Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry Adapted Energy Management
Standard Development
EMSPI: Energy Management Standardization in the Printing Industry
Luis Galiana – date: 07/04/2016
www.emspi.eu
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready
D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready
D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION
Not ready Ready? (verify with
partners)
D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION
Not ready Ready? (verify with
partners)
D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready
D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready
D4.5Coaching materials for Energy Management implementation (English) BASIC & FULL VERSION - adjusted material
Not ready Ready
D4.5.1Coaching materials for Energy Management implementation (translation 5 languages) BASIC & FULL VERSION
Not ready Ready? (verify with
partners)
D4.1cExplanatory document on difference between Basic/Full=EMS Spec (extra deliverable)
Not ready Ready
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
Before
One manual for both implementations.
Complete PDCA (Plan-Do-Check-Act)
After
Two versions: basic & full model.
Full model: Complete PDCA.
Basic model: PD
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
Energy baseline diagnosis manual
6 pages document (to be delivered from FCO2 to
Dienstencentrum).
Information gathered from “PR_444_Energy baseline” and Annex
1 of Full Model Guidelines “Guideline for definition of simple
energy performance indicators”.
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready
D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready
D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready
D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION
Not ready Ready? (verify with
partners)
D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION
Not ready Ready? (verify with
partners)
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready
D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready
D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION
Not ready Ready (verify with
partners)
D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION
Not ready Ready (verify with
partners)
D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready
D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready
D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready
D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION
Not ready Ready (verify with
partners)
D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION
Not ready Ready (verify with
partners)
D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready
D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready
D4.5Coaching materials for Energy Management implementation (English) BASIC & FULL VERSION - adjusted material
Not ready Ready
D4.5.1Coaching materials for Energy Management implementation (translation 5 languages) BASIC & FULL VERSION
Not ready Ready? (verify with
partners)
Coaching Materials
INDEX
1. Introduction to the EMSPI project.
2. Introduction to energy management.
a. Structure.
b. Deming Cycle.
3. Adaptation to graphic industry.
4. EnMS implementation.
a. Structure.
b. Basic Vs. Full Model.
c. Examples of registries / procedures.
d. List of measures.
5. Conclusion.
6. Discussion.
a. What have participants learnt?
b. How to start with energy management in your company?
c. Where to focus on the first place?
d. What has already been done in your company?
• 35 slides PPt document.
• To be adapted (if needed) per
Country and workshop.
Status of Deliverables
Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague
D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)
Ready
D4.1b Adapted standard manual’s requirements FULL VERSION Ready
D4.2 Energy baseline diagnosis manual Not ready Ready
D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready
D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready
D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION
Not ready Ready (verify with
partners)
D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION
Not ready Ready (verify with
partners)
D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready
D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready
D4.5Coaching materials for Energy Management implementation (English) BASIC & FULL VERSION - adjusted material
Not ready Ready
D4.5.1Coaching materials for Energy Management implementation (translation 5 languages) BASIC & FULL VERSION
Not ready Ready (verify with
partners)
D4.1cExplanatory document on difference between Basic/Full=EMS Spec (extra deliverable)
Not ready Ready
Basic Vs. Full Implementation
“Basic” version:
The basic implementation is specially focused in the
“PLAN” and “DO” phases of the Deming Cycle, which
include the energy planning, implementation and
operation tasks. These tasks are summarized in sections 2
and 3 of the Basic Version of the EnMS Manual
document.
The basic model do not cover the requirements of the
ISO 50001 standard, but can be used as a first step for
implementing the full model in the future.
“Full” version:
The full implementation covers all four phases of the Deming Cycle. These phases are specified in sections 2, 3, 4 and 5 of the
Full Version of the EnMS Manual document.
The full version includes procedures, which are used to describe in detail a specific and advanced task.
The full model covers the requirements of the ISO 50001 standard.
Thank you!