ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram ([email protected]) K. Milkowski, J. Gibbins, M. Pourkashanian 30/11/2018 1 12 th ECCRIA Conference, 5-7 September 2018, Cardiff

ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram ([email protected]) K. Milkowski,

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40%

MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT

Muhammad Akram([email protected])

K. Milkowski, J. Gibbins, M. Pourkashanian

30/11/2018112th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 2: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

• Background to CO2 capture

• Why this process (liquid solvents)

• Overall PACT facility

• Experimental setup

• Capture plant layout

• Measurements apparatus and techniques

• Test matrix

• Plant performance data

• Conclusions

SYNOPSIS:

30/11/2018 212th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 3: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

• CO2 is a problem

• Using biomass instead of fossils

• Renewables/ efficiency improvements / carbon capture can reduce emissions

• None of these can solve the problem on their own (technical, economical, social, availability issues)

• Every possible contender needs to play a part

BACKGROUND:

30/11/2018 312th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 4: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

• Post combustion capture by absorption using liquid solvents (mostly amines) is well understood process

• In the industry for over 6 decades (Urea plants, petrochemicals and gas sweetening plants)

• Can be retrofitted

• Mostly CO2 been used for EOR

• Power and industrial CO2 capture is new application

• Sask power (BD3, Canada), Petra Nova (USA) are examples of commercial scale deployment is power sector

• AVR, a waste incineration company is building full scale plant in Netherlands using MEA

WHY THIS PROCESS:

30/11/2018 412th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 5: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

ACP Integration:

Synthetic flue gas

30/11/2018 512th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 6: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Synthetic set up

CO2 N2 O2

Control panel

NOx

SOx

N2O

30/11/2018 612th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 7: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Experimental setup for this test campaign

CO2

Control panel

Air

30/11/2018 712th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 8: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

1TPD CO2 Capture plant

• FGD for S removal

• Water wash column

• Absorber 300mm dia; 6.5m mellapak CC3 packing

• Stripper pressure up to 3.5bar capability

• Pressurised hot water for stripping (up to 130 ⁰C)

30/11/2018 812th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 9: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Process description

30/11/2018 912th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 10: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Layout:

FCV203

FT203

PACT StripperV-

301

Reboiler E-301

PACT Absor

berV-101

C

T

P

F

Cooler

Carbon filter Wash

column

Rich pump

P102a

Lean pump

P301a

CO2

Reset

LT301

FCV30

1

LT102

LCV10

2

E-201

E-

202

FGD

30/11/2018 1012th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 11: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Measurements:

FCV203

FT203

PACT StripperV-

301

Reboiler E-301

PACT Absor

berV-101

C

T

P

F

Cooler

Carbon filter Wash

column

Rich pump

P102a

Lean pump

P301a

CO2

Reset

LT301

FCV30

1

LT102

LCV10

2

E-201

E-

202

FGD

Gas sampling: 1 FGD inlet2 absorber inlet3 absorber outlet 4 water wash outlet5 stripper outlet

12

345

Liquid sampling:1 rich solvent2 lean solvent3 water wash

1

2

3

30/11/2018 1112th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 12: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

30/11/2018 12

Gas Sampling System

12th ECCRIA Conference, 5-7 September 2018, Cardiff

FTIR measures: Concentrations of H2O, CO2, CO, NO, NO2, N2O, SO2, NH3,CH4, C2H6, C2H4, C3H8, C6H14, Formaldehyde, MEA and TOC

Page 13: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Measurements

Auto-titrator:

• Solvent concentration

• CO2 loading

• Water content (Karl Fischer Method)

Absorber temperature profile by ten RTDS (resistance temperature detectors)

30/11/2018 1312th ECCRIA Conference, 5-7 September 2018, Cardiff

23.4 cm

Page 14: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Fe measurements (Corrosion):

30/11/2018 1412th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 15: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Data Acquisition from the plant:

• Allen Bradley PLC – Controls the plant (solvent flows, stripper pressure, lean solvent temperature etc.)

• National Instruments Labview – records temperatures, pressures and flows (flue gas flow, CO2 flow, PHW flow)

• FTIR – Flue gas analysis

• Titration – Solvent analysis (COMCAT for continuous solvent monitoring

30/11/2018 1512th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 16: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Test Matrix: Air + CO2 mixture

MEA solvent for CO2 capture (40wt%)

Operational conditions varied

Samples taken manually at the end of each test run

Mettler Toledo auto-titrator used for titrations for CO2 loading and solvent concentration

Following parameters were fixed for the tests (unless reported):

• Stripper pressure = 1.5 bara

• Reboiler temperature set point = 128 ⁰C

• PHW flow to the reboiler = 10-10.5 m3/h

• Lean solvent temperature = 40 ⁰C

• Flue gas temperature = 40 ⁰C

30/11/2018 1612th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 17: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Effect of reboiler temperature

30/11/2018 1712th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 18: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Reboiler Temp. Vs. reboiler duty

30/11/2018 1812th ECCRIA Conference, 5-7 September 2018, Cardiff

0

1

2

3

4

5

6

7

8

0

10

20

30

40

50

60

70

80

90

100

110

119 120 121 122 123 124 125 126 127 128

Reb

oil

er d

uty

(M

J/kgC

O2)

Cap

ture

eff

icie

ncy

(%

)

Reboiler set point (C)

Capture efficiency at 0.4 barg

Capture efficiency at 0.5 barg

Reboiler duty at 0.4 barg

Reboiler duty at 0.5 barg

0.4 barg

0.5 barg

Page 19: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Effect of L/G ratio; lean loading = 0.26

30/11/2018 1912th ECCRIA Conference, 4-7 September 2018, Cardiff 12th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 20: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

30/11/2018 2012th ECCRIA Conference, 5-7 September 2018, Cardiff

0

1

2

3

4

5

6

7

8

9

0

10

20

30

40

50

60

70

80

90

100

0 2 4 6 8 10

Reb

oil

er d

uty

(M

J/kgC

O2)

Cap

ture

Eff

icie

ncy

(%

)

L/G ratio (kg/kg)

Reboiler setpoint 125C; Stripper pressur 0.5barg

Capture efficiency at 190 m3/h

Capture efficiency at 170 m3/h

Capture efficiency at 1200 kg/h

Reboiler duty at 190 m3/h

Reboiler duty at 170 m3/h

Reboiler duty at 1200 kg/h

Capture efficiency vs. L/G ratio

Page 21: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Capture efficiency vs. reboiler duty

30/11/2018 2112th ECCRIA Conference, 5-7 September 2018, Cardiff

0

1

2

3

4

5

6

7

0

50

100

150

200

250

300

350

400

60 65 70 75 80 85 90 95 100

Reb

oil

er d

uty

(M

J/kgC

O2)

Reb

oie

r duty

(M

J/h)

Capture Efficiency (%)

MJ/h

MJ/kgCO2

Page 22: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Comparison of 30% and 40% MEA

30/11/2018 2212th ECCRIA Conference, 5-7 September 2018, Cardiff

40% 40% 40% 30%30%30%

Page 23: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Comparison of 30% and 40% MEA

30/11/2018 2312th ECCRIA Conference, 5-7 September 2018, Cardiff

0

1

2

3

4

5

6

7

8

9

10

0

10

20

30

40

50

60

70

80

90

100

0 1 2 3 4

Reb

oile

r d

uty

(M

J/kg

CO

2)

Cap

ture

Eff

. (%

)

Test No.

Capture Eff. 40% MEA

Capture Eff. 30% MEA

Reboiler duty 40% MEA

Reboiler duty 30% MEA

Page 24: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Comparison of 30% and 40% MEA

30/11/2018 2412th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 25: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Emissions:

30/11/2018 2512th ECCRIA Conference, 5-7 September 2018, Cardiff

• Ammonia emissions = 25-100 ppm• MEA emissions

Absorber outlet 30-140 ppm (also observed up to 500ppm) water wash outlet always below 15 ppm

X-axis readings every 20 seconds; 1620 = 9hrs

-20

0

20

40

60

80

100

120

0 500 1000 1500 2000

Am

mo

nia

(p

pm

)

No. of readings

0

20

40

60

80

100

120

140

160

0 500 1000 1500 2000

MEA

(p

pm

)

No. of readings

water wash outlet MEA 6-10ppm

Page 26: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Fe measurements (Corrosion):

30/11/2018 2612th ECCRIA Conference, 5-7 September 2018, Cardiff

0

1

2

3

4

5

6

0 1 2 3 4 5 6 7 8 9

Fe (

mg/

L)

Operational days

• Then plant left idle for couple of months for modifications

• Fe measured 20 mg/L• With 30% MEA max Fe measured = 5 mg/L

Page 27: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Conclusions:• No obvious major handling differences from 30% w/w MEA

• Relative energy consumption ~12% lower under favourable conditions

• Lean loading more sensitive to pressure and temperature for 40% MEA

• Emissions higher than 30% MEA

• Corrosion rate needs to be considered when using high concentrations of MEA and operation particularly RPBs

• Absolute energy consumption higher due to short absorber column – planning to add a second column in series

30/11/2018 2712th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 28: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Publications• Paul Tait, Bill Buschle, Kris Milkowski, Muhammad Akram, Mohamed Pourkashanian, Mathieu Lucquiaud,

Flexible operation of post-combustion CO2 capture at pilot scale with demonstration of capture-efficiency control using online solvent measurements, International Journal of Greenhouse Gas Control, Volume 71, April 2018, Pages 253-277

• Usman Ali, Muhammad Akram, Carolina Font-Palma, Derek B Ingham, Mohamed Pourkashanian, (2017), “Part-load Performance of Direct-firing and Co-firing of Coal and Biomass in a Power Generation System Integrated with a CO2 Capture and Compression System”, Fuel. Volume 210, 15 December 2017, Pages 873-884

• Akram M., Ali U, pourkashanian M, font palma C.,Comparaive potential of NaturalGAs, Coal and Biomass Fired Power Plants with Post Combustion CO2 capture and Compression, International Journal of Greenhouse Gas Control. Volume 63, August 2017, Pages 184–193.

• Ali U., Font Palma C., Nikpey Somehsaraei H., Mansouri Majoumerd M., Akram M., Finney K.N., Best T., MohdSaid N.B., Assadi M., Pourkashanian M., (2017), Benchmarking of a micro gas turbine model integrated with post-combustion CO2 capture, Energy, 126. pp. 475-487. ISSN 0360-5442 .

• Maria Elena Diego, Muhammad Akram, Jean-Michel Bellas, Karen N. Finney, Mohamed Pourkashanian, (2017), Making gas-CCS a commercial reality: The challenges of scaling up, Greenhouse Gases: Science and Technology.

• Akram, M., Ali U., Best T., Finney K.N., Blakey S., Pourkashanian M., (2016), “Performance evaluation of PACT capture plant for CO2 capture from gas turbines with exhaust gas recycle”, International Journal of Greenhouse Gas Control”, Volume 47, April 2016, Pages 137–150.

• Rezazadeh F., Gale W.F., Akram M., Hughes K.J., , Pourkashanian M., (2016), “Performance evaluation and optimisation of post combustion CO2 capture processes for natural gas applications at pilot scale via a verified rate-based model”, International Journal of Greenhouse Gas Control, Volume 53, October 2016, Pages 243–253.

30/11/2018 2812th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 29: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

Acknowledgement:

The authors acknowledge that

PACT Facilities,

funded by the

Department of Energy and Climate Change

and

Engineering and Physical Sciences Research Council,

have been used for the experimental work reported in this presentation.

30/11/2018 2912th ECCRIA Conference, 5-7 September 2018, Cardiff

Page 30: ENERGY AND ENVIRONMENTAL PERFORMANCE …...ENERGY AND ENVIRONMENTAL PERFORMANCE OF 40% MONOETHANOLAMINE (MEA) AT PACT PILOT PLANT Muhammad Akram (m.akram@Sheffield.ac.uk) K. Milkowski,

QUESTIONS ?

[email protected]