Engineering a Successful Mission: Lessons from the Lunar Reconnaissance Orbiter

Presentation at the Supply Chain 2011 Conference October 19, 2011

David Everett, NASA GSFC

Page 2: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

2 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Abstract • Engineering a Successful Mission: Lessons from the Lunar Reconnaissance

Orbiter • Abstract—Schedule pressure is common in the commercial world, where late

delivery of a product means delayed income and loss of profit. Research spacecraft developed by NASA, on the other hand, tend to be driven by the high cost of launch vehicles and the public scrutiny of failure--the primary driver is ensuring proper operation in space for a system that cannot be retrieved for repair. The Lunar Reconnaissance Orbiter (LRO) development faced both schedule pressure and high visibility. The team had to balance the strong push to meet a launch date against the need to ensure that this first mission for Exploration succeeded. This presentation will provide an overview of the mission from concept through its first year of operation and explore some of the challenges the systems engineering team faced taking a mission from preliminary design review to pre-ship review in 3 years.

Page 3: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

3 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Topics

• LRO Objectives • LRO Results to Date • Programmatic Environment During Development • Challenges and Approaches • I&T Overview • Observations and Lessons Learned

Page 4: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

4 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Beginning

• January 2004, the President announced the “Vision for Space Exploration”, sending a “series of robotic missions” to the moon “beginning no later than 2008”.

• Announcement of Opportunity for LRO instruments released in June 2004; target launch October 2008.

• Six instruments selected in December 2004. – Selected instruments had strong relationship to recently-flown

instruments

• Funding started in early 2005. • Technology demonstration payload added in April 2005:

– Mini-RF development significantly behind other instruments – Data rate and power consumption are significant

Page 5: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

5 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Objectives, Polar Focus

• Characterize landing sites – High-resolution mapping – Surface characterization (slope, roughness)

• Identify resources – Water – Minerals – Sunlight

• Characterize radiation environment – Energy deposited in tissue-equivalent plastic – Neutron albedo

Page 6: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

6 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Lunar Rover, Schmidt, Big Boulder

Page 7: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

7 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Payload Layout

Page 8: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

8 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

CRaTER

Page 9: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

9 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Diviner

Temperatures down to ~35 K!

Page 10: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

10 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LAMP

Permanently shadowed craters are dark under ultraviolet illumination

South Pole—Lyman Alpha, nighttime only

Page 11: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

11 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LEND

Neutron absorption does not always correlate with permanent shadows

Page 12: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

12 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LOLA Global Topography

Page 13: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

13

Lunar Far Side Altitudes

10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Page 14: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

14

LOLA Laser Altimetry Data

10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Page 15: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

15 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LROC—Wide and Narrow Angles

WAC Mosaic of “Cobra Head” *Image width: 55 km

NAC closeup of WAC region marked by arrow *Image width: 500 m

Page 16: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

16

Near-Side Composite from WAC

10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Page 17: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

17 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LROC—Tycho Central Peak

Page 18: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

18 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LROC—Tycho Central Peak

Page 19: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

19 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LROC—Tycho Central Peak

Page 20: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

20 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Apollo 17 Image of Landing Site, 1972

Page 21: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

21 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Image from 100 km, 2009

Page 22: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

22 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Image from 50 km

Page 23: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

23

LRO Image from 25 km

10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Page 24: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

24 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Mini-RF—Herodetus

Page 25: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

25 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Schedule • We had a Level 1 requirement to launch in 2008 • HQ continued to emphasize this requirement

– Exploration Systems Mission Directorate’s (ESMD) credibility with Congress and OMB was tied to getting this first mission done on time

– HQ offered extra funding after CDR in order to hold schedule • Some money was applied in key areas • Overall effect reduced cost by saving schedule: one component can hold

up the entire development • Independent Review Team expressed concern with LRO’s

schedule at each review • LRO engineers frequently expressed concern with schedule

• LRO established a budget at confirmation which did not overly constrain the mission

• Project management and systems team needed to balance schedule against technical risk

Page 26: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

26 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Fortune Cookie

Page 27: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

27 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

The Constant Challenge

• Find ways to get things done faster without compromising the technical integrity – Work harder (we all did this—good team spirit) – Add more people (mechanical team) – Design for parallel development – Test early – Manage risk – Challenge the standard way of doing business – Focus on the people – Make decisions and move on

• All of the above were necessary!

Page 28: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

28 6/16/10, INCOSE, LRO, D. Everett, NASA GSFC

Risk Management • Monthly meetings with each of the subsystem leads provided input to our

risk management process – One-on-one atmosphere was good for identifying potential issues at the

system level – Kept the subsystem leads thinking about risk – Kept the database up-to-date

• Monthly risk management board meetings provided: – Insight to project management – Forum for project-level decisions about risks

• The LRO team did not wait for monthly meetings to address critical risks • Example: propulsion tank NTC issue • Example: hard drive radiation test failure • Example: C&DH power converter delayed delivery

– Built flight spare card with slightly lower quality part – Started investigating risk associated with flying this part – Bought time while we worked with the vendor to get flight part delivered

Page 29: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

29 6/16/10, INCOSE, LRO, D. Everett, NASA GSFC

Focus on the People • We solved problems quickly by bringing our full talent to bear

– Diverse perspectives – Minority opinions

• Constant effort to get people to voice their concerns – Some people don’t want to be a bother – Some people don’t realize the full impact of their concern – Some people don’t think their voice will make a difference

• Some people require more effort – Maybe their style doesn’t match your style – Perhaps they have less experience – Perhaps they worry too much – Or maybe they just think differently

• Example: propulsion trade to solve NTC problem • Example: coarse sun sensor circuit design issue

– Small discrepancy bothered engineers performing test – Pursued source (with systems support) until flaw was discovered

Page 30: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

30 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Over 50 Issues Between CDR and I&T!

• Nearly every component had some sort of unforeseeable problem during the build phase, with technical risk-vs.-schedule or subsystem-vs.-subsystem decisions required: – C&DH:

• Assembly issues—rework • SBC noise problem—rearrange spacewire ports • Power supply parts delays—build extra unit

– Comm • Transponder Software design flaw—change ground stations • Transponder Hardware design flaw—replace part, jumpers • Modulator assembly problems—bring in-house • Modulator performance at cold—modify circuit • TWTA design error in ground protection circuit—fly as-is

– GN&C • Wheel board layout problem—redo • Star Tracker resets—change part • MIMU part failure—replace part

Page 31: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

31 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Over 50 Issues (cont.)!

• Nearly every component had some sort of unforeseeable problem during the build phase, with technical risk-vs.-schedule or subsystem-vs.-subsystem decisions required: – Software performance problems—update code – Power: PSE frequency shift during vibe—tighten and retest – Payloads

• CRaTER ETU part failure—flight parts OK • Diviner actuator damaged during test by long screw—re-work • LAMP board damaged by long screw—replace board • LEND power surge during thermal vacuum—replace unit (flight spare) • LOLA housing corrosion—fly as is • LOLA overtest during sine burst—no damage • LOLA corona during thermal vacuum—no damage • LROC NAC vibration failure—redesign mount for secondary • Mini-RF strut failure during thermal vac—redesign strut

Page 32: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

32 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Flight Integration Begins, Jan 2008

Page 33: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

33 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

PDE Safe-to-Mate, January 2008

Page 34: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

34 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Propulsion Tank and Wheel Locations

Page 35: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

35 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Reaction Wheels, January 2008

Page 36: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

36 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Propulsion Module

Insertion Thruster Support Assembly

Main Deck

High Pressure Panel

Pressurant Tank Support Structure

Tank bolted to Cylinder (48 Places)

Filter panel Tank Cylinder (machined from aluminum forging)

Launch Vehicle Adapter

ACS Thruster Brackets (1 of 4)

Low Pressure Panel

Page 37: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

37 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Propulsion Module

Page 38: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

38 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Assembly Team

Page 39: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

39 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Propulsion Module, January 2008

Page 40: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

40 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

+Y Panel Integration, 3/13/08

Page 41: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

41 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Labled Look at LRO

Page 42: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

42 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Page 43: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

43 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

WS1 Antenna Assembly at White Sands

Page 44: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

44 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Shock Test (before)

Page 45: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

45 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Shock Test (after)

Page 46: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

46 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

EMI

Page 47: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

47 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Thermal Vacuum

Page 48: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

48 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Final Preparation for Ship

• Systems and Mission Assurance worked together to ensure clear and complete documentation

• Acceptance Reports for components – Pointer to all documentation – Signoff by component owner, subsystem lead, and cross-cutting

systems (mechanical systems, avionics systems, thermal systems)

• Work Order Authorizations were not closed until: – Associated PR’s were closed – All paperwork was complete and in the database

• Requirements were not considered “verified” until: – WOA was closed – Reports were in the configuration management system

Page 49: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

49 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

On the Truck

Page 50: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

50 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

LRO Crew at Astrotech

Page 51: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

51 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Launch Site Operations

• The end is in sight—don’t stumble now! • Shipped in February 2009 for April launch • Vehicle issues pushed launch into June

– Used extra time for additional operations testing • Extra attention at launch site

– Upper-level management gets very interested – Engineers become hyper-vigilant

• Project loses control of the schedule – Launch vehicle and range issues dominate – Spacecraft team must stay flexible

• Lots of fun and lots of stress!

Page 52: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

52 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Cumulative Orbiter Hours

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

2600

2800

3000

3200

3400

02/16/2008 04/16/2008 06/16/2008 08/16/2008 10/16/2008 12/16/2008 02/16/2009 04/16

Mechanical Environments

Mission Rehearsal #2

EMI

Thermal Balance

Thermal Cycling 1

Thermal Cycling 2

CPT-2

MR#4

MR#5Astrotech

3400 hours!

Page 53: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

53 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Stacked and Ready for the Fairing

Page 54: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

54 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Onto the Rocket!

Page 55: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

55 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Page 56: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

56 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

June 18, 2009

Page 57: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

57 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Mistakes • Expect mistakes!

– We all make mistakes; the challenge is to avoid the fatal ones – Treat mistakes and failures as a normal part of the job—keep things out in the

open, clean up, and move on • Some of our biggest mistakes:

– Underestimated the system-level complexity of the High-Gain Antenna System and the Solar Array System

• Interplay of thermal with RF and with actuator electronics • Gimbal blankets • Resistive losses in solar array cables

– Failed to anticipate the impact of the change in the center’s engineering services contract

• Major contract change right in the middle of the build phase • Created uncertainty, impacted workforce, delayed harness

– Underestimated some warning signs on overloaded engineers • High performers don’t always take a break when they should, and sometimes take

on more than they can handle • Extended schedule created extra stress—working hard for longer than expected • Impacted efficiency rather than integrity of the system

Page 58: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

58 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Failures and Flaws • Coarse Sun Sensor interface circuit—wrong resistance

– Found during ACS testing before environmental testing – Removed C&DH and replaced resistors

• Solar array gimbal power dissipation—14x higher than planned in thermal design

– Found during thermal balance testing – Added radiator and removed blankets

• LEND high voltage arcing—damaged detectors – Found during thermal vacuum testing – Replaced instrument with flight spare after final Orbiter CPT – Further issues on orbit, but additional safing has protected the instrument and

kept all detectors running • LOLA blanket too tight—causing alignment issues

– Found shortly after instrument activation – Only impacts some measurements over cold surfaces—instrument still

achieving objectives

Page 59: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

59 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Observations and Lessons Learned Observations on motivation (inspired by Daniel Pink, Drive): • Autonomy

– Team members at all levels were invited to promote their best ideas in support of the mission as a whole—ownership of solutions

– Systems engineering held the big picture view, facilitated communication, documented design decisions, verified system-level performance

– Team members understood their control over mission success and were, therefore, motivated to excel

• Mastery – We challenged our experts in a constructive way

• Used basic physics, expected explanations in those terms • Encouraged a discipline lead to represent their own perspective, but with an eye to

the system impact – We expected ownership and probing inquiry of anomalies and design issues

• Purpose – Headed to the moon, paving the way for the new exploration – We tried to make sure everyone realized the criticality of every piece of the

system – We held regular get-togethers and we celebrated our victories along the way,

encouraging a sense of team

Page 60: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

60 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Observations and Lessons Learned

• Don’t be afraid to point out to stakeholders decisions that can be made to relieve your problems (launch vehicle example)

• Programmatic constraints affect the development: – Tight schedules force decisions – Tight budget approaching confirmation forces

optimization – Extra money after CDR can save schedule and probably

save money in the long run • Even if the schedule is tight, make sound technical

choices (remember the fortune cookie)

Page 61: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

61 10/19/11, Supply Chain 2011, LRO, D. Everett, NASA GSFC

Observations and Lessons (cont.)

• Interface tests save money in the long run—test early and often

• Plan early for parallel development and assembly • Decouple delivery events so that integration can

move forward even if one item is late • Systems engineering is all about the team

– Success depends on the performance of the entire team – Some people on the team will require more effort, but the

extra effort is required to get different perspectives – Watch for overloading, especially in those requiring little

effort, and definitely in yourself – Be flexible and optimistic

Page 62: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

62

Credits LRO Credits compilied by David Everett, 9/22/09

Craig Tooley Project Manager GSFC code 451Cathy Peddie Deputy Project Manager GSFC code 451Bill Sluder Deputy Project Mgr/Resources GSFC code 451Keith Opperhauser Project Support Mgr GSFC code 451Deanna Adamczyk Financial Manager GSFC code 451Tricia Gregory Admin/Project SupportJulie Janus Contracting OfficerAmy Aqueche Contract SpecialistJim Smith Mission Business MgrMary Bernhard General Business (-2007)Vanessa Hernandez-Martinez Resource AnalystLinnette Morales Resource AnalystBob Hesenperger EVMAndy Eaker Scheduling LeadMarty Campbell SchedulingDebbie Dusterwald CM/DM ManagerDorothy Hall CM/DMWarren Shultzaberger CM/DMAngela Hess MISJen Brill MISKristina Safdie Risk Management (2006-present)Adrian Rad Risk Management (2004-2006)LaShonda Jacobs-Terry Procurement (CSS, Star Tracker)

Project Office

Page 63: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Rich Vondrak Project Scientist (2008) GSFC code 690Gordon Chin Project Scientist (2004-2007) GSFC code 693Tom Morgan Project Scientist (2007) NASA HQJohn Keller Deputy Project Scientist GSFC code 691

Arlin Bartels Payload Systems ManagerMary Reden Payload Systems EngrJoe Cerullo Payload Systems EngrStan Scott Science Data Mgmt

Dave Everett Mission Systems Engineer GSFC code 599Martin Houghton Deputy MSE, Mission Design GSFC code 599Rick Saylor Deputy MSE, I&T HoneywellPhil Luers Avionics Systems GSFC code 561Tom Ajluni Spacecraft Bus & LV Systems ATKSteve Andrews Safing Engineer, HGAS Systems Lead GSFC code 599Mark Beckman Flight Dynamics GSFC code 595Rivers Lamb Flight Dynamics GSFC code 595Leslie Hartz Systems Analysis GSFC code 599Eric Holmes GN&C Systems GSFC code 591Mike Pryzby Orbiter Systems ATKSteve Wasserzug Mechanical/Thermal Systems ATKCharlie Wildermann SW/HW Systems GSFC code 580Joe Novotka Electrical Systems, EMI/EMC QSSJudy Brannen Requirements Database Manager Constellation Software EngineeringTom Jones Launch Vehicle Mgr GSFC code 429

GSFC Science Team

Payload Team

Systems Engineering Team

Page 64: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

EEE Parts TeamRich Williams EEE Parts Lead GSFC code 562Chris Greenwell EEE Parts Support QSS

Bruno Munoz EEE Parts SupportBall Aerospace and Technologies Corporation

Maxine Windhausen LRO Parts Storage & Procurement MEI TechnologiesHenning Leidecker EEE Parts Expert Consultant GSFC code 562

Contamination ControlChris Lorentson Contamination Control Lead GSFC code 546Rachel Rivera Contamination Engineering GSFC code 546Joe Hammerbacher Contamination I&T SGTGlenn Rosecrans Contamination Analyst SGTPatsy Dickens Contamination support and Documentation SGTMarcello Rodriguez Purge Systems and contamination support GSFC code 546Alfred Wong Cleanroom Support Systems SGTLeon Bailey Contamination Control Technician ManTechKarrie Houston Contamination Engineering GSFC code 546

Joanne Baker Orbiter I&T Lead GSFC code 568Mike Wright Deputy I&T Manager GSFC code 568Kevin Blahut GSE Systems Engineer ATKHarold "Rex" Richardson I&T Engineer ATKMassoud Ainloo Senior Test Engineer MEIJoshua Grodin I&T Engineer MEIGary Lepore I&T Engineer MEIMarsha Shanahan FlatSat Manager MEICarroll Trickey Senior Electrical Technician OSCPatrick Kilroy I&T Engineer GSFC Code 568George Moore I&T Engineer GSFC Code 568Greg Greer ITOS Lead Engineer HammersWarren Thompson Front End Processor Developer HammersMichael Smit Spacecraft Simulator Developer HammersMatt Lew Spacecraft Simulator Developer HammersKaren Calvert ITOS Developer Hammers

I&T Team

Page 65: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Matilda Ewancio Electrical Technician OSCBrenda Wallace Electrical Technician SGTDeneen Ferro Electrical Technician SGTKim Cousler Environmental Project Engineer GSFC Code 549Janet Thomas Environmental Project Engineer GSFC Code 549

EMI Testing Laboratory at GSFCMark Branch EMC Environmental Test Engineer GSFC Code 549Vaughn Nelson Rick JonesRobert HouleNathan BlockGreg JamrozAndrew Mentges

Vibration Test GroupTimothy Schwartz Vibroacoustic Environmental Test Engineer GSFC Code 549

Thermal Vac test GroupAna-Mellina Espiritu Thermal Vacuum Environmental Test Engineer GSFC Code 549

Optical Alignment TeamHenry Sampler Optical Alignment Lead code 551Dr. Samuel Hetherington Optics Support Engineer code 551Carlos Aviado Optics Support Engineer AnalexJames Gill Optics Support Engineer AnalexNicholas Spartana Optics Support Technician AnalexDean Osgood Optics Support Technician Analex

Ron Kolecki System Assurance Mgr (SAM)Lydia Lee Deputy SAMJana Rezac Safety LeadChuck Peterson SafetyCindy Taylor Software Quality EngineerNick Virmani Manufacturing EngineerAl Lacks Quality AssuranceJoe Calabrese Quality Assurance

Safety and Mission Assurance Team

Page 66: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Giulio Rosanova Mechanical System Lead Engineer 543Pilar Joy Material Engineer 541Craig Stevens Lead Structural Analysis 542Jeff Pattison Acoustic Analyst 542Wayne Chen SB, IM Structural Analyst 542Darian Robbins Mechanical GSE Lead Engineer 543Gordon Casto SB, IM Structure Lead Engineer 543Greg Martins HGAS Lead Engineer 543Jason Hair HGAS Engineering Support 543Karl Schuler Senior Technician 543Larry Madison Composite Support Engineer 543Rene Carlos Coupon Test Engineer 543Steve Patton Lead Technician 543Katheryn Vasquez MGSE Lead 543Joe Schepis Gimbals Lead Engineer 544Kamal Thakore GCE Lead Engineer 544Boris Chernyakov GCE Support Engineer ATKNick Shurr Gimbal Engineering Support 544Charlie English Technician 547Chris Kolos Technician 547Dave Dollard Shop Planner 547Frank Rondeau Technician 547Mike Schoolman Technician 547Ron Walters Technician 547Tim Schwartz Test Engineer 549Nick Galassi Senior Analyst AerostressBryan Rizzo SAS Structural Analyst ATKEd Dobins Designer (MGSE) ATKGeorge Mooney Technician ATKGinger Bronke Designer (IM) ATKGreg Davis Designer Mass Simulators ATKHal Baesch Technician (Detailed to PROP Group) ATKHeather Borowski IM Structural Analyst ATK

Mechanical Team

Page 67: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Jimmy Lee QA Mechanical ATKJoe Green Designer (SAS) ATKJohn Harvey Designer HGAS MGSE ATKKen Pellak Designer (MGSE) ATKMike Golob MGSE Engineering Support ATKMike Hersh SAS Lead Engineer ATKPaul Baird Loads Analyst ATKPete Patterson MGSE Analyst ATKRodney Deensie Analyst ATKShelly Conkey HGAS Structural Analyst ATKSteve Wasserzug PM Lead Engineer ATKSuk Yoon Senior Designer (HGAS) ATKKurt Wolko Designer (Detailed to PROP Group) ChesapeakeChris Ross PM Designer ManTechDan Hayward Lead Designer (PM) ManTechJim Baker Facilitator ManTechGlen Byron HGAS Support SGTJustin Ward SAS Engineer SGTKevin Nims Analyst SGTLisa.Mryncza CM Drawings Administrator SGTMonique Fetzer ITP/RAD Lead Engineer SGTNereses Armani Designer (SB) SGTPhil Kurilchik Designer SGTSandy Shuman Designer SGTCecilia Chow Analyst/Dynamics SGTRick Baird MGSE Designer SGTWasam Aboufasha SB Analyst SGTBrian Kittle Technician OSCTony Sanders AM Analyst Vantage

Page 68: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Charles Baker LRO Thermal Systems LeadChristine Cottingham LRO Thermal Hardware LeadSharon Peabody LRO Thermal Analysis LeadMatt Garrison LRO Thermal Instrument LeadTony Melak LRO Thermal High Gain and Solar Array LeadJeff Maynard LRO Thermal High Gain and Solar Array AnalystDan Powers LRO Thermal AnalystJuan Rodrigues LRO Thermal AnalystBill Chang LRO Thermal AnalystWes Ousley LRO Thermal ConsultantWalter Ancarrow LRO Thermal AnalystDiane Schuster LRO Hardware TechnicianDoug Varney LRO Hardware TechnicianRosalyn Nelson LRO MLI TechnicianShirley Adams LRO MLI TechnicianBrenda Estavia LRO MLI TechnicianHume Peabody LRO Thermal AnalystJesse Arminger LRO Thermal AnalystMarkham Hacke ITP Project ManagerElizabeth Oey Avionics Radiator Project ManagerSargon Addi Avionics Radiator Quality AssuranceMellina Espirito Thermal Test ManagerChris Skocik Thermal Test Fixture DesignerSherrod Ware Thermal Test Fixture TechnicianGrace Miller LRO Thermal Coating TechnicianGeorge Harris LRO Thermal Coating TechnicianJohn Petro LRO Thermal Coating Technician

Thermal System

Page 69: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Mary Jane Stevenson LRO Thermal Coating ManagerWanda Peters LRO Thermal Coating ManagerJack Triolo LRO Thermal Coating ConsultantMarcello Rodrigues LRO Thermal Coating EngineerJay Chung Kapton Film Heater ManufacturerGeorge Davis Mechanical Thermostat EngineerDoug Brown Mechanical Thermostat ManagerWarren Chen Heat Pipe Production ManagerMeshack Aduwu ITP and Avionics Radiator Heat Pipe LeadMichael Deiuliis RWA and Battery Heat Pipe LeadMario Martins Lead Test Technician

Tom Spitzer Power System LeadDong Sui Power GSE Lead

Power System--PSEAmri Hernandez-Pellerano PSE Lead EngineerBrad Kercheval PSE Design EngineerGreg Alkire PSE Master Controller FPGA Design EngineerRobert Stone PSE Slave FPGA & PMC Design EngineerJeff Travis PSE PMC Design & FPGA Test Engineer Syed Ameen PSE Hardware Command FPGA Design EngineerMehul Patel PSE Test ConductorFederico Sanidad PSE Test ConductorJohn Washington GSE TechnicianTom Rozanski GSE Technician

Power System

Page 70: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Power System--BatteryDavid Jung LRO Lead Battery EngineerGopal Rao Staff EngineerDavid Sullivan LRO Battery Test EngineerTom Rozanski Battery Lab Manager

ABSL TeamRaz Sawar ABSL LRO Project ManagerDave Curzon ABSL LRO Project Manager (formerly)Rod Ng ABSL LRO Technical LeadAndy McNamara ABSL Mechanical/Thermal EngineerRalph Ball ABSL QA Engineer

Power System--Solar ArrayJohn Lyons Solar Array Lead

Emcore Engineering and Management:David Danzilio GM/VPNavid Fatemi Program DirectorBrad Clevenger Director of OperationsPat Coil Director of ContractsMary Beth Chumney Proposal mgr.Kip Dodge LRO Program ManagerJeff Hillseth Mfg. DirectorVivien Bercier Mfg. Engineering ManagerJody Wood Engineering ManagerJimmy Pappan LRO Panel EngineerJohn Crisman QA Mgr.Robert Young QAKaren Fellner QAEric Lochausen Parts and MaterialsTeri King ProcurementKay Naranjo Accounting MgmtCheryl Anderson AccountingDon Wichhart Accounting

Page 71: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Rick Bishop ProductionScott Wilkinson Cost AccountingEric Downard Cell ProductionStephanie Baer Configuration MgmtDrew Flores Production SupportJill Courtney ShippingRichard Coatney Production SupervisorThomas Angon ReceivingKevin Malone AccountingArt Chevez Test Panel EngineeringRobert Gallegos Test/CICAndy Anders Test Panel Engineering

Emcore ManufacturingAlfred Gutierrez Panel Area ManufacuringAngelica Trujillo Panel Area ManufacuringDalena Trinh Panel Area ManufacuringDavid Zier Panel Area ManufacuringEstuardo Marroquin Panel Area ManufacuringLan Dao Panel Area ManufacuringMaria Luisa Verdejo Panel Area ManufacuringMeliane Nettles Panel Area ManufacuringRene Lacad Panel Area ManufacuringRick Manzanares Panel Area ManufacuringSamuel Watson Panel Area ManufacuringMile Hicks CIC Area ManufacturingGloria Kurkowski CIC Area ManufacturingMai Vuong CIC Area ManufacturingCarmen Ceniceros CIC Area ManufacturingHa Nguyen CIC Area ManufacturingPamela Richardson CIC Area Manufacturing

Page 72: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Fermin Rodriguez CIC Area ManufacturingMarianne Trinh CIC Area ManufacturingAshly Donaldson CIC Area ManufacturingLilibeth Manzon CIC Area ManufacturingEmelina Marroquin CIC Area ManufacturingDeanene Gonzales CIC Area ManufacturingAmy Saiz CIC Area Manufacturing

National Technical Systems (NTS)—Thermal Vacuum TestingPrimary Crew

AcousticJori Czajkowski TechnicianEdward Nelsen Engineer

Thermal VacuumPhilip Carr Program Manager/EngineerEric Kogen Technician

Secondary Crew

Mark Kawai TechnicianJames King TechnicianChris Marin TechnicianMike Rudy Technician

Support Personnel

Victor Alfano SalesKent Burgdorfer Instrumentation TechnicianDamian Castello Fluids TechnicianKelly Delia Program CoordinatorRon Foster Shipping/Receiving Manager

Page 73: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Troy Haag Maintenance ManagerJerry Hatley ElectricianMarie Jensen Shipping/ReceivingJudy Jones Quality ControlLarry Jones Fluids TechnicianSergey Klochko Instrumentation EngineerErik Knowles Fluids ManagerTim Kogen Instrumentation TechnicianMarco Macias Maintenance TechnicianRussell Presswood Machine Shop ManagerJanice Saari Quality Assurance ManagerJuan Sanchez Fluids TechnicianRandy Shaw Environmental ManagerMike Springer Programs ManagerGary Thompson Sales

Exceptional SuppliersRoger Green Exclusive Welding

Applied Technology Associates (ATA)—Hot Box Design and ConstructionTony TenorioSteve DolbeyDennis SmithCharlene BausingerTroy JensenLarry MartellJeff SteinShatona Martin

QIOPTIQ Space Technology (Cover Glass)John Martin

Page 74: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Chuck Zakrzwski Propulsion Leadunder construction

Jim Simpson ACS Lead Engineer GSFC code 591ACS Hardware Team

Ken McCaughey ACS Hardware Lead GSFC code 596Laurie Easter Technician GSFC code 596Steve Scruggs Technician GSFC code 596Joe Roman Technician GSFC code 596Tracy Price Technician OrbitalRani Lavu Technician OrbitalMillie Ewancio Technician OrbitalInpong Sivilay Technician OrbitalCarol Zepp Technician OrbitalNat Gill PDE and RW FPGA GSFC code 566Jeff Keck FPGA Support Northrop GrummanEric Bentley Mechanical Drafting Swales Aerospace

Reaction Wheel TeamRuss Roder RW Lead and Mechanical Engineer GSFC code 596John Wilson RW Electrical Engineer GSFC code 596Joe Vitale RW Software GSFC code 596Mary Kerbe RW PWB Layout Orbital Sciences CorporationFred Manage RW and PDE PWB Checking Orbital Sciences CorporationTom Miccolis RW Parts Engineer Orbital Sciences CorporationBob Read RW Support Task Orbital Sciences Corporation

PDE TeamJason Badgley PDE Lead Engineer GSFC code 596Noble Jones PDE Mechanical Engr GSFC code 596Tom Gibboney PDE and GDS Support Task Orbital Sciences CorporationAllan Hoffman PDE Module PWB Layout Orbital Sciences CorporationAmanda Virts PDE Inhibit Unit PWB Layout Orbital Sciences Corporation

Propulsion System

Attitude Control System

Page 75: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Star Tracker TeamNoble Jones Star Tracker COTR GSFC code 596Roberto Casini Program Manager Galileo AvionicaStefano Lorenzini Galileo AvionicaDorico Procopio Galileo AvionicaMassimo Materassi Galileo AvionicaGiuseppe Borghi Galileo AvionicaAnna Fabri Galileo AvionicaSimone Becucci Galileo AvionicaAndrea Landi Galileo AvionicaDavide Fiorini Galileo AvionicaMarco Picchi Galileo AvionicaMoreno Stagi Galileo Avionica

Miniature Inertial Measurement Unit TeamEd Davis MIMU COTR GSFC code 596Reginald Sherman Technical Director Honeywell InternationalPaul Brueggeman Technical Director Honeywell InternationalJim Akins Technical Director Honeywell InternationalMarion Rowe Program Manager Honeywell InternationalJon Lawler Contract Management Honeywell InternationalKevin Toliver Product Assurance Honeywell InternationalJoe Protola Systems Analysis Honeywell InternationalJeff Young Technical Director Honeywell International

Coarse Sun Sensor TeamKristen Brown CSS COTR GSFC code 596Dwight Barefoot Program Director Adcole CorporationMike Kagan Electrical Engineer Adcole CorporationKevin Lucciarini Quality Assurance Engineer Adcole CorporationJim Mirotta Manager, Reliability and Quality Assurance Adcole Corporation

Page 76: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

ACS Design and AnalysisJoseph Garrick Lead Analyst GSFC code 595Oscar Hsu RW Sizing, Delta V and Delta H Modes GSFC code 595Phil Calhoun Attitude Kalman Filter GSFC code 595Neerav Shah Analyst GSFC code 595Roger Chen Sun Safe Modes R&D ResearchGerardo Ortiz-Cruz Cooperative Education Student GSFC code 595Neal Patel Cooperative Education Student GSFC code 591Alice Liu Jitter Analysis GSFC code 591Carl Blaurock Analysis Nightsky Systems

GSFC Dynamic SimulatorGeorge Heisey GDS Project Lead Northrop GrummanStephen Leake GDS Software Lead GSFC code 582Juan Raymond GDS Systems SupportTom Correll GDS PMRD Card GSFC code 596Agbontaen Imasuen GDS Hardware GSFC code 596Wattana Kem GDS HardwareNamrita Owens GDS Hardware GSFC code 564Brad Smith GDS Cards Orbital Sciences CorporationRob Thompson GDS AssemblyLaurie Easter GDS AssemblyJim Rawlings GDS AssemblyKarin Blank GDS Software GSFC code 586Kevin D Fisher GDS SoftwareVictor W. Lu GDS Software Emergent AerospaceLinh Nguyen GDS Software GSFC code 596

PDE and RW Off-Site Teammates - Orbital Sciences CorporationKarim Iman OrbitalTom Gibboney OrbitalBob Read OrbitalVictor Evans OrbitalTom Miccolis OrbitalPeter Koump OrbitalBill Seidell Orbital

Page 77: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Tracy Price OrbitalCarrol Zepp OrbitalMilly E. OrbitalMary Kerbe OrbitalEd Naimaster OrbitalAmanda Virts OrbitalAllan Hoffman OrbitalSteven Heishman OrbitalFred Manage OrbitalRobert Demme OrbitalDaryl Dillow OrbitalAnderson Chun OrbitalRon Johnson OrbitalLaura Cook OrbitalShirely Jones OrbitalGlenn Luckett OrbitalPeggy McCviker OrbitalVandell Roseman Orbital

Printed Wiring Board ManufacturerCoretec Denver, INC

InvestigationDr. Maria T. Zuber LOLA Deputy Principal InvestigatorDr. David E. Smith LOLA Principal InvestigatorDr. Gregory A Neumann LOLA Co-InvestigatorDr. Frank G. Lemoine LOLA Co-InvestigatorMark H. Torrence Science Analysis SupportDavid R. Rowlands Science Analysis Support

Management / Systems EngineeringRon Zellar Laser Ranging Team LeadDr. Xiaoli Sun System ScientistKeith Cleveland LOLA / LRO Quality Assurance Engineer

Laser Ranging

Page 78: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Peer Review PanelJay Smith Peer Review Panel ChairDon Cornwell Peer Review Panel MemberDr. Barry Coyle Peer Review Panel MemberDr. John Degnan Peer Review Panel MemberGreg Ellman Peer Review Panel MemberDr. Tony Martino Peer Review Panel MemberEric Mentzell Peer Review Panel MemberTed Michalek Peer Review Panel MemberArmando Morell Peer Review Panel MemberDr. Michael Pearlman Peer Review Panel Member

OpticsLuis Ramos-Izquierdo Optical Systems LeadJoe Connelly Optical EngineerScott Stan Optical Engineer

Fiber OpticsMark Flanegan Fiber Optics Lead EngineerRichard Chuska EO Test and Manufacturing EngineerFrank LaRocca EO Testing EngineerShawn Macmurphy Manufacturing EngineerMelanie N. Ott Photonics Group Lead, Lead FO Engineer LRORob Switzer EO Testing engineerWilliam Joe Thomes Photonics Group Operations Manager

MechanicalAdam Matuszeski Mechanical LeadDonneise Briscoe Mechanical Fabrication PlannerShelly Conkey Mechanical AnalystCaner Cooperrider Mechanical EngineerKen Cory MachinistDave Dollard Mechanical Fabrication PlannerChris Hennen Mechanical DesignerSid Johnson Mechanical TechnicianMike Mulloney Mechanical Engineer

Page 79: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Andrew Neal Mechanical TechnicianDave Pfenning Mechanical TechnicianDave Pfenning Mechanical TechnicianSteve Schmidt LOLA Mechanical Subsystem LeadMatt Showalter MachinistCraig Stevens Mechanical AnalystBuddy Taylor Mechanical DesignerBobby Taylor Mechanical SupportQuan Tu Machinist

MaterialsPilar Joy Materials EngineerDiane Kolos Materials Engineer

Ground SystemJan McGarry Ground System LeadThomas Zagwodzki Ground System LeadGeorge Bertholdt Support EngineerOscar Brogdon Support EngineerDavid Carter NGSLR ManagerJohn Cheek Support EngineerChristopher Clarke Support EngineerHoward Donovan Support EngineerMike Golob Support EngineerJulie Horvath Support EngineerAnthony Mallama Support EngineerAnthony Mann Support EngineerCarey Noll CDDIS LeadDonald Patterson Support EngineerRandall Rickelfs SLR System Engineer at Univ. of TexasThomas Varghese Support EngineerJerry Wiant Support Engineer

ThermalChristine Cottingham Thermal EngineerTony Melak Thermal Engineer

Page 80: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Bench Checkout EquipmentPete Liiva LOLA BCE LeadMike Rodriguez BCE Engineer

Mike Blau Flight Software LeadKris Naylor FSW RequirementsKrishnan Narayanan FSW RequirementsRu Perrera FSW Configuration ManagementLenard Beacraft FSW Configuration ManagementGlenn Cammarata FSW Development Team LeadSusie Strege FSW DeveloperLarry Shackelford FSW DeveloperScott Walling FSW DeveloperFreemon Johnson FSW DeveloperMoses McCall FSW DeveloperJoel Chiralo FSW DeveloperTawanda Jacobs FSW DeveloperLadd Wheeler FSW DeveloperTim Ray FSW DeveloperTom Johnson FSW DeveloperGeorge Varndell FSW DeveloperJi-Wei Wu FSW Development Team LeadDave McComas FSW DeveloperJeff D'Agostino FSW DeveloperMichael Yang FSW DeveloperJacob Hageman FSW DeveloperBruce Trout FSW DeveloperSteve Mann FSW DeveloperAnne Kosloski FSW DeveloperTom Clement FSW Test Team LeadMike Paoletta FSW TestingEva Stattel FSW TestingScott Applebee FSW TestingRay Ferrer FSW Testing

Flight Software

Page 81: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Maureen Armbruster FSW TestingIngrid Albright FSW TestingJack Fu FSW TestingAnren Hu FSW TestingBob Schwenk FSW TestingGary Welter FSW TestingBob Rapp FSW TestingJohn Heavener FSW TestingDave Grosh FSW TestingJanet McDonnell FSW TestingBill Keksz FSW TestingTom Phillips FSW Testing

Rick Saylor Ground Sys & Ops LeadRick Saylor GS&O Lead HTSIJim Clapsadle Deputy GS&O Lead HTSIHoward Calk GS&O Systems QSSRalph Casasanta System Engineer CSCChristine Marinaccio GS&O MOC SW Tester QSSMark Neuberger GS&O MOC SW Tester HTSIDave Waters MRT Test Lead HTSI

Mission Operations TeamJack Murphy MOT Lead HTSIJabari Carrington Mission Operations HTSIKeith Crew Mission Operations HTSIGarland Dixon Mission Operations BoeingMike Gardner Mission Operations HTSIBob Ignasiak Mission Operations HTSITim Johnson Mission Operations HTSITim Johnson Mission Operations HTSIJohn Koenig Mission Operations BoeingJoe Kowalski Mission Operations HTSIJeff Parker Mission Operations HTSIMehul Patel Mission Operations HTSI

Ground System and Operations

Page 82: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Rich Sanidad Mission Operations HTSIMaxine Saylor Mission Operations HTSIDan Sutermeister Mission Operations HTSIPaul Swenson MOC System Administrator HTSI

Mission Operations Center SoftwareTheresa Beech Flexplan Software Eng. GMVHiam Brummer ITPS Technical Lead HTSIJean-Pierre Chamoun Flexplan Software Technical Lead GMVSung Cho ITPS Tester HTSISusan Dyer ITOS Developer HammersMike Foreman ITOS Task Lead GSFC code 584Gonzalo García Flexplan Software Eng. GMVBrian Goldman ITOS Developer HTSIGreg Greer ITOS Technical Lead HammersKaren Keadle-Calvert ITOS Developer HammersJay Kim Flexplan Software Eng. GMVMatt Lew ITOS Developer HammersBarbara Milner ITOS Task Lead GSFC code 584Jean Puckett ITPS Sys. Admin HTSIDenise Reitan ITPS Developer HTSIMark Richardson ITOS Developer HTSISheia Ritter ITPS Task Lead GSFC code 583Tim Singletary ITOS Developer HammersMike Smit ITOS Developer HammersWarren Thompson ITOS Developer HammersLucinda Taylor SW QA HTSI

Flight DynamicsMark Beckman Flight Dynamics Lead GSFC code 595Rivers Lamb FD Ground System Lead GSFC code 595Michael Mesarch Maneuver Team Lead GSFC code 595Karen Richon Maneuver Team GSFC code 595Dave Folta Maneuver Team GSFC code 595Rick Harmon FD Ground Attitude Lead GSFC code 595Ann Nicholson FD Task Lead AI SolutionsSteve Slojkowski Orbit Team Lead

Page 83: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Andy Dykes Orbit TeamAnne Long Navigation AnalysisPatrick Morinelli Tracking Data EvaluationRichard Campion Tracking Data EvaluationMark Nicholson Software DevelopmentWarren Miller Software Development

Attitude Ground SystemRick Harmon FD Ground Attitude Lead GSFC code 591Joe Sedlak AI SolutionsJoe Hashmall AI SolutionsNeil Ottenstein AI SolutionsRick Coon AI SolutionsDave Hooshmand AI SolutionsLaurie Mann AI SolutionsGregory Natanson AI SolutionsSteve Slojkowski AI SolutionsAndy Dykes AI SolutionsAnne Long AI SolutionsLauren Chung AI SolutionsGreg Dell AI SolutionsMark Nicholson AI SolutionsAnn Nicholson AI SolutionsPatrick Morinelli HoneywellRichard Campion HoneywellMark Scooby HoneywellDarla German HoneywellJames Shaw HoneywellJohn Lorah HoneywellSteve Hendry Honeywell

Page 84: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Flight Software MaintenanceKris Naylor FSW Sustaining Engineering CSCMike Oben FSW Sustaining Engineering GSFC code 582Scott Snell FSW Sustaining Engineering CSC

Ground NetworkApril Adams NENS Documentation Support HTSIBret Aguilar USN Ops USNHollys Allen NENS System Engineer HTSIScott Allen WSC Engineer HTSILeslie Ambrose GN/SN/PSLA GSFC code 582Mike Anderson NENS WS1 Project Management HTSIVelma Anderson NENS System Engineer HTSIRobert Ash NENS Facilities SGTCathy Barclay NENS WS1/USN Project Management HTSIJoe Baros NENS RF SOC/Compat HTSIMerri Benjamin NENS O&M/WSC HTSIMatthew Bieneman NENS Engineering HTSIElaine Bowers NENS Docs SGTMatt Boyd USN Ops USNRonna Brockdorff GN ArchitectureBill Brown NENS Sys Eng HTSIDavid Carter GN SLR Lead GSFC code 582Bill Chaney NENS Engineering HTSIChris Christopolous NENS Engineering HTSIDale Cole NENS I&T HTSIAbbas Contractor NENS Facilities HTSIChris Cook NENS Security HTSIArt Corella NENS Facilities SGTSteve Currier GN DPM GSFC code 453Mark Czumak NENS Engineering HTSIDumas Donna NENS Admin HTSIDebbie Dukes NENS O&M/GN HTSIAlice Eskins NENS Docs HTSIRichard Feinstein NENS Facilities SGTJohn Fleming NENS Engineering HTSILinda Fuller NENS Docs HTSI

Page 85: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Fred Gams NENS RF SOC/Compat CRCWilliam Gardner NENS Security HTSIDon Gittle USN Lead Engineer USNBob Gonzales SN TO&A GDJane Gracie NENS Docs SGTJoanne Greet-Swank USN PM Support USNJay Heberle USN Project Manager USNDaniel Hobel USN Engineering USNBob Hudgins GN Scheduling GDDoug Hughes USN Engineering USNConnie Jefferies NENS Admin HTSIBrad Johnson PSLA Support HTSIEvans Jones TO Management Support HTSIDeepak Kaul NENS Enigneering HTSIJohn Kim NENS RF SOC/Compat HTSIMike Kohout NENS Network Commitment HTSITom Kovac NENS Scheduler HTSIDavid Lassiter GN WS1 Systems GSFC code 569Ken Lavery NENS RF SOC/CompatBarry Lusby NENS O&M/WSC HTSIScott Lynch USN Engineer USNDale Massey USN Engineer USNDennis Mateik NENS O&M/WSC HTSIKen McIntyre NENS Docs HTSIMarco Midon WS1 Technical Lead GSFC code 567Peter Militch NENS Chief Eng HTSISteve Montgomery USN Engineer USNYonwoo Nam NENS I&T HTSIValeria Nitz NENS Docs HTSIOnyeali Onyeberechi NENS Docs HTSIPaul Pardoe NENS Docs HTSIBrent Parker NENS RF SOC/Compat HTSIPati Peskett NENS GN Eng HTSILesley Rahman NENS O&M HTSIPeggy Reno NENS QA HTSI

Page 86: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Laurel Rossow NENS Safety HTSIGregory Sanders NENS Sys Eng HTSIJul Scarborough NENS Security HTSIBruce Schupler NENS Sys Eng HTSIThomas Shult NENS Ops USNDon Small WS1 Sys Eng HTSIDonna Smith NENS Admin HTSIJeanette Smolinski NENS GN Eng HTSIBob Stancel GN Software Engineering GSFC code 589Frank Stocklin GN Architecture Support GSFC code 450Rod Summerford NENS I&T HTSIJohn Taylor USN Engineer USNSteve Testoff NENS Docs SGTMike Uffer NENS Eng HTSIScott Underwood GN Chief Eng LJTBourgondien Van NENS Facilities HTSISteve Vogelwede USN SW Engineer USNJim Wiedman WS1 Security HTSIStephania Young NENS Scheduler HTSI

Deep Space NetworkIda Baker LRO NOPE Lead ITTEd Luers DSN POC NASA/JPLSteve Walderr DSN MCM NASA/JPL

NISNJim Cameron NISN Network Engineer GSFC code 721Mike Eder NISN Network Engineer SAICChris Jermann NISN IPNOC SAICChi Le NISN Network Engineer GSFC code 721Chris Spinolo NISN Network Engineer GSFC code 721

Page 87: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

William Yuknis C&DH System Lead (2007-2008) / Technical Lead GSFCQuang Nguyen C&DH System Lead (2004-2007) GSFC

Dennis AlbaijesHousekeeping I/O Card Engineer / Signal Integrity Engineer GSFC

Omar Haddad Jack of All Trades Engineer GSFCNoosha Haghani Leviste Communications Card Engineer GSFCDamaris Guevara Communications Card Engineer GSFCJames Fraction Low Voltage Power Converter Engineer GSFC

John SiedleckiSpaceWire Engineer / Multifunction Analog Card Digital Engineer GSFC

George MooreMultifunction Analog Card Test and Verification Engineer GSFC

Michael Lin Multifunction Analog Card Analog Engineer GSFCRenee Reynolds Multifunction Analog Card Digital Engineer GSFCGlenn Rakow SpaceWire Consultant GSFCLoc Luu Test and Diagnostic Software Engineer GSFCTawanda Jacobs Test and Diagnostic Software Engineer GSFC

Warren ThompsonCommunications Ground Support Equipment Engineer GSFC

Timothy Johnson Test Conductor GSFCRobert Ignasiak Test Conductor GSFCScott Pursley Data Storage Board Engineer GSFCDudley Yuknis Mascot Engineer GSFCCynthia Lewis Integration and Test Manager GSFCDarryl Younger Test Facilities Manager GSFCLocksley Haynes Data Storage Board Digital Engineer GSFCCin Swangwatanaratn Technican Support GSFCBrenda Wallace Technican Support GSFCBrenda Feldman Technican Support GSFCThomas Winkert Communications Encoder FPGA Engineer GSFCAl Grasley PWB Designer Northrop GrummanAl Lookingland Mechanical Engineer Northrop GrummanTony Granados PWB/Mechanical Designer Northrop GrummanBarbara Neff Task Manager Northrop Grumman

Command and Data Handling

Page 88: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Betty Pearsall Assemby Technician Northrop GrummanCharlie Mcclunin Packaging Engineer/Checker Northrop GrummanDave Meyers Planning Inventory Control (PIC) Northrop GrummanDoug Lumsden Program Manager Northrop GrummanEva Rice Procurement/Buyer Northrop GrummanFrank Vreeland PWB Designer Northrop GrummanMike Merryman PWB Designer/Manager Northrop GrummanHarry Yackman Packaging Engineer/Checker Northrop GrummanJim Krivensky PWB Designer Northrop GrummanJeff Keck Electrical Engineer Northrop GrummanJeff Diehl Operations/Lab Manager Northrop GrummanJohn Cook Mechanical Designer Northrop GrummanKaren Nearhoff Assemby Technician Northrop GrummanKaren Chaney Assemby Technician Northrop GrummanKeith Ellis Assemby Technician Northrop GrummanLang Diep Assemby Technician Northrop GrummanLori Protheroe QA Inspector Northrop GrummanLorinda Burrows Assemby Technician Northrop GrummanMike Johnson QE/QA Manager Northrop GrummanNancy Baily Configuration Management (CM) Northrop GrummanNicole Hackley Quality Engineer Northrop GrummanPaul Kemlage Mechanical Designer Northrop GrummanRick Butler QA Inspector Northrop GrummanRichard Burrows Components Engineer Northrop GrummanRoy Kohn Packaging Engineer/Checker Northrop GrummanRyan Pranschke Mechanical Engineer Northrop GrummanSean Bowen Planning Inventory Control (PIC) Northrop GrummanThomas Anderjaska Test Engineer Northrop GrummanJerry Belote Planning Inventory Control (PIC) Northrop GrummanTracey Clay Mechanical Engineering Manager Northrop GrummanTuan Duong Electrical Engineer Northrop GrummanViguen Ter-Minassian Mechanical Engineer Northrop Grumman

Page 89: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Alan Dennis Lead Electrical Engineer BAESuzanne Miller EPM and Software Engr BAECathy Lue Chee Lip SUROM Software engineer BAEDean Saridakis Lead Software Engineer BAEMarc Vancampen Lead Mechanical Engineer BAEMichael E Smith Mechanical Enginer STE BAELes Crawley Quality Assurance BAESteve Johnson STE Software BAEJoseph Hilger Operations Program Manager BAEDavid Eckhardt Program Manager BAEMason Fisher Material Planning BAEEverett Drew Engineering Manager BAERichard Kim Manufacturing Engineer BAERobert Davidson Electrical Engineer BAETim Whalen Mechancal Analysis BAERema Smoot Contracts BAEJohn Carr Finance BAEJames Ramsden Reliability BAEPhuong "Tee" Osborne Assembly Operator BAETri Nguyen Assembly Operator BAEPauline Gordon Assembly Operator BAEHang Tran Assembly Operator BAEConrad Walker Assembly Operator BAEMargaret High Assembly Operator BAEJudy Bui Assembly Operator BAETeresa Blaylock Stock room BAEBen Reardon 9639B Electronics Design Engineer SymmetricomLuis Vargas 9639B Electronics Design Engineer SymmetricomSanjiv Patel 9639B Test Engineer SymmetricomJohan Welgemoed 9512A Development Engineer SymmetricomDoug Harvey 9512A Engineering Technician SymmetricomLiz Lasher 9512A Prototype/Senior Assembler Symmetricom

Page 90: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

LRO Communications SystemAdan Rodriguez-Arroyo Communications System Lead GSFC code 567Vince Briani RF Networks (S-/Ka-Band) ATK, Inc

Daniel FeldmanMEI Task29 Leader (Coupler, Hybrids, coax, waveguides, omni procurements) MEI Technologies

Rick JacobsSenior Buyer (Coupler, Hybrids, coax, waveguides, omni procurements) MEI Technologies

Bill Klimczak HGAS RF Support MEI TechnologiesJames Lee QA ATK, IncAnatoly Lyubomirsky RF support MEI TechnologiesJohn Pocius Ground Support Equipment GSFC code 567Lamont Poole Ground Support Equipment GSFC code 567Victor Sank Senior RF Support MEI TechnologiesSteve Seufert RF Test Support GSFC code 567Dale Shama RF Networks Support MEI TechnologiesSteve Smith RF Test Support ATK, Inc

Barbara SelbyContract Specialist (Coupler, Hybrids, coax, waveguides, omni procurements) MEI Technologies

John Staren Modeling / Analysis MEI TechnologiesJerry Visalsawat Ka-Band Subsystem GSFC code 567

LRO Ka-band ModulatorJeff Jaso LRO Ka-band Modulator Lead Designer GSFC code 567Carl W. Kellenbenz LRO Modulator Power Supply Lead GSFC code 563Robert Lussier Modulator Power Supply Technical Support GSFC code 563Hanson Nguyen Modulator Power Supply Test Engineer GSFC code 563Laura Cook Power Supply Re-work OrbitalJeff Keck Initial Northrop Project Manager Northrop - LanhamDoug Lumsden Second Northrop Project Manager Northrop - LanhamTerry Miller Third Northrop Project Manager Northrop - LanhamKim Allgood Materials Technician - Assembly & coat and stake BallRichard Burrows Northrop Parts Manager Northrop - LanhamJeff Diehl Northrop Manufacturing Lead Northrop - LanhamKyle Huth Wirebonding specialist Independent consultantAl Lookingland Northrop Assembly Documentation Northrop - Lanham

Communications

Page 91: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Shawn McMurphy Communications Engineer MEI TechnologiesXuan Nguyen Communications Engineer MEI TechnologiesTraci Pluchak-Rosnack Micro Electronic Technician OrbitalArt Ruitberg Design Consultant Space Power Electronics, Inc.

LRO S-/Ka-band High Gain AntennaAli Mahnad High Gain Antenna Lead MEI TechnologiesJohn Boger LRO HGA Sr. Manufacturing Engineer AASCNelis DuToit Antenna Design / Analysis Perot Systems, Inc.David Green HGA electro-mechanical Support MEI TechnologiesMike Guthmiller LRO HGA Sr. Program Manager AASCKen Hersey Senior High Gain Antenna Support Perot Systems, Inc.Doug Keehr LRO Purchasing Manager AASCTodd Krafchak HGA mechanical analysis Orbital Science CorporationScott Miskovish LRO HGA Thermal Analysis Lead ATA-EEric Nelson LRO Sr. Assembly Technician AASCMike Noyes LRO HGA Mechanical Design Lead AASCTroy Nunes LRO HGA Manufacturing Engineer AASCBob Phillips LRO HGA Quality Engineer AASCAnna Shifflet LRO Production Control AASCDawn Valero LRO HGA Strutural Analysis Lead AASC

Telemetry Tracking and Command UnitKen Moloney Project Leader General Dynamics Advanced Information Cheryl Ross Program Manager General Dynamics Advanced Information Fichelle Fields Configuration & Data Manager General Dynamics Advanced Information Tricia Lord-Brumm Contracts General Dynamics Advanced Information Christina Muckenhoupt Document Control General Dynamics Advanced Information Jeffery Gaines Finance General Dynamics Advanced Information Jerry Thorson Finance General Dynamics Advanced Information Gary Placke Integrated Cost & Schedule General Dynamics Advanced Information Jim Crawford Sr Lead Engineer - Systems General Dynamics Advanced Information Paul Schneider, Jr. Sr Lead Engineer - Systems General Dynamics Advanced Information John Stephen Principal Engineer - Electrical General Dynamics Advanced Information Mark Bockmann Sr Lead Engineer - Electrical General Dynamics Advanced Information

Page 92: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Clarence Huntley Sr Lead Engineer - Electrical General Dynamics Advanced Information Robert Prentice, Jr. Sr Lead Engineer - Electrical General Dynamics Advanced Information Carl Robello Sr Lead Engineer - Electrical General Dynamics Advanced Information Rick Scott Lead Engineer - Electrical General Dynamics Advanced Information Wade Understiller Lead Engineer - Mechanical General Dynamics Advanced Information Dave Anderson Lead Engineer - Software General Dynamics Advanced Information Marty Siemon Distinguish Member Technical Staff General Dynamics Advanced Information Mike Henggeler Designer General Dynamics Advanced Information James Praught Designer General Dynamics Advanced Information Paul Scott Designer General Dynamics Advanced Information Dan Glenn Manufacturing Manager General Dynamics Advanced Information Todd Zuercher Manufacturing Engineer General Dynamics Advanced Information Betty Marsh Material Planner General Dynamics Advanced Information Fred Dunikoski Material Specialist General Dynamics Advanced Information Rosemarie Nelson Manufacturing Technician General Dynamics Advanced Information Lois Washington Manufacturing Technician General Dynamics Advanced Information David Baker Engineering Technician General Dynamics Advanced Information Jack Brust Engineering Technician General Dynamics Advanced Information Lawrence Clint Engineering Technician General Dynamics Advanced Information Robert Cordray Engineering Technician General Dynamics Advanced Information Les Eakins Engineering Technician General Dynamics Advanced Information Virgina Grajiola Engineering Technician General Dynamics Advanced Information Steven Hair Engineering Technician General Dynamics Advanced Information Joan Harnish Engineering Technician General Dynamics Advanced Information Edward Harrison Engineering Technician General Dynamics Advanced Information James Henry Engineering Technician General Dynamics Advanced Information Marilyn Law Engineering Technician General Dynamics Advanced Information Chip Leivas Engineering Technician General Dynamics Advanced Information Bach Nguyen Engineering Technician General Dynamics Advanced Information Mike Nichols Engineering Technician General Dynamics Advanced Information Michael Pellerin Engineering Technician General Dynamics Advanced Information Carlos Fraijo Engineering Technician General Dynamics Advanced Information

Page 93: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Ruth Freeze Engineering Technician General Dynamics Advanced Information Terry Mendoza Engineering Technician General Dynamics Advanced Information Fern Ross Engineering Technician General Dynamics Advanced Information John Shaw Engineering Technician General Dynamics Advanced Information Myron Stineman Engineering Technician General Dynamics Advanced Information Steven VanHolton Engineering Technician General Dynamics Advanced Information Bennie Warren Engineering Technician General Dynamics Advanced Information Dolores Anaya Operator General Dynamics Advanced Information Rannie Arnold Operator General Dynamics Advanced Information Ruth Boivin Operator General Dynamics Advanced Information Theresa Duffy Operator General Dynamics Advanced Information Leeann Guest Operator General Dynamics Advanced Information Donna Longacre Operator General Dynamics Advanced Information Rachel Slater Operator General Dynamics Advanced Information David Soto Operator General Dynamics Advanced Information Pauline Williams Operator General Dynamics Advanced Information Pam Embree Principal Quality Engineer General Dynamics Advanced Information Don Davenport Sr Lead Quality Engineer General Dynamics Advanced Information Greg Hayes Quaility Specialist General Dynamics Advanced Information Joseph Levine Quaility Specialist General Dynamics Advanced Information Charles Beckham Quality Specialist General Dynamics Advanced Information Keyana Willcox Inspector 1 - Quality General Dynamics Advanced Information Russ Graves Radiation Engineer General Dynamics Advanced Information Lamonte Einspahr Reliability Engineer General Dynamics Advanced Information Mike Newman Reliability Engineer General Dynamics Advanced Information Mitch Witkowski Reliability Engineer General Dynamics Advanced Information Lynda Dorsett Sr Technology Specialist General Dynamics Advanced Information

Traveling Wave Tube AmplifierTodd T. Peterson TWTA Project Manager NASA/GRCDale A. Force TWTA COTR NASA/GRCRainee N. Simons TWTA Principal Engineer NASA/GRCJane M. Cochran TWTA Contracting Officer NASA/GRCBen Bauman TWTA Budget Analyst NASA/GRC

Page 94: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Corinna Vilkatis Contract Manager L-3 Electron Technologies, IncLou Ann Flaherty Program Office Director L-3 Electron Technologies, IncPaul Spitsen Program Manager L-3 Electron Technologies, IncDan Scaboo TWT Manufacturing Engineeing L-3 Electron Technologies, IncDaniel Dibb TWT Responsible Engineering Authority L-3 Electron Technologies, IncDave Newell TWT Engineeing L-3 Electron Technologies, IncDavid Eze TWT Mechanical Engineeing L-3 Electron Technologies, IncEric Young TWT Test Engineeing L-3 Electron Technologies, IncHelen Cohen TWT Manuracturing Engineeing L-3 Electron Technologies, IncMary Connors TWT Test Engineeing L-3 Electron Technologies, IncMatt Patterson TWT Engineeing Manager L-3 Electron Technologies, IncRandy Gibson TWT Test Engineeing L-3 Electron Technologies, IncTony Romero TWT Manufacturing Engineeing L-3 Electron Technologies, IncTony Ronco TWT Manufacturing Engineeing L-3 Electron Technologies, IncDr. William Menninger TWT Design Engineeing L-3 Electron Technologies, IncZev Liang TWT Test Engineeing L-3 Electron Technologies, IncDr. Roger Hollister TWT Mechanical Engineeing L-3 Electron Technologies, IncNeal Robbins Ka Band TWT Development L-3 Electron Technologies, IncAdileen Saucedo TWT Assembly Technician L-3 Electron Technologies, IncAnh Nguyen TWT Assembly Technician L-3 Electron Technologies, IncBarbara Lemons TWT Assembly Technician L-3 Electron Technologies, IncTina Nguyen TWT Assembly Technician L-3 Electron Technologies, IncDennis Lynch TWT Assembly Technician L-3 Electron Technologies, IncDorothy Kratzer TWT Assembly Technician L-3 Electron Technologies, IncEdna Beleno TWT Assembly Technician L-3 Electron Technologies, IncEmy Estocado TWT Assembly Technician L-3 Electron Technologies, IncFernando Lizaraga TWT Assembly Technician L-3 Electron Technologies, IncFlorence Militar TWT Assembly Technician L-3 Electron Technologies, IncJanet Ekenstam TWT Assembly Technician L-3 Electron Technologies, IncJose Peralta TWT Assembly Technician L-3 Electron Technologies, IncKyong Su TWT Assembly Technician L-3 Electron Technologies, IncLani Faalafua TWT Assembly Technician L-3 Electron Technologies, IncLinda Clark TWT Assembly Technician L-3 Electron Technologies, IncMargaratia Hydro TWT Assembly Technician L-3 Electron Technologies, IncMary La Riccia TWT Assembly Supervisor L-3 Electron Technologies, Inc

Page 95: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Peral Dupuy TWT Assembly Technician L-3 Electron Technologies, IncRebecca Huizar TWT Assembly Technician L-3 Electron Technologies, IncRhonda Gersh TWT Assembly Technician L-3 Electron Technologies, IncStephanie Collins TWT Assembly Technician L-3 Electron Technologies, IncSueng Lim TWT Test Technician L-3 Electron Technologies, IncBruce Sharp TWT Manufacturing Planning L-3 Electron Technologies, IncPamela Donnelly TWT Manufacturing Planning L-3 Electron Technologies, IncAndrew Peak TWTA Design Engineering L-3 Electron Technologies, IncDave Lewis TWTA Electrical Engineering L-3 Electron Technologies, IncDouglas Strother TWTA Test Engineering L-3 Electron Technologies, IncFarrell Deibel TWTA Mechanical Engineering L-3 Electron Technologies, IncJack McDowell TWTA Mechanical Engineering L-3 Electron Technologies, IncJanusz Pyter TWTA Engineering Manager L-3 Electron Technologies, IncJatin Vaghela TWTA Test Engineering L-3 Electron Technologies, IncJoe Araki TWTA Test Engineering L-3 Electron Technologies, IncKeith Loi TWTA Test Engineering L-3 Electron Technologies, IncKeith Phelps TWTA Electrical Engineering L-3 Electron Technologies, IncManuel Peralta TWTA Electrical Engineering L-3 Electron Technologies, IncMark Tafoya TWTA Electrical Engineering L-3 Electron Technologies, IncMike Choe TWTA Mechanical Engineering L-3 Electron Technologies, IncOliver Graham TWTA Test Engineering L-3 Electron Technologies, IncPhil Todd TWTA Electrical Engineering L-3 Electron Technologies, IncRichard Atienza TWTA Mechanical Engineering L-3 Electron Technologies, IncRoger Williams TWTA Design Engineering L-3 Electron Technologies, IncRoy Perry TWTA Manufacturing Engineering L-3 Electron Technologies, IncWilliam Takahashi TWTA Design Engineering L-3 Electron Technologies, IncCullen Chapman TWTA Lead Manufacturing Engineering L-3 Electron Technologies, IncGreg Maxwell TWTA Manufacturing Engineering L-3 Electron Technologies, IncBrian Nguyen TWTA Test Engineering L-3 Electron Technologies, IncTan Nguyen TWTA Test Engineering L-3 Electron Technologies, IncWilliam Council TWTA Manufacturing Engineering L-3 Electron Technologies, IncWesley Clanin TWTA Manufacturing Engineering L-3 Electron Technologies, IncMirna Lima TWTA Manufacturing Engineering L-3 Electron Technologies, IncDeanne Widmark TWTA Manufacturing Planning L-3 Electron Technologies, IncBuzz Carter TWTA Manufacturing Planning L-3 Electron Technologies, Inc

Page 96: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Donna Mahony TWTA Manufacturing Planning L-3 Electron Technologies, IncAndy Dailo TWTA Manufacturing Engineering L-3 Electron Technologies, IncChris Trudeau Assembly and Test Supervisor L-3 Electron Technologies, IncAl Martinez TWTA Assembly Technician L-3 Electron Technologies, IncAlbert Solis TWTA Assembly Technician L-3 Electron Technologies, IncAndrew Calderon TWTA Test Technician L-3 Electron Technologies, IncAnthony Bui TWTA Test Technician L-3 Electron Technologies, IncBharti Shah TWTA Test Technician L-3 Electron Technologies, IncBrian Yamanoha TWTA Test Technician L-3 Electron Technologies, IncCynthia Gomez TWTA Assembly Technician L-3 Electron Technologies, IncDavid Hernandez TWTA Test Technician L-3 Electron Technologies, IncDung Le TWTA Assembly Technician L-3 Electron Technologies, IncGeorginia Resurrection TWTA Assembly Technician L-3 Electron Technologies, IncGrace Rameriz TWTA Assembly Technician L-3 Electron Technologies, IncGuadalupe Amezcua TWTA Assembly Technician L-3 Electron Technologies, IncJim Parsons TWTA Test Technician L-3 Electron Technologies, IncJohn Vu TWTA Assembly Technician L-3 Electron Technologies, IncJuan Reyes TWTA Assembly Technician L-3 Electron Technologies, IncKen Hodge TWTA Test Technician L-3 Electron Technologies, IncKyong Kim TWTA Assembly Technician L-3 Electron Technologies, IncLettie Morales TWTA Assembly Technician L-3 Electron Technologies, IncMichelle Staton TWTA Assembly Technician L-3 Electron Technologies, IncMike Martin TWTA Test Technician L-3 Electron Technologies, IncPatricia Williams TWTA Assembly Technician L-3 Electron Technologies, IncRamona Diaz TWTA Assembly Technician L-3 Electron Technologies, IncTanya Pham TWTA Test Technician L-3 Electron Technologies, IncTeresita Espanola TWTA Assembly Technician L-3 Electron Technologies, IncTien Nguyen TWTA Assembly Technician L-3 Electron Technologies, IncTrung Nguyen TWTA Assembly Technician L-3 Electron Technologies, IncTuan Bui TWTA Assembly Technician L-3 Electron Technologies, Inc

Page 97: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Doug Duvall Harness lead (2007-2008)Rick Kinder Harness lead (2004-2007)Curtis Dunsmore TechnicianDeneen Ferro TechnicianGreg Griffith TechnicianShirley Jones TechnicianBrian Kittle TechnicianLester Putnam TechnicianRam Ramrattan TechnicianDaryl Riley TechnicianSteve Smith TechnicianCharley Stone TechnicianBrad Swearingen TechnicianRob Thompson TechnicianSteven Tomaszewski TechnicianCarroll "Trick" Trickey TechnicianBrenda Wallace Technician

Harlan Spence CRaTER Principal Investigator Boston UniversityMichael Golightly Deputy Project Scientist Boston UniversityKristin Sacca Project Coordinator Boston UniversityNicholas Gross E/PO Lead Boston UniversityTony Case Calibration Scientist Boston UniversityErik Wilson SOC Programmer Boston UniversityJennifer Brown Data Technician Boston UniversityDavid Bradford IT Management Boston UniversityJeffrey Sanborn Technical Support Boston UniversityEric O'Dea Thermal Modeling Boston UniversityHuade Tan Thermal Modeling Boston UniversityJustin Kasper Project Scientist Harvard-SmithsonianDemetrios Athens GSE Programmer MITBill Forbes Machinist MITPeter Ford SOC Developer MITRick Foster Program Manager MIT

Harness Team

CRaTER Team

Page 98: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Robert Goeke Project Engineer MITDorothy Gordon Electrical Engineer MITBrian Klatt SMA Manager MITFred Miller Technician MITJimmy O'Connor Project Technician MITMatt Smith Mechanical Engineer MITJoan Quigley SOC Analyst MITJ. Bernard Blake Co-Investigator The Aerospace CorporationJoesph Mazur Co-Investigator The Aerospace CorporationWilliam Crain Electrical Engineer The Aerospace CorporationAlbert Lin Mechanical Engineer The Aerospace CorporationDeborah Salvaggio Program Manager The Aerospace CorporationPaul Carranza Quality Assurance The Aerospace CorporationFrancisca Fuentes Senior Research Assistant The Aerospace CorporationRachael Galvan Senior Research Assistant The Aerospace CorporationMark Lalic Research Associate The Aerospace CorporationLarry Townsend Co-Investigator University of Tennessee, KnoxvilleTerry Onsager Co-Investigator NOAA Space Weather Prediction Center

David Paige Diviner PIWayne Hartford Instrument Project ManagerBradley Drake Electronics FabricationOrland Harrison SoftwareScott Nolte IntegrationMark Duran Thermal EngCharles Avis SOC LeadPeter Barry Mission Assur MgmtJim Aragon Quality AssuranceJohn Bousman IntegrationNick Taylor ReliabilityDennis Cate IntegrationScott Loring Software EngMichael O'connell Dynamics Test

Diviner Team

Page 99: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Tom Pierce EMC TestKim Plourde Project Mgmt StaffDaniel Preston Calibration EngLaurie Guay Business Mgmt StaffHenry Awaya TestNickolas Emis Thermal EngGary Kinsella Thermal EngTarek Baayoun Business Mgmt StaffMarc Foote IntegrationBruno Jau Mechanical Eng.Susan Lee Software AssuranceCami Vongsouthy Safety EngMichael Blakely Environmental EngBryan Bell ReliabilityDon Lewis Material EndGlenn Aveni Contamination Control EngLee Wigglesworth Test SupportRobert Stephenson Structural AnalysisDave Randall Test SupportSam Galaske Mechanical DesignRobert Hughes Thermal Analysis

Igor Mitrofanov LEND PIunder construction

David Smith LOLA PIunder construction

LEND Team

LOLA Team

Page 100: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Mark Robinson LROC PIEric EliasonHarald HiesingerBrad JolliffMichael MalinAlfred McEwenPeter ThomasElizabeth TurtleScott Brylow Instrument ManagerMike Ravine Senior Project ManagerMike Caplinger Systems EngineerJacob Schaffner Lead Electrical EngineerPaul Otjens Electrical EngineerTony Ghaemi Lead Optical EngineerDavid HummChris Martin Flight AssemblerHakeem Olawale Lab TechnicianJose Navarro Junior Mechanical EngineerWill Cowell Junior Mechanical EngineerSteven Mi Junior Mechanical EngineerAnn Pasquini Procurement LeadJeff Zerr I&T Maser

LROC Science Operations CenterErnest Bowman-Cisneros SOC ManagerIan Bennett SOC Senior System AdministratorKen Bowley SOC System AdministratorJoe Digilio SOC System AdministratorTim Donnelly SOC OperationsSean Merritt SOC OperationsDavid Nelson SOC OperationsJulie Stopar SOC OperationsShane Thompson SOC OperationsJim Stewart SOC Lead Software DeveloperNick Avlontis SOC Software Developer

LROC Team

Page 101: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Jacob Danton SOC Software DeveloperErick Malaret ACT President, supporting LROC SOC OperationsDoug Fuller HPCI Manager, supporting LROC SOC OperationsKirt Karl HPCI Storage, supporting LROC SOC Operations

Gil SpeyerHPCI Software Developer, supporting LROC SOC Operations

Dan Stanzione HPCI Director, supporting LROC SOC OperationsCarmen Salas Business Manager & LROC EPODoug Roberts EPO LeadWendy Taylor EPOBrett Denevi Post-DocSam Lawrence Post-DocMartin Tschimmel Post-Doc

Randy Gladstone LAMP PI (2007-2008)Alan Stern LAMP PI (2004-2007)Ron BlackDave SlaterMaarten VersteegMichael DavisKristian PerssonGreg DirksKen JohnsonHenry SykesArmando De Los SantosJessica StackJohn ScherrerBrian GuptaJohn StoneKurt RetherfordLarry McCulloughJoerg GerhardusTommy GreathouseDavid Kaufman

LAMP Team

Page 102: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Joel ParkerAnthony EganTraci CaseRebecca ThibodeauxRoy GrahamMichael YoungDana CriderPaul FeldmanWayne PryorPolly AndrewsGianna SullivanSensor SciencesNuTekJobin-YvonSwRI Division 15 Power Systems GroupSwRI Division 15 Quality AssuranceSwRI Division 15 Drafting DepartmentSwRI Division 15 Model ShopSwRI Division 15 Parts Control GroupSwRI Division 15 Fabrication Group

Page 103: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28
Page 104: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Tony Lavoie Program ManagerLarry Hill LRO Mission Manager MSFCTodd Holloway Launch Service Provider Interface MSFCDanielle Moran Education and Public Outreach MSFCDonna Patterson Business Office MSFC

Program Office at MSFC

Page 105: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Independent Review TeamLinda Pacini Review Chair/Systems Review Manager NASA Goddard Space Flight Center (GSFC)Chris Jones Review Co-chair/ Director for Solar System ExploratioJet Propulsion Laboratory (JPL)John Niehoff IPAO Review Chair SAICDave Kusnierkiewicz Space Division Chief Engineer Applied Physics LaboratoryBrian Keegan Chief Engineer NASA HQ (Retired)Steven Scott GSFC Chief Engineer GSFC code 500Ed Powers Thermal and Systems Swales, ATK, SGTEd Ashford Mission Design Science International Applications Corporatio Mike Bay Instrument Systems J&TTom Kenney GN&C GSFC code 591Ivar Tillotson Mission Operations HTSIMinh Phan Mechanical GSFC code 540Stephen Thompkins Mission Operations GSFCRobert Kichak Electrical, C&DH NESCDaniel Nguyen Thermal GSFC code 545

SRR onlyPete Theisinger Deputy Director for Mars Exploration JPLLiz Citrin Project Management GSFC code 464Riley Duren Systems Engineering JPLJames C. Smith Systems Engineering GSFC code 550Steve Wasserzug Systems, I&T Swales

PDR onlyRandy Hedgeland Contamination GSFC code 546Don Cornwell Instrument Systems SwalesTom Luchik Mgr. Instruments and Science Data Systems Jet Propulsion Laboratory (JPL)Paul Geithner SMD Program Executive NASA HQ

CDR additionsEileen Dukes Spacecraft Systems AerospaceFred Huegel Electrical, C&DH GSFC code 560Scott Gordon Mechanical Systems GSFC code 542Alphonso Stewart Mechanical Systems GSFC code 543Dave Ward Spacecraft Systems GSFC code 599Carolyn Dent Mission Operations GSFC code 301

Page 106: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Launch Support TeamA.I. Solutions

Clinton E. Plaisted Flight Controls a.i. solutionsAnalex

Bill Boggs AE Comm and Telemetry AnalexTom Casale Power Systems/Batteries AnalexMarsha Causey Launch Site Support AnalexTim Clinger AE Comm & Telemetry Engr AnalexLamar Davis Launch Site Support Engineer AnalexMilt Draves Mission Integration Coordinator AnalexRoy A. Fisher Launch Site Support Engineer AnalexRichard A. Flage Flight Software AnalexEugene J. Fourney LV Mechanical - Denver AnalexJohn Glass Ordnance AnalexPenni Herbst Contamination Control AnalexChuck Holmes Booster Prop AnalexKathleen Kerr Badging/Security AnalexAngela M. Lawhead OCE Support AnalexDave Loiselle Avionics AnalexJohn Magisano Denver Res Office - Avionics AnalexLinda Lee Matthias Contamination Control AnalexJanice E. McMillen Mission Integration Coordinator AnalexRuby Montoya Denver Resident Office AnalexChip Moore Ordnance AnalexJim Myers Propulsion AnalexSkip Owens Flight Design AnalexJohn Pavone Environmental Control Systems AnalexSuzie Raines Technical Integration AnalexRandy Reid Booster Prop AnalexTed Schmoll Pneumatics AnalexCarl Schultz Denver Res Office - LV Structures AnalexEstil G. Smith Launch Support AnalexGregg Stoll AE Comm AnalexCharlie Thompson AE Comm & Telemetry Engr AnalexDomenick Tutera Flight Design Analex

Page 107: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Tom Vogel Propulsion AnalexTom Woodard Electrical AnalexPaul Wubbena EGSE AnalexJames W. Zimmerman Loads Analex

AstrotechBruce Campbell ASO Safety Lead/Mission Manager AstrotechBeau Suzanne Du ASO Badging/Security AstrotechRob Ferrraro ASO Mission Manager - LCROSS AstrotechGerard Gleeson ASO Mission Manager - LRO AstrotechDwayne Light ASO Facility Manger AstrotechDon Moore ASO Mission Manager - LCROSS AstrotechDon White ASO Manager Astrotech

Boeing KSCJeffery Boykin Design Visualization Modeling Boeing KSCDavid Muldowney S/C Security Boeing KSCSharon Sieber S/C Securtiy Boeing KSCCharlie Smith CAPPS Fueling Lead Boeing KSC

NASA KSCCarlos Alvarado Flight Controls NASA KSCOmar Baez Assistant Launch Director (ALD) NASA KSCDan Baker LSIM NASA KSCSerkan Bastug Strength NASA KSCJohn Bauschlicher Flight Dynamics NASA KSCGary Beatovich ASO Contract Officer NASA KSCBrian Beaver Flight Design NASA KSCNorman M. Beck LCROSS Integration Engineer NASA KSCBill Benson Flight Dynamics NASA KSCFrank M. Billingham Propulsion NASA KSCJamie Bjornbak Instrumentation NASA KSCRobert J. Bosnyak Integration Engineer NASA KSCDonald E. Brandl Thermal NASA KSCJacqueline A Brooks Contracting Officer NASA KSCDiana M. Calero LRO Integration Engineer NASA KSCDanial M. Campbell Thermal Analysis NASA KSCMichael C. Carbone Mechanical and GSE NASA KSC

Page 108: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Keith Castilow Denver Resident Office Mngr NASA KSCRobert L Choy Launch Director NASA KSCKevin J. Clinton EMC/RF NASA KSCHarold Coleman COTR/PIM NASA KSCDaniel M. Coon LV Software NASA KSCEmilio Cruz LSP Budget Office NASA KSCChuck Davis KSC Fueling Lead NASA KSCGeorge Diller Public Affairs NASA KSCCharles P. Dovale Launch Director NASA KSCRonald B Driggers Safety & Mission Assurance NASA KSCLennie Duncil Thermal NASA KSCKristie Durham Education and Public Outreach NASA KSCMary Faller LRO Integration Engineer NASA KSCEb Farris Launch Vehicle Testing NASA KSCDaniel K. Foss Launch Operations Manager NASA KSCAaron Fournier Ordnance NASA KSCKevin Grelck LV Software NASA KSCEric Haddox Orbital Debris Analysis NASA KSCStephen A. Jeffress Comm & Telemetry NASA KSCMark Jensen Instrumentation NASA KSCDaniel J. Johnson Atlas Vehicle Systems Engr NASA KSCJames C. Kinney LV Loads Analysis NASA KSCSusan Lambert S/C Processing Support Manager NASA KSCCynthia D. Lessne PIM NASA KSCMartin J. Lougheed Comm & Telemetry NASA KSCJeffrey R. Lyons Denver Resident Office - Electrical NASA KSCShermane Martino Budget Analyst NASA KSCSam Michel S/C Processing Support Manager NASA KSCRandall K Mizelle PIM/COTR NASA KSCTiffany V. Nail Public Affairs/Outreach NASA KSCGary J. ONeil Thermal NASA KSCChristine A. Pacariem Electrical NASA KSCMichael D. Patton Comm & Telemetry NASA KSCChristopher B. Rawlins Contamination Control NASA KSC

Page 109: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Thomas R. Reinarts LRO-LCROSS Mission Chief Engineer NASA KSCCraig Schreiber Mission Assurance NASA KSCKeith M Schuh Electrical NASA KSCMark D. Shugg Launch site integration Manager NASA KSCGeorge Simone Centaur Propulsion NASA KSCDavid R. Sollberger OCE NASA KSCBen Studenski Budget Office/Fairing Decals NASA KSCCharles A Tatro Mission Manager NASA KSCKarl J. Thal Stress NASA KSCAkash V. Vangani Vehicle Systems Engineer - Lead NASA KSCMichele L. Veneri MGSE and LV Mech Operations NASA KSCMartha Vreeland Education and Public Outreach NASA KSCMic Woltman Vehicle System Engineer NASA KSCJames S. Wood NASA LSP Chief Engineer NASA KSCNate Wood AE Telemetry NASA KSCTracy Young Public Affairs NASA KSC

Redi-CritiqueTom Rucci Launch Site Support Engineer Redi-Critique

ULAPamela K Alstott Atlas Control Dynamics ULAMitchel C Arnold Atlas Tiger Team Engineer ULADouglas E Baker Atlas Range Requirements Lead ULADavid Ballou Atlas Cape Ops Contamination Control ULAJames J Becia Atlas EMI/EMC Analysis ULAEric Best Atlas System Software ULAFred Boudreau Atlas Structural Analysis ULAJason Buchholz Atlas Contamination Control ULAKathryn Buchholz Atlas Systems Engineer ULAGrant E Colley Atlas Systems Integration ULAJeffrey S Dekruif Atlas Thermodynamics ULAGordon England Atlas Chief Vehicle Engineer ULADonald E Foley Atlas Systems Integration ULAThomas E George Atlas Mass Properties ULARichard D Gerberding Atlas Thermal Control ULAMarc A Ginsburg Atlas Flight Design ULA

Page 110: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28

Jeffery R Gonzales Atlas Aerophysics ULAPaul R Gross Atlas Systems Engineer ULAMichael L Grubbs Atlas Video System Design ULAKevin Harris Atlas Range Requirements ULAAl J. Hegemann Atlas System Software ULAJeff Holdridge Atlas Separation System CPE ULASteven W Kuethe Atlas Contamination Control Lead ULAMatthew J Lacy Atlas RF Systems ULABrian Lathrop Atlas Mission Design Lead ULADavid R Lollini Alas Deputy Integration Mgr ULAMarty R Malinowski Atlas Chief Engineer's Staff ULADedra M Martinez Atlas Avionics & Electrical Design Lead ULABrian McGraw Atlas System Software Mgr ULAKelly McTeer Atlas P/L Stuctural I/F Design ULAPatrick J Murphy Atlas Payload Ops Engineer ULAKen L Nauta Atlas Control Dynamics Mgr ULALars J Onsager Atlas Mission Design ULAScott Person Atlas Guidance & Accuracy Lead ULADarrell J Ray Atlas System Safety ULAJohn G Reed Atlas Guidance & Accuracy ULAPaul A Rizzo Atlas Ground Mechcanical Design ULAJames E Rotole Atlas P/L Stuctural I/F Design Mgr ULALee E Salem Atlas Accoustics & Shock Analysis ULASteven P Sakla Atlas Propulsion Systems ULADirk U Schreier Atlas Mission Mgr ULARandal W Smith Atlas Chief Engineer's Staff ULAAntonio M Soto Atlas Cape Ops Payload Integrator ULACarl D Sterling Atlas Vehicle Thermal Control Mgr ULAMichael C Stitt Atlas Mission Thermal Control Mgr ULALee H Terwilliger Atlas Systems Engineer ULAWalter E Thompson Atlas Mission Design Mgr ULADarin Toronjo Atlas P/L Stuctural I/F Design ULAPhillip D Vanlaw Atlas Dyamic Loads & Environments ULARandall S Walker Altlas Integration Mgr ULAReza Zarei Atlas Ground Mechanical Design ULADavid H Zimmermann Atlas Contamination Control ULA

Page 111: Engineering a Successful Mission: Lessons from LRO · Engineering a Successful Mission: Lessons from the Lunar ... • Project management and systems team needed to balance ... 28