Town of Peterborough Main Street Bridge, Intersection & Retaining Wall Project Public Informational Meeting June 16, 2015 Prepared by:

Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, Intersection & Retaining Wall ProjectPublic Informational Meeting

June 16, 2015

Prepared by:

Page 2: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Outline

Project Purpose Key Elements of Project Status of Design Conceptual Construction Sequencing Upcoming Milestones

Page 3: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Project Purpose

Address Structurally-Deficient Bridge Stabilize Boulder Retaining Wall Improve Intersection Safety

Page 4: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Key Elements of Project

Replace Bridge “In-Kind” +/- Construct Permanent Pedestrian Bridge Realign Intersection / Roadway Improvements Build New Retaining Wall Stabilize Existing Boulder Wall Repair Main Street Canal

Page 5: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Preliminary Design Began September 2014: Geotechnical Investigation (Borings) Hydrology and Hydraulics Updated Survey Right-of-Way Research Utility Coordination Preliminary Bridge & Roadway Design Environmental Coordination

Page 6: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Page 7: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Proposed Main Street Bridge

Page 8: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Proposed Main Street Bridge

Page 9: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Pedestrian Bridge Located 10’ Downstream of Vehicular Bridge Half-Through Truss Configuration Painted Black Steel Low Maintenance Concrete Deck

Looking for Public Input

Page 10: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Pedestrian Bridge

Page 11: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Intersection Realignment / Roadway Improvements Remove Abrupt Kink Uniform Lane and Shoulder Widths Add East Sidewalk New Retaining Wall / Reconstruct Right Dam

Abutment Stabilize Boulder Wall

Page 12: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Guardrail Options Located behind sidewalk along retaining walls

Looking for Public Input

Rail at Elm Street Bridge

Page 13: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Main Street Canal Existing Condition

Failed Top Granite Slab June 2011

Page 14: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Main Street Canal Rehabilitation Proposed:

Remove and Salvage Top Slabs of Canal Install a Pipe Inside Existing Canal (“Slip-Line”)

Page 15: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Conceptual Main Street Parking Layout Plan

Page 16: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Utility Coordination Existing Utilities Within Project Limits:

Telecommunications – Fairpoint Communications and FirstLight

Power – Eversource Energy Cable – Comcast Cable Water and Sewer – Town of Peterborough

On-Site Meeting Held March 18, 2015

Page 17: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Design

Environmental Coordination NHDOT Cultural Resources

Presented Project at December 11, 2014 Meeting NHDOT Natural Resources

Presented Project at February 18, 2015 Meeting NH Department of Environmental Services

(NHDES) Pre-Application Correspondence

Page 18: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Conceptual Construction Sequencing

Construct Pedestrian Bridge & Relocate Utilities Close Bridge to Traffic Implement Route 202 Traffic Control Pattern Construct Retaining Wall & Demolish Bridge Construct Roadway & Bridge Open Bridge & Reestablish Permanent Traffic Pattern

Page 19: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Upcoming Milestones

Preliminary Plans Summer 2015 Complete NEPA Fall 2015 NHDES Permit Applications Late 2016 Final Plans Late 2016 / Early 2017 Bidding Late Spring 2017 Award Project Fall 2017

Page 20: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Page 21: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Page 22: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Outline

Conceptual Construction Sequencing and Schedule Status of NHDOT funding Public Input on Design Details Upcoming Milestones

Page 23: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Update Since April 2013

Elimination of phased construction Roundabout removed No need for over-widening bridge

Page 24: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Update Since April 2013

Complete Main Street Bridge closure Vehicular detour Pedestrians detoured to downstream pedestrian

bridge Maintain overall existing bridge width Intersection configuration similar

Minor improvements

Page 25: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

US Route 202 Reconstruct Pine Street to Library Drive (900 lf) 25 mph design speed (min.) 10” pavement reclamation & step-box widening Provide 11’ travel lanes, 5’ shoulders (both sides),

5-6” sidewalks (both sides) Horizontal alignment will soften curves through

Main St intersection and remove pinch point Vertical profile to mimic existing to limit impacts

Page 26: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

US Route 202 Retaining wall reconstruction (550’ +/-) on west

side to accommodate realignment Extend bridge rail to protect portions of wall

Shift utility poles to east side of roadway Maintain stop controlled intersection with Main St Improved sight distance at intersection

Page 27: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Roadway Plan Add sketch (Jeff to update Friday)

Page 28: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Retaining Wall Improvements Located along east side of Contoocook River

adjacent to US Route 202, south of bridge Need for improvements:

Existing boulder wall in poor condition Accommodate realignment of US Route 202

Page 29: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Retaining Wall Improvements Add plan view of rehab/reconstruct limits, cropped

from presentation plan

Page 30: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Retaining Wall Improvements Rehabilitation

Stabilize through the use of grout and micropiles Reconstruction

Feasible wall types: Soldier pile and lagging Steel sheetpile with king piles

Page 31: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Proposed Main Street Bridge Maintain existing 43’ out-to-out width Maintain existing bridge rail geometry Maintain existing upstream sidewalk Remove downstream sidewalk

Relocate to pedestrian bridge Allows for additional travel way width

Maintain visible shape and dimensions of existing bridge Maintain hydraulic opening

Page 32: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Canal (TOO MANY CANAL SLIDES, NEED TO MAKE 2 SLIDES, MAYBE 3 WITH PHOTO) 7’x7’ structure consisting of granite stone masonry Located under west approach of Main Street Bridge Outlets through northwest wingwall Previously utilized by the Transcript Printing

Company (1925 to 1942) Currently used as an overflow structure Add picture of layout

Page 33: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Canal Existing Condition

Brief inspection December 2010 Overall condition is poor Several of top granite slabs are broken Stabilize to prevent further sinkholes or damage to

structures, roadways or private property above canal

Page 34: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Transcript Dam (HOW MUCH DAM DISCUSSION NEEDED??) Constructed circa 1925 Served as part of infrastructure for Transcript

Printing Company (1925 to 1942) No hydraulic/commercial purpose since 1942 Consists of timber cribbing and stone with a

concrete cap Removal of some/all good trade-off

environmentally for project - KRP

Page 35: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Utility Coordination Overhead utility relocation prior to start of bridge

and retaining wall construction Short duration temporary outages may be required Two utility accommodation options:

Aerial relocation likely (moving existing poles) Underground relocation being investigated

Page 36: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Utility Coordination Action Items

Evaluate feasibility of pole relocation to east side of US Route 202 between Pine Street and bridge

Investigate cost of underground relocation

Page 37: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Status of Roadway/Bridge Design

Right-of-Way (ROW) (THIS SLIDE NEEDED?) Preliminary findings show potential ROW shift Final coordination with NHDOT still required Some ROW impacts may be necessary Not expected to impact ultimate project design

Page 38: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Environmental Coordination

Permitting Requirements NEPA Request for Categorical Exclusion and

Section 4(f) Evaluation NHDES Wetland Application and USACOE PGP Shoreland Permit By Notification (PBN) FEMA CLOMR for potential fill in

floodway/increase in BFE EPA/NHDES Stormwater Permit - NPDES

Construction General Permit (CGP)

Page 39: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Environmental Coordination

National Environmental Policy Act (NEPA) Categorical Exclusion and Section 4(f) Evaluation

In process Located in Historic District Main Street Bridge eligible for National Register Effect Memo to be issued from NHSHPO Memorandum of Agreement required for

mitigation for resource impacts

Page 40: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Construction Schedule

Traffic Control Plan for Main Street Bridge Full closure of bridge Pedestrians will be relocated to pedestrian bridge Vehicular traffic will be detoured around project

site Detour Route – US 202 / NH 101 / Grove Street

Page 41: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Construction Schedule

Traffic Control Plan for US Route 202 Phase 1

Concurrent with bridge closure Construct temporary widening & sidewalk on east side

(within ROW) Shift utility poles to east side Shift traffic to east, maintain one travel way in each

direction with Maintain access to pedestrian bridge Construct retaining wall, step-box widening, &

sidewalk

Page 42: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Construction Schedule

Traffic Control Plan for US Route 202 Phase 2

Concurrent with bridge closure Open new sidewalk west side Utilizing daily one-way alternating pattern, reclaim

existing pavement and const. binder pavement Construct permanent sidewalk on east side Perform final paving & restoration

Page 43: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Construction Schedule

Coordination with Library Renovations Library closed during bridge construction Library parking lot used as construction staging

area Maintain access to pedestrian bridge

Page 44: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

NHDOT Funding

Anticipated Construction Costs Add eng. Study cost, plus ped bridge, inflated to

2017 Separate bridge project cost from roadway project

cost Status of NHDOT Funding Explain breakdown of bridge and Rt 202 project funding?

Page 45: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Public Input on Design Details

Highway Bridge Rail Height Existing height shorter than current standards for

pedestrians Options:

Modify rail to meet current standards Match existing rail height

Page 46: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Public Input on Design Details

Highway Bridge Rail Height Modify rail to meet current standards

Supplement existing rail with steel hand rail Increase rail height by changing bridge geometry

Match existing rail height NHDOT design exception

Required for matching existing rail height Town accepts liability for reduced rail height

Page 47: Engineering Services Bridge · 2015-06-16 · Traffic Control Plan for US Route 202 Phase 1 Concurrent with bridge closure Construct temporary widening & sidewalk on east side (within

Town of Peterborough

Main Street Bridge, US Route 202 & Retaining Wall Project

Outstanding Items for Public Input

Main Street Parking Improvements Solicit input from Town on including in project Add picture of impacted area on this slide?