The Slough Studley Warwickshire B80 7EN +44 (0) 1527 852408 www.allelys.co.uk Engineering Study Concerning the Vertical and Swept path analysis for the Road Transportation of a 54.3Te Transformer Along The Proposed Transport Route To Lochay Road Substation Issue Reason for Issue Date Prepared By Approved By 00 Issued for Comment 27/11/2018 LLR MJC 01 Route Survey Sections Amended 12/03/2019 LLR MJC

Engineering Study Concerning the Vertical and Swept path

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Engineering Study Concerning the Vertical and Swept path

The Slough

Studley Warwickshire B80 7EN

+44 (0) 1527 852408

www.allelys.co.uk

Engineering Study Concerning the Vertical and

Swept path analysis for the Road Transportation of a

54.3Te Transformer

Along

The Proposed Transport Route

To

Lochay Road Substation

Issue Reason for Issue Date Prepared By Approved By

00 Issued for Comment 27/11/2018 LLR MJC

01 Route Survey Sections Amended 12/03/2019 LLR MJC

Page 2: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 2 of 12

AP-R-01 Rev0

Route Feasibility Study

Contents 1. REPORT OUTLINE ............................................................................................................................................4

1.1. Introduction .................................................................................................................................................4

1.2. Summary ....................................................................................................................................................4

1.3. Route Overview ..........................................................................................................................................4

2. REPORT OUTLINE ............................................................................................................................................6

2.1. Definition of Abnormal Indivisible Load (AIL)..............................................................................................6

2.2. Legislation ...................................................................................................................................................6

3. TRANSPORTATION REQUIREMENTS ............................................................................................................7

3.1. Cargo Dimensions ......................................................................................................................................7

3.2. 5 Axle Goldhofer Semi Trailer ....................................................................................................................7

4. ROUTE SURVEY Section 1 – A827 GRAY STREET ........................................................................................8

5. ROUTE SURVEY Section 2 – A827 MAIN STREET/ A827 ...............................................................................8

6. ROUTE SURVEY SECTION 3 – GLEN LOCHAY ROAD ..................................................................................9

7. SWEPT PATH ANALYSIS ............................................................................................................................... 12

8. TRACTIVE EFFORT CALCULATION………………………………………………………………………………. 23

Page 3: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 3 of 12

AP-R-01 Rev0

ALLELYS HEAVY HAULAGE - ROUTE FEASEABILITY STUDY

Allelys Group

The Slough

Studley

Warwickshire

B80 7EN

01527 852 408

www.allelys.co.uk

CONTACTS

David Allely Director 01527 852 408 (op.3) [email protected]

Matt Cobain Engineering Manager 01527 852 408 (op.3) [email protected]

Report prepared by:

Luc Llywelyn-Roberts Junior Engineer

Report approved by:

David Allely Managing Director, Allelys Heavy Haulage

Date: 27/11/2018

Page 4: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 4 of 12

AP-R-01 Rev0

1. REPORT OUTLINE

1.1. Introduction

This route feasibility study is concerned with the proposed transport route for the delivery of the Transformer.

A vertical analysis, swept path analysis and tractive effort calculation have been carried out to highlight any

problematic areas along the route. This report does not cover any structures on the route or tree trimming

required.

1.2. Summary

No issues have been identified with the route relating to trailer clearance on ascents, break overs or descents.

There is only one identified location where the trailer is showing its full suspension stroke utilised but this is

deemed to be OK. Trailer tracking has highlighted the need for a parking restriction to be in place for the

move but no other issues have been identified.

1.3. Route Overview

Page 5: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 5 of 12

AP-R-01 Rev0

Page 6: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 6 of 12

AP-R-01 Rev0

2. REPORT OUTLINE

2.1. Definition of Abnormal Indivisible Load (AIL)

The Department of transport, of which the Highways Agency (HA) is an executive agency, state that the strict

definition of an AIL refers to a load which cannot, without undue expense or risk of damage, be divided into two or

more loads for the purpose of carriage on roads which, owing to its dimensions or weight, cannot be carried on a

vehicle which complies in all respect with the ‘standard vehicle regulations’ these are:

The Road Vehicles (Construction and Use) Regulations 1986 (as amended)

The Road Vehicles (Authorised Weight) Regulations 1998 (as amended)

The Road Vehicles Lighting Regulations 1989 (as amended)

All equipment should be stripped of their ancillaries before they are transported. The HA will only accept that

further dismantling is not required where it cannot be economically achieved due to the requirement for its

construction within factory environments or where extremely high tolerances have to be maintained.

2.2. Legislation

Conventional heavy goods vehicles have an operating weight limit of 44 tonnes. The category known as

Abnormal Indivisible Loads (AIL) covers those vehicles where the gross weight exceeds 44 tonnes. An Abnormal

Load is defined as that which cannot be carried under Construction and use (C&U) Regulations.

Items which, when loaded on the load carrying vehicle exceed the weights encompassed by the C&U regulations,

but do not exceed Special Order Permission Limits are governed by Special Types General Order (STGO)

categories 1 to 3 depending on size. Where dimensions exceed 6100mm in width, 30000mm in rigid length or 150

tonnes gross weight, Special Order from the Highways Agency (HA), is required.

Special Order category AIL movements are authorized by the Highways Agency (HA) Abnormal Loads team, An

executive agency of the Department for Transport (DfT, based in Birmingham)

Page 7: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 7 of 12

AP-R-01 Rev0

3. TRANSPORTATION REQUIREMENTS

3.1. Cargo Dimensions

Length – 5650mm

Width – 2780mm

Height – 3150mm

Weight – 54,300kg

3.2. 5 Axle Goldhofer Semi Trailer

Page 8: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 8 of 12

AP-R-01 Rev0

The following points on the first part of this route have been identified as potentially problematic areas where

there is a noticeable change in the routes gradient i.e. start of an ascent, crest (break over), or the end of a

descent to check that the trailer being used is suitable. To make sure that the trailer is suitable the ground

clearance and suspension stroke have been assessed. Maximum suspension stroke differential is 260 mm.

4. ROUTE SURVEY Section 1 – A827 GRAY STREET

4.1.

Suspension Stroke – 38mm

Chainage – 10.00

Start of Descent, no issues

4.2.

Suspension

Stroke – 7mm

Chainage – 95.00

Descent, no

issues

4.3.

Suspension Stroke – 1mm

Chainage – 175.00

Descent, no issues

4.4.

Suspension Stroke – 25mm

Chainage – 490.00

Descent, no issues

5. ROUTE SURVEY Section 2 – A827 MAIN STREET/ A827

5.1.

Suspension Stroke – 31mm

Chainage – 10.00

Start of Ascent, no issues

Page 9: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 9 of 12

AP-R-01 Rev0

5.2.

Suspension

Stroke – 35mm

Chainage – 190.00

Descent, no

issues

5.3.

Suspension Stroke – 95mm

Chainage – 380.00

Break over, no issues

5.4.

Suspension Stroke – 4mm

Chainage – 460.00

Ascent, no issues

6. ROUTE SURVEY SECTION 3 – GLEN LOCHAY ROAD

6.1.

Suspension Stroke – 78mm

Chainage – 10.00

Start of Ascent, no issues

6.2.

Suspension

Stroke –

121mm

Chainage – 75.00

Break over, no

issues

6.3.

Suspension Stroke – 30mm

Chainage – 160.00

Break over, no issues

Page 10: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 10 of 12

AP-R-01 Rev0

6.4.

Suspension Stroke – 58mm

Chainage – 240.00

Break over, no issues

6.5.

Suspension Stroke – 139mm

Chainage – 335.00

Descent, no issues

6.6.

Suspension Stroke – 116mm

Chainage – 460.00

Start of Ascent, no issues

6.7.

Suspension Stroke – 128mm

Chainage – 605.00

Descent, no issues

6.8.

Suspension Stroke – 185mm

Chainage – 690.00

Break over, no issues

6.9.

Suspension Stroke – 260mm

Chainage – 895.00

Break over, full suspension stroke used no issues

Page 11: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 11 of 12

AP-R-01 Rev0

6.10.

Suspension Stroke – 29mm

Chainage – 1015.00

Descent, no issues

6.11.

Suspension Stroke – 51mm

Chainage – 1150.00

Ascent, no issues

6.12.

Suspension Stroke – 145mm

Chainage – 1295.00

Break over, no issues

6.13.

Suspension Stroke – 39mm

Chainage – 3255.00

Start of Ascent, no issues

6.14.

Suspension Stroke – 1mm

Chainage – 3525.00

Ascent, no issues

In summary there are no issues with the proposed route. There is only one identified location where the trailer

reaches full suspension stroke but this has been deemed OK. There is no time where the ground clearance of the

trailer is not sufficient.

Page 12: Engineering Study Concerning the Vertical and Swept path

CLIENT: Tony Gee

PROJECT: Lochay Road Substation

Ref: P-8605-18

First Issue 27/11/2018 Page 12 of 12

AP-R-01 Rev0

7. SWEPT PATH ANALYSIS

Swept path analysis has been carried out along the full route using specialised trailer tracking.

Various pinch points have been identified along the route, these are covered in the following drawings. There

are no points of concern though, the route is suitable for the proposed transport.

It may be necessary to plate the verge at the turning in to the Power Station.

A tractive effort calculation has been carried out (page 23) to ensure that one tractor unit will have sufficient

traction. This confirms that one tractor is OK and extra ballast tractors are not required.

In summary we see no issues with the route for the proposed transport.

GLEN LOCHAY ROAD

Section 3

A827 MAIN STREET/A827

Section 2

GRAY STREET

Section 1

Page 13: Engineering Study Concerning the Vertical and Swept path

LP

MH

MH

MH

T

T

T

T

T

T

T

T

T

G

MH

MH

MH

MH

MH

MH

MH

MH

MP

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-30

NTS MJC

1 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

Page 14: Engineering Study Concerning the Vertical and Swept path

MH

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-31

NTS MJC

2 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

4

2

0

Pinch Point

3

1

4

2

4

6

Page 15: Engineering Study Concerning the Vertical and Swept path

LP

MH

MH

MH

MH

T

T

T

T

G

MH

MH

MH

MH

MH

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-32

NTS MJC

3 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

2

1

5

6

1

1

4

4

6

Page 16: Engineering Study Concerning the Vertical and Swept path

G

G

TP

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-33

NTS MJC

4 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

527

Distance to Wall

2

9

1

Pinch Point

Page 17: Engineering Study Concerning the Vertical and Swept path

Overhead P

ow

er

Overhead P

ow

er

Overhead P

ow

er

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-34

NTS MJC

5 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

Page 18: Engineering Study Concerning the Vertical and Swept path

IC

MH

MH

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-35

NTS MJC

6 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

51

Pinch Point

Page 19: Engineering Study Concerning the Vertical and Swept path

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-36

NTS MJC

7 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

Page 20: Engineering Study Concerning the Vertical and Swept path

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-37

NTS MJC

8 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

Page 21: Engineering Study Concerning the Vertical and Swept path

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-38

NTS MJC

9 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

Page 22: Engineering Study Concerning the Vertical and Swept path

MH

G

G

O

v

e

r

h

e

a

d

P

o

w

e

r

Dwg. No

Scale (A3)

Client

Project

Rev.

Title

Sheet

Drawn Checked

Revision

Revisions

The Slough,

Studley,

Warwickshire,

B80 7EN

Tel: +44 (0) 1527 852 408

e-mail: [email protected]

AmmendmentsDate

This drawing has been produced by Allelys Limited in accordance with the instructions of the client for their sole and specific use. Allelys shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Copyright © Allelys Ltd.

GroupAllelys

DO NOT SCALE IF IN DOUBT ASK

DRAWING NOTES: TECHNICAL NOTES:

Drawn

KEY:

54.3Te Transformer

LLR

Trailer Tracking - 5 Axle Goldhofer Semi Trailer

P-8605-18-39

NTS MJC

10 of 10 0

Lochay Road Substation

Tony Gee

PLAN VIEW

1. All dimensions are in mm unless otherwise stated

2. All weights are in metric tonnes unless otherwise stated

3. All details are provisional and are subject to confirmation

0 30/11/2018 Issued for commentLLR

1. Tracking based on transport arrangement drawing P-8605-18-00

Tractor Wheel Trace

Trailer Wheel Trace

Trailer Swept Area

Load Swept Area

Plating Required

Page 23: Engineering Study Concerning the Vertical and Swept path

Allelys Group The Slough Studley Warwickshire B80 7EN Tel +44 (0)1527 857 621 Fax +44 (0)1527 857 623 Web

www.allelys.co.uk

HEAVY TRANSPORT, LIFTING AND MARINE SPECIALISTS

Calculation Sheet

Client: Tony Gee Project: Lochay Road Substation Project Number: P-8605-18-00

Details:

Tractive Effort Calculation

Prepared: LLR Date: 30/11/18

Ref. P-8605-18-00

Checked: MJC Date: 30/11/18

Sheet: 1 of 1

Vehicle Gross Weight: 89.30 Te

Rolling Resistance: 3%

Maximum Road Gradient: 14.00% or 8o

Required Tractive Effort: = Vehicle Gross Weight x (Rolling Resistance + Gradient)

= 89.30 Te x (3% + 14.05%)

= 15.23 Te

Tractor Unit Drive Axles: 2

Drive Axle Weights: 11.73 Te

Tractor Pull Force Efficiency: 80%

Available Tractive Effort: = Tractor Driven Axle Weights x Efficiency

= (2 x 11.73 Te) x 80%

= 18.77 Te

Available Tractive Effort > Required Tractive Effort

Therefore Transport Combination is Ok

From EasyLOAD

Paved Road Gravel Road

Rolling Resistance

Tractive Effort

4%

70%

7%

50%