EMMA/BASROC/CONFORM etc: FFAG developments at the Cockcroft Institute. Cockcroft SAC - 26 November 2007 Roger Barlow. BASROC. British Accelerator Science Radiation Oncology Consortium - PowerPoint PPT Presentation
Citation preview
EMMA/BASROC/CONFORM etc: FFAG developments at the
Cockcroft InstituteCockcroft SAC - 26 November 2007
Roger Barlow
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 2
BASROC
• British Accelerator Science Radiation Oncology Consortium
• An association of universities and institutes (Cockcroft and Adams!). Group came together out of PPARC meeting aimed at raising accelerator activity outside particle physics
• Aim to build a complete hadron therapy facility using an NS-FFAG.
• Hope to increase use of accelerators, their manufacture, R and D etc in the UK
• General umbrella for CONFORM and other projects, e.g. Medical Instrumentation Meeting
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 3
CONFORM
• Construction Of a Nonscaling FFAG for Oncology, Research and Medicine
• Project (first of many?) produced by BASROC • Successful bid last year to Basic Technology fund for £8M
• Outline proposal put together – selected for consideration
• Full proposal written across many institutes and submitted through Manchester. Interviewed by panel.
• Funded in full – announcement 12 months ago• Started 1st April 2007
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 4
3 Components
• EMMA: Construction of the first NS FFAG to prove the principle, and study behaviour. £5.3m over 3.5 year project lifecycle (Equipment £3.8m, Staff £1.5m)
• PAMELA: Design of a hadron therapy machine funding - £865k
• Applications: exploitation of other areas where an FFAG could be used funding - £273k
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 5
PeopleRoger Barlow (CONFORM PI), Neil Bliss (CONFORM PM and EMMA
PM)
Ken Peach(PAMELA PM), Ian Gardner (PAMELA PI), Rob Edgecock (EMMA PI), Karen Kirkby (Applications PI), Bob Cywinski (Applications PM)
Gillies McKenna, Jűrgen Pozimski, Boris Voynovic, Alex Elliott, Bleddyn Jones
Stefan Tzenov, Bruno Muratori, Hywel Owen, Sue Smith, Peter Macintosh, Neil Marks, Ben Shepherd, … and many others
Pat Gorham, Cristian Bungau, Sam Tygier
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 6
EMMA
Energy range 10 – 20 MeV in 16 turns
Lattice F/D Doublet
Circumference 16. 5 m
No of cells 42
Normalised transverse acceptance 3 mm
Frequency (nominal) 1.3 GHz
No of RF cavities 19
Average beam current 13 μA
Repetition rate 1, 5, 20 Hz
Bunch charge 16-32 pC single bunch
Electron Machine with Many Applications
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 7
EMMA
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 8
EMMA Magnets
Magnet prototypes produced by TESLA
Being measured and understood
Production magnet tender open
Delivery Summer 08
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 9
EMMA RF
Normal conductingsingle cell
re-entrant cavity design
Cavity machined form 3 pieces and EB welded at 2 locations
Capacitive post tuner
Probe
Coolant channels
Input coupling loop
EVAC Flange
Aperture Ø 40 mm
110 mm
Prototypes ordered – Delivery January
OJEC notice December
Place contract March
Delivery June-August 2008
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 10
Injection Region
Kicker Kicker
Septum
Cavity
Cavity
Injection
Screen Not easy! But possible.
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 11
EMMA Extraction
DIAGNOSTIC BEAMLINE PHASE 2
Quadrupole x 3
New Dipole 21°& BPMs
Screen or Wire Scanner
Screen x 3Tomography Section(emittance measurement)
New Quadrupole x 9
Spectrometer (extracted momentum)ScreenBPMsF/Cup
Slit
Screen
Resistive Wall Current Monitor
Diagnostics
Not all affordable
FP7 bid
for
full set
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 12
EMMA summary
Final Design Review Daresbury 10-11 Dec
Main components on site by 1st Aug 08
Assembly on girders June 08-Jan 09
Assembly in hall Jan -May 09
Installation and testing Jun-Aug 09
Operation in September 09
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 13
PAMELA
• Clinical Hadron Therapy machine, probably at Oxford
• Carbon is essential. Proton solution is commercially available.
• 3-ring solution (Keil and Trbojevic) or 1 ring (Koscielniak and Johnstone)
• Workshop next summer to settle final parameters
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 14
Applications
• Cell Irradiation – Surrey post filled. Answer questions about dosage, Ion types, etc
• ADSRs – Manchester+Leeds. Additional grant obtained to look at energy possibilities.
• Neutrons: Leeds post now being advertised
Cockcroft SAC 26 November 2007
Roger Barlow: FFAG developments
Slide 15
Future
• ADSR workshop here January 7/8
• EMMA construction and commissioning 2008 on
• FFAG2008 workshop in Manchester, September
• Working nsFFAG at Daresbury in September 2009