Emulsion Development Activity
C.Sirignano
Opera CM - Mizunami - 20/01/2009
CS facility status
Activities:
1) Chemicals preparation on-site2) Films labeling3) Development ( max 60 CSD /shift)4) Films drying (24 h + 24 h)
• Since September we are running with automatic temperature control on the developer tank.
• Brick development accomplished (2-5 / week)
• Wireless connection to BMM software running since December
LAB 1 development facility status
Activities:1) Chemicals preparation on-site2) Films labeling3) Development ( max 20 ECC / shift)4) Films drying (24 h + 36 h)
September January
• 5 lines working 5 lines working
• No temperature control Temperature control HW & SW installed on 6 lines, final configuration under test on line 1
• No humidity control in drying rooms Humidity control working since October.
• Line #6 to be completed Line # 6 under preparation
• Rolling carpet to be completed Rolling carpet to be completed
SBAM
The “opening” unit is installed and working (10 min /brick full cycle).
SBAM
• Two “depiling” units installed • SW fixed for gridding and data storage (emulsion and lead thickness stored in
the DB.• Tests on-going on unit #1 using mechanical bricks to achieve robust and fast
cycle (< 30 min).
Development statistics
20/0
7/20
08
20/0
8/20
08
20/0
9/20
08
20/1
0/20
08
20/1
1/20
08
20/1
2/20
08
0
10
20
Dev
elop
ed b
ricks
per
shi
ft
812 bricks developed up to now
Emulsion films quality checks
• Regular tests on emulsion transparency, thickness, fog density and alphatracks density. Data shown in the last CM are confirmed no emulsion poisoninginside bricks, no lead surface radioactivity increase.
0 5 10 15 200
10
20
30
40
Fog Density (g/10(m)3
Cou
nts
35 40 45 50 55 600
20
40
60
Thickness (m)
Co
un
ts
Chemicals
Available @ LNGS
• Developer & Starter - 2000 bricks
• Acetic Acid – 2500 bricks
• Fixer – 2500 bricks
• Glycerin & Driwell – 2500 bricks
NEEDED for 2009 RUN (5000 bricks)
• Developer & Driwell - 2000 bricks ready at FUJI firm, order needed by the end of January in order to get the material @ LNGS in May.
• Quote under preparation for Chemicals available in Europe.
Conclusions & Planning
• 800 bricks and more than 1500 CSD handled and develop with no major faults
• We established a working protocol for training (development and quality checks) and the work is going smoothly day by day….
• Man power needed (expected 20 – 60 bricks/week from Feb up to Apr) agreed with Mario (1team leader + 2 shifters /week + LNGS experts + external operators) and call done.