 2 0 0 50 0 0 50 0 0 0 0 0 0 0 0 56 0 0 56 108
Total 0 0 0 5 0 5 0 0 249 1 0 250 0 0 0 0 0 0 0 0 287 0 0 287 542
08:00 PM 0 0 0 1 0 1 0 0 39 0 0 39 0 0 0 0 0 0 1 1 67 0 0 69 10908:15 PM 0 1 0 0 0 1 0 0 30 0 0 30 0 0 0 0 0 0 0 1 73 0 0 74 10508:30 PM 0 0 0 0 0 0 0 0 26 0 0 26 0 0 0 0 0 0 0 0 52 0 0 52 7808:45 PM 0 2 0 0 0 2 0 0 20 0 0 20 0 0 0 0 0 0 0 1 50 0 0 51 73
Total 0 3 0 1 0 4 0 0 115 0 0 115 0 0 0 0 0 0 1 3 242 0 0 246 365
09:00 PM 0 0 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 0 0 1 37 0 0 38 5409:15 PM 0 0 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 0 0 0 35 0 0 35 5109:30 PM 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 0 0 35 0 0 35 4809:45 PM 0 0 0 1 0 1 0 0 18 0 0 18 0 0 0 0 0 0 0 0 22 0 0 22 41
Total 0 0 0 1 0 1 0 0 63 0 0 63 0 0 0 0 0 0 0 1 129 0 0 130 194
10:00 PM 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 0 0 26 0 0 26 3310:15 PM 0 0 0 0 0 0 0 0 13 0 0 13 0 0 0 0 0 0 0 0 18 0 0 18 3110:30 PM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 15 0 0 15 19
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D45 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-7-17Site Code : 4Start Date : 1/7/2017Page No : 4
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes East Access
SouthboundHudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 0 0 0 0 0 0 0 15 0 0 15 0 0 0 0 0 0 0 0 12 0 0 12 27
Total 0 0 0 0 0 0 0 0 39 0 0 39 0 0 0 0 0 0 0 0 71 0 0 71 110
11:00 PM 0 0 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 0 0 14 0 0 14 2411:15 PM 0 0 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 5 0 0 5 1011:30 PM 0 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 0 0 6 0 0 6 1011:45 PM 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 6 0 0 6 9
Total 0 0 0 0 0 0 0 0 22 0 0 22 0 0 0 0 0 0 0 0 31 0 0 31 53
Grand Total 0 43 0 61 0 104 1 0 6314 70 0 6385 0 0 0 0 0 0 12 23 7168 0 0 7203 13692Apprch % 0 41.3 0 58.7 0 0 0 98.9 1.1 0 0 0 0 0 0 0.2 0.3 99.5 0 0
Total % 0 0.3 0 0.4 0 0.8 0 0 46.1 0.5 0 46.6 0 0 0 0 0 0 0.1 0.2 52.4 0 0 52.6Cars + 0 43 0 61 0 104 1 0 6307 70 0 6378 0 0 0 0 0 0 12 23 7144 0 0 7179 13661
% Cars + 0 100 0 100 0 100 100 0 99.9 100 0 99.9 0 0 0 0 0 0 100 100 99.7 0 0 99.7 99.8Trucks 0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 0 0 0 24 0 0 24 31
% Trucks 0 0 0 0 0 0 0 0 0.1 0 0 0.1 0 0 0 0 0 0 0 0 0.3 0 0 0.3 0.2
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D46 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-7-17Site Code : 4Start Date : 1/7/2017Page No : 5
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Woodbury Lakes East Access
Hud
son
Rd
Hudson R
d
Right
61 0
61 Thru
0 0 0
Left
43 0
43 UTrn
0 0 0
Peds
0 0 0
InOut Total93 104 197 0 0 0
93 197 104
Out0 0 0 In0 0 0 Total0 0 0
Right 70 0
70 Thru
6307 7 6314
Left 0 0 0 U
Trn 1 0 1 Peds 0 0 0
Out
TotalIn
7187 6378
13565 24
7 31
7211 13596
6385
Out
1 0
1 In
0 0
0 Tota
l
1 0
1 UTrn0 0 0
Left0 0 0
Thru0 0 0
Right0 0 0
Peds0 0 0
Out TotalIn
0 0 0 0 0 0 0 0 0
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n12 0 12
Left23
0 23
Thru
7144
24
71
68
Rig
ht0 0 0 Pe
ds
0 0 0
Tota
lO
utIn
6368
71
79
1354
7 7
24
31
6375
13
578
7203
Out12
0 12
In 0 0
0
Total
12 0 12
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D47 Spack Consulting
File Name : 4 - Hudson Rd & Woodbury Lakes East Access, 1-7-17Site Code : 4Start Date : 1/7/2017Page No : 6
Hudson Rd & Woodbury Lakes East AccessWoodbury, MN
Woodbury Lakes East AccessSouthbound
Hudson RdWestbound Northbound
Hudson RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 0 48 1 0 49 0 0 0 0 0 0 0 0 47 0 0 47 9609:15 AM 0 0 0 0 0 0 0 0 60 1 0 61 0 0 0 0 0 0 0 0 47 0 0 47 10809:30 AM 0 0 0 0 0 0 0 0 85 1 0 86 0 0 0 0 0 0 0 0 62 0 0 62 14809:45 AM 0 0 0 0 0 0 0 0 87 1 0 88 0 0 0 0 0 0 0 0 62 0 0 62 150
Total Volume 0 0 0 0 0 0 0 0 280 4 0 284 0 0 0 0 0 0 0 0 218 0 0 218 502% App. Total 0 0 0 0 0 0 0 98.6 1.4 0 0 0 0 0 0 0 0 100 0 0
PHF .000 .000 .000 .000 .000 .000 .000 .000 .805 1.00 .000 .807 .000 .000 .000 .000 .000 .000 .000 .000 .879 .000 .000 .879 .837
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 01:00 PM
01:00 PM 0 0 0 0 0 0 0 0 212 2 0 214 0 0 0 0 0 0 0 0 204 0 0 204 41801:15 PM 0 2 0 1 0 3 0 0 188 2 0 190 0 0 0 0 0 0 2 0 195 0 0 197 39001:30 PM 0 0 0 1 0 1 0 0 147 1 0 148 0 0 0 0 0 0 1 0 201 0 0 202 35101:45 PM 0 0 0 3 0 3 0 0 188 3 0 191 0 0 0 0 0 0 0 0 225 0 0 225 419
Total Volume 0 2 0 5 0 7 0 0 735 8 0 743 0 0 0 0 0 0 3 0 825 0 0 828 1578% App. Total 0 28.6 0 71.4 0 0 0 98.9 1.1 0 0 0 0 0 0 0.4 0 99.6 0 0
PHF .000 .250 .000 .417 .000 .583 .000 .000 .867 .667 .000 .868 .000 .000 .000 .000 .000 .000 .375 .000 .917 .000 .000 .920 .942
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:00 PM
02:00 PM 0 2 0 6 0 8 0 0 187 5 0 192 0 0 0 0 0 0 0 0 210 0 0 210 41002:15 PM 0 2 0 4 0 6 0 0 166 1 0 167 0 0 0 0 0 0 0 1 188 0 0 189 36202:30 PM 0 2 0 1 0 3 0 0 174 3 0 177 0 0 0 0 0 0 1 0 213 0 0 214 39402:45 PM 0 2 0 2 0 4 0 0 163 3 0 166 0 0 0 0 0 0 1 0 228 0 0 229 399
Total Volume 0 8 0 13 0 21 0 0 690 12 0 702 0 0 0 0 0 0 2 1 839 0 0 842 1565% App. Total 0 38.1 0 61.9 0 0 0 98.3 1.7 0 0 0 0 0 0 0.2 0.1 99.6 0 0
PHF .000 1.00 .000 .542 .000 .656 .000 .000 .922 .600 .000 .914 .000 .000 .000 .000 .000 .000 .500 .250 .920 .000 .000 .919 .954
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D48 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-6-17Site Code : 5Start Date : 1/6/2017Page No : 1
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 112:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 012:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 012:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 2
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 3 3
01:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 101:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 201:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 3 3
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 103:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 103:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2
04:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 004:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 104:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 304:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 6
05:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 0 4 405:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 205:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 7 705:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 1 0 9 9
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 2 0 22 22
06:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 2 0 0 2 306:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3 306:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 2 0 5 506:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 2 0 12 12
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 15 7 0 22 23
07:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 507:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 3 307:30 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 8 0 0 8 9
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D49 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-6-17Site Code : 5Start Date : 1/6/2017Page No : 2
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 7 2 0 9 10
Total 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 22 3 0 25 27
08:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 11 0 0 11 1208:15 AM 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 16 0 0 16 1708:30 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 15 0 0 15 1608:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 23 0 0 23 24
Total 0 0 0 0 0 0 1 2 0 0 0 3 0 0 0 1 0 1 0 0 65 0 0 65 69
09:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 0 13 1309:15 AM 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 1 0 1 0 0 26 1 0 27 3009:30 AM 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 25 0 0 25 2609:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 33 1 0 34 35
Total 0 0 0 0 0 0 2 2 0 0 0 4 0 0 0 1 0 1 0 0 97 2 0 99 104
10:00 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 3 0 3 0 0 33 1 0 34 3810:15 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 30 1 0 31 3310:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36 0 0 36 3610:45 AM 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 2 0 2 0 0 41 0 0 41 44
Total 0 0 0 0 0 0 1 3 0 0 0 4 0 0 0 5 0 5 0 0 140 2 0 142 151
11:00 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 33 0 0 33 3511:15 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 39 2 0 41 4311:30 AM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 1 0 1 0 0 36 2 0 38 4411:45 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 44 1 0 45 47
Total 0 0 0 0 0 0 0 11 0 0 0 11 0 0 0 1 0 1 0 0 152 5 0 157 169
12:00 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 53 1 0 54 5612:15 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0 38 5 0 43 4612:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 44 0 0 44 4512:45 PM 0 0 0 0 0 0 1 5 0 0 0 6 0 0 0 1 0 1 0 0 40 0 0 40 47
Total 0 0 0 0 0 0 1 10 0 0 0 11 0 0 0 2 0 2 0 0 175 6 0 181 194
01:00 PM 0 0 0 0 0 0 1 5 0 0 0 6 0 0 0 1 0 1 0 0 28 0 0 28 3501:15 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 1 0 1 0 0 26 1 0 27 3301:30 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 3 0 3 0 0 45 3 0 48 5401:45 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 38 2 0 40 42
Total 0 0 0 0 0 0 1 15 0 0 0 16 0 0 0 5 0 5 0 0 137 6 0 143 164
02:00 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 35 1 0 36 3802:15 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 38 0 0 38 4102:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 42 0 0 42 4502:45 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 1 0 1 0 0 37 3 0 40 44
Total 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 5 0 5 0 0 152 4 0 156 168
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D50 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-6-17Site Code : 5Start Date : 1/6/2017Page No : 3
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 0 0 0 0 0 0 6 0 0 0 6 0 0 0 0 0 0 0 0 29 2 0 31 3703:15 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0 51 1 0 52 5503:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 54 2 0 56 5703:45 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 2 0 2 0 0 64 3 0 67 72
Total 0 0 0 0 0 0 0 13 0 0 0 13 0 0 0 2 0 2 0 0 198 8 0 206 221
04:00 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 57 5 0 62 6404:15 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 2 0 2 0 0 53 1 0 54 5804:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 2 0 69 6904:45 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 3 0 3 0 0 68 1 0 69 74
Total 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 6 0 6 0 0 245 9 0 254 265
05:00 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 41 2 0 43 4505:15 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 61 1 0 62 6505:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 36 0 0 36 3905:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 42 1 0 43 44
Total 0 0 0 0 0 0 0 6 0 0 0 6 0 0 0 3 0 3 0 0 180 4 0 184 193
06:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 44 1 0 45 4706:15 PM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 1 0 1 0 0 46 0 0 46 5106:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 24 0 0 24 2706:45 PM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 2 0 2 0 0 27 1 0 28 34
Total 0 0 0 0 0 0 0 10 0 0 0 10 0 0 0 6 0 6 0 0 141 2 0 143 159
07:00 PM 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 0 0 0 0 0 24 2 0 26 2807:15 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 20 2 0 22 2507:30 PM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 1 0 1 0 0 29 0 0 29 3407:45 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 16 2 0 18 20
Total 0 0 0 0 0 0 1 9 0 0 0 10 0 0 0 2 0 2 0 0 89 6 0 95 107
08:00 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 1 0 1 0 0 12 0 0 12 1608:15 PM 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 0 0 0 0 0 17 1 0 18 2008:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 9 0 0 9 1108:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 5
Total 0 0 0 0 0 0 1 6 0 0 0 7 0 0 0 1 0 1 0 0 43 1 0 44 52
09:00 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 7 0 0 7 909:15 PM 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 0 0 0 0 0 5 3 0 8 1009:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 9 1 0 10 1209:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 1 0 6 6
Total 0 0 0 0 0 0 1 5 0 0 0 6 0 0 0 0 0 0 0 0 26 5 0 31 37
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 4 1 0 5 610:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 7 710:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 3
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D51 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-6-17Site Code : 5Start Date : 1/6/2017Page No : 4
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 4 1 0 5 6
Total 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 18 2 0 20 22
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 111:15 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 211:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 311:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 3
Total 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 7 0 0 7 9
Grand Total 0 0 0 0 0 0 9 108 0 0 0 117 0 0 0 43 0 43 0 0 1935 76 0 2011 2171Apprch % 0 0 0 0 0 7.7 92.3 0 0 0 0 0 0 100 0 0 0 96.2 3.8 0
Total % 0 0 0 0 0 0 0.4 5 0 0 0 5.4 0 0 0 2 0 2 0 0 89.1 3.5 0 92.6Cars + 0 0 0 0 0 0 9 106 0 0 0 115 0 0 0 43 0 43 0 0 1921 71 0 1992 2150
% Cars + 0 0 0 0 0 0 100 98.1 0 0 0 98.3 0 0 0 100 0 100 0 0 99.3 93.4 0 99.1 99Trucks 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 14 5 0 19 21
% Trucks 0 0 0 0 0 0 0 1.9 0 0 0 1.7 0 0 0 0 0 0 0 0 0.7 6.6 0 0.9 1
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D52 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-6-17Site Code : 5Start Date : 1/6/2017Page No : 5
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Woo
dbur
y La
kes
Rd
Woodbury Lakes R
d
Spring Hill Dr
Right
0 0 0
Thru
0 0 0
Left
0 0 0
UTrn
0 0 0
Peds
0 0 0
InOut Total0 0 0 0 0 0 0 0 0
Out0 0 0 In0 0 0 Total0 0 0
Right 0 0 0
Thru 0 0 0 Left
106 2 108
UTrn 9 0 9
Peds 0 0 0
Out
TotalIn
1964 115
2079 14
2 16
1978 2095
117
Out
9 0
9 In
0 0
0 Tota
l
9 0
9 UTrn0 0 0
Left0 0 0
Thru0 0 0
Right43 0
43
Peds0 0 0
Out TotalIn
177 43 220 7 0 7
184 227 43
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n0 0 0 Le
ft0 0 0 Th
ru
1921
14
19
35
Rig
ht71 5 76
Peds
0 0 0
Tota
lO
utIn
0 19
92
1992
0
19
19
0 20
11
2011
Out0
0 0
In 0 0
0
Total0
0 0
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D53 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-6-17Site Code : 5Start Date : 1/6/2017Page No : 6
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 0 13 1309:15 AM 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 1 0 1 0 0 26 1 0 27 3009:30 AM 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 25 0 0 25 2609:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 33 1 0 34 35
Total Volume 0 0 0 0 0 0 2 2 0 0 0 4 0 0 0 1 0 1 0 0 97 2 0 99 104% App. Total 0 0 0 0 0 50 50 0 0 0 0 0 0 100 0 0 0 98 2 0
PHF .000 .000 .000 .000 .000 .000 .500 .500 .000 .000 .000 .500 .000 .000 .000 .250 .000 .250 .000 .000 .735 .500 .000 .728 .743
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 11:45 AM
11:45 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 44 1 0 45 4712:00 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 53 1 0 54 5612:15 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0 38 5 0 43 4612:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 44 0 0 44 45
Total Volume 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 1 0 1 0 0 179 7 0 186 194% App. Total 0 0 0 0 0 0 100 0 0 0 0 0 0 100 0 0 0 96.2 3.8 0
PHF .000 .000 .000 .000 .000 .000 .000 .583 .000 .000 .000 .583 .000 .000 .000 .250 .000 .250 .000 .000 .844 .350 .000 .861 .866
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 57 5 0 62 6404:15 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 2 0 2 0 0 53 1 0 54 5804:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 2 0 69 6904:45 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 3 0 3 0 0 68 1 0 69 74
Total Volume 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 6 0 6 0 0 245 9 0 254 265% App. Total 0 0 0 0 0 0 100 0 0 0 0 0 0 100 0 0 0 96.5 3.5 0
PHF .000 .000 .000 .000 .000 .000 .000 .625 .000 .000 .000 .625 .000 .000 .000 .500 .000 .500 .000 .000 .901 .450 .000 .920 .895
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D54 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-7-17Site Code : 5Start Date : 1/7/2017Page No : 1
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 012:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 212:30 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 1 0 0 1 312:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 3 0 0 3 6
01:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 101:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
04:00 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 104:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 004:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 204:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 3
05:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 005:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 305:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 505:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 10 10
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 18 18
06:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 106:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 206:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 0 4 406:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 6
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 1 0 13 13
07:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 207:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 107:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 4 0 0 4 5
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D55 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-7-17Site Code : 5Start Date : 1/7/2017Page No : 2
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total07:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 7 7
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 13 1 0 14 15
08:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 9 908:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 9 908:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 25 0 0 25 2608:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26 0 0 26 26
Total 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 69 0 0 69 70
09:00 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 20 2 0 22 2409:15 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 27 0 0 27 2909:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27 0 0 27 2709:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 27 1 0 28 31
Total 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 3 0 3 0 0 101 3 0 104 111
10:00 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 32 0 0 32 3510:15 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 34 0 0 34 3510:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 42 1 0 43 4410:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 49 3 0 52 53
Total 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 4 0 4 0 0 157 4 0 161 167
11:00 AM 0 0 0 0 0 0 1 3 0 0 0 4 0 0 0 1 0 1 0 0 32 1 0 33 3811:15 AM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 1 0 1 0 0 44 1 0 45 5011:30 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 50 1 0 51 5311:45 AM 0 0 0 0 0 0 1 3 0 0 0 4 0 0 0 1 0 1 0 0 59 5 0 64 69
Total 0 0 0 0 0 0 2 11 0 0 0 13 0 0 0 4 0 4 0 0 185 8 0 193 210
12:00 PM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 1 0 1 0 0 62 0 0 62 6712:15 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 3 0 3 0 0 48 3 0 51 5912:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 53 0 0 53 5412:45 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 3 0 3 0 0 53 1 0 54 59
Total 0 0 0 0 0 0 0 12 0 0 0 12 0 0 0 7 0 7 0 0 216 4 0 220 239
01:00 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 1 0 1 0 0 48 0 0 48 5401:15 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 0 0 0 0 0 55 1 0 56 6101:30 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 3 0 3 0 0 62 0 0 62 7001:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 53 0 0 53 54
Total 0 0 0 0 0 0 0 16 0 0 0 16 0 0 0 4 0 4 0 0 218 1 0 219 239
02:00 PM 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 1 0 1 0 0 52 2 0 54 5702:15 PM 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 1 0 1 0 0 67 2 0 69 7702:30 PM 0 0 0 0 0 0 1 10 0 0 0 11 0 0 0 1 0 1 0 0 46 2 0 48 6002:45 PM 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 1 0 1 0 0 65 3 0 68 76
Total 0 0 0 0 0 0 2 25 0 0 0 27 0 0 0 4 0 4 0 0 230 9 0 239 270
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D56 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-7-17Site Code : 5Start Date : 1/7/2017Page No : 3
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total03:00 PM 0 0 0 0 0 0 1 9 0 0 0 10 0 0 0 2 0 2 0 0 52 1 0 53 6503:15 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 2 0 2 0 0 42 2 0 44 5103:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 52 1 0 53 5503:45 PM 0 0 0 0 0 0 1 3 0 0 0 4 0 0 0 0 0 0 0 0 62 1 0 63 67
Total 0 0 0 0 0 0 2 19 0 0 0 21 0 0 0 4 0 4 0 0 208 5 0 213 238
04:00 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 1 0 1 0 0 51 2 0 53 5904:15 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 44 3 0 47 4904:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 35 2 0 37 3804:45 PM 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 50 0 0 50 51
Total 0 0 0 0 0 0 1 8 0 0 0 9 0 0 0 1 0 1 0 0 180 7 0 187 197
05:00 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 2 0 2 0 0 36 0 0 36 4305:15 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0 44 1 0 45 4805:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 32 1 0 33 3605:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 40 1 0 41 44
Total 0 0 0 0 0 0 0 11 0 0 0 11 0 0 0 5 0 5 0 0 152 3 0 155 171
06:00 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 1 0 1 0 0 37 2 0 39 4506:15 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 40 0 0 40 4306:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 34 2 0 36 3706:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 33 2 0 35 36
Total 0 0 0 0 0 0 0 8 0 0 0 8 0 0 0 3 0 3 0 0 144 6 0 150 161
07:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 16 0 0 16 1707:15 PM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 19 1 0 20 2407:30 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 19 0 0 19 2107:45 PM 0 0 0 0 0 0 0 6 0 0 0 6 0 0 0 1 0 1 0 0 15 1 0 16 23
Total 0 0 0 0 0 0 0 12 0 0 0 12 1 0 0 1 0 2 0 0 69 2 0 71 85
08:00 PM 0 0 0 0 0 0 1 2 0 0 0 3 0 0 0 0 0 0 0 0 14 0 0 14 1708:15 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 6 1 0 7 908:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 16 0 0 16 1708:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 2 0 4 5
Total 0 0 0 0 0 0 1 6 0 0 0 7 0 0 0 0 0 0 0 0 38 3 0 41 48
09:00 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 1 0 1 0 0 7 1 0 8 1109:15 PM 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0 5 0 0 5 809:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 5 0 0 5 609:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 1 0 10 10
Total 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 2 0 2 0 0 26 2 0 28 35
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 2 0 0 2 410:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1 0 7 710:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 3 0 0 3 4
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D57 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-7-17Site Code : 5Start Date : 1/7/2017Page No : 4
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Groups Printed- Cars + - Trucks
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total10:45 PM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 1 0 0 1 3
Total 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 2 0 2 0 0 12 1 0 13 18
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 211:15 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 0 0 2 311:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 2 311:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
Total 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 6 1 0 7 9
Grand Total 0 0 0 0 0 0 8 147 0 0 0 155 2 0 0 46 0 48 0 0 2061 61 0 2122 2325Apprch % 0 0 0 0 0 5.2 94.8 0 0 0 4.2 0 0 95.8 0 0 0 97.1 2.9 0
Total % 0 0 0 0 0 0 0.3 6.3 0 0 0 6.7 0.1 0 0 2 0 2.1 0 0 88.6 2.6 0 91.3Cars + 0 0 0 0 0 0 8 146 0 0 0 154 2 0 0 46 0 48 0 0 2058 61 0 2119 2321
% Cars + 0 0 0 0 0 0 100 99.3 0 0 0 99.4 100 0 0 100 0 100 0 0 99.9 100 0 99.9 99.8Trucks 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 3 0 0 3 4
% Trucks 0 0 0 0 0 0 0 0.7 0 0 0 0.6 0 0 0 0 0 0 0 0 0.1 0 0 0.1 0.2
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D58 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-7-17Site Code : 5Start Date : 1/7/2017Page No : 5
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
Woo
dbur
y La
kes
Rd
Woodbury Lakes R
d
Spring Hill Dr
Right
0 0 0
Thru
0 0 0
Left
0 0 0
UTrn
0 0 0
Peds
0 0 0
InOut Total0 0 0 0 0 0 0 0 0
Out0 0 0 In0 0 0 Total0 0 0
Right 0 0 0
Thru 0 0 0 Left
146 1 147
UTrn 8 0 8
Peds 0 0 0
Out
TotalIn
2104 154
2258 3
1 4
2107 2262
155
Out
8 0
8 In
0 0
0 Tota
l
8 0
8 UTrn2 0 2
Left0 0 0
Thru0 0 0
Right46 0
46
Peds0 0 0
Out TotalIn
207 48 255 1 0 1
208 256 48
Out
2 0 2
In
0 0 0
Total
2 0 2
UTr
n0 0 0 Le
ft0 0 0 Th
ru
2058
3 20
61
Rig
ht61 0 61
Peds
0 0 0
Tota
lO
utIn
0 21
19
2119
0
3 3
0 21
22
2122
Out0
0 0
In 0 0
0
Total0
0 0
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D59 Spack Consulting
File Name : 5 - Woodbury Lakes Rd & Spring Hill Dr, 1-7-17Site Code : 5Start Date : 1/7/2017Page No : 6
Woodbury Lakes Rd & Spring Hill DrWoodbury, MN
SouthboundWoodbury Lakes Rd
WestboundSpring Hill DrNorthbound
Woodbury Lakes RdEastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 20 2 0 22 2409:15 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 1 0 0 27 0 0 27 2909:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27 0 0 27 2709:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 2 0 2 0 0 27 1 0 28 31
Total Volume 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 3 0 3 0 0 101 3 0 104 111% App. Total 0 0 0 0 0 0 100 0 0 0 0 0 0 100 0 0 0 97.1 2.9 0
PHF .000 .000 .000 .000 .000 .000 .000 .500 .000 .000 .000 .500 .000 .000 .000 .375 .000 .375 .000 .000 .935 .375 .000 .929 .895
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 11:45 AM
11:45 AM 0 0 0 0 0 0 1 3 0 0 0 4 0 0 0 1 0 1 0 0 59 5 0 64 6912:00 PM 0 0 0 0 0 0 0 4 0 0 0 4 0 0 0 1 0 1 0 0 62 0 0 62 6712:15 PM 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 3 0 3 0 0 48 3 0 51 5912:30 PM 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 53 0 0 53 54
Total Volume 0 0 0 0 0 0 1 13 0 0 0 14 0 0 0 5 0 5 0 0 222 8 0 230 249% App. Total 0 0 0 0 0 7.1 92.9 0 0 0 0 0 0 100 0 0 0 96.5 3.5 0
PHF .000 .000 .000 .000 .000 .000 .250 .650 .000 .000 .000 .700 .000 .000 .000 .417 .000 .417 .000 .000 .895 .400 .000 .898 .902
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:15 PM
02:15 PM 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 1 0 1 0 0 67 2 0 69 7702:30 PM 0 0 0 0 0 0 1 10 0 0 0 11 0 0 0 1 0 1 0 0 46 2 0 48 6002:45 PM 0 0 0 0 0 0 0 7 0 0 0 7 0 0 0 1 0 1 0 0 65 3 0 68 7603:00 PM 0 0 0 0 0 0 1 9 0 0 0 10 0 0 0 2 0 2 0 0 52 1 0 53 65
Total Volume 0 0 0 0 0 0 2 33 0 0 0 35 0 0 0 5 0 5 0 0 230 8 0 238 278% App. Total 0 0 0 0 0 5.7 94.3 0 0 0 0 0 0 100 0 0 0 96.6 3.4 0
PHF .000 .000 .000 .000 .000 .000 .500 .825 .000 .000 .000 .795 .000 .000 .000 .625 .000 .625 .000 .000 .858 .667 .000 .862 .903
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D60 Spack Consulting
File Name : 6 - Woodbury Lakes Rd & Site Access 1, 1-6-17Site Code : 6Start Date : 1/6/2017Page No : 1
Woodbury Lakes Rd & Site Access 1Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundSite Access 1Westbound
Woodbury Lakes RdNorthbound
Site Access 1Eastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
04:00 PM 0 7 24 1 0 32 0 24 8 1 0 33 0 17 3 14 0 34 0 4 5 30 0 39 13804:15 PM 0 11 19 2 0 32 0 25 4 0 0 29 0 15 3 23 0 41 0 6 4 22 0 32 13404:30 PM 0 9 20 0 0 29 0 28 5 1 0 34 0 21 0 15 0 36 0 4 2 28 0 34 13304:45 PM 0 16 18 0 0 34 0 24 11 1 0 36 0 23 1 15 0 39 0 3 3 36 0 42 151
Total 0 43 81 3 0 127 0 101 28 3 0 132 0 76 7 67 0 150 0 17 14 116 0 147 556
05:00 PM 0 5 16 6 0 27 0 30 9 2 0 41 0 21 4 13 0 38 0 2 9 29 0 40 146
Total 0 5 16 6 0 27 0 30 9 2 0 41 0 21 4 13 0 38 0 2 9 29 0 40 146
Grand Total 0 48 97 9 0 154 0 131 37 5 0 173 0 97 11 80 0 188 0 19 23 145 0 187 702Apprch % 0 31.2 63 5.8 0 0 75.7 21.4 2.9 0 0 51.6 5.9 42.6 0 0 10.2 12.3 77.5 0
Total % 0 6.8 13.8 1.3 0 21.9 0 18.7 5.3 0.7 0 24.6 0 13.8 1.6 11.4 0 26.8 0 2.7 3.3 20.7 0 26.6Cars + 0 47 95 9 0 151 0 131 36 5 0 172 0 97 11 79 0 187 0 19 23 144 0 186 696
% Cars + 0 97.9 97.9 100 0 98.1 0 100 97.3 100 0 99.4 0 100 100 98.8 0 99.5 0 100 100 99.3 0 99.5 99.1Trucks 0 1 2 0 0 3 0 0 1 0 0 1 0 0 0 1 0 1 0 0 0 1 0 1 6
% Trucks 0 2.1 2.1 0 0 1.9 0 0 2.7 0 0 0.6 0 0 0 1.2 0 0.5 0 0 0 0.7 0 0.5 0.9
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D61 Spack Consulting
File Name : 6 - Woodbury Lakes Rd & Site Access 1, 1-6-17Site Code : 6Start Date : 1/6/2017Page No : 2
Woodbury Lakes Rd & Site Access 1Woodbury, MN
Woodbury Lakes Rd
Site
Acc
ess
1 Site Access 1
Woodbury Lakes Rd
Right
9 0 9
Thru
95 2
97 Left
47 1
48 UTrn
0 0 0
Peds
0 0 0
InOut Total35 151 186 0 3 3
35 189 154
Out0 0 0 In0 0 0 Total0 0 0
Right 5 0 5
Thru 36 1 37
Left
131 0 131
UTrn 0 0 0
Peds 0 0 0
Out
TotalIn
149 172
321 2
1 3
151 324
173
Out
0 0
0 In
0 0
0 Tota
l
0 0
0 UTrn0 0 0
Left97 0
97
Thru11 0
11
Right79 1
80
Peds0 0 0
Out TotalIn
370 187 557 3 1 4
373 561 188
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n0 0 0 Le
ft19 0 19
Thru23
0 23
Rig
ht144 1
145
Peds
0 0 0
Tota
lO
utIn
142
186
328
1 1
2 14
3 33
0 18
7
Out0
0 0
In 0 0
0
Total0
0 0
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D62 Spack Consulting
File Name : 6 - Woodbury Lakes Rd & Site Access 1, 1-6-17Site Code : 6Start Date : 1/6/2017Page No : 3
Woodbury Lakes Rd & Site Access 1Woodbury, MN
Woodbury Lakes RdSouthbound
Site Access 1Westbound
Woodbury Lakes RdNorthbound
Site Access 1Eastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 11 19 2 0 32 0 25 4 0 0 29 0 15 3 23 0 41 0 6 4 22 0 32 13404:30 PM 0 9 20 0 0 29 0 28 5 1 0 34 0 21 0 15 0 36 0 4 2 28 0 34 13304:45 PM 0 16 18 0 0 34 0 24 11 1 0 36 0 23 1 15 0 39 0 3 3 36 0 42 15105:00 PM 0 5 16 6 0 27 0 30 9 2 0 41 0 21 4 13 0 38 0 2 9 29 0 40 146
Total Volume 0 41 73 8 0 122 0 107 29 4 0 140 0 80 8 66 0 154 0 15 18 115 0 148 564% App. Total 0 33.6 59.8 6.6 0 0 76.4 20.7 2.9 0 0 51.9 5.2 42.9 0 0 10.1 12.2 77.7 0
PHF .000 .641 .913 .333 .000 .897 .000 .892 .659 .500 .000 .854 .000 .870 .500 .717 .000 .939 .000 .625 .500 .799 .000 .881 .934
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D63 Spack Consulting
File Name : 6 - Woodbury Lakes Rd & Site Access 1, 1-7-17Site Code : 6Start Date : 1/7/2017Page No : 1
Woodbury Lakes Rd & Site Access 1Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
SouthboundSite Access 1Westbound
Woodbury Lakes RdNorthbound
Site Access 1Eastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
02:00 PM 0 13 1 4 0 18 0 26 22 1 0 49 0 40 5 19 0 64 0 3 8 41 0 52 18302:15 PM 0 9 10 5 0 24 0 31 20 3 0 54 0 32 3 27 0 62 0 2 8 46 0 56 19602:30 PM 0 22 6 1 0 29 0 25 20 5 0 50 0 23 3 22 0 48 0 0 14 39 0 53 18002:45 PM 0 11 17 4 0 32 0 31 15 2 0 48 0 27 9 21 0 57 0 1 8 60 0 69 206
Total 0 55 34 14 0 103 0 113 77 11 0 201 0 122 20 89 0 231 0 6 38 186 0 230 765
Grand Total 0 55 34 14 0 103 0 113 77 11 0 201 0 122 20 89 0 231 0 6 38 186 0 230 765Apprch % 0 53.4 33 13.6 0 0 56.2 38.3 5.5 0 0 52.8 8.7 38.5 0 0 2.6 16.5 80.9 0
Total % 0 7.2 4.4 1.8 0 13.5 0 14.8 10.1 1.4 0 26.3 0 15.9 2.6 11.6 0 30.2 0 0.8 5 24.3 0 30.1Cars + 0 55 34 14 0 103 0 113 77 11 0 201 0 122 20 89 0 231 0 6 38 186 0 230 765
% Cars + 0 100 100 100 0 100 0 100 100 100 0 100 0 100 100 100 0 100 0 100 100 100 0 100 100Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D64 Spack Consulting
File Name : 6 - Woodbury Lakes Rd & Site Access 1, 1-7-17Site Code : 6Start Date : 1/7/2017Page No : 2
Woodbury Lakes Rd & Site Access 1Woodbury, MN
Woodbury Lakes Rd
Site
Acc
ess
1 Site Access 1
Woodbury Lakes Rd
Right
14 0
14 Thru
34 0
34 Left
55 0
55 UTrn
0 0 0
Peds
0 0 0
InOut Total37 103 140 0 0 0
37 140 103
Out0 0 0 In0 0 0 Total0 0 0
Right 11 0
11 Thru 77 0
77 Left
113 0 113
UTrn 0 0 0
Peds 0 0 0
Out
TotalIn
182 201
383 0
0 0
182 383
201
Out
0 0
0 In
0 0
0 Tota
l
0 0
0 UTrn0 0 0
Left122
0 122
Thru20 0
20
Right89 0
89
Peds0 0 0
Out TotalIn
333 231 564 0 0 0
333 564 231
Out
0 0 0
In
0 0 0
Total
0 0 0
UTr
n0 0 0 Le
ft6 0 6 Th
ru38 0 38
Rig
ht186 0
186
Peds
0 0 0
Tota
lO
utIn
213
230
443
0 0
0 21
3 44
3 23
0
Out0
0 0
In 0 0
0
Total0
0 0
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D65 Spack Consulting
File Name : 6 - Woodbury Lakes Rd & Site Access 1, 1-7-17Site Code : 6Start Date : 1/7/2017Page No : 3
Woodbury Lakes Rd & Site Access 1Woodbury, MN
Woodbury Lakes RdSouthbound
Site Access 1Westbound
Woodbury Lakes RdNorthbound
Site Access 1Eastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:00 PM
02:00 PM 0 13 1 4 0 18 0 26 22 1 0 49 0 40 5 19 0 64 0 3 8 41 0 52 18302:15 PM 0 9 10 5 0 24 0 31 20 3 0 54 0 32 3 27 0 62 0 2 8 46 0 56 19602:30 PM 0 22 6 1 0 29 0 25 20 5 0 50 0 23 3 22 0 48 0 0 14 39 0 53 18002:45 PM 0 11 17 4 0 32 0 31 15 2 0 48 0 27 9 21 0 57 0 1 8 60 0 69 206
Total Volume 0 55 34 14 0 103 0 113 77 11 0 201 0 122 20 89 0 231 0 6 38 186 0 230 765% App. Total 0 53.4 33 13.6 0 0 56.2 38.3 5.5 0 0 52.8 8.7 38.5 0 0 2.6 16.5 80.9 0
PHF .000 .625 .500 .700 .000 .805 .000 .911 .875 .550 .000 .931 .000 .763 .556 .824 .000 .902 .000 .500 .679 .775 .000 .833 .928
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D66 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-6-17Site Code : 7Start Date : 1/6/2017Page No : 1
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 012:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 112:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 012:45 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
01:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:30 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 101:45 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:30 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103:45 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
04:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 104:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 004:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 004:45 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2
05:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 0 0 8 0 1 0 0 0 1 905:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 3 0 0 0 3 0 1 0 0 0 1 505:30 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 2 0 0 0 2 0 1 0 2 0 3 605:45 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 5 0 0 0 5 0 0 0 0 0 0 6
Total 0 0 3 0 0 3 0 0 0 0 0 0 0 18 0 0 0 18 0 3 0 2 0 5 26
06:00 AM 0 0 2 0 0 2 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 3 0 3 606:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 9 1006:30 AM 0 0 2 0 0 2 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 3 0 3 706:45 AM 0 0 4 1 0 5 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 1 0 1 9
Total 0 0 9 1 0 10 0 0 0 0 0 0 0 5 1 0 0 6 0 0 0 16 0 16 32
07:00 AM 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 207:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 207:30 AM 0 0 3 0 0 3 0 0 0 0 0 0 0 3 1 0 0 4 0 0 0 1 0 1 8
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D67 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-6-17Site Code : 7Start Date : 1/6/2017Page No : 2
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
07:45 AM 0 0 7 0 0 7 0 0 0 0 0 0 0 4 5 0 0 9 0 0 0 2 0 2 18Total 0 0 13 0 0 13 0 0 0 0 0 0 0 8 6 0 0 14 0 0 0 3 0 3 30
08:00 AM 0 0 6 1 0 7 0 0 0 0 0 0 0 3 2 0 0 5 0 0 0 3 0 3 1508:15 AM 0 0 5 1 0 6 0 0 0 0 0 0 0 9 0 0 0 9 0 0 0 4 0 4 1908:30 AM 0 0 5 0 0 5 0 0 0 0 0 0 0 9 4 0 0 13 0 0 0 5 0 5 2308:45 AM 0 0 6 1 0 7 0 0 0 0 0 0 0 13 7 0 0 20 0 0 0 8 0 8 35
Total 0 0 22 3 0 25 0 0 0 0 0 0 0 34 13 0 0 47 0 0 0 20 0 20 92
09:00 AM 0 0 1 1 0 2 0 0 0 0 0 0 0 15 8 0 0 23 0 0 0 9 0 9 3409:15 AM 0 0 14 2 0 16 0 0 0 0 0 0 0 28 8 0 0 36 0 1 0 19 0 20 7209:30 AM 0 0 15 0 0 15 0 0 0 0 0 0 0 18 11 0 0 29 0 0 0 17 0 17 6109:45 AM 0 0 6 1 0 7 0 0 0 0 0 0 0 38 13 0 0 51 0 1 0 18 0 19 77
Total 0 0 36 4 0 40 0 0 0 0 0 0 0 99 40 0 0 139 0 2 0 63 0 65 244
10:00 AM 0 0 23 3 0 26 0 0 0 0 0 0 0 18 25 0 0 43 0 2 0 22 0 24 9310:15 AM 0 0 17 7 0 24 0 0 0 0 0 0 0 30 28 0 0 58 0 1 0 34 0 35 11710:30 AM 0 0 35 3 3 41 0 0 0 0 0 0 0 33 24 0 0 57 0 1 0 36 0 37 13510:45 AM 0 0 25 5 0 30 0 0 0 0 0 0 0 30 20 0 0 50 0 1 0 41 0 42 122
Total 0 0 100 18 3 121 0 0 0 0 0 0 0 111 97 0 0 208 0 5 0 133 0 138 467
11:00 AM 0 0 38 2 0 40 0 0 0 0 0 0 0 32 31 0 0 63 0 1 0 35 0 36 13911:15 AM 0 0 38 4 0 42 0 0 0 0 0 0 0 20 35 0 0 55 0 1 0 38 0 39 13611:30 AM 0 0 42 3 0 45 0 0 0 0 0 0 0 30 40 0 0 70 0 2 0 34 0 36 15111:45 AM 0 0 35 7 2 44 0 0 0 0 0 0 0 31 34 0 0 65 0 2 0 47 0 49 158
Total 0 0 153 16 2 171 0 0 0 0 0 0 0 113 140 0 0 253 0 6 0 154 0 160 584
12:00 PM 0 0 51 4 0 55 0 0 0 0 0 0 0 34 39 0 0 73 0 0 0 60 0 60 18812:15 PM 0 0 44 10 0 54 0 0 0 0 0 0 0 34 41 0 0 75 0 0 0 38 0 38 16712:30 PM 0 0 54 15 0 69 0 0 0 0 0 0 0 36 44 0 0 80 0 1 0 53 1 55 20412:45 PM 0 0 70 4 0 74 0 0 0 0 0 0 0 37 35 0 0 72 0 2 0 63 1 66 212
Total 0 0 219 33 0 252 0 0 0 0 0 0 0 141 159 0 0 300 0 3 0 214 2 219 771
01:00 PM 0 0 52 2 0 54 0 0 0 0 0 0 0 29 22 0 0 51 0 1 0 67 0 68 17301:15 PM 0 0 58 6 0 64 0 0 0 0 0 0 0 44 39 0 0 83 0 3 0 62 0 65 21201:30 PM 0 0 55 7 0 62 0 0 0 0 0 0 0 45 32 0 0 77 0 1 0 66 2 69 20801:45 PM 0 0 54 10 0 64 0 0 0 0 0 0 0 42 32 0 0 74 0 0 0 71 0 71 209
Total 0 0 219 25 0 244 0 0 0 0 0 0 0 160 125 0 0 285 0 5 0 266 2 273 802
02:00 PM 0 0 48 3 0 51 0 0 0 0 0 0 0 37 31 0 0 68 0 5 0 60 0 65 18402:15 PM 0 0 51 7 0 58 0 0 0 0 0 0 0 36 42 0 0 78 0 5 0 53 0 58 19402:30 PM 0 0 51 10 0 61 0 0 0 0 0 0 0 33 31 0 0 64 0 4 0 69 1 74 19902:45 PM 0 0 54 5 0 59 0 0 0 0 0 0 0 37 43 0 0 80 0 2 0 66 0 68 207
Total 0 0 204 25 0 229 0 0 0 0 0 0 0 143 147 0 0 290 0 16 0 248 1 265 784
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D68 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-6-17Site Code : 7Start Date : 1/6/2017Page No : 3
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
03:00 PM 0 0 56 6 0 62 0 0 0 0 0 0 0 41 28 0 0 69 0 4 0 60 1 65 19603:15 PM 0 0 59 3 0 62 0 0 0 0 0 0 0 43 43 0 0 86 0 4 0 56 0 60 20803:30 PM 0 0 49 7 0 56 0 0 0 0 0 0 0 45 46 0 0 91 0 3 0 54 0 57 20403:45 PM 0 0 63 12 0 75 0 0 0 0 0 0 0 42 35 0 0 77 0 4 0 73 1 78 230
Total 0 0 227 28 0 255 0 0 0 0 0 0 0 171 152 0 0 323 0 15 0 243 2 260 838
04:00 PM 0 0 76 5 0 81 0 0 0 0 0 0 0 42 38 0 0 80 0 0 0 56 1 57 21804:15 PM 0 0 54 8 0 62 0 0 0 0 0 0 0 50 44 0 0 94 0 3 0 84 1 88 24404:30 PM 0 0 66 7 0 73 0 0 0 0 0 0 0 36 36 0 0 72 0 4 0 54 0 58 20304:45 PM 0 0 69 9 0 78 0 0 0 0 0 0 0 46 55 0 0 101 0 4 0 76 0 80 259
Total 0 0 265 29 0 294 0 0 0 0 0 0 0 174 173 0 0 347 0 11 0 270 2 283 924
05:00 PM 0 0 69 11 0 80 0 0 0 0 0 0 0 50 44 0 0 94 0 5 0 87 0 92 26605:15 PM 0 0 63 12 0 75 0 0 0 0 0 0 0 33 39 0 0 72 0 1 0 56 2 59 20605:30 PM 0 0 50 7 0 57 0 0 0 0 0 0 0 27 45 0 0 72 0 2 0 61 0 63 19205:45 PM 0 0 62 7 0 69 0 0 0 0 0 0 0 31 40 0 0 71 0 2 0 60 0 62 202
Total 0 0 244 37 0 281 0 0 0 0 0 0 0 141 168 0 0 309 0 10 0 264 2 276 866
06:00 PM 0 0 49 10 0 59 0 0 0 0 0 0 1 37 37 0 0 75 0 0 0 56 0 56 19006:15 PM 0 0 40 6 0 46 0 0 0 0 0 0 1 27 34 0 0 62 0 6 0 62 0 68 17606:30 PM 0 0 47 11 0 58 0 0 0 0 0 0 0 26 43 0 0 69 0 3 0 62 0 65 19206:45 PM 0 0 54 5 0 59 0 0 0 0 0 0 0 25 30 0 0 55 0 4 0 51 0 55 169
Total 0 0 190 32 0 222 0 0 0 0 0 0 2 115 144 0 0 261 0 13 0 231 0 244 727
07:00 PM 0 0 50 1 0 51 0 0 0 0 0 0 0 20 26 0 0 46 0 1 0 40 2 43 14007:15 PM 0 0 46 4 0 50 0 0 0 0 0 0 0 13 21 0 0 34 0 1 0 33 1 35 11907:30 PM 0 0 43 3 0 46 0 0 0 0 0 0 0 9 18 0 0 27 0 2 0 28 2 32 10507:45 PM 0 0 60 3 0 63 0 0 0 0 0 0 0 8 14 0 0 22 0 0 0 32 0 32 117
Total 0 0 199 11 0 210 0 0 0 0 0 0 0 50 79 0 0 129 0 4 0 133 5 142 481
08:00 PM 0 0 59 4 0 63 0 0 0 0 0 0 0 11 12 0 0 23 0 0 0 42 0 42 12808:15 PM 0 0 56 4 0 60 0 0 0 0 0 0 0 9 12 0 0 21 0 2 0 19 0 21 10208:30 PM 0 0 40 3 0 43 0 0 0 0 0 0 0 5 9 0 0 14 0 0 0 41 5 46 10308:45 PM 0 0 25 6 0 31 0 0 0 0 0 0 0 5 1 0 0 6 0 0 0 27 4 31 68
Total 0 0 180 17 0 197 0 0 0 0 0 0 0 30 34 0 0 64 0 2 0 129 9 140 401
09:00 PM 0 0 24 1 0 25 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 13 1 14 4109:15 PM 0 0 16 0 0 16 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 9 0 9 2809:30 PM 0 0 31 1 0 32 0 0 0 0 0 0 0 1 3 0 0 4 0 0 0 13 0 13 4909:45 PM 0 0 4 1 0 5 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 3 0 3 11
Total 0 0 75 3 0 78 0 0 0 0 0 0 0 3 9 0 0 12 0 0 0 38 1 39 129
10:00 PM 0 0 13 1 0 14 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 5 0 5 2010:15 PM 0 0 12 1 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 1 12 2510:30 PM 0 0 10 1 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 13 5 19 30
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D69 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-6-17Site Code : 7Start Date : 1/6/2017Page No : 4
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
10:45 PM 0 0 10 0 0 10 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 2 1 3 15Total 0 0 45 3 0 48 0 0 0 0 0 0 0 1 2 0 0 3 0 1 0 31 7 39 90
11:00 PM 0 0 8 1 0 9 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 2 4 6 1611:15 PM 0 0 6 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2 811:30 PM 0 0 8 0 0 8 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 1011:45 PM 0 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
Total 0 0 25 1 0 26 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 4 4 8 37
Grand Total 0 0 2435 286 5 2726 0 0 0 0 0 0 2 1517 1493 0 0 3012 0 96 0 2462 37 2595 8333Apprch % 0 0 89.3 10.5 0.2 0 0 0 0 0 0.1 50.4 49.6 0 0 0 3.7 0 94.9 1.4
Total % 0 0 29.2 3.4 0.1 32.7 0 0 0 0 0 0 0 18.2 17.9 0 0 36.1 0 1.2 0 29.5 0.4 31.1Cars + 0 0 2416 280 5 2701 0 0 0 0 0 0 2 1500 1484 0 0 2986 0 95 0 2441 37 2573 8260
% Cars + 0 0 99.2 97.9 100 99.1 0 0 0 0 0 0 100 98.9 99.4 0 0 99.1 0 99 0 99.1 100 99.2 99.1Trucks 0 0 19 6 0 25 0 0 0 0 0 0 0 17 9 0 0 26 0 1 0 21 0 22 73
% Trucks 0 0 0.8 2.1 0 0.9 0 0 0 0 0 0 0 1.1 0.6 0 0 0.9 0 1 0 0.9 0 0.8 0.9
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D70 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-6-17Site Code : 7Start Date : 1/6/2017Page No : 5
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Woodbury Lakes Rd
Site
Acc
ess
2
Woodbury Lakes Rd
Right
280 6
286 Thru
2416 19
2435 Left
0 0 0
UTrn
0 0 0
Peds
5 0 5
InOut Total1579 2701 4280
10 25 35 1589 4315 2726
Out0 0 0 In0 0 0 Total0 0 0
Right 0 0 0
Thru 0 0 0 Left 0 0 0
UTrn 0 0 0
Peds 0 0 0
Out
TotalIn
0 0
0 0
0 0
0 0
0
Out
0 0
0 In
0 0
0 Tota
l
0 0
0 UTrn2 0 2
Left1500
17 1517
Thru1484
9 1493
Right0 0 0
Peds0 0 0
Out TotalIn
4857 2986 7843 40 26 66
4897 7909 3012
Out
2 0 2
In
0 0 0
Total
2 0 2
UTr
n0 0 0 Le
ft95 1 96
Thru
0 0 0 R
ight
2441
21
24
62
Peds37
0 37
Tota
lO
utIn
1780
25
73
4353
23
22
45
18
03
4398
25
95
Out0
0 0
In 0 0
0
Total0
0 0
1/6/2017 12:00 AM1/6/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D71 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-6-17Site Code : 7Start Date : 1/6/2017Page No : 6
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Woodbury Lakes RdSouthbound Westbound
Woodbury Lakes RdNorthbound
Site Access 2Eastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 1 1 0 2 0 0 0 0 0 0 0 15 8 0 0 23 0 0 0 9 0 9 3409:15 AM 0 0 14 2 0 16 0 0 0 0 0 0 0 28 8 0 0 36 0 1 0 19 0 20 7209:30 AM 0 0 15 0 0 15 0 0 0 0 0 0 0 18 11 0 0 29 0 0 0 17 0 17 6109:45 AM 0 0 6 1 0 7 0 0 0 0 0 0 0 38 13 0 0 51 0 1 0 18 0 19 77
Total Volume 0 0 36 4 0 40 0 0 0 0 0 0 0 99 40 0 0 139 0 2 0 63 0 65 244% App. Total 0 0 90 10 0 0 0 0 0 0 0 71.2 28.8 0 0 0 3.1 0 96.9 0
PHF .000 .000 .600 .500 .000 .625 .000 .000 .000 .000 .000 .000 .000 .651 .769 .000 .000 .681 .000 .500 .000 .829 .000 .813 .792
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 12:45 PM
12:45 PM 0 0 70 4 0 74 0 0 0 0 0 0 0 37 35 0 0 72 0 2 0 63 1 66 21201:00 PM 0 0 52 2 0 54 0 0 0 0 0 0 0 29 22 0 0 51 0 1 0 67 0 68 17301:15 PM 0 0 58 6 0 64 0 0 0 0 0 0 0 44 39 0 0 83 0 3 0 62 0 65 21201:30 PM 0 0 55 7 0 62 0 0 0 0 0 0 0 45 32 0 0 77 0 1 0 66 2 69 208
Total Volume 0 0 235 19 0 254 0 0 0 0 0 0 0 155 128 0 0 283 0 7 0 258 3 268 805% App. Total 0 0 92.5 7.5 0 0 0 0 0 0 0 54.8 45.2 0 0 0 2.6 0 96.3 1.1
PHF .000 .000 .839 .679 .000 .858 .000 .000 .000 .000 .000 .000 .000 .861 .821 .000 .000 .852 .000 .583 .000 .963 .375 .971 .949
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 0 54 8 0 62 0 0 0 0 0 0 0 50 44 0 0 94 0 3 0 84 1 88 24404:30 PM 0 0 66 7 0 73 0 0 0 0 0 0 0 36 36 0 0 72 0 4 0 54 0 58 20304:45 PM 0 0 69 9 0 78 0 0 0 0 0 0 0 46 55 0 0 101 0 4 0 76 0 80 25905:00 PM 0 0 69 11 0 80 0 0 0 0 0 0 0 50 44 0 0 94 0 5 0 87 0 92 266
Total Volume 0 0 258 35 0 293 0 0 0 0 0 0 0 182 179 0 0 361 0 16 0 301 1 318 972% App. Total 0 0 88.1 11.9 0 0 0 0 0 0 0 50.4 49.6 0 0 0 5 0 94.7 0.3
PHF .000 .000 .935 .795 .000 .916 .000 .000 .000 .000 .000 .000 .000 .910 .814 .000 .000 .894 .000 .800 .000 .865 .250 .864 .914
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D72 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-7-17Site Code : 7Start Date : 1/7/2017Page No : 1
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
12:00 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 112:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 212:30 AM 0 0 3 0 0 3 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 512:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 5 0 0 5 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 1 0 1 8
01:00 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 201:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 101:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 1
Total 0 0 2 0 0 2 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 4
02:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 002:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 103:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 003:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 2
04:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 104:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 004:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 004:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 1
05:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 005:15 AM 0 0 1 1 0 2 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 405:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 2 0 1 0 0 0 1 305:45 AM 0 0 4 0 0 4 0 0 0 0 0 0 0 8 1 0 0 9 0 0 0 0 0 0 13
Total 0 0 5 1 0 6 0 0 0 0 0 0 0 12 1 0 0 13 0 1 0 0 0 1 20
06:00 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 206:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106:30 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 206:45 AM 0 0 2 0 0 2 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 1 0 1 6
Total 0 0 5 0 0 5 0 0 0 0 0 0 0 3 0 0 0 3 0 0 0 3 0 3 11
07:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 207:15 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 207:30 AM 0 0 1 0 0 1 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 3
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D73 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-7-17Site Code : 7Start Date : 1/7/2017Page No : 2
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
07:45 AM 0 0 5 0 0 5 0 0 0 0 1 1 0 6 4 0 0 10 0 1 0 2 0 3 19Total 0 0 7 0 0 7 0 0 0 0 1 1 0 9 6 0 0 15 0 1 0 2 0 3 26
08:00 AM 0 0 0 1 0 1 0 0 0 0 0 0 0 11 1 0 0 12 0 0 0 3 0 3 1608:15 AM 0 0 3 0 0 3 0 0 0 0 0 0 0 12 1 0 0 13 0 0 0 12 0 12 2808:30 AM 0 0 5 3 0 8 0 0 0 0 0 0 0 16 4 0 0 20 0 0 0 14 0 14 4208:45 AM 0 0 2 1 0 3 0 0 0 0 0 0 1 22 10 0 0 33 0 0 0 9 0 9 45
Total 0 0 10 5 0 15 0 0 0 0 0 0 1 61 16 0 0 78 0 0 0 38 0 38 131
09:00 AM 0 0 7 1 0 8 0 0 0 0 0 0 0 23 7 0 0 30 0 0 0 18 0 18 5609:15 AM 0 0 13 3 0 16 0 0 0 0 0 0 0 29 6 0 0 35 0 0 0 13 0 13 6409:30 AM 0 0 16 5 0 21 0 0 0 0 0 0 0 25 10 0 0 35 0 1 0 20 0 21 7709:45 AM 0 0 12 5 0 17 0 0 0 0 0 0 0 35 26 0 0 61 0 1 0 35 0 36 114
Total 0 0 48 14 0 62 0 0 0 0 0 0 0 112 49 0 0 161 0 2 0 86 0 88 311
10:00 AM 0 0 16 2 0 18 0 0 0 0 0 0 0 33 30 0 0 63 0 2 0 28 0 30 11110:15 AM 0 0 27 8 0 35 0 0 0 0 0 0 0 52 28 0 0 80 0 1 0 42 0 43 15810:30 AM 0 0 27 6 0 33 0 0 0 0 0 0 0 43 19 0 0 62 0 0 0 67 2 69 16410:45 AM 0 0 44 10 0 54 0 0 0 0 0 0 0 50 57 0 0 107 0 1 0 56 2 59 220
Total 0 0 114 26 0 140 0 0 0 0 0 0 0 178 134 0 0 312 0 4 0 193 4 201 653
11:00 AM 0 0 49 7 0 56 0 0 0 0 0 0 0 58 51 0 0 109 0 0 0 59 0 59 22411:15 AM 0 0 52 14 0 66 0 0 0 0 0 0 0 57 49 0 0 106 0 0 0 75 2 77 24911:30 AM 0 0 54 11 0 65 0 0 0 0 0 0 0 60 47 0 0 107 0 0 0 78 4 82 25411:45 AM 0 0 71 10 0 81 0 0 0 0 0 0 0 68 51 0 0 119 0 4 0 72 2 78 278
Total 0 0 226 42 0 268 0 0 0 0 0 0 0 243 198 0 0 441 0 4 0 284 8 296 1005
12:00 PM 0 0 68 7 0 75 0 0 0 0 0 0 0 52 65 0 0 117 0 3 0 99 0 102 29412:15 PM 0 0 74 9 0 83 0 0 0 0 0 0 0 45 69 0 0 114 0 5 0 76 0 81 27812:30 PM 0 0 67 7 0 74 0 0 0 0 0 0 0 71 59 0 0 130 0 1 0 68 0 69 27312:45 PM 0 0 80 14 0 94 0 0 0 0 0 0 0 54 59 0 0 113 0 3 0 88 6 97 304
Total 0 0 289 37 0 326 0 0 0 0 0 0 0 222 252 0 0 474 0 12 0 331 6 349 1149
01:00 PM 0 0 83 13 0 96 0 0 0 0 0 0 0 75 63 0 0 138 0 2 0 97 0 99 33301:15 PM 0 0 74 10 0 84 0 0 0 0 0 0 0 65 83 0 0 148 0 5 0 84 0 89 32101:30 PM 0 0 83 11 0 94 0 0 0 0 0 0 0 59 59 0 0 118 0 5 0 86 0 91 30301:45 PM 0 0 83 13 0 96 0 0 0 0 0 0 0 77 71 0 0 148 0 1 0 115 0 116 360
Total 0 0 323 47 0 370 0 0 0 0 0 0 0 276 276 0 0 552 0 13 0 382 0 395 1317
02:00 PM 0 0 85 7 0 92 0 0 0 0 0 0 0 70 76 0 0 146 0 3 0 104 0 107 34502:15 PM 0 0 87 12 0 99 0 0 0 0 0 0 0 48 66 0 0 114 0 4 0 100 0 104 31702:30 PM 0 0 100 10 0 110 0 0 0 0 0 0 0 79 57 0 0 136 0 3 0 115 0 118 36402:45 PM 0 0 106 17 0 123 0 0 0 0 0 0 0 50 49 0 0 99 0 4 0 104 0 108 330
Total 0 0 378 46 0 424 0 0 0 0 0 0 0 247 248 0 0 495 0 14 0 423 0 437 1356
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D74 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-7-17Site Code : 7Start Date : 1/7/2017Page No : 3
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
03:00 PM 0 0 79 8 0 87 0 0 0 0 0 0 0 46 65 0 0 111 0 4 0 102 0 106 30403:15 PM 0 0 96 8 0 104 0 0 0 0 0 0 0 50 60 0 0 110 0 1 0 104 0 105 31903:30 PM 0 0 81 12 0 93 0 0 0 0 0 0 0 48 52 0 0 100 0 3 0 86 0 89 28203:45 PM 0 0 81 10 0 91 0 0 0 0 0 0 0 63 57 0 0 120 0 6 0 76 0 82 293
Total 0 0 337 38 0 375 0 0 0 0 0 0 0 207 234 0 0 441 0 14 0 368 0 382 1198
04:00 PM 0 0 83 9 0 92 0 0 0 0 0 0 0 57 45 0 0 102 0 1 0 82 0 83 27704:15 PM 0 0 74 9 0 83 0 0 0 0 0 0 0 44 57 0 0 101 0 7 0 93 0 100 28404:30 PM 0 0 94 14 0 108 0 0 0 0 0 0 0 65 54 0 0 119 0 1 0 86 0 87 31404:45 PM 0 0 73 6 0 79 0 0 0 0 0 0 0 56 42 0 0 98 0 4 0 76 0 80 257
Total 0 0 324 38 0 362 0 0 0 0 0 0 0 222 198 0 0 420 0 13 0 337 0 350 1132
05:00 PM 0 0 62 15 0 77 0 0 0 0 0 0 0 40 46 0 0 86 0 4 0 88 0 92 25505:15 PM 0 0 57 3 0 60 0 0 0 0 0 0 0 39 49 0 0 88 0 4 0 80 2 86 23405:30 PM 0 0 56 11 0 67 0 0 0 0 0 0 1 33 52 0 0 86 0 3 0 59 0 62 21505:45 PM 0 0 70 7 0 77 0 0 0 0 0 0 0 34 49 0 0 83 0 4 0 68 4 76 236
Total 0 0 245 36 0 281 0 0 0 0 0 0 1 146 196 0 0 343 0 15 0 295 6 316 940
06:00 PM 0 0 49 7 0 56 0 0 0 0 0 0 0 20 41 0 0 61 0 3 0 61 0 64 18106:15 PM 0 0 64 5 0 69 0 0 0 0 0 0 0 31 29 0 0 60 0 3 0 53 5 61 19006:30 PM 0 0 46 4 0 50 0 0 0 0 0 0 0 24 25 0 0 49 0 1 0 44 7 52 15106:45 PM 0 0 52 6 0 58 0 0 0 0 0 0 0 21 37 0 0 58 0 1 0 44 0 45 161
Total 0 0 211 22 0 233 0 0 0 0 0 0 0 96 132 0 0 228 0 8 0 202 12 222 683
07:00 PM 0 0 48 3 0 51 0 0 0 0 0 0 0 12 23 0 0 35 0 2 0 32 0 34 12007:15 PM 0 0 41 8 0 49 0 0 0 0 0 0 0 23 25 0 0 48 0 3 0 44 0 47 14407:30 PM 0 0 43 4 0 47 0 0 0 0 0 0 0 6 14 0 0 20 0 0 0 26 5 31 9807:45 PM 0 0 45 4 0 49 0 0 0 0 0 0 0 8 13 0 0 21 0 0 0 32 0 32 102
Total 0 0 177 19 0 196 0 0 0 0 0 0 0 49 75 0 0 124 0 5 0 134 5 144 464
08:00 PM 0 0 40 1 0 41 0 0 0 0 0 0 0 8 14 0 0 22 0 0 0 26 0 26 8908:15 PM 0 0 7 2 0 9 0 0 0 0 0 0 0 6 7 0 0 13 0 2 0 52 4 58 8008:30 PM 0 0 37 2 0 39 0 0 0 0 0 0 0 11 1 0 0 12 0 1 0 32 2 35 8608:45 PM 0 0 24 3 0 27 0 0 0 0 0 0 0 3 3 0 0 6 0 0 0 20 0 20 53
Total 0 0 108 8 0 116 0 0 0 0 0 0 0 28 25 0 0 53 0 3 0 130 6 139 308
09:00 PM 0 0 13 2 0 15 0 0 0 0 0 0 0 1 5 0 0 6 0 2 0 16 0 18 3909:15 PM 0 0 20 2 0 22 0 0 0 0 0 0 0 0 2 0 0 2 0 2 0 5 0 7 3109:30 PM 0 0 19 0 0 19 0 0 0 0 0 0 0 1 2 0 0 3 0 0 0 3 0 3 2509:45 PM 0 0 21 0 0 21 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 3 0 3 25
Total 0 0 73 4 0 77 0 0 0 0 0 0 0 2 10 0 0 12 0 4 0 27 0 31 120
10:00 PM 0 0 10 3 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 0 11 2410:15 PM 0 0 15 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 11 3 15 3010:30 PM 0 0 8 0 0 8 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 3 1 4 13
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D75 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-7-17Site Code : 7Start Date : 1/7/2017Page No : 4
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Groups Printed- Cars + - TrucksWoodbury Lakes Rd
Southbound WestboundWoodbury Lakes Rd
NorthboundSite Access 2
EastboundStart Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. Total
10:45 PM 0 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 5 12 15Total 0 0 36 3 0 39 0 0 0 0 0 0 0 0 1 0 0 1 0 1 0 32 9 42 82
11:00 PM 0 0 6 0 0 6 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 6 0 6 1311:15 PM 0 0 5 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 611:30 PM 0 0 4 1 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 611:45 PM 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2
Total 0 0 16 1 0 17 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 8 0 8 27
Grand Total 0 0 2939 387 0 3326 0 0 0 0 1 1 2 2115 2057 0 0 4174 0 114 0 3277 56 3447 10948Apprch % 0 0 88.4 11.6 0 0 0 0 0 100 0 50.7 49.3 0 0 0 3.3 0 95.1 1.6
Total % 0 0 26.8 3.5 0 30.4 0 0 0 0 0 0 0 19.3 18.8 0 0 38.1 0 1 0 29.9 0.5 31.5Cars + 0 0 2935 386 0 3321 0 0 0 0 1 1 2 2109 2054 0 0 4165 0 114 0 3268 56 3438 10925
% Cars + 0 0 99.9 99.7 0 99.8 0 0 0 0 100 100 100 99.7 99.9 0 0 99.8 0 100 0 99.7 100 99.7 99.8Trucks 0 0 4 1 0 5 0 0 0 0 0 0 0 6 3 0 0 9 0 0 0 9 0 9 23
% Trucks 0 0 0.1 0.3 0 0.2 0 0 0 0 0 0 0 0.3 0.1 0 0 0.2 0 0 0 0.3 0 0.3 0.2
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D76 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-7-17Site Code : 7Start Date : 1/7/2017Page No : 5
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Woodbury Lakes Rd
Site
Acc
ess
2
Woodbury Lakes Rd
Right
386 1
387 Thru
2935 4
2939 Left
0 0 0
UTrn
0 0 0
Peds
0 0 0
InOut Total2168 3321 5489
3 5 8 2171 5497 3326
Out0 0 0 In0 0 0 Total0 0 0
Right 0 0 0
Thru 0 0 0 Left 0 0 0
UTrn 0 0 0
Peds 1 0 1
Out
TotalIn
0 1
1 0
0 0
0 1
1
Out
0 0
0 In
0 0
0 Tota
l
0 0
0 UTrn2 0 2
Left2109
6 2115
Thru2054
3 2057
Right0 0 0
Peds0 0 0
Out TotalIn
6203 4165 10368 13 9 22
6216 10390 4174
Out
2 0 2
In
0 0 0
Total
2 0 2
UTr
n0 0 0 Le
ft114 0
114
Thru
0 0 0 R
ight
3268
9 32
77
Peds56
0 56
Tota
lO
utIn
2495
34
38
5933
7
9 16
25
02
5949
34
47
Out0
0 0
In 0 0
0
Total0
0 0
1/7/2017 12:00 AM1/7/2017 11:45 PM Cars +Trucks
North
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D77 Spack Consulting
File Name : 7 - Woodbury Lakes Rd & Site Access 2, 1-7-17Site Code : 7Start Date : 1/7/2017Page No : 6
Woodbury Lakes Rd & Site Access 2Woodbury, MN
Woodbury Lakes RdSouthbound Westbound
Woodbury Lakes RdNorthbound
Site Access 2Eastbound
Start Time UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total UTrn Left Thru Right Peds App. Total Int. TotalPeak Hour Analysis From 12:00 AM to 09:45 AM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 09:00 AM
09:00 AM 0 0 7 1 0 8 0 0 0 0 0 0 0 23 7 0 0 30 0 0 0 18 0 18 5609:15 AM 0 0 13 3 0 16 0 0 0 0 0 0 0 29 6 0 0 35 0 0 0 13 0 13 6409:30 AM 0 0 16 5 0 21 0 0 0 0 0 0 0 25 10 0 0 35 0 1 0 20 0 21 7709:45 AM 0 0 12 5 0 17 0 0 0 0 0 0 0 35 26 0 0 61 0 1 0 35 0 36 114
Total Volume 0 0 48 14 0 62 0 0 0 0 0 0 0 112 49 0 0 161 0 2 0 86 0 88 311% App. Total 0 0 77.4 22.6 0 0 0 0 0 0 0 69.6 30.4 0 0 0 2.3 0 97.7 0
PHF .000 .000 .750 .700 .000 .738 .000 .000 .000 .000 .000 .000 .000 .800 .471 .000 .000 .660 .000 .500 .000 .614 .000 .611 .682
Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 01:00 PM
01:00 PM 0 0 83 13 0 96 0 0 0 0 0 0 0 75 63 0 0 138 0 2 0 97 0 99 33301:15 PM 0 0 74 10 0 84 0 0 0 0 0 0 0 65 83 0 0 148 0 5 0 84 0 89 32101:30 PM 0 0 83 11 0 94 0 0 0 0 0 0 0 59 59 0 0 118 0 5 0 86 0 91 30301:45 PM 0 0 83 13 0 96 0 0 0 0 0 0 0 77 71 0 0 148 0 1 0 115 0 116 360
Total Volume 0 0 323 47 0 370 0 0 0 0 0 0 0 276 276 0 0 552 0 13 0 382 0 395 1317% App. Total 0 0 87.3 12.7 0 0 0 0 0 0 0 50 50 0 0 0 3.3 0 96.7 0
PHF .000 .000 .973 .904 .000 .964 .000 .000 .000 .000 .000 .000 .000 .896 .831 .000 .000 .932 .000 .650 .000 .830 .000 .851 .915
Peak Hour Analysis From 02:00 PM to 11:45 PM - Peak 1 of 1Peak Hour for Entire Intersection Begins at 02:00 PM
02:00 PM 0 0 85 7 0 92 0 0 0 0 0 0 0 70 76 0 0 146 0 3 0 104 0 107 34502:15 PM 0 0 87 12 0 99 0 0 0 0 0 0 0 48 66 0 0 114 0 4 0 100 0 104 31702:30 PM 0 0 100 10 0 110 0 0 0 0 0 0 0 79 57 0 0 136 0 3 0 115 0 118 36402:45 PM 0 0 106 17 0 123 0 0 0 0 0 0 0 50 49 0 0 99 0 4 0 104 0 108 330
Total Volume 0 0 378 46 0 424 0 0 0 0 0 0 0 247 248 0 0 495 0 14 0 423 0 437 1356% App. Total 0 0 89.2 10.8 0 0 0 0 0 0 0 49.9 50.1 0 0 0 3.2 0 96.8 0
PHF .000 .000 .892 .676 .000 .862 .000 .000 .000 .000 .000 .000 .000 .782 .816 .000 .000 .848 .000 .875 .000 .920 .000 .926 .931
Appendix D: Traffic Counts
Traffic Impact StudyWoodbury Lakes Movie Theater
D78 Spack Consulting
Weekday Daily VolumesDAILY ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
Multiplex Movie Theater 445 Movie Screens 9.0 292.50 50% 50% 25% 658 0% 0 987 987
658 0 987 987
Friday Peak VolumesPEAK ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
Multiplex Movie Theater 445 Movie Screens 9.0 22.76 59% 41% 25% 51 0% 0 91 63
51 0 91 63
Saturday Peak VolumesPEAK ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
Multiplex Movie Theater 445 Movie Screens 9.0 69.14 52% 48% 25% 156 0% 0 243 224
156 0 243 224
NOTES:
1. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition unless otherwise noted.
2. Friday Peak Trip Generation is for the One Hour Between 4 and 6 p.m.
3. Saturday Peak Trip Generation is for the Peak Hour of Generator
Weekday Daily VolumesDAILY ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
High-Turnover (Sit-Down) Restaurant 932 1,000 GFA 16 127.15 50% 50% 15% 305 0% 0 865 865
305 0 865 865
Friday Peak VolumesPEAK ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
High-Turnover (Sit-Down) Restaurant 932 1,000 GFA 16 9.85 60% 40% 15% 24 43% 58 46 31
24 58 46 31
Saturday Peak VolumesPEAK ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
High-Turnover (Sit-Down) Restaurant 932 1,000 GFA 16 14.07 53% 47% 15% 34 43% 82 58 51
34 82 58 51
NOTES:
1. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition unless otherwise noted.
2. Friday Peak Trip Generation is for the One Hour Between 4 and 6 p.m.
3. Saturday Peak Trip Generation is for the Peak Hour of Generator
Weekday Daily VolumesDAILY ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
High-Turnover (Sit-Down) Restaurant 932 1,000 GFA 56 127.15 50% 50% 15% 1,068 0% 0 3,026 3,026
Shopping Center 820 1,000 GFA 369.0 42.70 50% 50% 0% 0 0% 0 7,878 7,878
1,068 0 10,904 10,904
Friday Peak VolumesPEAK ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
High-Turnover (Sit-Down) Restaurant 932 1,000 GFA 56 9.85 60% 40% 15% 83 43% 202 160 107
Shopping Center 820 1,000 GFA 369.0 3.71 48% 52% 0% 0 34% 465 434 470
83 667 594 577
Saturday Peak VolumesPEAK ENTER EXIT INTERNAL INTERNAL PASSBY PASSBY
RATE PERCENT PERCENT PERCENT TRIPS PERCENT TRIPS ENTER EXIT
High-Turnover (Sit-Down) Restaurant 932 1,000 GFA 56 14.07 53% 47% 15% 118 43% 288 202 179
Shopping Center 820 1,000 GFA 369.0 4.82 52% 48% 0% 0 34% 605 610 563
118 893 812 742
NOTES:
1. All trip generation rates based on "Trip Generation", Institute of Transportation Engineers, 9th Edition unless otherwise noted.
2. Friday Peak Trip Generation is for the One Hour Between 4 and 6 p.m.
3. Saturday Peak Trip Generation is for the Peak Hour of Generator
NEW TRIPS
Total
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
NEW TRIPS
Total
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
Total
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
NEW TRIPS
LAND USEITE
CODE #
DEVELOPMENT
UNITSQUANTITY
Table E1Forecasted Theater Trip Generation
Table E2Restaurant Usage Trip Generation
Table E3Originally Planned Woodbur Lakes Trip Generation
Appendix E: Trip Generation Tables
Traffic Impact StudyWoodbury Lakes Movie Theater
E1 Spack Consulting
Research Brief — Volume No. 3
Level of Service (LOS)Level of Service (LOS) is a qualitative description, similar to typical school grades, that traffic engineers use to communi-cate how good or bad traffic operations are on a corridor, intersection, or interchange.
Common FactorsTraffic can be a hard thing to quantify as everyone has a different tolerance for congestion. What seems excessively long to one person may seem good enough for another. These differences are readily apparent when comparing small towns or rural areas, where five cars an hour can be the norm, to big cities or downtowns, where less than hundred cars an hour, even in the middle of night, is rare.
To combat this issue and provide a consistent measuring tool for traffic studies, a “Level of Service” rating was developed. Level of Service ratings are based on the roadway or intersection characteristics and the amount of traffic. Just like grade school, LOS A represents the best traffic operations, where traffic flows freely. LOS F, on the other hand, represents failing operations, where the road or intersection is congested and running beyond maximum capacity. LOS E is typically considered “at capacity” which means the amount of traffic is right at the level the roadway or intersection can adequately accommodate. Using Level of Service letter grades provides an easy way to convey road operations to the general public and has been adopted across the United States.
Level of Service criteria have been developed for multiple types of traffic operations including:• Intersections• Urban Corridors• Freeways• Transit Service• Bicycle Operations• Pedestrian Operations
The most common LOS criteria used is for car operations at intersections; both signalized and unsignalized. For an intersection Level of Service analysis, average delay for cars travelling through the intersection is used to determine the appropriate grade. A high delay results in a poor LOS rating and equates to poor operations. Similarly, low delay results in a good LOS rating and equates to good or great operations.LOS can be determined for the intersection as a whole, or for individual movements. It is common during peak periods in major population areas for an intersection to have an acceptable overall LOS rating, but fail to achieve a good grade for individual movements.
Common Factors Impacting Level of Service
• Number of Lanes.•TrafficVolumes.•Intersection Control (stop sign, signal, roundabout,interchange.)
•Amountofaccessonacorridor.•Percentageofturningtraffic.•Traffic signal cycle length (green time devoted to eachapproach) and phasing (one green for all approachmovementsorseparategreenarrows.)
•Percentageofheavytrucks.•RoadwayGrades.•Distributionoftrafficwithinapeakhouraswellasoverthecourseofaday.
•Pedestrianactivity.•Bicycleactivity.
Appendix F: Level of Service (LOS)
Traffic Impact Study Woodbury Lakes Movie Theater F1 Spack Consulting
Resources
• Highway Capacity Manual, fifth edition
• Nation Cooperative Highway Research Program Report 616; Multimodal Level of Service Analysis for Urban Streets
• http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_616.pdf
• Florida Department of Transportation Quality/Level of Service Handbook
• http://www.dot.state.fl.us/planning/systems/programs/sm/los/pdfs/2009FDOTQLOS_Handbook.pdf
Although a Level of Service rating of A represents the best traffic operations, it is not always the most desirable. Providing LOS A for all corridors and all operations at all times would require a significant amount of land to be devoted to the road infrastructure, which makes it extremely costly to build and maintain. During non-peak times, like overnight, much of that infrastructure would sit unused. On the opposite side of the spectrum, a Level of Service rating of E and F represent traffic operations close to breaking down, or that already have. These ratings mean high delays, long queues, and slow speeds, not to mention driver frustration. Instead of trying to achieve one or the other, government agencies try to strike a balance between providing acceptable operations, neither falling nor flowing too freely. Because of this, LOS D is typically considered the lowest LOS acceptable by government agencies and is reflective of a balanced approach between cost and benefit.
About This BriefSpack Consulting prepared this brief as part of our company’s vision to significantly improve the practice of traffic engineering and transportation planning. Transportation professionals from around the world have assisted us in developing this document. We are providing this brief under the Creative Commons Attribution License. Feel free to use-modify-share this guide, but please give us some credit in your document. To request our whole series of Design Briefs and to be included on our distribution list for new materials, please email [email protected]. And please reach out if you have any comments or questions related to this Design Brief.
There are many tools and guidelines used to determine a roads Level of Service rating. Simple tools like generalized roadway capacities allow for planning-level efforts. While inexpensive and quick to complete, they are not as accurate as other options. More complicated tools, such as mi-cro-simulations, provide more accurate results, but cost more and take more time. It is important to understand the trade-offs between the analysis types as well as the purpose of the study.
Research Brief — Volume No. 3
Source: Florida Deptarment of Transportation
LOS A
LOS C
LOS D = Acceptable
LOS F = UnacceptableSource: City of San Jose, CA.
Appendix F: Level of Service (LOS)
Traffic Impact Study Woodbury Lakes Movie Theater F2 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\Existing Friday.pdf
Scenario 2: Exist_Friday PEAK_1.25Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
C20.70.534SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
A9.0NB LeftHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.20.009WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
C17.50.000SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
D25.00.010SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
C18.20.025NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B12.90.313SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G1 Spack Consulting
Version 4.00-02
Generated with
0.313Volume to Capacity (v/c):
BLevel Of Service:
12.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
22030246121211093041224389216Total Analysis Volume [veh/h]
557623052776369754Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.9818Peak Hour Factor
21629242121211072981224382212Total Hourly Volume [veh/h]
70004003500800Right-Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
28629242161211422981232382212Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G2 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
035003500442004430Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G3 Spack Consulting
Version 4.00-02
Generated with
85.27109.983.897.2434.3246.521.555.1744.9214.8295th-Percentile Queue Length [ft]
3.414.400.160.291.371.860.060.211.800.5995th-Percentile Queue Length [veh]
47.3761.102.164.0219.0725.840.862.8724.958.2350th-Percentile Queue Length [ft]
1.892.440.090.160.761.030.030.111.000.3350th-Percentile Queue Length [veh]
NoYesNoNoNoYesNoNoNoYesCritical Lane Group
BBBBBBAABALane Group LOS
16.8017.1913.4313.6714.2514.285.909.1110.236.14d, Delay for Lane Group [s/veh]
0.570.540.030.060.270.330.010.040.290.14X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.360.890.030.060.590.360.010.050.200.07d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.190.190.110.190.190.19k, delay calibration
15.4416.2913.4013.6113.6613.925.899.0710.036.06d1, Uniform Delay [s]
38351038338241091780760013441506c, Capacity [veh/h]
158315001583950158335471125158335472636s, saturation flow rate [veh/h]
0.140.180.010.020.070.090.010.020.110.08(v / s)_i Volume / Saturation Flow Rate
0.240.240.240.240.260.260.510.380.380.51g / C, Green / Cycle
11111111121224181824g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G4 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
13.67 13.4313.67 17.19 16.8017.1914.256.14 10.23d_M, Delay for Movement [s/veh] 14.289.11 5.90
B BB BB BBBMovement LOS A BA A
13.59 17.02d_A, Approach Delay [s/veh] 14.038.78
B BApproach LOS A B
12.87d_I, Intersection Delay [s/veh]
BIntersection LOS
0.313Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G5 Spack Consulting
Version 4.00-02
Generated with
0.025Volume to Capacity (v/c):
CLevel Of Service:
18.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
47251164937Total Analysis Volume [veh/h]
1181316212Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96340.96340.96340.96340.96340.9634Peak Hour Factor
45551162537Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
45551162537Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G6 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.18d_I, Intersection Delay [s/veh]
AACApproach LOS
0.090.0015.98d_A, Approach Delay [s/veh]
0.000.410.000.002.282.2895th-Percentile Queue Length [ft]
0.000.020.000.000.090.0995th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.008.920.000.0010.6918.24d_M, Delay for Movement [s/veh]
0.000.010.000.010.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G7 Spack Consulting
Version 4.00-02
Generated with
0.010Volume to Capacity (v/c):
DLevel Of Service:
25.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
7743147635823251205Total Analysis Volume [veh/h]
191081215926113101Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.96650.96650.96650.96651.00001.00001.00001.00000.96651.00000.9665Peak Hour Factor
7741747614823251205Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
7741747614823251205Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G8 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
1.29d_I, Intersection Delay [s/veh]
AACCApproach LOS
0.070.1018.1317.90d_A, Approach Delay [s/veh]
0.000.000.320.000.000.5720.3420.3420.341.881.881.8895th-Percentile Queue Length [ft]
0.000.000.010.000.000.020.810.810.810.080.080.0895th-Percentile Queue Length [veh]
AAAAAABDCBCCMovement LOS
0.000.008.850.000.008.4412.4025.0420.4510.6224.2620.81d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.010.030.010.180.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G9 Spack Consulting
Version 4.00-02
Generated with
0.000Volume to Capacity (v/c):
CLevel Of Service:
17.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
0526699120Total Analysis Volume [veh/h]
0131175010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
0505671120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0505671120Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G10 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.02d_I, Intersection Delay [s/veh]
AAAApproach LOS
0.000.019.91d_A, Approach Delay [s/veh]
0.000.000.000.070.200.2095th-Percentile Queue Length [ft]
0.000.000.000.000.010.0195th-Percentile Queue Length [veh]
AAAAACMovement LOS
0.000.000.008.479.9117.54d_M, Delay for Movement [s/veh]
0.000.010.010.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G11 Spack Consulting
Version 4.00-02
Generated with
0.009Volume to Capacity (v/c):
BLevel Of Service:
10.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
061027470Total Analysis Volume [veh/h]
0136820Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.89530.89530.89530.89531.0000Peak Hour Factor
05924560Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
05924560Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G12 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
7.29d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.177.410.00d_A, Approach Delay [s/veh]
0.000.6515.9015.900.000.0095th-Percentile Queue Length [ft]
0.000.030.640.640.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.170.007.680.000.00d_M, Delay for Movement [s/veh]
0.000.010.000.170.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G13 Spack Consulting
Version 4.00-02
Generated with
ALevel Of Service:
9.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
429107123181587341668118Total Analysis Volume [veh/h]
172731542181017229Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.93381.00001.00001.00001.00001.00001.00001.00000.9338Peak Hour Factor
429107115181587341668110Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
429107115181587341668110Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G14 Spack Consulting
Version 4.00-02
Generated with
AIntersection LOS
9.04Intersection Delay [s/veh]
AAAAApproach LOS
9.318.568.989.27Approach Delay [s/veh]
18.2317.9210.395.498.1717.8895th-Percentile Queue Length [ft]
0.730.720.420.220.330.7295th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G15 Spack Consulting
Version 4.00-02
Generated with
0.534Volume to Capacity (v/c):
CLevel Of Service:
20.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0003300183828300196199Total Analysis Volume [veh/h]
00082041071004950Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.91261.00000.91260.91260.91261.00000.91260.91260.9126Peak Hour Factor
0003010163525800179182Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0003010163525800179182Base Volume Input [veh/h]
Name
volumes
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G16 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
12.34d_I, Intersection Delay [s/veh]
ABCAApproach LOS
0.0010.3520.437.53d_A, Approach Delay [s/veh]
0.000.000.0038.140.0038.1493.6493.640.0010.2810.3710.4695th-Percentile Queue Length [ft]
0.000.000.001.530.001.533.753.750.000.410.410.4295th-Percentile Queue Length [veh]
BBCCAAAMovement LOS
0.000.000.0010.130.0014.2218.7120.660.000.007.527.53d_M, Delay for Movement [s/veh]
0.000.000.000.300.000.040.050.530.000.000.120.12V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G17 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G18 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 2: 2: Exist_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G19 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\Existing Saturday.pdf
Scenario 1: Exist_Weekend PEAK_1.25Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
D28.20.677SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
B10.8NB LeftHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.30.054WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
C24.90.043SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
E39.50.007SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
C23.50.030NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B14.90.419SEB RightHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G20 Spack Consulting
Version 4.00-02
Generated with
0.419Volume to Capacity (v/c):
BLevel Of Service:
14.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3461334275251484211317445302Total Analysis Volume [veh/h]
86385216371053411175Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.9774Peak Hour Factor
3381333475241454111317435295Total Hourly Volume [veh/h]
112002004800600Right-Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
4501333495241934111323435295Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G21 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
035003500442004430Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G22 Spack Consulting
Version 4.00-02
Generated with
152.11153.032.2710.0757.0979.822.294.4864.7329.1195th-Percentile Queue Length [ft]
6.086.120.090.402.283.190.090.182.591.1695th-Percentile Queue Length [veh]
84.5085.011.265.6031.7244.341.272.4935.9616.1750th-Percentile Queue Length [ft]
3.383.400.050.221.271.770.050.101.440.6550th-Percentile Queue Length [veh]
NoYesNoNoNoYesNoNoNoYesCritical Lane Group
BBBBBBABBALane Group LOS
18.3017.3912.5512.9717.1917.307.4110.6812.338.04d, Delay for Lane Group [s/veh]
0.740.610.010.070.390.500.020.030.360.23X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
2.321.030.010.071.130.770.010.040.290.16d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.190.190.110.190.190.19k, delay calibration
15.9816.3612.5412.8916.0616.527.4010.6412.047.88d1, Uniform Delay [s]
46858346841237884869855912521289c, Capacity [veh/h]
158315001583950158335471087158335472522s, saturation flow rate [veh/h]
0.220.240.000.030.090.120.010.010.130.12(v / s)_i Volume / Saturation Flow Rate
0.290.290.290.290.240.240.480.350.350.48g / C, Green / Cycle
15151515121224181824g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G23 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
12.97 12.5512.97 17.39 18.3017.3917.198.04 12.33d_M, Delay for Movement [s/veh] 17.3010.68 7.41
B BB BB BBBMovement LOS A BB A
12.89 17.84d_A, Approach Delay [s/veh] 17.0510.60
B BApproach LOS B B
14.88d_I, Intersection Delay [s/veh]
BIntersection LOS
0.419Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G24 Spack Consulting
Version 4.00-02
Generated with
0.030Volume to Capacity (v/c):
CLevel Of Service:
23.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
6283479976Total Analysis Volume [veh/h]
1571120022Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96620.96620.96620.96620.96620.9662Peak Hour Factor
6073477276Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
6073477276Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G25 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.17d_I, Intersection Delay [s/veh]
AACApproach LOS
0.040.0017.04d_A, Approach Delay [s/veh]
0.000.280.000.003.253.2595th-Percentile Queue Length [ft]
0.000.010.000.000.130.1395th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.009.420.000.0011.5023.50d_M, Delay for Movement [s/veh]
0.010.000.000.010.010.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G26 Spack Consulting
Version 4.00-02
Generated with
0.007Volume to Capacity (v/c):
ELevel Of Service:
39.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
115571467621026171601Total Analysis Volume [veh/h]
291431219037018200Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.97150.97150.97150.97151.00001.00001.00001.00000.97151.00000.9715Peak Hour Factor
115555467401026171601Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
115555467401026171601Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G27 Spack Consulting
Version 4.00-02
Generated with
EIntersection LOS
1.95d_I, Intersection Delay [s/veh]
AADBApproach LOS
0.050.1229.0613.26d_A, Approach Delay [s/veh]
0.000.000.360.000.000.8445.3445.3445.341.201.201.2095th-Percentile Queue Length [ft]
0.000.000.010.000.000.031.811.811.810.050.050.0595th-Percentile Queue Length [veh]
AAAAAACEDBDDMovement LOS
0.000.009.300.000.009.0319.4739.5032.4310.9734.3627.03d_M, Delay for Movement [s/veh]
0.000.010.000.000.010.010.040.010.360.010.000.01V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G28 Spack Consulting
Version 4.00-02
Generated with
0.043Volume to Capacity (v/c):
CLevel Of Service:
24.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
127198743148Total Analysis Volume [veh/h]
3180218132Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
126908393138Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
126908393138Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G29 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.24d_I, Intersection Delay [s/veh]
AACApproach LOS
0.000.0316.31d_A, Approach Delay [s/veh]
0.000.000.000.265.165.1695th-Percentile Queue Length [ft]
0.000.000.000.010.210.2195th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.000.000.009.1611.3824.93d_M, Delay for Movement [s/veh]
0.000.010.010.000.020.04V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G30 Spack Consulting
Version 4.00-02
Generated with
0.054Volume to Capacity (v/c):
BLevel Of Service:
10.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
039925560Total Analysis Volume [veh/h]
01026410Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.90260.90260.90260.90261.0000Peak Hour Factor
035823050Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
035823050Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G31 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
7.60d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.277.380.00d_A, Approach Delay [s/veh]
0.004.2714.5614.560.000.0095th-Percentile Queue Length [ft]
0.000.170.580.580.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.270.007.640.000.00d_M, Delay for Movement [s/veh]
0.000.050.000.160.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G32 Spack Consulting
Version 4.00-02
Generated with
BLevel Of Service:
10.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
11771132003861490558940163Total Analysis Volume [veh/h]
319285010242314221041Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.92841.00001.00001.00001.00001.00001.00001.00000.9284Peak Hour Factor
11771131863861490558940151Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
11771131863861490558940151Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G33 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
10.75Intersection Delay [s/veh]
BBBBApproach LOS
11.1810.6010.1610.91Approach Delay [s/veh]
33.5437.7915.968.5518.3330.7095th-Percentile Queue Length [ft]
1.341.510.640.340.731.2395th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G34 Spack Consulting
Version 4.00-02
Generated with
0.677Volume to Capacity (v/c):
DLevel Of Service:
28.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0004560124437300284288Total Analysis Volume [veh/h]
000114031193007172Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95191.00000.95190.95190.95191.00000.95190.95190.9519Peak Hour Factor
0004340114235500270274Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0004340114235500270274Base Volume Input [veh/h]
Name
volumes
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G35 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
14.74d_I, Intersection Delay [s/veh]
ABDAApproach LOS
0.0011.4028.157.69d_A, Approach Delay [s/veh]
0.000.000.0060.670.0060.67162.42162.420.0015.8515.9816.1295th-Percentile Queue Length [ft]
0.000.000.002.430.002.436.506.500.000.630.640.6495th-Percentile Queue Length [veh]
BCDDAAAMovement LOS
0.000.000.0011.220.0018.5127.4528.230.000.007.697.70d_M, Delay for Movement [s/veh]
0.000.000.000.420.000.040.070.680.000.000.170.18V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G36 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G37 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 1: 1: Exist_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G38 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\2018 No-Build Friday.pdf
Scenario 4: 2018_Nobuild_Friday PEAK_1.25Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
C20.70.534SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
A9.0NB LeftHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.30.012WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
C18.40.000SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
D27.00.010SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
C19.20.027NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B12.90.322SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G39 Spack Consulting
Version 4.00-02
Generated with
0.322Volume to Capacity (v/c):
BLevel Of Service:
12.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
22030246121211093341224418216Total Analysis Volume [veh/h]
5576230527843610454Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.9818Peak Hour Factor
21629242121211073281224410212Total Hourly Volume [veh/h]
70004003500800Right-Turn on Red Volume [veh/h]
00000003000280Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
28629242161211422981232382212Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G40 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
035003500442004430Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G41 Spack Consulting
Version 4.00-02
Generated with
85.33110.073.897.2534.3351.691.565.1748.7714.8495th-Percentile Queue Length [ft]
3.414.400.160.291.372.070.060.211.950.5995th-Percentile Queue Length [veh]
47.4161.152.164.0319.0728.720.862.8727.098.2550th-Percentile Queue Length [ft]
1.902.450.090.160.761.150.030.111.080.3350th-Percentile Queue Length [veh]
NoYesNoNoNoYesNoNoNoYesCritical Lane Group
BBBBBBAABALane Group LOS
16.8117.2013.4413.6814.2514.465.959.1110.356.17d, Delay for Lane Group [s/veh]
0.570.540.030.060.270.360.020.040.310.15X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.360.890.030.060.590.410.010.050.220.08d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.190.190.110.190.190.19k, delay calibration
15.4516.3013.4113.6213.6614.045.949.0710.126.09d1, Uniform Delay [s]
38351038338241091878760013451477c, Capacity [veh/h]
158315001583950158335471103158335472602s, saturation flow rate [veh/h]
0.140.180.010.020.070.090.010.020.120.08(v / s)_i Volume / Saturation Flow Rate
0.240.240.240.240.260.260.510.380.380.51g / C, Green / Cycle
11111111121224181824g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G42 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
13.68 13.4413.68 17.20 16.8117.2014.256.17 10.35d_M, Delay for Movement [s/veh] 14.469.11 5.95
B BB BB BBBMovement LOS A BA A
13.60 17.02d_A, Approach Delay [s/veh] 14.188.93
B BApproach LOS A B
12.92d_I, Intersection Delay [s/veh]
BIntersection LOS
0.322Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G43 Spack Consulting
Version 4.00-02
Generated with
0.027Volume to Capacity (v/c):
CLevel Of Service:
19.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
50351167837Total Analysis Volume [veh/h]
1261316912Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96340.96340.96340.96340.96340.9634Peak Hour Factor
48551165337Total Hourly Volume [veh/h]
30002800Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
45551162537Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G44 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.18d_I, Intersection Delay [s/veh]
AACApproach LOS
0.090.0016.67d_A, Approach Delay [s/veh]
0.000.420.000.002.432.4395th-Percentile Queue Length [ft]
0.000.020.000.000.100.1095th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.009.020.000.0010.8519.17d_M, Delay for Movement [s/veh]
0.010.010.000.010.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G45 Spack Consulting
Version 4.00-02
Generated with
0.010Volume to Capacity (v/c):
DLevel Of Service:
27.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
7746247664823251205Total Analysis Volume [veh/h]
191161216626113101Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.96650.96650.96650.96651.00001.00001.00001.00000.96651.00000.9665Peak Hour Factor
7744747642823251205Total Hourly Volume [veh/h]
03000280000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
7741747614823251205Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G46 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
1.31d_I, Intersection Delay [s/veh]
AACCApproach LOS
0.070.1019.3618.86d_A, Approach Delay [s/veh]
0.000.000.330.000.000.5922.1522.1522.152.022.022.0295th-Percentile Queue Length [ft]
0.000.000.010.000.000.020.890.890.890.080.080.0895th-Percentile Queue Length [veh]
AAAAAABDCBDCMovement LOS
0.000.008.950.000.008.5412.9927.0121.9310.7925.9522.08d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.010.030.010.190.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G47 Spack Consulting
Version 4.00-02
Generated with
0.000Volume to Capacity (v/c):
CLevel Of Service:
18.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
0557728120Total Analysis Volume [veh/h]
0139182010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
0535699120Total Hourly Volume [veh/h]
03028000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0505671120Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G48 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.02d_I, Intersection Delay [s/veh]
AABApproach LOS
0.000.0110.02d_A, Approach Delay [s/veh]
0.000.000.000.070.210.2195th-Percentile Queue Length [ft]
0.000.000.000.000.010.0195th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.000.000.008.5710.0218.42d_M, Delay for Movement [s/veh]
0.000.010.010.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G49 Spack Consulting
Version 4.00-02
Generated with
0.012Volume to Capacity (v/c):
BLevel Of Service:
10.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
0826274230Total Analysis Volume [veh/h]
0266860Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.89530.89530.89530.89531.0000Peak Hour Factor
0723245210Total Hourly Volume [veh/h]
02140150Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
05924560Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G50 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
6.62d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.357.030.00d_A, Approach Delay [s/veh]
0.000.8917.1417.140.000.0095th-Percentile Queue Length [ft]
0.000.040.690.690.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.350.007.700.000.00d_M, Delay for Movement [s/veh]
0.000.010.000.170.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G51 Spack Consulting
Version 4.00-02
Generated with
ALevel Of Service:
9.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
429107123181587341668118Total Analysis Volume [veh/h]
172731542181017229Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.93381.00001.00001.00001.00001.00001.00001.00000.9338Peak Hour Factor
429107115181587341668110Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
429107115181587341668110Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G52 Spack Consulting
Version 4.00-02
Generated with
AIntersection LOS
9.04Intersection Delay [s/veh]
AAAAApproach LOS
9.318.568.989.27Approach Delay [s/veh]
18.2317.9210.395.498.1717.8895th-Percentile Queue Length [ft]
0.730.720.420.220.330.7295th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G53 Spack Consulting
Version 4.00-02
Generated with
0.534Volume to Capacity (v/c):
CLevel Of Service:
20.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0003300183828300196199Total Analysis Volume [veh/h]
00082041071004950Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.91261.00000.91260.91260.91261.00000.91260.91260.9126Peak Hour Factor
0003010163525800179182Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0003010163525800179182Base Volume Input [veh/h]
Name
volumes
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G54 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
12.34d_I, Intersection Delay [s/veh]
ABCAApproach LOS
0.0010.3520.437.53d_A, Approach Delay [s/veh]
0.000.000.0038.140.0038.1493.6493.640.0010.2810.3710.4695th-Percentile Queue Length [ft]
0.000.000.001.530.001.533.753.750.000.410.410.4295th-Percentile Queue Length [veh]
BBCCAAAMovement LOS
0.000.000.0010.130.0014.2218.7120.660.000.007.527.53d_M, Delay for Movement [s/veh]
0.000.000.000.300.000.040.050.530.000.000.120.12V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G55 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G56 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G57 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Future Total Volume
Scenario 4: 4: 2018_Nobuild_Friday PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G58 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\2018 No-Build Saturday.pdf
Scenario 9: 2018_Nobuild_Weekend PEAK_1.25Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
D28.20.677SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
B10.8NB LeftHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.30.054WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
D26.40.046SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
E43.60.008SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
C24.80.032NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B15.70.410SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G59 Spack Consulting
Version 4.00-02
Generated with
0.410Volume to Capacity (v/c):
BLevel Of Service:
15.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3461334275251484511317474302Total Analysis Volume [veh/h]
86385216371133411875Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.9774Peak Hour Factor
3381333475241454411317463295Total Hourly Volume [veh/h]
112002004800600Right-Turn on Red Volume [veh/h]
00000003000280Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
4501333495241934111323435295Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G60 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
045001500301003020Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G61 Spack Consulting
Version 4.00-02
Generated with
149.21167.442.2810.0961.6593.712.644.9477.0233.4395th-Percentile Queue Length [ft]
5.976.700.090.402.473.750.110.203.081.3495th-Percentile Queue Length [veh]
82.9093.021.265.6134.2552.061.462.7542.7918.5750th-Percentile Queue Length [ft]
3.323.720.050.221.372.080.060.111.710.7450th-Percentile Queue Length [veh]
YesNoNoNoNoYesNoNoNoYesCritical Lane Group
BBBBBBABBALane Group LOS
17.0519.0412.1412.5318.3618.788.2911.6113.578.96d, Delay for Lane Group [s/veh]
0.680.670.010.070.410.550.020.030.390.25X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.603.220.010.071.241.000.010.040.360.18d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.240.110.110.190.190.110.190.190.19k, delay calibration
15.4515.8212.1312.4717.1217.788.2811.5713.218.78d1, Uniform Delay [s]
50953250943136581864753812041215c, Capacity [veh/h]
158315001583950158335471069158335472492s, saturation flow rate [veh/h]
0.220.240.000.030.090.130.010.010.130.12(v / s)_i Volume / Saturation Flow Rate
0.320.320.320.320.230.230.460.340.340.46g / C, Green / Cycle
17171717121224181824g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G62 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
12.53 12.1412.53 19.04 17.0519.0418.368.96 13.57d_M, Delay for Movement [s/veh] 18.7811.61 8.29
B BB BB BBBMovement LOS A BB A
12.46 18.06d_A, Approach Delay [s/veh] 18.4611.77
B BApproach LOS B B
15.75d_I, Intersection Delay [s/veh]
BIntersection LOS
0.410Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G63 Spack Consulting
Version 4.00-02
Generated with
0.032Volume to Capacity (v/c):
CLevel Of Service:
24.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
6593482876Total Analysis Volume [veh/h]
1651120722Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96620.96620.96620.96620.96620.9662Peak Hour Factor
6373480076Total Hourly Volume [veh/h]
30002800Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
6073477276Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G64 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.17d_I, Intersection Delay [s/veh]
AACApproach LOS
0.040.0017.74d_A, Approach Delay [s/veh]
0.000.280.000.003.443.4495th-Percentile Queue Length [ft]
0.000.010.000.000.140.1495th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.009.540.000.0011.6924.81d_M, Delay for Movement [s/veh]
0.010.000.000.010.010.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G65 Spack Consulting
Version 4.00-02
Generated with
0.008Volume to Capacity (v/c):
ELevel Of Service:
43.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
115602467911026171601Total Analysis Volume [veh/h]
291511219837018200Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.97150.97150.97150.97151.00001.00001.00001.00000.97151.00000.9715Peak Hour Factor
115585467681026171601Total Hourly Volume [veh/h]
03000280000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
115555467401026171601Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G66 Spack Consulting
Version 4.00-02
Generated with
EIntersection LOS
2.06d_I, Intersection Delay [s/veh]
AADBApproach LOS
0.050.1132.1013.63d_A, Approach Delay [s/veh]
0.000.000.370.000.000.8650.1750.1750.171.261.261.2695th-Percentile Queue Length [ft]
0.000.000.010.000.000.032.012.012.010.050.050.0595th-Percentile Queue Length [veh]
AAAAAACEEBEDMovement LOS
0.000.009.410.000.009.1421.5243.6435.8111.1136.9628.79d_M, Delay for Movement [s/veh]
0.000.010.000.000.010.010.040.010.380.010.000.01V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G67 Spack Consulting
Version 4.00-02
Generated with
0.046Volume to Capacity (v/c):
DLevel Of Service:
26.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
127509033148Total Analysis Volume [veh/h]
3187226132Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
127208673138Total Hourly Volume [veh/h]
03028000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
126908393138Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G68 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
0.24d_I, Intersection Delay [s/veh]
AACApproach LOS
0.000.0316.97d_A, Approach Delay [s/veh]
0.000.000.000.275.465.4695th-Percentile Queue Length [ft]
0.000.000.000.010.220.2295th-Percentile Queue Length [veh]
AAAABDMovement LOS
0.000.000.009.2711.6026.37d_M, Delay for Movement [s/veh]
0.000.010.010.000.020.05V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G69 Spack Consulting
Version 4.00-02
Generated with
0.054Volume to Capacity (v/c):
BLevel Of Service:
10.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
039925560Total Analysis Volume [veh/h]
01026410Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.90260.90260.90260.90261.0000Peak Hour Factor
035823050Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
035823050Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G70 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
7.60d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.277.380.00d_A, Approach Delay [s/veh]
0.004.2714.5614.560.000.0095th-Percentile Queue Length [ft]
0.000.170.580.580.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.270.007.640.000.00d_M, Delay for Movement [s/veh]
0.000.050.000.160.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G71 Spack Consulting
Version 4.00-02
Generated with
BLevel Of Service:
10.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
11771132003861490558940163Total Analysis Volume [veh/h]
319285010242314221041Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.92841.00001.00001.00001.00001.00001.00001.00000.9284Peak Hour Factor
11771131863861490558940151Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
11771131863861490558940151Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G72 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
10.75Intersection Delay [s/veh]
BBBBApproach LOS
11.1810.6010.1610.91Approach Delay [s/veh]
33.5437.7915.968.5518.3330.7095th-Percentile Queue Length [ft]
1.341.510.640.340.731.2395th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G73 Spack Consulting
Version 4.00-02
Generated with
0.677Volume to Capacity (v/c):
DLevel Of Service:
28.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0004560124437300284288Total Analysis Volume [veh/h]
000114031193007172Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95191.00000.95190.95190.95191.00000.95190.95190.9519Peak Hour Factor
0004340114235500270274Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0004340114235500270274Base Volume Input [veh/h]
Name
volumes
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G74 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
14.74d_I, Intersection Delay [s/veh]
ABDAApproach LOS
0.0011.4028.157.69d_A, Approach Delay [s/veh]
0.000.000.0060.670.0060.67162.42162.420.0015.8515.9816.1295th-Percentile Queue Length [ft]
0.000.000.002.430.002.436.506.500.000.630.640.6495th-Percentile Queue Length [veh]
BCDDAAAMovement LOS
0.000.000.0011.220.0018.5127.4528.230.000.007.697.70d_M, Delay for Movement [s/veh]
0.000.000.000.420.000.040.070.680.000.000.170.18V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G75 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G76 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G77 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Future Total Volume
Scenario 9: 9: 2018_Nobuild_Weekend PEAK_1.25
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G78 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\2018 Build Friday.pdf
Scenario 6: 2018_build_Friday PEAK_2.3Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
D30.50.683SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
A9.6NB LeftHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.40.012WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
C19.50.000SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
D29.40.011SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
C20.30.033NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B13.50.350SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G79 Spack Consulting
Version 4.00-02
Generated with
0.350Volume to Capacity (v/c):
BLevel Of Service:
13.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
24631274122211483341224418254Total Analysis Volume [veh/h]
6286831537843610463Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.9818Peak Hour Factor
24230269122211453281224410249Total Hourly Volume [veh/h]
70004003500800Right-Turn on Red Volume [veh/h]
00000003000280Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
2612701038000037Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
28629242161211422981232382212Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G80 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
035003500442004430Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G81 Spack Consulting
Version 4.00-02
Generated with
97.72125.563.917.6451.5455.141.755.5752.6319.8595th-Percentile Queue Length [ft]
3.915.020.160.312.062.210.070.222.110.7995th-Percentile Queue Length [veh]
54.2969.752.174.2428.6330.630.973.0929.2411.0350th-Percentile Queue Length [ft]
2.172.790.090.171.151.230.040.121.170.4450th-Percentile Queue Length [veh]
NoYesNoNoNoYesNoNoNoYesCritical Lane Group
BBBBBBAABALane Group LOS
16.8217.3413.1713.4315.7615.236.429.6410.956.75d, Delay for Lane Group [s/veh]
0.600.570.030.060.370.370.020.040.320.18X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.370.960.030.060.990.450.010.050.240.10d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.190.190.110.190.190.19k, delay calibration
15.4516.3813.1513.3714.7714.786.419.5910.716.65d1, Uniform Delay [s]
41353541339239889276158813171439c, Capacity [veh/h]
158315001583950158335471103158335472608s, saturation flow rate [veh/h]
0.160.200.010.020.090.090.010.020.120.10(v / s)_i Volume / Saturation Flow Rate
0.260.260.260.260.250.250.500.370.370.50g / C, Green / Cycle
12121212121224181824g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G82 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
13.43 13.1713.43 17.34 16.8217.3415.766.75 10.95d_M, Delay for Movement [s/veh] 15.239.64 6.42
B BB BB BBBMovement LOS A BA A
13.34 17.11d_A, Approach Delay [s/veh] 15.189.37
B BApproach LOS A B
13.46d_I, Intersection Delay [s/veh]
BIntersection LOS
0.350Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G83 Spack Consulting
Version 4.00-02
Generated with
0.033Volume to Capacity (v/c):
CLevel Of Service:
20.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
54251270538Total Analysis Volume [veh/h]
1351317612Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96340.96340.96340.96340.96340.9634Peak Hour Factor
52251267938Total Hourly Volume [veh/h]
30002800Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
37012601Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
45551162537Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G84 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.19d_I, Intersection Delay [s/veh]
AACApproach LOS
0.080.0017.76d_A, Approach Delay [s/veh]
0.000.430.000.002.912.9195th-Percentile Queue Length [ft]
0.000.020.000.000.120.1295th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.009.120.000.0011.0720.27d_M, Delay for Movement [s/veh]
0.010.010.000.010.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G85 Spack Consulting
Version 4.00-02
Generated with
0.011Volume to Capacity (v/c):
DLevel Of Service:
29.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
7950048690823251206Total Analysis Volume [veh/h]
201251217326113102Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.96650.96650.96650.96651.00001.00001.00001.00000.96651.00000.9665Peak Hour Factor
7948348667823251206Total Hourly Volume [veh/h]
03000280000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
23601250000001Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
7741747614823251205Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G86 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
1.35d_I, Intersection Delay [s/veh]
AACCApproach LOS
0.060.1020.9220.44d_A, Approach Delay [s/veh]
0.000.000.340.000.000.6124.4324.4324.432.572.572.5795th-Percentile Queue Length [ft]
0.000.000.010.000.000.020.980.980.980.100.100.1095th-Percentile Queue Length [veh]
AAAAAABDCBDCMovement LOS
0.000.009.040.000.008.6613.7829.4323.8011.0428.0723.58d_M, Delay for Movement [s/veh]
0.000.010.000.000.010.010.030.010.210.000.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G87 Spack Consulting
Version 4.00-02
Generated with
0.000Volume to Capacity (v/c):
CLevel Of Service:
19.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
0597754120Total Analysis Volume [veh/h]
0149189010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
0573724120Total Hourly Volume [veh/h]
03028000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
03825000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0505671120Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G88 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.02d_I, Intersection Delay [s/veh]
AABApproach LOS
0.000.0110.17d_A, Approach Delay [s/veh]
0.000.000.000.080.220.2295th-Percentile Queue Length [ft]
0.000.000.000.000.010.0195th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.000.000.008.6910.1719.52d_M, Delay for Movement [s/veh]
0.000.010.010.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G89 Spack Consulting
Version 4.00-02
Generated with
0.012Volume to Capacity (v/c):
BLevel Of Service:
10.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
9826288230Total Analysis Volume [veh/h]
2267260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.89530.89530.89530.89531.0000Peak Hour Factor
9723258210Total Hourly Volume [veh/h]
02140150Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
9001300Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
05924560Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G90 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
6.69d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.457.090.00d_A, Approach Delay [s/veh]
0.000.9118.1218.120.000.0095th-Percentile Queue Length [ft]
0.000.040.720.720.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.450.007.730.000.00d_M, Delay for Movement [s/veh]
0.000.010.000.180.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G91 Spack Consulting
Version 4.00-02
Generated with
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
4421071402915895416637135Total Analysis Volume [veh/h]
1112735742241017934Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.93381.00001.00001.00001.00001.00001.00001.00000.9338Peak Hour Factor
4421071312915895416637126Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
013016110022002916Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
429107115181587341668110Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G92 Spack Consulting
Version 4.00-02
Generated with
AIntersection LOS
9.61Intersection Delay [s/veh]
AAAAApproach LOS
9.869.249.479.83Approach Delay [s/veh]
21.6123.6314.445.7212.9222.0295th-Percentile Queue Length [ft]
0.860.950.580.230.520.8895th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G93 Spack Consulting
Version 4.00-02
Generated with
0.683Volume to Capacity (v/c):
DLevel Of Service:
30.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0003470183832400245233Total Analysis Volume [veh/h]
00087041081006158Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.91261.00000.91260.91260.91261.00000.91260.91260.9126Peak Hour Factor
0003170163529600224213Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0001600038004531Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0003010163525800179182Base Volume Input [veh/h]
Name
volumes
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G94 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
15.33d_I, Intersection Delay [s/veh]
ABDAApproach LOS
0.0010.6130.287.60d_A, Approach Delay [s/veh]
0.000.000.0041.910.0041.91152.98152.980.0012.9112.9112.9195th-Percentile Queue Length [ft]
0.000.000.001.680.001.686.126.120.000.520.520.5295th-Percentile Queue Length [veh]
BCDDAAAMovement LOS
0.000.000.0010.350.0015.7228.1730.530.000.007.607.60d_M, Delay for Movement [s/veh]
0.000.000.000.320.000.040.060.680.000.000.150.14V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G95 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G96 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G97 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Net New Site Trips
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G98 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Future Total Volume
Scenario 6: 6: 2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G99 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\2018 Build Saturday.pdf
Scenario 10: 2018_Build_Weekend PEAK_2.3Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
F154.81.159SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
B14.8EB RightHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.50.057WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
D32.20.058SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
F62.90.010SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
D30.30.054NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B19.30.491SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G100 Spack Consulting
Version 4.00-02
Generated with
0.491Volume to Capacity (v/c):
BLevel Of Service:
19.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4161544377252254511317474404Total Analysis Volume [veh/h]
10441112265611334118101Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.9774Peak Hour Factor
4071543377242204411317463395Total Hourly Volume [veh/h]
135002007400600Right-Turn on Red Volume [veh/h]
00000003000280Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
922990201010000100Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
4501333495241934111323435295Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G101 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
045001500301003020Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G102 Spack Consulting
Version 4.00-02
Generated with
203.97285.582.4111.43108.5899.222.775.1179.7548.6995th-Percentile Queue Length [ft]
8.1611.420.100.464.343.970.110.203.191.9595th-Percentile Queue Length [veh]
115.75176.601.346.3560.3255.121.542.8444.3027.0550th-Percentile Queue Length [ft]
4.637.060.050.252.412.200.060.111.771.0850th-Percentile Queue Length [veh]
YesNoNoNoYesNoNoNoNoYesCritical Lane Group
CCBBCBABBALane Group LOS
20.2232.9112.6313.0821.6819.518.4111.6613.609.52d, Delay for Lane Group [s/veh]
0.810.860.010.080.610.550.020.030.380.33X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
3.1814.820.010.072.820.980.010.040.330.27d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.430.110.110.190.190.110.190.190.19k, delay calibration
17.0418.0912.6213.0018.8618.538.4011.6213.279.26d1, Uniform Delay [s]
51253051242436882364055812511228c, Capacity [veh/h]
158315001583950158335471060158335472509s, saturation flow rate [veh/h]
0.260.310.000.030.140.130.010.010.130.16(v / s)_i Volume / Saturation Flow Rate
0.320.320.320.320.230.230.470.350.350.47g / C, Green / Cycle
18181818131326191926g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G103 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
13.08 12.6313.08 32.91 20.2232.9121.689.52 13.60d_M, Delay for Movement [s/veh] 19.5111.66 8.41
B BB CC CCBMovement LOS A BB A
13.00 26.87d_A, Approach Delay [s/veh] 20.0111.72
B CApproach LOS B C
19.33d_I, Intersection Delay [s/veh]
BIntersection LOS
0.491Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G104 Spack Consulting
Version 4.00-02
Generated with
0.054Volume to Capacity (v/c):
DLevel Of Service:
30.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
7623692878Total Analysis Volume [veh/h]
1901223222Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96620.96620.96620.96620.96620.9662Peak Hour Factor
7363689778Total Hourly Volume [veh/h]
30002800Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
99029702Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
6073477276Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G105 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
0.21d_I, Intersection Delay [s/veh]
AACApproach LOS
0.040.0022.13d_A, Approach Delay [s/veh]
0.000.310.000.005.315.3195th-Percentile Queue Length [ft]
0.000.010.000.000.210.2195th-Percentile Queue Length [veh]
AAAABDMovement LOS
0.009.960.000.0012.7430.33d_M, Delay for Movement [s/veh]
0.010.000.000.010.010.05V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G106 Spack Consulting
Version 4.00-02
Generated with
0.010Volume to Capacity (v/c):
FLevel Of Service:
62.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
120702488881026171603Total Analysis Volume [veh/h]
301761222237018201Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.97150.97150.97150.97151.00001.00001.00001.00000.97151.00000.9715Peak Hour Factor
120682488631026171603Total Hourly Volume [veh/h]
03000280000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
59702950000002Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
115555467401026171601Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G107 Spack Consulting
Version 4.00-02
Generated with
FIntersection LOS
2.66d_I, Intersection Delay [s/veh]
AAECApproach LOS
0.050.1146.7020.00d_A, Approach Delay [s/veh]
0.000.000.400.000.000.9570.4370.4370.432.802.802.8095th-Percentile Queue Length [ft]
0.000.000.020.000.000.042.822.822.820.110.110.1195th-Percentile Queue Length [veh]
AAAAAADFFBEEMovement LOS
0.000.009.800.000.009.5432.2662.8851.7611.9548.0036.08d_M, Delay for Movement [s/veh]
0.000.010.010.000.010.010.040.010.490.010.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G108 Spack Consulting
Version 4.00-02
Generated with
0.058Volume to Capacity (v/c):
DLevel Of Service:
32.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
1285610023148Total Analysis Volume [veh/h]
3214250132Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
128229623138Total Hourly Volume [veh/h]
03028000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
010295000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
126908393138Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G109 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
0.24d_I, Intersection Delay [s/veh]
AACApproach LOS
0.000.0319.64d_A, Approach Delay [s/veh]
0.000.000.000.296.666.6695th-Percentile Queue Length [ft]
0.000.000.000.010.270.2795th-Percentile Queue Length [veh]
AAAABDMovement LOS
0.000.000.009.6812.4632.21d_M, Delay for Movement [s/veh]
0.000.010.010.000.020.06V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G110 Spack Consulting
Version 4.00-02
Generated with
0.057Volume to Capacity (v/c):
BLevel Of Service:
10.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
3139929260Total Analysis Volume [veh/h]
81027310Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.90260.90260.90260.90261.0000Peak Hour Factor
3135826450Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
31003400Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
035823050Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G111 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
7.70d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.557.480.00d_A, Approach Delay [s/veh]
0.004.5017.0617.060.000.0095th-Percentile Queue Length [ft]
0.000.180.680.680.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.550.007.710.000.00d_M, Delay for Movement [s/veh]
0.000.060.000.180.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G112 Spack Consulting
Version 4.00-02
Generated with
BLevel Of Service:
14.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
11113113263696141675589118208Total Analysis Volume [veh/h]
328286617244214223052Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.92841.00001.00001.00001.00001.00001.00001.00000.9284Peak Hour Factor
11113113244696141675589118193Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
036058310077007842Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
11771131863861490558940151Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G113 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
14.76Intersection Delay [s/veh]
BCBBApproach LOS
14.7716.1913.3014.42Approach Delay [s/veh]
55.4085.9240.649.9844.0153.0295th-Percentile Queue Length [ft]
2.223.441.630.401.762.1295th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G114 Spack Consulting
Version 4.00-02
Generated with
1.159Volume to Capacity (v/c):
FLevel Of Service:
154.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0005170124451500410375Total Analysis Volume [veh/h]
00012903111290010294Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95191.00000.95190.95190.95191.00000.95190.95190.9519Peak Hour Factor
0004920114249000390357Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000580001350012083Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0004340114235500270274Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G115 Spack Consulting
Version 4.00-02
Generated with
FIntersection LOS
53.08d_I, Intersection Delay [s/veh]
ABFAApproach LOS
0.0012.66154.737.92d_A, Approach Delay [s/veh]
0.000.000.0080.800.0080.80572.20572.200.0023.7723.7723.7795th-Percentile Queue Length [ft]
0.000.000.003.230.003.2322.8922.890.000.950.950.9595th-Percentile Queue Length [veh]
BDFFAAAMovement LOS
0.000.000.0012.360.0025.72153.71154.810.000.007.927.92d_M, Delay for Movement [s/veh]
0.000.000.000.480.000.060.091.160.000.000.250.23V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G116 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G117 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G118 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Net New Site Trips
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G119 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Future Total Volume
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G120 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\2018 Mitigation Build Friday.pdf
Scenario 8: MITI_2018_build_Friday PEAK_2.3Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
C16.90.683SB ThruHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
A9.6NB LeftHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.40.012WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
C19.50.000SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
D29.40.011SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
C20.30.033NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B13.50.350SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G121 Spack Consulting
Version 4.00-02
Generated with
0.350Volume to Capacity (v/c):
BLevel Of Service:
13.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
24631274122211483341224418254Total Analysis Volume [veh/h]
6286831537843610463Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.98180.9818Peak Hour Factor
24230269122211453281224410249Total Hourly Volume [veh/h]
70004003500800Right-Turn on Red Volume [veh/h]
00000003000280Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
2612701038000037Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
28629242161211422981232382212Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G122 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
035003500442004430Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G123 Spack Consulting
Version 4.00-02
Generated with
97.72125.563.917.6451.5455.141.755.5752.6319.8595th-Percentile Queue Length [ft]
3.915.020.160.312.062.210.070.222.110.7995th-Percentile Queue Length [veh]
54.2969.752.174.2428.6330.630.973.0929.2411.0350th-Percentile Queue Length [ft]
2.172.790.090.171.151.230.040.121.170.4450th-Percentile Queue Length [veh]
NoYesNoNoNoYesNoNoNoYesCritical Lane Group
BBBBBBAABALane Group LOS
16.8217.3413.1713.4315.7615.236.429.6410.956.75d, Delay for Lane Group [s/veh]
0.600.570.030.060.370.370.020.040.320.18X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
1.370.960.030.060.990.450.010.050.240.10d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.110.110.110.190.190.110.190.190.19k, delay calibration
15.4516.3813.1513.3714.7714.786.419.5910.716.65d1, Uniform Delay [s]
41353541339239889276158813171439c, Capacity [veh/h]
158315001583950158335471103158335472608s, saturation flow rate [veh/h]
0.160.200.010.020.090.090.010.020.120.10(v / s)_i Volume / Saturation Flow Rate
0.260.260.260.260.250.250.500.370.370.50g / C, Green / Cycle
12121212121224181824g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G124 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
13.43 13.1713.43 17.34 16.8217.3415.766.75 10.95d_M, Delay for Movement [s/veh] 15.239.64 6.42
B BB BB BBBMovement LOS A BA A
13.34 17.11d_A, Approach Delay [s/veh] 15.189.37
B BApproach LOS A B
13.46d_I, Intersection Delay [s/veh]
BIntersection LOS
0.350Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G125 Spack Consulting
Version 4.00-02
Generated with
0.033Volume to Capacity (v/c):
CLevel Of Service:
20.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
54251270538Total Analysis Volume [veh/h]
1351317612Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96340.96340.96340.96340.96340.9634Peak Hour Factor
52251267938Total Hourly Volume [veh/h]
30002800Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
37012601Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
45551162537Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G126 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.19d_I, Intersection Delay [s/veh]
AACApproach LOS
0.080.0017.76d_A, Approach Delay [s/veh]
0.000.430.000.002.912.9195th-Percentile Queue Length [ft]
0.000.020.000.000.120.1295th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.009.120.000.0011.0720.27d_M, Delay for Movement [s/veh]
0.010.010.000.010.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G127 Spack Consulting
Version 4.00-02
Generated with
0.011Volume to Capacity (v/c):
DLevel Of Service:
29.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
7950048690823251206Total Analysis Volume [veh/h]
201251217326113102Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.96650.96650.96650.96651.00001.00001.00001.00000.96651.00000.9665Peak Hour Factor
7948348667823251206Total Hourly Volume [veh/h]
03000280000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
23601250000001Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
7741747614823251205Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G128 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
1.35d_I, Intersection Delay [s/veh]
AACCApproach LOS
0.060.1020.9220.44d_A, Approach Delay [s/veh]
0.000.000.340.000.000.6124.4324.4324.432.572.572.5795th-Percentile Queue Length [ft]
0.000.000.010.000.000.020.980.980.980.100.100.1095th-Percentile Queue Length [veh]
AAAAAABDCBDCMovement LOS
0.000.009.040.000.008.6613.7829.4323.8011.0428.0723.58d_M, Delay for Movement [s/veh]
0.000.010.000.000.010.010.030.010.210.000.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G129 Spack Consulting
Version 4.00-02
Generated with
0.000Volume to Capacity (v/c):
CLevel Of Service:
19.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
0597754120Total Analysis Volume [veh/h]
0149189010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
0573724120Total Hourly Volume [veh/h]
03028000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
03825000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0505671120Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G130 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
0.02d_I, Intersection Delay [s/veh]
AABApproach LOS
0.000.0110.17d_A, Approach Delay [s/veh]
0.000.000.000.080.220.2295th-Percentile Queue Length [ft]
0.000.000.000.000.010.0195th-Percentile Queue Length [veh]
AAAABCMovement LOS
0.000.000.008.6910.1719.52d_M, Delay for Movement [s/veh]
0.000.010.010.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G131 Spack Consulting
Version 4.00-02
Generated with
0.012Volume to Capacity (v/c):
BLevel Of Service:
10.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
9826288230Total Analysis Volume [veh/h]
2267260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.89530.89530.89530.89531.0000Peak Hour Factor
9723258210Total Hourly Volume [veh/h]
02140150Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
9001300Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
05924560Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G132 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
6.69d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.457.090.00d_A, Approach Delay [s/veh]
0.000.9118.1218.120.000.0095th-Percentile Queue Length [ft]
0.000.040.720.720.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.450.007.730.000.00d_M, Delay for Movement [s/veh]
0.000.010.000.180.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G133 Spack Consulting
Version 4.00-02
Generated with
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
4421071402915895416637135Total Analysis Volume [veh/h]
1112735742241017934Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.93381.00001.00001.00001.00001.00001.00001.00000.9338Peak Hour Factor
4421071312915895416637126Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
013016110022002916Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
429107115181587341668110Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G134 Spack Consulting
Version 4.00-02
Generated with
AIntersection LOS
9.61Intersection Delay [s/veh]
AAAAApproach LOS
9.869.249.479.83Approach Delay [s/veh]
21.6123.6314.445.7212.9222.0295th-Percentile Queue Length [ft]
0.860.950.580.230.520.8895th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G135 Spack Consulting
Version 4.00-02
Generated with
0.683Volume to Capacity (v/c):
CLevel Of Service:
16.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0003470183832400245233Total Analysis Volume [veh/h]
00087041081006158Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.91261.00000.91260.91260.91261.00000.91260.91260.9126Peak Hour Factor
0003170163529600224213Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0001600038004531Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0003010163525800179182Base Volume Input [veh/h]
Name
volumes
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G136 Spack Consulting
Version 4.00-02
Generated with
CIntersection LOS
11.21d_I, Intersection Delay [s/veh]
ABCAApproach LOS
0.0010.6116.587.60d_A, Approach Delay [s/veh]
0.000.000.0041.910.0041.9139.9942.060.0012.9112.9112.9195th-Percentile Queue Length [ft]
0.000.000.001.680.001.681.601.680.000.520.520.5295th-Percentile Queue Length [veh]
BCBCAAAMovement LOS
0.000.000.0010.350.0015.7214.1116.870.000.007.607.60d_M, Delay for Movement [s/veh]
0.000.000.000.320.000.040.060.680.000.000.150.14V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G137 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G138 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G139 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Net New Site Trips
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G140 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Future Total Volume
Scenario 8: 8: MITI_2018_build_Friday PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G141 Spack Consulting
Version 4.00-02
Generated with
Intersection Analysis Summary
2/7/2017Report File: C:\...\2018 Mitigation Build Saturday.pdf
Scenario 10: 2018_Build_Weekend PEAK_2.3Vistro File: C:\...\Woodbury Lakes.vistro
V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. forall other control types, they are taken for the whole intersection.
D25.70.056EB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Access 27
B14.8EB RightHCM 2010All-way stopWoodbury Lakes Road &
Access 16
B10.50.057WB LeftHCM 2010Two-way stopWoodbury Lakes Road &
Spring Hill Drive5
D32.20.058SB LeftHCM 2010Two-way stopHudson Road and Woodbury
Lakes East Access4
F62.90.010SB ThruHCM 2010Two-way stopHudson Road and Turnberry
Alcove3
D30.30.054NB LeftHCM 2010Two-way stopHudson Road and Troon
Court2
B19.30.491SEB LeftHCM 2010SignalizedHudson Road and Woodbury
Lakes Road1
LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G142 Spack Consulting
Version 4.00-02
Generated with
0.491Volume to Capacity (v/c):
BLevel Of Service:
19.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
SignalizedControl Type:
Intersection 1: Hudson Road and Woodbury Lakes Road
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0030.0045.0045.00Speed [mph]
100.00100.00100.0075.00100.00100.00275.00100.00400.00220.00100.00435.00Pocket Length [ft]
000100101101No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
SoutheastboundNorthwestboundSouthwestboundNortheastboundApproach
Name
Intersection Setup
0000Bicycle Volume [bicycles/h]
0000Pedestrian Volume [ped/h]
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
4161544377252254511317474404Total Analysis Volume [veh/h]
10441112265611334118101Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.97740.9774Peak Hour Factor
4071543377242204411317463395Total Hourly Volume [veh/h]
135002007400600Right-Turn on Red Volume [veh/h]
00000003000280Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
922990201010000100Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
4501333495241934111323435295Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G143 Spack Consulting
Version 4.00-02
Generated with
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase
1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]
0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft]
NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoYesNoYesNoMinimum Recall
0.03.50.00.03.50.00.04.03.00.04.03.0l2, Clearance Lost Time [s]
0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s]
0260027002100110Pedestrian Clearance [s]
070070070070Walk [s]
0.03.00.00.03.00.00.04.53.00.04.53.0Vehicle Extension [s]
000000000000Split [s]
0.02.00.00.02.00.00.01.51.50.01.51.5All red [s]
0.03.50.00.03.50.00.04.53.50.04.53.5Amber [s]
045001500301003020Maximum Green [s]
08008001270127Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040080061025Signal group
PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type
Phasing & Timing
0.00Lost time [s]
SingleBandPermissive Mode
LeadGreenOffset Reference
0.0Offset [s]
Fully actuatedActuation Type
Free RunningCoordination Type
90Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G144 Spack Consulting
Version 4.00-02
Generated with
203.97285.582.4111.43108.5899.222.775.1179.7548.6995th-Percentile Queue Length [ft]
8.1611.420.100.464.343.970.110.203.191.9595th-Percentile Queue Length [veh]
115.75176.601.346.3560.3255.121.542.8444.3027.0550th-Percentile Queue Length [ft]
4.637.060.050.252.412.200.060.111.771.0850th-Percentile Queue Length [veh]
YesNoNoNoYesNoNoNoNoYesCritical Lane Group
CCBBCBABBALane Group LOS
20.2232.9112.6313.0821.6819.518.4111.6613.609.52d, Delay for Lane Group [s/veh]
0.810.860.010.080.610.550.020.030.380.33X, volume / capacity
Lane Group Results
1.001.001.001.001.001.001.001.001.001.00PF, progression factor
1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio
0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]
3.1814.820.010.072.820.980.010.040.330.27d2, Incremental Delay [s]
1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor
0.110.430.110.110.190.190.110.190.190.19k, delay calibration
17.0418.0912.6213.0018.8618.538.4011.6213.279.26d1, Uniform Delay [s]
51253051242436882364055812511228c, Capacity [veh/h]
158315001583950158335471060158335472509s, saturation flow rate [veh/h]
0.260.310.000.030.140.130.010.010.130.16(v / s)_i Volume / Saturation Flow Rate
0.320.320.320.320.230.230.470.350.350.47g / C, Green / Cycle
18181818131326191926g_i, Effective Green Time [s]
3.503.503.503.504.004.000.004.004.000.00l2, Clearance Lost Time [s]
0.002.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]
5.505.505.505.506.006.006.006.006.006.00L, Total Lost Time per Cycle [s]
RCRCRCLRCLLane Group
Lane Group Calculations
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G145 Spack Consulting
Version 4.00-02
Generated with
Movement, Approach, & Intersection Results
13.08 12.6313.08 32.91 20.2232.9121.689.52 13.60d_M, Delay for Movement [s/veh] 19.5111.66 8.41
B BB CC CCBMovement LOS A BB A
13.00 26.87d_A, Approach Delay [s/veh] 20.0111.72
B CApproach LOS B C
19.33d_I, Intersection Delay [s/veh]
BIntersection LOS
0.491Intersection V/C
----------------Ring 4
----------------Ring 3
------------8-65Ring 2
------------4-21Ring 1
Sequence
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G146 Spack Consulting
Version 4.00-02
Generated with
0.054Volume to Capacity (v/c):
DLevel Of Service:
30.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Hudson Road and Troon Court
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00115.00220.00100.00100.00100.00Pocket Length [ft]
011000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
7623692878Total Analysis Volume [veh/h]
1901223222Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96620.96620.96620.96620.96620.9662Peak Hour Factor
7363689778Total Hourly Volume [veh/h]
30002800Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
99029702Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
6073477276Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G147 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
0.21d_I, Intersection Delay [s/veh]
AACApproach LOS
0.040.0022.13d_A, Approach Delay [s/veh]
0.000.310.000.005.315.3195th-Percentile Queue Length [ft]
0.000.010.000.000.210.2195th-Percentile Queue Length [veh]
AAAABDMovement LOS
0.009.960.000.0012.7430.33d_M, Delay for Movement [s/veh]
0.010.000.000.010.010.05V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G148 Spack Consulting
Version 4.00-02
Generated with
0.010Volume to Capacity (v/c):
FLevel Of Service:
62.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Hudson Road and Turnberry Alcove
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
45.0045.0030.0030.00Speed [mph]
300.00100.00225.00100.00100.00125.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
101001000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
120702488881026171603Total Analysis Volume [veh/h]
301761222237018201Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.97150.97150.97150.97151.00001.00001.00001.00000.97151.00000.9715Peak Hour Factor
120682488631026171603Total Hourly Volume [veh/h]
03000280000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
59702950000002Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
115555467401026171601Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G149 Spack Consulting
Version 4.00-02
Generated with
FIntersection LOS
2.66d_I, Intersection Delay [s/veh]
AAECApproach LOS
0.050.1146.7020.00d_A, Approach Delay [s/veh]
0.000.000.400.000.000.9570.4370.4370.432.802.802.8095th-Percentile Queue Length [ft]
0.000.000.020.000.000.042.822.822.820.110.110.1195th-Percentile Queue Length [veh]
AAAAAADFFBEEMovement LOS
0.000.009.800.000.009.5432.2662.8851.7611.9548.0036.08d_M, Delay for Movement [s/veh]
0.000.010.010.000.010.010.040.010.490.010.000.03V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeFreeStopStopPriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G150 Spack Consulting
Version 4.00-02
Generated with
0.058Volume to Capacity (v/c):
DLevel Of Service:
32.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Hudson Road and Woodbury Lakes East Access
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
45.0045.0030.00Speed [mph]
100.00100.00100.00215.00100.00100.00Pocket Length [ft]
100100No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruThruLeftRightLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
1285610023148Total Analysis Volume [veh/h]
3214250132Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.96010.96010.96010.96010.96010.9601Peak Hour Factor
128229623138Total Hourly Volume [veh/h]
03028000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
010295000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
126908393138Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G151 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
0.24d_I, Intersection Delay [s/veh]
AACApproach LOS
0.000.0319.64d_A, Approach Delay [s/veh]
0.000.000.000.296.666.6695th-Percentile Queue Length [ft]
0.000.000.000.010.270.2795th-Percentile Queue Length [veh]
AAAABDMovement LOS
0.000.000.009.6812.4632.21d_M, Delay for Movement [s/veh]
0.000.010.010.000.020.06V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
FreeFreeStopPriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G152 Spack Consulting
Version 4.00-02
Generated with
0.057Volume to Capacity (v/c):
BLevel Of Service:
10.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 5: Woodbury Lakes Road & Spring Hill Drive
Intersection Level Of Service Report
YesYesYesCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
ThruLeftRightThruRightLeftTurning Movement
Lane Configuration
WestboundEastboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
3139929260Total Analysis Volume [veh/h]
81027310Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00000.90260.90260.90260.90261.0000Peak Hour Factor
3135826450Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
31003400Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
035823050Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G153 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
7.70d_I, Intersection Delay [s/veh]
BAAApproach LOS
10.557.480.00d_A, Approach Delay [s/veh]
0.004.5017.0617.060.000.0095th-Percentile Queue Length [ft]
0.000.180.680.680.000.0095th-Percentile Queue Length [veh]
BAAAMovement LOS
0.0010.550.007.710.000.00d_M, Delay for Movement [s/veh]
0.000.060.000.180.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
Flared Lane
StopFreeFreePriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G154 Spack Consulting
Version 4.00-02
Generated with
BLevel Of Service:
14.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
All-way stopControl Type:
Intersection 6: Woodbury Lakes Road & Access 1
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00190.00100.00100.00100.00Pocket Length [ft]
000000001000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
11113113263696141675589118208Total Analysis Volume [veh/h]
328286617244214223052Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.92841.00001.00001.00001.00001.00001.00001.00000.9284Peak Hour Factor
11113113244696141675589118193Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
036058310077007842Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
11771131863861490558940151Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G155 Spack Consulting
Version 4.00-02
Generated with
BIntersection LOS
14.76Intersection Delay [s/veh]
BCBBApproach LOS
14.7716.1913.3014.42Approach Delay [s/veh]
55.4085.9240.649.9844.0153.0295th-Percentile Queue Length [ft]
2.223.441.630.401.762.1295th-Percentile Queue Length [veh]
Movement, Approach, & Intersection Results
Lanes
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G156 Spack Consulting
Version 4.00-02
Generated with
0.056Volume to Capacity (v/c):
DLevel Of Service:
25.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 7: Woodbury Lakes Road & Access 2
Intersection Level Of Service Report
YesYesYesYesCrosswalk
0.000.000.000.00Grade [%]
30.0015.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0005170124451500410375Total Analysis Volume [veh/h]
00012903111290010294Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95191.00000.95190.95190.95191.00000.95190.95190.9519Peak Hour Factor
0004920114249000390357Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000580001350012083Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
0004340114235500270274Base Volume Input [veh/h]
Name
volumes
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G157 Spack Consulting
Version 4.00-02
Generated with
DIntersection LOS
14.46d_I, Intersection Delay [s/veh]
ABDAApproach LOS
0.0012.6625.337.92d_A, Approach Delay [s/veh]
0.000.000.0080.800.0080.80101.28103.400.0023.7723.7723.7795th-Percentile Queue Length [ft]
0.000.000.003.230.003.234.054.140.000.950.950.9595th-Percentile Queue Length [veh]
BDCFAAAMovement LOS
0.000.000.0012.360.0025.7223.8825.460.000.007.927.92d_M, Delay for Movement [s/veh]
0.000.000.000.480.000.060.091.160.000.000.250.23V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoNoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoNoFlared Lane
FreeStopStopFreePriority Scheme
Intersection Settings
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G158 Spack Consulting
Version 4.00-02
Generated with
Lane Configuration and Traffic Control
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G159 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Base Volume
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G160 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Net New Site Trips
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G161 Spack Consulting
Version 4.00-02
Generated with
Traffic Volume - Future Total Volume
Scenario 10: 10: 2018_Build_Weekend PEAK_2.3
Appendix G: Capacity Analysis Backups
Traffic Impact StudyWoodbury Lakes Movie Theater
G162 Spack Consulting