Energy Trends. Trift bridge 560’ long 333’ high. Trift glacier 1948. Trift glacier 2006. 2 miles since 1948. Do you believe?. Industry 32%. Buildings 40%. Transport 28%. Energy. 39% of CO 2 72% electricity. Surprised?. Industry 32%. Buildings 40%. Transport 28%. - PowerPoint PPT Presentation
Citation preview
Energy Trends
2
Trift bridge
560’ long333’ high
Trift glacier 1948
Trift glacier 2006
2 miles since 1948
Do you believe?
Industry32%
Transport28%
Buildings40%
Surprised?
39% of CO2
72% electricity
Energy
18%
11%12%16%
43%
HVAC Plug Load
Hot Water Lighting OtherIndustry
32%
Transport28%
Buildings40%
20%
26%
7%
13%
34%
HVAC Plug Load
Hot Water Lighting Other
Res22%
Com18%
Energy
Even if you don’t believe…
…believe in hard savings of 15% to 60%
O&M 7% to 28%Controls 7% to 23%Lighting 6% to 25%Equipment 3% to 15%
Behavior 3% to 15%
Size of the prize…
Making the invisible visible
Making the invisible visible
Why now?
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 20106
7
8
9
10
45% increase
US
ave
rage
ele
ctri
city
cos
t -
$0
.01
/ kw
hElectricity pricing
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 20104
5
6
7
8
9
10
11
12
13
Highly volatile
Co
mm
erc
ial n
atu
ral g
as p
rice
s -
$ /
cu ft
Natural gas pricing
Efficiency is the cheapest form of clean power
20:20:20BEQLEEDEnergy Star
Net zero energy
Pilot phase
21 buildings
14.5M sq ft
A- to C grades
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 20100
100
200
300
400
500Series 1
LEEDM
illio
ns o
f sq
ft c
ertif
ied
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 20100
100
200
300
400
500
Energy StarM
illio
ns o
f sq
ft c
ertif
ied
How?
Intelligent buildings
Day lighting
Sub-metering
Efficient lighting
Occupancy sensing
Variable speed drives
Demand-based ventilation
Continuous commissioning
Utility automated demand/response
Fully integrated building management system
Smart Grid&
Demand / Response
What is the Smart Grid?
Use of digital information and controls
to improve reliability, security
and efficiency of the grid.
Use of smart automation systems
that optimize the operation
of buildings and homes.
Installation of smart meters
to enable real time pricing
Deployment of demand / response
6:0
0a
m
7:0
0a
m
8:0
0a
m
9:0
0a
m
10
:00
am
11
:00
am
12
:00
pm
1:0
0p
m
2:0
0p
m
3:0
0p
m
4:0
0p
m
5:0
0p
m
6:0
0p
m
7:0
0p
m
8:0
0p
m
9:0
0p
m
10
:00
pm
The Problem
Energy Demand
Coal
Hydro
Renewables
Diesel Peaker
Gas Turbine
Spot Market
$.04
$.06
$.10
$.25
$.30
$2.00
Energy Cost
6:0
0a
m
7:0
0a
m
8:0
0a
m
9:0
0a
m
10
:00
am
11
:00
am
12
:00
pm
1:0
0p
m
2:0
0p
m
3:0
0p
m
4:0
0p
m
5:0
0p
m
6:0
0p
m
7:0
0p
m
8:0
0p
m
9:0
0p
m
10
:00
pm
0
200
400
600
800
1000
1200
1400
1600
1800
Efficiency
Original load
Bu
ildin
g p
ower
con
sum
ptio
n -
kw
With energy efficiency250 kW reduction
6:0
0a
m
7:0
0a
m
8:0
0a
m
9:0
0a
m
10
:00
am
11
:00
am
12
:00
pm
1:0
0p
m
2:0
0p
m
3:0
0p
m
4:0
0p
m
5:0
0p
m
6:0
0p
m
7:0
0p
m
8:0
0p
m
9:0
0p
m
10
:00
pm
0
200
400
600
800
1000
1200
1400
1600
1800
Demand / Response
Original load
Bu
ildin
g p
ower
con
sum
ptio
n -
kw
With energy efficiency
With demand response
Auto Demand Response
Demand Response - a utility requestsenergy curtailment during an anticipatedpeak period where demand exceedssupply.
Utility options are:Purchase power on the spot market Start up old generation plantsBuild new power plants (very costly)Rolling blackoutsDemand / Response
Auto DR is an automated way to achievedemand reduction.
Demand response - lowest installed cost
GENERATION ASSET INSTALLED COST ($ / kW)
Photovoltaic $ 6,038
Solar thermal $ 5,021
Wind offshore $ 3,851
IGCC w/ CCS $ 3,496
Nuclear $ 3,300
IGCC $ 2,378
Scrubbed coal $ 2,058
Wind $ 1,923
Distributed gas – peak $ 1,645
Distributed generation – base $ 1,370
Gas plant $ 962
Demand response $ 573
Thank you